CN209339382U - A kind of precast concrete box-frame - Google Patents

A kind of precast concrete box-frame Download PDF

Info

Publication number
CN209339382U
CN209339382U CN201820855250.7U CN201820855250U CN209339382U CN 209339382 U CN209339382 U CN 209339382U CN 201820855250 U CN201820855250 U CN 201820855250U CN 209339382 U CN209339382 U CN 209339382U
Authority
CN
China
Prior art keywords
frame
precast concrete
concrete box
box shell
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820855250.7U
Other languages
Chinese (zh)
Inventor
黄健
陈兴华
陈剑峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiashi (group) Co Ltd
Original Assignee
Shanghai Jiashi (group) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiashi (group) Co Ltd filed Critical Shanghai Jiashi (group) Co Ltd
Priority to CN201820855250.7U priority Critical patent/CN209339382U/en
Application granted granted Critical
Publication of CN209339382U publication Critical patent/CN209339382U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a kind of precast concrete box-frame, including;Concrete frame, and the top of frame, bottom have recess, recess can be used for the laying of pipeline.The precast concrete box shell of the utility model reduces when can be realized the installation of distribution box shell and cuts brick, avoids fugitive dust, wall damaged, and when repairing prevents hollowing, is greatly improved installation effectiveness, the energy conservation and environmental protection of distribution box shell.

Description

A kind of precast concrete box-frame
Technical field
The utility model relates to the technical fields of electrical installation project.It can ensure to exempt to chisel when the installation of distribution box shell, week While guaranteeing the integrality of wall without hollowing.Distribution box shell installation quality and efficiency are specifically improved, green construction, section are reached The effect of energy environmental protection.
Background technique
Distribution box is generally divided into bright dress and concealed installation according to the installation method.Usually box shell pedestal is fixed in structure when concealed installation. In common residential houses engineering, box shell can be mounted in wall, box shell periphery is repaired with cement sand-lime.
The prior art generallys use following two mode in distribution box shell when filling is installed within the walls;
(1) brick method is cut after
After cut brick method be filling wall build complete after, according to the size and designed elevation of distribution box shell, chiselled, directly To the installation requirement for completing distribution box shell.
(2) case position method is reserved
When reserved case position is building construction, cabinet is carried out according to distribution box size and is reserved, case position top disposes lintel, box shell Periphery is repaired using sand-lime when installation.
However, above two method is both needed to carry out secondary construction, the duplication of labour, therefore have the disadvantage that
(1) it after filling wall is completed, is chiselled, fugitive dust is more during chiselling, and destroys wall body structure, and repairing is beaten It is big to dig manpower consumption amount.
(2) reserving cabinet has certain randomness, not manageability, easily burst or position inaccuracy, after cabinet installation Repaired using sand-lime, periphery can occur hollowing, cracking, infiltration phenomena such as.
Utility model content
In view of the foregoing deficiencies of prior art, the purpose of this utility model is to provide one kind can precast concrete case Frame.He can ensure to exempt to chisel when box shell installation, reduce wall plastering hollowing, and distribution box shell simple to install, significant increase Distribution box shell installation effectiveness and work quality.
In order to achieve the above objects and other related objects, the utility model one kind is provided can precast concrete box-frame, comprising:
Precast concrete outline border, size and distribution box bottom case including outline border are matched;
Oblong notches are reserved on concrete outline border;
Further, precast concrete box-frame is poured using C20 strength concrete.
Precast concrete box-frame can match the size of distribution box shell.
Precast concrete box-frame locates reserved distribution box pipeline recess up and down.
Precast concrete box-frame is integrally formed.
Precast concrete box-frame is square or rectangle.
As described above, the utility model can precast concrete box-frame, have the advantages that
(1) it is chiselled without cutting, it is environmentally protective, it is energy-saving;
(2) simple, box shell is installed securely, there is good practicability.
(3) box shell periphery without gaul, flake, crack phenomena such as.
Detailed description of the invention
What Fig. 1 was shown as the utility model can precast concrete box-frame and distribution box shell scheme of installation.
Fig. 2 be shown as the utility model can precast concrete box-frame structural schematic diagram.
In figure: 1- precast concrete box-frame, 11- oblong notches, 22- distribution box shell, 33- spool, 331- cement mortar Fill area, 44- fill wall building block
Specific embodiment
Illustrate the embodiments of the present invention below by way of specific specific example, it should be noted that the present embodiment Provided in diagram only illustrate the basic conception of the utility model in a schematic way, only display and the utility model in schema then In related component rather than component count, shape and size when according to actual implementation draw, when actual implementation each component Kenel, quantity and ratio can arbitrarily change for one kind, and its assembly layout kenel may also be increasingly complex.
Fig. 1 be embodiment in scheme of installation, Fig. 2 be can precast concrete box-frame structural schematic diagram.Mainly by 1- Precast concrete box-frame, 11- oblong notches, 22- distribution box shell, 33- spool, 331- cement mortar fill area, 44- fill wall Building block composition.Distribution box shell is inserted into inside box-frame, and periphery is blocked with cement mortar.
The precast concrete box-frame of the utility model is further described below by specific implementation case.In the embodiment In, distribution box shell is installed using following steps:
(1) according to design requirement and distribution box shell material sample, citing distribution box enclosure is 20*30*12cm, wide 20cm, High 30cm, depth 12cm.If preparing dry setting steel mold, each lattice inner edge are as follows: 25cm*35cm*12cm, periphery are as follows: 35cm*45cm*12cm, with a thickness of 5cm.
(2) it is moved towards according to spool, the recess of 10cm*6cm is reserved on mold (see Figure of description 1).
(3) after mold fastening, binding structure reinforcing bar and with C20 pea gravel concreten, immersion vibrator, which pours, to be smash, and is sufficiently vibrated It is closely knit extremely to stop sinking.
(4) start to conserve in 12 hours after casting and compacting of concrete is complete, maintenance uses water seasoning.
So far, the production of precast concrete box-frame is completed.To ensure that concrete box-frame is placed accurately, using BIM technology Carry out brick typesetting, coordinate setting box-frame position.After positioning, when masonry and concrete box-frame one-off construction.
A: distribution box shell is installed to inside concrete box-frame and fixes.
B: box shell periphery filled 1:1 cement mortar and carries out filleting processing after limit, through 36 hours defects liability periods.
C: the secondary piping work of distribution box is completed.
Finally, it completes and distribution box shell is installed by concrete box-frame, complete the overall process of secondary piping.
In conclusion the concrete box-frame of the utility model can be realized the installation of distribution box shell, secondary piping conveniently, it is not necessarily to It chisels, greatly improves distribution box shell and secondary piping installation effectiveness;Cost is relatively low, repairing is without hollowing, infiltration, guarantees wall Globality has good practicability.So the utility model effectively overcomes various shortcoming in the prior art and has height Industry utility value.

Claims (5)

1. a kind of precast concrete box-frame, the installation applied to distribution box shell, it is characterised in that;Precast concrete box-frame is C20 The outline border of concrete structure, top and bottom are that have recess, can lay spool.
2. precast concrete box-frame according to claim 1, it is characterised in that;Precast concrete box-frame uses C20 intensity Concreting forms.
3. precast concrete box-frame according to claim 1, it is characterised in that;Precast concrete box-frame can match distribution box The size of shell.
4. precast concrete box-frame according to claim 1, it is characterised in that;The precast concrete box-frame is integrated into Type.
5. precast concrete box-frame according to claim 1, it is characterised in that;The precast concrete box-frame is square Or rectangle.
CN201820855250.7U 2018-06-04 2018-06-04 A kind of precast concrete box-frame Expired - Fee Related CN209339382U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820855250.7U CN209339382U (en) 2018-06-04 2018-06-04 A kind of precast concrete box-frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820855250.7U CN209339382U (en) 2018-06-04 2018-06-04 A kind of precast concrete box-frame

Publications (1)

Publication Number Publication Date
CN209339382U true CN209339382U (en) 2019-09-03

Family

ID=67744847

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820855250.7U Expired - Fee Related CN209339382U (en) 2018-06-04 2018-06-04 A kind of precast concrete box-frame

Country Status (1)

Country Link
CN (1) CN209339382U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236469A (en) * 2020-01-13 2020-06-05 河南宏程工程建设有限责任公司 Indoor distribution box notch lintel construction process

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236469A (en) * 2020-01-13 2020-06-05 河南宏程工程建设有限责任公司 Indoor distribution box notch lintel construction process

Similar Documents

Publication Publication Date Title
CN100570076C (en) Jackstone-type rockfill concrete construction method
CN104746772B (en) Ash concrete hollow partition board anti-cracking construction method
CN104746639B (en) A kind of installation method that the prefabricated window that floats is installed in composite wallboard
CN206707101U (en) Scarf electronic box installs precast segment and prefabricated mould within the walls for one kind filling
CN103276916B (en) A kind of building method of sealing light weight concrete construction board wall wall hole and filling plate
CN110258848A (en) A kind of construction method of building energy conservation CL composite shear wall
CN104532985B (en) Shear wall cast with tenon-and-mortise precast concrete blocks replacing formworks and construction method thereof
CN106553263B (en) It is a kind of for the prefabricated construction method with side slope model cavitation of laboratory test cut-and-cover tunnel model
CN105019651B (en) Hollow brick fills wall into the efficient installation engineering method of winding box
CN107630565A (en) The method and its equipment of a kind of outer wall opening of closing
CN209339382U (en) A kind of precast concrete box-frame
CN109236033A (en) A kind of building prefabrication Assembled enclosing wall and its production technology
CN105649235A (en) Construction technique for MS dense thin-wall building block filling
CN107975651A (en) A kind of method of floor pipeline quick blocking
CN105507607A (en) Method for repairing crack in ancient building wall
CN105041340A (en) Structure and construction method for increasing arch crown concrete pouring speed in tunnel engineering
CN203096762U (en) Anti-frost ground beam
CN109898698A (en) A kind of construction method of pseudo-classic architecture silk seam wall
CN106499088B (en) A kind of useless brick facing prefabricated thermal insulation exterior wall plate and preparation method thereof
CN105545002A (en) Method of mending crack in ancient building wall body
CN112709374A (en) Thickness control device for protective layer of reinforced concrete floor and construction process
CN104675135A (en) Repairing method of carved stone cave eaves of stone cave temple
CN204418229U (en) Poured band of outer wall of basement concrete draw-in groove
CN111136763A (en) Manufacturing method of air conditioner hole and exhaust hole concrete precast block
CN102587543B (en) Building shading cast-in-place concrete lattice wall and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190903

CF01 Termination of patent right due to non-payment of annual fee