CN209339175U - A kind of aquatic measurement platform of aquatic measurement platform multilayer damping stake and damping - Google Patents

A kind of aquatic measurement platform of aquatic measurement platform multilayer damping stake and damping Download PDF

Info

Publication number
CN209339175U
CN209339175U CN201821902947.1U CN201821902947U CN209339175U CN 209339175 U CN209339175 U CN 209339175U CN 201821902947 U CN201821902947 U CN 201821902947U CN 209339175 U CN209339175 U CN 209339175U
Authority
CN
China
Prior art keywords
steel pipe
layer steel
layer
measurement platform
damping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821902947.1U
Other languages
Chinese (zh)
Inventor
刘垚
刘国良
张泽卫
董子龙
卢金栋
李学刚
许俊伟
王申宇
李治国
邓永斌
杜玉珊
姜山
肖方奇
刘建军
李秋光
王洋洋
卢卫锋
郑湘芝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Co Ltd CRTG
CRTG Survey and Design Institute Co Ltd
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG, CRTG Survey and Design Institute Co Ltd filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CN201821902947.1U priority Critical patent/CN209339175U/en
Application granted granted Critical
Publication of CN209339175U publication Critical patent/CN209339175U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of multilayer damping stake of aquatic measurement platform, lower end is embedded under water layer, and passes through Soft Soil Layer to hard formation, and upper end is located on water layer, is used to support measuring table;The multilayer damping stake successively includes first layer steel pipe, second layer steel pipe and the third layer steel pipe being set-located, the bottom flush of the first layer steel pipe, second layer steel pipe and third layer steel pipe from the outer to the inner;It is each between each adjacent steel pipe to form a filling space;It pours in the lower section and the third layer steel pipe in the filling space between the lower section and the second layer steel pipe and third layer steel pipe in the filling space between first layer steel pipe and second layer steel pipe as concrete;The upper section in the filling space between the first layer steel pipe and second layer steel pipe is stuffed entirely with as fine sand, and the upper section in the space between the second layer steel pipe and third layer steel pipe is filled with rubber.Damping effect is obvious, meets requirement of the measuring device to vibration.

Description

A kind of aquatic measurement platform of aquatic measurement platform multilayer damping stake and damping
Technical field
The utility model belongs to engineering measuring technology field, and in particular to a kind of aquatic measurement platform multilayer damping stake and The aquatic measurement platform of damping.
Background technique
In recent years, China's urban transportation facility, which is built, is rapidly developed, and in carrying out water transportation work progress, is needed Build aquatic measurement platform.But aquatic measurement platform is influenced seriously, platform to be caused to shake by sea beat, to cause precision Decline.Site operation is influenced, it is most important how to solve the problems, such as that aquatic measurement platform is had become by wave vibration.
Currently, pier mainly uses steel bar concrete pile plinth.Mainly by increasing the diameter of concrete-pile, mention High concrete stake intensity reduces vibration.But the method needs to increase the diameter of concrete-pile, and pier construction cost is caused to increase Add, also, the method is only capable of influence of seldom decrease vibration to aquatic measurement platform, increased diameter and weaken vibration not at Proportionate relationship.So only the influence that vibration shakes pier can not be reduced well by increasing the diameter of concrete-pile.
Utility model content
The technical problem to be solved by the utility model is in view of the above shortcomings of the prior art, provide a kind of survey waterborne Platform multilayer damping stake is measured, damping effect is obvious, meets requirement of the measuring device to vibration.
In order to solve the above technical problems, the technical solution adopted in the utility model is, a kind of aquatic measurement platform multilayer Damping stake, lower end are embedded under water layer, and pass through Soft Soil Layer to hard formation, and upper end is located on water layer, and it is flat to be used to support measurement Platform;The multilayer damping stake successively includes first layer steel pipe, second layer steel pipe and the third layer being set-located from the outer to the inner Steel pipe, the bottom flush of the first layer steel pipe, second layer steel pipe and third layer steel pipe;It is each between each adjacent steel pipe to be formed One filling space;The lower section and the second layer steel pipe and third in the filling space between first layer steel pipe and second layer steel pipe It pours in the lower section and the third layer steel pipe in the filling space between layer steel pipe as concrete;The first layer steel pipe and The upper section in the filling space between second layer steel pipe is stuffed entirely with as fine sand, the space between the second layer steel pipe and third layer steel pipe Upper section be filled with rubber.
Further, between the first layer steel pipe and second layer steel pipe and between the second layer steel pipe and third layer steel pipe The upper end of concrete be located at the intersection of Soft Soil Layer and hard rock interlayer.
Further, each steel pipe is coaxially arranged, and the spacing between adjacent each steel pipe is 10~20cm.
Further, it by first layer steel pipe, second layer steel pipe to third layer steel pipe, highly successively increases, and adjacent two Difference in height between a steel pipe is 15-20cm.
Further, which selects ultra-retardation concrete, and final setting time is not less than 48 hours.
The invention also discloses a kind of aquatic measurement platforms of damping, including above-mentioned multiple multilayer damping stakes, also Including a measuring table, measuring table is set to multiple multilayer damping stake tops.
Further, which is set as 4, and two-by-two laterally in a row, it is vertical in column.
A kind of above-mentioned aquatic measurement platform is as follows with the construction method of multilayer damping stake:
Step 1: drilling in the position of damping stake to be applied, aperture is consistent with the diameter of first layer steel pipe;
Step 2: vertical in drilling place first layer steel pipe;
Step 3: pouring ultra-retardation concrete in first layer steel pipe described in step 2, height is poured to Soft Soil Layer With the intersection of hard rock interlayer;
Step 4: second layer steel pipe socket is set in first layer steel pipe, and the bottom of the second layer steel pipe is across super slow Solidifying concrete, until foot of hole;
Step 5: third layer steel pipe socket is set in second layer steel pipe, and the bottom of the third layer steel pipe is across super slow Solidifying concrete, until foot of hole;
Step 6: continuing to pour ultra-retardation concrete in the third layer steel pipe, until its top;
Step 7: filled rubber in space between the second layer steel pipe and third layer steel pipe, until filling is to pushing up Portion;
Step 8: fine sand is filled between first layer steel pipe and second layer steel pipe, until being fills up to top.
Further, this method further includes following steps:
Step 9: repeating step 1~eight, the construction of other multilayer damping stakes is completed;
Step 10: placing a measuring table at the top of each multilayer damping stake.
A kind of aquatic measurement platform of the utility model has the advantages that 1. damping effects are obvious with multilayer damping stake, full Requirement of the sufficient measuring device to vibration.2. can effectively reduce the diameter of concrete-pile, to reduce cost.
Detailed description of the invention
Fig. 1 is a kind of schematic top plan view of aquatic measurement platform multilayer damping stake of the utility model.
Fig. 2 is the side structure schematic view of one of the utility model damping windproof sea survey platform.
Wherein: 1. first layer steel pipes;2. second layer steel pipe;3. third layer steel pipe;4. fine sand;5. rubber;6. concrete;7. Measuring table;A. water layer;B. Soft Soil Layer;C. hard formation.
Specific embodiment
A kind of the utility model aquatic measurement platform multilayer damping stake, as depicted in figs. 1 and 2, lower end is embedded in water Under layer A, and Soft Soil Layer B to hard formation C is passed through, upper end is located on water layer A, is used to support measuring table 7;The multilayer damping stake by Outer layer successively includes the first layer steel pipe 1, second layer steel pipe 2 and third layer steel pipe 3 being set-located, first layer steel pipe to internal layer 1, the bottom flush of second layer steel pipe 2 and third layer steel pipe 3;It is each between each adjacent steel pipe to form a filling space;First Filling between the lower section and second layer steel pipe 2 and third layer steel pipe 3 in the filling space between layer steel pipe 1 and second layer steel pipe 2 It pours in the lower section and third layer steel pipe 3 in space as concrete 6;Filling between first layer steel pipe 1 and second layer steel pipe 2 The upper section in space is stuffed entirely with as fine sand 4, and the upper section in the space between second layer steel pipe 2 and third layer steel pipe 3 is filled with rubber 5.
Since hard formation is hard, to guarantee the firm of the multilayer damping stake, first layer steel pipe 1 and second layer steel pipe 2 Between and concrete 6 between second layer steel pipe 2 and third layer steel pipe 3 boundary of the upper end between Soft Soil Layer B and hard formation C Place.After concrete 6 condenses, become an entirety with hard formation C, to play firm effect.Its construction requirement is, when answering rock stratum When being complete severely-weathered, each layer steel pipe enters rock not less than 7m, and when middle weathering enters rock not less than 5m, and when gentle breeze enters rock not less than 2m.
A kind of aquatic measurement platform of the utility model is concrete with the lower part of multilayer damping stake, plays firm effect, Top filled rubber and fine sand play the role of damping, and the material between each layer steel pipe in water layer A is from outside to inside successively For fine sand 4, rubber 5 and concrete 6, when sea laps damping stake, the transmitting of rubber 5, fine sand 4 and 6 pairs of concrete vibrations is Different, using the difference between unlike material, that is, damping is realized, in turn ensures intensity.Each steel pipe is coaxially arranged, and adjacent each Spacing between steel pipe is 10~20cm, that is, is able to satisfy the requirement of damping.By first layer steel pipe 1, second layer steel pipe 2 to third layer steel Pipe 3, highly successively increases, and the difference in height between two adjacent steel pipes is 15-20cm.
The invention also discloses a kind of aquatic measurement platforms of damping, including above-mentioned multiple multilayer damping stakes, also Including a measuring table 7, measuring table 7 is set to multiple multilayer damping stake tops.Multilayer damping stake is set as 4, and two Two laterally in a row, it is vertical in column.
A kind of above-mentioned aquatic measurement platform is as follows with the construction method of multilayer damping stake: for convenience of constructing, using by outer To interior construction method, specific step is as follows
Step 1: drilling in the position of damping stake to be applied, aperture is consistent with the diameter of first layer steel pipe 1;
Step 2: vertical in drilling place first layer steel pipe 1.
Step 3: pour ultra-retardation concrete in first layer steel pipe 1 in step 2, pour height to Soft Soil Layer B and Intersection between hard formation C.
Step 4: second layer steel pipe 2 is sheathed in first layer steel pipe 1, and the bottom of second layer steel pipe 2 passes through extra retarded set Concrete, until foot of hole.
Step 5: third layer steel pipe 3 is sheathed in second layer steel pipe 2, and the bottom of third layer steel pipe 3 passes through extra retarded set Concrete, until foot of hole;
In operating procedure four and step 5, need to complete before ultra-retardation concrete final set.In order to guarantee Two layers of steel pipe 2 and third layer steel pipe 3 pass through concrete, until foot of hole, it is necessary to select ultra-retardation concrete, and final setting time Not less than 48 hours.
Step 6: continuing to pour ultra-retardation concrete in third layer steel pipe 3, until its top.
Step 7: filled rubber in space between second layer steel pipe 2 and third layer steel pipe 3, until filling is to top.
Step 8: fine sand is filled between first layer steel pipe 1 and second layer steel pipe 2, until being fills up to top.
Step 9: repeating step 1~eight, the construction of other multilayer damping stakes is completed;
Step 10: placing a measuring table 7 at the top of each multilayer damping stake.Measuring table 7 uses armored concrete Production, and measure equipment and be placed on measuring table 7.
Field engineer tests in Project in Guangdong Province section, using the coagulation of multilayer damping stake and routine in the application Native stake compares, and show that the diameter of conventional concrete damping stake needs to be set as 1.5 meters~2 meters, and uses in the application When multilayer damping stake, required diameter is 1.4 meters~1.8 meters, can meet the requirement of damping, meets the use of measurement equipment Demand.Measurement equipment is by taking total station as an example, and under same measuring condition, test condition is slightly wave in the present embodiment, It, will be complete on measuring table on the measuring table of the damping stake support for the conventional design constructed and in the utility model Instrument of standing is placed on measuring table, after the completion of leveling, is measured, is met monitoring condition on measuring table in the present invention Duration is 3~5 times on the measuring table of conventional concrete-pile support.

Claims (7)

1. a kind of multilayer damping stake of aquatic measurement platform, which is characterized in that its lower end is embedded under water layer A, and passes through weak soil Layer B to hard formation C, upper end are located on water layer A, are used to support measuring table (7);
The multilayer damping stake from the outer to the inner successively include be set-located first layer steel pipe (1), second layer steel pipe (2) and Third layer steel pipe (3), the first layer steel pipe (1), second layer steel pipe (2) and third layer steel pipe (3) bottom flush;Each phase It is each between adjacent steel pipe to form a filling space;
The lower section and the second layer steel pipe (2) in the filling space between the first layer steel pipe (1) and second layer steel pipe (2) It pours in the lower section and the third layer steel pipe (3) in the filling space between third layer steel pipe (3) as concrete (6);Institute The upper section for stating the filling space between first layer steel pipe (1) and second layer steel pipe (2) is stuffed entirely with as fine sand (4), the second layer The upper section in the space between steel pipe (2) and third layer steel pipe (3) is filled with rubber (5).
2. a kind of aquatic measurement platform multilayer damping stake according to claim 1, which is characterized in that the first layer steel Manage the upper of the concrete (6) between (1) and second layer steel pipe (2) and between the second layer steel pipe (2) and third layer steel pipe (3) Hold the intersection between Soft Soil Layer B and hard formation C.
3. a kind of aquatic measurement platform multilayer damping stake according to claim 1 or 2, which is characterized in that each steel Pipe is coaxially arranged, and the spacing between adjacent each steel pipe is 10~20cm.
4. a kind of aquatic measurement platform multilayer damping stake according to claim 3, which is characterized in that by the first layer Steel pipe (1), second layer steel pipe (2) to third layer steel pipe (3), highly successively increase, and the height between two adjacent steel pipes Difference is 15-20cm.
5. a kind of aquatic measurement platform multilayer damping stake according to claim 4, which is characterized in that the concrete choosing With ultra-retardation concrete, and final setting time is not less than 48 hours.
6. a kind of aquatic measurement platform of damping, which is characterized in that including multiple multilayers of any of claims 1-5 Damping stake, further includes a measuring table (7), and the measuring table (7) is set to multiple multilayer damping stake tops.
7. a kind of aquatic measurement platform of damping according to claim 6, which is characterized in that the multilayer damping stake setting Be 4, and two-by-two laterally in a row, it is vertical in column.
CN201821902947.1U 2018-11-19 2018-11-19 A kind of aquatic measurement platform of aquatic measurement platform multilayer damping stake and damping Active CN209339175U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821902947.1U CN209339175U (en) 2018-11-19 2018-11-19 A kind of aquatic measurement platform of aquatic measurement platform multilayer damping stake and damping

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821902947.1U CN209339175U (en) 2018-11-19 2018-11-19 A kind of aquatic measurement platform of aquatic measurement platform multilayer damping stake and damping

Publications (1)

Publication Number Publication Date
CN209339175U true CN209339175U (en) 2019-09-03

Family

ID=67748534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821902947.1U Active CN209339175U (en) 2018-11-19 2018-11-19 A kind of aquatic measurement platform of aquatic measurement platform multilayer damping stake and damping

Country Status (1)

Country Link
CN (1) CN209339175U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109306704A (en) * 2018-11-19 2019-02-05 中铁隧道局集团有限公司 A kind of aquatic measurement platform multilayer damping stake

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109306704A (en) * 2018-11-19 2019-02-05 中铁隧道局集团有限公司 A kind of aquatic measurement platform multilayer damping stake
CN109306704B (en) * 2018-11-19 2023-12-26 中铁隧道局集团有限公司 Multilayer shock absorption pile for water measurement platform

Similar Documents

Publication Publication Date Title
CN108061687B (en) Geotechnical engineering simulation test platform for researching potential failure surface
CN104374648B (en) A kind of experimental rig and method for testing dynamic shear characteristic between pile tube and the slip casting soil body
CN103996348B (en) The cross-over tunnel construction indoor model test device on operation tunnel impact up and down
CN103510551A (en) Three-directional static and dynamic loading model test platform for deep water foundations of bridges
Rietdijk et al. The drizzle method for sand sample preparation
CN106088172B (en) Testing device for combined measurement of pile top and pile end displacement of cast-in-place pile
CN103669385A (en) Method for improving pile group bearing capacity by means of reticular pile foundations
CN203365430U (en) Testing device for three-dimensional soil arch effect of pile type reinforcement embankment
CN103389364A (en) Pile-supported reinforced embankment three-dimensional soil arching effect testing apparatus and pile-supported reinforced embankment three-dimensional soil arching effect testing method
CN209339175U (en) A kind of aquatic measurement platform of aquatic measurement platform multilayer damping stake and damping
CN202492854U (en) Foundation platform structures of deepwater bare rock and karstic piles
CN205894049U (en) A first pitching pile formula jacket structure for marine booster station
CN109306704A (en) A kind of aquatic measurement platform multilayer damping stake
CN105651604B (en) Simulate the experimental rig and test method of anti-float anchor rod concrete slab combining structure
CN105862535A (en) Dredger fill solidification pile roadbed and construction method thereof
CN103938609B (en) A kind of rubble/sand loaded filter-porous concrete pile composite foundation and processing method
CN108387710A (en) A kind of experimental rig and method for simulating the rectangle head boundary effect soil body
CN205776292U (en) A kind of for the centrical positioner in pile foundation engineering hole
CN105241648A (en) Loading device simulating loess tunnel lock foot anchor pipe end stress and use method thereof
CN108267370A (en) A kind of one-dimensional cylinder test device and method for simulating the kinetic head boundary effect soil body
CN108875267B (en) Method for treating and designing foundation of dynamic compaction aggregate pile in filling side slope hole
CN208517977U (en) A kind of anti-float anchor rod that existing basement bottom board is reinforced
CN103276755A (en) Raft foundation bottom soil body void deformation monitoring device
CN105839621B (en) A kind of implementation method of abrupt-change cross section and unlike material drilled pile
CN205742170U (en) The pile tube anchor pole composite foundation of tension compression bidirectional load can be born

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant