CN209339007U - A kind of collapsible interior Hanging Basket of wet seam construction of highway bridge - Google Patents

A kind of collapsible interior Hanging Basket of wet seam construction of highway bridge Download PDF

Info

Publication number
CN209339007U
CN209339007U CN201920025442.XU CN201920025442U CN209339007U CN 209339007 U CN209339007 U CN 209339007U CN 201920025442 U CN201920025442 U CN 201920025442U CN 209339007 U CN209339007 U CN 209339007U
Authority
CN
China
Prior art keywords
fixed
operation plate
highway bridge
wet seam
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920025442.XU
Other languages
Chinese (zh)
Inventor
杨臻
毛艳芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920025442.XU priority Critical patent/CN209339007U/en
Application granted granted Critical
Publication of CN209339007U publication Critical patent/CN209339007U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of collapsible interior Hanging Baskets of the wet seam construction of highway bridge, it is related to highway bridge construction technical field, the collapsible interior Hanging Basket of the wet seam construction of the highway bridge, including operation plate, the outer surface of the operation plate is fixedly connected with pull ring, the side of the operation plate is provided with sleeve, the side of the operation plate is connected with the first fixed block, the side of the fixed block is fixedly connected with support frame, the second fixed block is fixedly connected in the middle part of the support frame, the side of second fixed block is connected with telescopic rod.The collapsible interior Hanging Basket of the wet seam construction of the highway bridge, by the way that fixed rope is arranged, utilize pulling force fixed operation plate, when recyclable device, the one end for drawing fixed rope to be flexibly connected with support plate can achieve the purpose that folding operation plate, by the way that idler wheel is arranged, keep equipment easy to remove, by setting grafting and socket between beam column, fixed beam and moving beam, make to remove easier when the device.

Description

A kind of collapsible interior Hanging Basket of wet seam construction of highway bridge
Technical field
The utility model relates to highway bridge construction technical field, specially a kind of wet seam construction folding of highway bridge Hanging Basket in formula.
Background technique
Wet seam construction need to be carried out after completing beam body and setting up when bridge construction at present, i.e., coagulation is perfused between beam seam Soil transversely links beam body, so that beam body, which mutually consolidates, becomes an entirety, since bridge often crosses over mountain valley, river, Lower part is often not easy to erect bracket, therefore the construction of wet seam belongs to high altitude operation, and usual construction method is: using wooden model as wet Wooden model, is hung in beam body bottom plane by the bed die of seam construction using iron wire, and wet seam cuts iron wire after having constructed, then will Bed die abate one by one also has reserved hanging duct in order to the method for demoulding, and with the development of modern bridge Construction Technology, Bridge height gradually increases, and the technological merit of the wet seam construction of assembling bridge is also more and more important, how to make wet seam Constructing operation is safer convenient, and more efficient, becomes an important content of bridge construction, existing construction technology: one, needing It constructs under very important person to beam bottom, makes operation platform, by constructing on the workbench under ladder to beam bottom from beam, Two, with elevation and subsidence mechanical, formation operation platform, personnel operate on the operational platform, both construction methods install template Or the transport of disassembly is all comparatively laborious, to the more demanding of machinery, construction efficiency is low, higher cost, and the safety of construction personnel To spend lower, place is also restrained under bridge, traffic under bridge is affected, the prior art three: a kind of wet joint work vehicle of bridge, including There are vehicle frame, wheel, upper lift beam and a bed die, bed die is mounted on wet seam, lower surface, and vehicle frame and wheel composition are can be along wet seam Wet seam is clamped in centre by the mobile trolley in upper surface, trolley and bed die, lift beam is additionally provided on vehicle frame, upper lift beam is in Wet seam center, the screw rod by passing through wet seam are connect with bed die, and the upper lift beam is channel steel structure, opening down It is fixed on vehicle frame top center, upper lift beam level is arranged along wet seam direction.
Currently, the existing wet jointing apparatus mass activity of highway bridge is poor, construction personnel enters operation platform and compares expense Power, constructing device is heavy, inconvenient for use, is unfavorable for promoting the use of.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of collapsible interior extension of wet seam construction of highway bridge Basket, it is poor to solve the wet jointing apparatus mass activity of existing highway bridge, and it is relatively elaborate that construction personnel enters operation platform, applies Tooling sets heaviness, inconvenient for use, is unfavorable for the problem of promoting the use of.
(2) technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs:
A kind of highway bridge wet seam construction collapsible interior Hanging Basket, including operation plate, the outer surface of the operation plate are solid Surely it is connected with pull ring, the side of the operation plate is provided with sleeve, and the side of the operation plate is connected with the first fixed block, The side of the fixed block is fixedly connected with support frame, is fixedly connected with the second fixed block in the middle part of the support frame, and described The side of two fixed blocks is connected with telescopic rod, and the outer surface of the telescopic rod is connected with safety net, the safety net Bottom be fixedly connected with fixed column, the safety net by fixed column and sleeve grafting, fix by the outer surface of the support frame It is connected with metal cylinder, the inner wall of the metal cylinder is plugged with metal bar, and one end of the metal bar is fixedly connected with fixed rope, institute It states fixed rope and is connected with pull ring far from one end of metal bar;
Beam column is fixedly connected at the top of the support frame, the outer surface of the beam column is connected with rope ladder, the beam The both ends of column are fixedly connected to cylinder, and the beam column is socketed by cylinder and moving beam grafting, the outer surface of the moving beam There is a fixed beam, the both ends of the fixed beam are respectively set fluted, and the moving beam is socketed by groove and fixed beam, the shifting The both ends of dynamic beam are provided with idler wheel.
Optionally, the quantity of the operation plate is six, movable between the two sides of support frame, every two operation plates respectively Connection.
Optionally, the quantity of the telescopic rod is four, is respectively and movably connected to the two sides of support frame.
Optionally, the quantity of the fixed rope is 12, and every fixed rope is connected between support frame and operation plate.
Optionally, the quantity of the fixed beam is two, is socketed respectively in the two sides of beam column and moving beam.
Optionally, the quantity of the moving beam is two.
(3) beneficial effect
The utility model provides a kind of collapsible interior Hanging Basket of wet seam construction of highway bridge, has following beneficial to effect Fruit:
(1), the collapsible interior Hanging Basket of the wet seam construction of the highway bridge makes one end of fixed rope by the way that fixed rope is arranged It is flexibly connected with support frame, the other end is flexibly connected with operation plate, using pulling force fixed operation plate, may stand in construction personnel It constructs on operation plate, when recyclable device, the one end for drawing fixed rope to be flexibly connected with support plate can reach folding operation plate Purpose keeps recycling easier, and by the way that idler wheel is arranged, when operation can be pushed the device by top personnel, needs when avoiding mobile It wants uplifting device mobile, achieve the purpose that save manpower and improves working efficiency, by setting between beam column, fixed beam and moving beam The mode for setting grafting and socket, makes to remove simpler when the device, and when recycling is more convenient.
(2), the collapsible interior Hanging Basket of the wet seam construction of the highway bridge, by the way that safety net is arranged, by the work of construction personnel Industry region enclosing gets up, and ensures to the safety belt of construction worker, achievees the purpose that safe construction, is fixed by setting Beam, secures the spacing between two moving beams, and avoiding device changes two mobile case bays, causes support frame inclined when mobile It moves, to operating personnel's bring security risk above operation plate, passes through grafting between setting beam column and two moving beams, Ke Yigu Determine support frame, support frame is avoided to be swung left and right bring security risk.
Detailed description of the invention
Fig. 1 is the schematic view of the front view of the utility model;
Fig. 2 is the overlooking structure diagram of the utility model;
Fig. 3 is the support frame structural schematic diagram of the utility model;
Fig. 4 is the operation plate structural schematic diagram of the utility model;
Fig. 5 is the fixed beam structural schematic diagram of the utility model.
In figure: 1- operation plate, 2- pull ring, 3- sleeve, the first fixed block of 4-, 5- support frame, the second fixed block of 6-, 7- are flexible Bar, 8- safety net, 9- fixed column, 10- metal cylinder, 11- metal bar, 12- fixed rope, 13- beam column, 14- rope ladder, 15- cylinder, 16- moving beam, 17- fixed beam, 18- groove, 19- idler wheel.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", " length ", " width Degree ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside", " suitable The orientation or positional relationship of the instructions such as hour hands ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " is orientation based on the figure Or positional relationship, be merely for convenience of describing the present invention and simplifying the description, rather than the device of indication or suggestion meaning or Element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as the limit to the utility model System.
In the present invention unless specifically defined or limited otherwise, term " setting ", " connected ", " connects " installation " Connect ", the terms such as " fixation " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection;It can be machine Tool connection;It can be directly connected, it can also be indirectly connected through an intermediary.For those of ordinary skill in the art and Speech, can understand the concrete meaning of above-mentioned term in the present invention as the case may be.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more of the features.
Fig. 1-5 is please referred to, the utility model provides a kind of technical solution:
A kind of highway bridge wet seam construction collapsible interior Hanging Basket, including operation plate 1, the outer surface of operation plate 1 is fixed It is connected with pull ring 2, the side of operation plate 1 is provided with sleeve 3, and the side of operation plate 1 is connected with the first fixed block 4, fixed The side of block 4 is fixedly connected with support frame 5, and the middle part of support frame 5 is fixedly connected with the second fixed block 6, and the one of the second fixed block 6 Side is connected with telescopic rod 7, and the outer surface of telescopic rod 7 is connected with safety net 8, and the bottom of safety net 8 is fixedly connected with Fixed column 9, for safety net 8 by fixed column 9 and 3 grafting of sleeve, effect is to ensure the personal safety of operating personnel, reaches safety and applies The purpose of work, the outer surface of support frame 5 are fixedly connected with metal cylinder 10, and the inner wall of metal cylinder 10 is plugged with metal bar 11, metal One end of stick 11 is fixedly connected with fixed rope 12, and fixed rope 12 is connected with pull ring 2 far from one end of metal bar 11, and effect is Fixed operation plate 1 and folding operation plate 1;
The top of support frame 5 is fixedly connected with beam column 13, and the outer surface of beam column 13 is connected with rope ladder 14, and effect is to allow Operation plate 1 is arrived under operating personnel, the both ends of beam column 13 are fixedly connected to cylinder 15, and beam column 13 passes through cylinder 15 and moving beam 16 Grafting, effect are firm support frames 5, and the outer surface of moving beam 16 is socketed with fixed beam 17, and the both ends of fixed beam 17 are respectively set Fluted 18, moving beam 16 is socketed by groove 18 and fixed beam 17, and effect is to fix two moving beams 16, avoids two movements The variation of 16 spacing of beam, the both ends of moving beam 16 are provided with idler wheel 19, easy to remove.
A kind of optional technical solution as the utility model:
The quantity of operation plate 1 is six, and respectively in the two sides of support frame 5, effect is to provide operating area to operating personnel, It is flexibly connected between every two operation plates 1, effect is easy for folding.
A kind of optional technical solution as the utility model:
The quantity of telescopic rod 7 is four, is respectively and movably connected to the two sides of support frame 5, and effect is fixed safety net 8.
A kind of optional technical solution as the utility model:
The quantity of fixed rope 12 is 12, and every fixed rope 12 is connected between support frame 5 and operation plate 1, and effect is Firm operation plate 1.
A kind of optional technical solution as the utility model:
The quantity of fixed beam 17 is two, is socketed respectively in the two sides of beam column 13 and moving beam 16, effect is to fix two Moving beam 16 avoids two 16 spacing of moving beam variations.
A kind of optional technical solution as the utility model:
The quantity of moving beam 16 is two, supports whole device, and easy to remove.
The collapsible interior Hanging Basket in conclusion the wet seam of the highway bridge is constructed, in use, by setting fixed rope 12, It is flexibly connected one end of fixed rope 12 with support frame 5, the other end is flexibly connected with operation plate 1, utilizes pulling force fixed operation plate 1, it may stand in construction personnel on operation plate 1 and construct, when recyclable device, draw one that fixed rope 12 is flexibly connected with support plate 5 End can achieve the purpose that folding operation plate 1, keep recycling easier, and by the way that idler wheel 19 is arranged, when operation can be by top Personnel push the device, need uplifting device mobile when avoiding mobile, achieve the purpose that save manpower and improve working efficiency, beam Between column 13, fixed beam 17 and moving beam 16 setting grafting and socket by way of, make to remove it is simpler when the device, return Time receiving is more convenient, by the way that safety net 8 is arranged, the operating area enclosing of construction personnel is got up, to the peace of construction worker Guarantee is brought entirely, achievees the purpose that safe construction, by setting fixed beam 17, secures the spacing between two moving beams 16, Avoiding device changes two 16 spacing of moving beam when mobile, cause support frame 5 to deviate, to the operating personnel above operation plate 1 Bring security risk can avoid support frame 5 by grafting between setting beam column 13 and two moving beams 16 with fixed support frame 5 The bring that is swung left and right security risk.
It should be noted that in the present invention unless specifically defined or limited otherwise, fisrt feature is in the second spy It can be that the first and second features directly contact or the first and second features are connect indirectly by intermediary "above" or "below" sign Touching.Moreover, fisrt feature can be above the second feature " above ", " above " and " above " fisrt feature right above second feature or Oblique upper, or first feature horizontal height is merely representative of higher than second feature.Fisrt feature second feature " under ", " lower section " " following " can be fisrt feature and be directly under or diagonally below the second feature, or is merely representative of first feature horizontal height and is less than Second feature.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

  1. Collapsible interior Hanging Basket, including operation plate (1) 1. a kind of wet seam of highway bridge is constructed, it is characterised in that: the operation The outer surface of plate (1) is fixedly connected with pull ring (2), and the side of the operation plate (1) is provided with sleeve (3), the operation plate (1) Side be connected with the first fixed block (4), the side of the fixed block (4) is fixedly connected with support frame (5), the support It is fixedly connected in the middle part of frame (5) the second fixed block (6), the side of second fixed block (6) is connected with telescopic rod (7), the outer surface of the telescopic rod (7) is connected with safety net (8), and the bottom of the safety net (8) is fixedly connected with solid Fixed column (9), by fixed column (9) and sleeve (3) grafting, the outer surface of the support frame (5) is fixedly connected the safety net (8) Have metal cylinder (10), the inner wall of the metal cylinder (10) is plugged with metal bar (11), and one end of the metal bar (11) is fixed to be connected It is connected to fixed rope (12), the fixed rope (12) is connected with pull ring (2) far from the one end of metal bar (11);The support frame (5) it is fixedly connected at the top of beam column (13), the outer surface of the beam column (13) is connected with rope ladder (14), the beam column (13) both ends are fixedly connected to cylinder (15), and the beam column (13) is described by cylinder (15) and moving beam (16) grafting The outer surface of moving beam (16) is socketed with fixed beam (17), and fluted (18), institute is respectively set in the both ends of the fixed beam (17) It states moving beam (16) to be socketed by groove (18) and fixed beam (17), the both ends of the moving beam (16) are provided with idler wheel (19).
  2. The collapsible interior Hanging Basket 2. the wet seam of a kind of highway bridge according to claim 1 is constructed, which is characterized in that described The quantity of operation plate (1) is six, is flexibly connected between the two sides of support frame (5), every two operation plates (1) respectively.
  3. The collapsible interior Hanging Basket 3. the wet seam of a kind of highway bridge according to claim 1 is constructed, which is characterized in that described The quantity of telescopic rod (7) is four, is respectively and movably connected to the two sides of support frame (5).
  4. The collapsible interior Hanging Basket 4. the wet seam of a kind of highway bridge according to claim 1 is constructed, which is characterized in that described The quantity of fixed rope (12) is 12, and every fixed rope (12) is connected between support frame (5) and operation plate (1).
  5. The collapsible interior Hanging Basket 5. the wet seam of a kind of highway bridge according to claim 1 is constructed, which is characterized in that described The quantity of fixed beam (17) is two, is socketed respectively in the two sides of beam column (13) and moving beam (16).
  6. The collapsible interior Hanging Basket 6. the wet seam of a kind of highway bridge according to claim 1 is constructed, which is characterized in that described The quantity of moving beam (16) is two.
CN201920025442.XU 2019-01-08 2019-01-08 A kind of collapsible interior Hanging Basket of wet seam construction of highway bridge Expired - Fee Related CN209339007U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920025442.XU CN209339007U (en) 2019-01-08 2019-01-08 A kind of collapsible interior Hanging Basket of wet seam construction of highway bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920025442.XU CN209339007U (en) 2019-01-08 2019-01-08 A kind of collapsible interior Hanging Basket of wet seam construction of highway bridge

Publications (1)

Publication Number Publication Date
CN209339007U true CN209339007U (en) 2019-09-03

Family

ID=67761107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920025442.XU Expired - Fee Related CN209339007U (en) 2019-01-08 2019-01-08 A kind of collapsible interior Hanging Basket of wet seam construction of highway bridge

Country Status (1)

Country Link
CN (1) CN209339007U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111851321A (en) * 2020-07-20 2020-10-30 刘礼铸 Novel folding type externally-hung basket for construction of wet joint of highway bridge
CN113931071A (en) * 2021-10-27 2022-01-14 中交第二航务工程局有限公司 Prefabricated box girder wet joint adhesion type construction platform and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111851321A (en) * 2020-07-20 2020-10-30 刘礼铸 Novel folding type externally-hung basket for construction of wet joint of highway bridge
CN111851321B (en) * 2020-07-20 2022-03-29 刘礼铸 Novel folding type externally-hung basket for construction of wet joint of highway bridge
CN113931071A (en) * 2021-10-27 2022-01-14 中交第二航务工程局有限公司 Prefabricated box girder wet joint adhesion type construction platform and construction method thereof
CN113931071B (en) * 2021-10-27 2024-03-29 中交第二航务工程局有限公司 Prefabricated box girder wet joint attached construction platform and construction method thereof

Similar Documents

Publication Publication Date Title
CN106677211B (en) Wall tears assembled piping lane aluminum dipping form trolley system and its construction method open with the top plate whole morning poured
CN209339007U (en) A kind of collapsible interior Hanging Basket of wet seam construction of highway bridge
CN207700067U (en) A kind of packaged type box culvert construct trolley
CN205152788U (en) But telescopic bridge testing platform of antihunting
CN204298742U (en) For the supporting and protection structure of Bridge High-pier construction
CN201301581Y (en) Absorption tower wall construction device employing reversal installation method
CN102359109A (en) Static pile press for narrow site and ultra-short side pile distance construction
CN210289602U (en) Movable herringbone ladder device
CN210370687U (en) Template trolley for construction with adjustable template size
CN204983582U (en) Multi -functional fitment platform
CN202882375U (en) Elevator shaftway tool type scaffold operation platform
CN203320928U (en) Overhead hanging basket
CN216008539U (en) Be used for subway tunnel steel truss to support multi-functional platform truck
CN203248171U (en) Full fracture surface needle beam trolley without beam frame
CN211863614U (en) Auxiliary suspension device for movable portable safety belt
CN212447645U (en) Folding device of fixed support for transformer substation inspection
CN211651629U (en) Road and bridge construction measuring device
CN207700655U (en) A kind of precast beam stretching construction lift work platform
CN203559909U (en) Height-adjustable lining trolley
CN206529699U (en) Bridge guardrail external hanging type multi-function device
CN208251585U (en) A kind of scaffold of the building materials and ornaments convenient for placing
CN208363574U (en) A kind of convenient clamping type climbing frame limit safety lock
CN209721382U (en) A kind of Novel crane portal structure
CN206189286U (en) A long span gallows platform that is used for outer surface repairing of double width case roof beam
CN209838432U (en) Lining trolley for large-span tunnel construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190903

Termination date: 20200108

CF01 Termination of patent right due to non-payment of annual fee