CN209336768U - Trolley for transport pipeline - Google Patents
Trolley for transport pipeline Download PDFInfo
- Publication number
- CN209336768U CN209336768U CN201920025737.7U CN201920025737U CN209336768U CN 209336768 U CN209336768 U CN 209336768U CN 201920025737 U CN201920025737 U CN 201920025737U CN 209336768 U CN209336768 U CN 209336768U
- Authority
- CN
- China
- Prior art keywords
- trolley
- pipeline
- clamping device
- transport pipeline
- pieces
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Handcart (AREA)
Abstract
The utility model discloses a kind of trolleies for transport pipeline, are related to transporting equipment field.Including trolley front and trolley rear portion, trolley front includes first movement mechanism, the first clamping device, and trolley rear portion includes the second mobile mechanism, the second clamping device;First clamping device, the second clamping device are respectively fixedly connected in first movement mechanism, the second mobile mechanism;First clamping device includes two pieces of first baffles being oppositely arranged, and second clamping device includes two pieces of second baffles being oppositely arranged, and the ring flange of pipe ends is clamped in centre respectively by two pieces of first baffles, two pieces of second baffles.Utility model has the advantages that the convenient transport pipeline in coal mine roadway, alleviates the labor intensity of worker, improves work efficiency.
Description
Technical field
The utility model relates to transporting equipment field more particularly to a kind of trolleies for transport pipeline.
Background technique
In coal mine work progress, comprising sprinkling water, pressing the more Pipe installings such as wind, draining, slip casting, note nitrogen, gas exhaust
Work, wherein the transport of pipeline occupies the most of the time of project progress in tunnel, and existing tunnel is beaten in fortune system
There is no special pipeline conveying device, general to transport pipeline using artificial lift, labor intensity is high, and working efficiency is low.
Utility model content
The technical problem to be solved by the utility model is to provide it is a kind of can be improved working efficiency for transport pipeline
Trolley.
The utility model is to solve above-mentioned technical problem by the following technical programs: after trolley front and trolley
Portion, trolley front include first movement mechanism (1), the first clamping device (2), and trolley rear portion includes the second mobile mechanism (4), the
Two clamping devices (5);
The first movement mechanism (2) includes axle and two wheels, and two wheels are connected to the both ends of axle;Institute
It states the first clamping device (2) to be fixedly connected on the first movement mechanism (1), first clamping device (2) includes two pieces
The first baffle (21) being oppositely arranged;The ring flange of pipeline one end is clamped in centre by two pieces of first baffles (21);
Second mobile mechanism (4) uses rolling mechanism or sliding equipment;Second clamping device (5) is fixedly connected
On second mobile mechanism (4), second clamping device (5) includes two pieces of second baffles being oppositely arranged (51);Two
The ring flange of the pipeline other end is clamped in centre by block second baffle (51).
As the technical solution of optimization, the ring flange upper flange hole of corresponding pipeline is respectively equipped on two pieces of first baffles (21)
The first connecting hole (22) of position, two pieces of first baffles (21) pass through the attachment device and pipe across first connecting hole (22)
The ring flange of road one end links together;The ring flange upper flange hole location of corresponding pipeline is respectively equipped on two pieces of second baffles (51)
The second connecting hole (52) set, two pieces of second baffles (51) pass through the attachment device and pipeline across second connecting hole (52)
The ring flange of the other end links together.
As the technical solution of optimization, the attachment device uses bolt.
As the technical solution of optimization, which further includes the first bindiny mechanism (3), the second connection
Mechanism (6), first bindiny mechanism (3) are fixedly connected on first clamping device (2), second bindiny mechanism
(6) it is fixedly connected on second clamping device (5).It can will be multiple small by the first bindiny mechanism, the second bindiny mechanism
It links together after Chinese herbaceous peony, convenient transportation.
As the technical solution of optimization, first bindiny mechanism (3), the second bindiny mechanism (6) are all made of casing.It will be even
The both ends of connecting sleeve lever are respectively inserted in the casing of front and back trolley and can connect, and are easy to use.
As the technical solution of optimization, which further includes pulling rope, and the pulling rope is connected to
On pipeline.
As the technical solution of optimization, the axle of the first movement mechanism (1) uses round steel.
As the technical solution of optimization, the first baffle (21), second baffle (51) are all made of steel plate.
As the technical solution of optimization, second mobile mechanism (4) includes axle and two wheels, two wheel difference
It is connected to the both ends of axle.
As the technical solution of optimization, second mobile mechanism (4) includes two sleds, between two sleds are parallel to each other
Every setting.
Utility model has the advantages that the convenient transport pipeline in coal mine roadway, alleviates the labor intensity of worker, mentions
High working efficiency;Structure is simple, is easy production, facilitates operation.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the utility model embodiment one for the trolley of transport pipeline.
Fig. 2 is structural schematic diagram of the utility model embodiment two for the trolley of transport pipeline.
Fig. 3 is the structural schematic diagram of the utility model embodiment one and the medium and small Chinese herbaceous peony portion of embodiment two.
Fig. 4 is the structural schematic diagram at trolley rear portion in the utility model embodiment one.
Fig. 5 is the structural schematic diagram at trolley rear portion in the utility model embodiment two.
Specific embodiment
Embodiment one
As shown in figure 1, figure 3 and figure 4, for the trolley of transport pipeline, including trolley front and trolley rear portion, trolley front
Including first movement mechanism 1, the first clamping device 2, the first bindiny mechanism 3, trolley rear portion includes the second mobile mechanism 4, second
Clamping device 5, the second bindiny mechanism 6.
First movement mechanism 1 includes axle and two wheels, and axle uses round steel, and two wheels are connected to axle
Both ends.
First clamping device 2 is fixedly connected on the top of first movement mechanism 1;First clamping device 2 includes two pieces opposite
The first baffle 21 of setting, first baffle 21 use steel plate;The method of two corresponding pipelines is respectively equipped on every piece of first baffle 21
First connecting hole 22 of blue disk upper flange hole site;The ring flange of pipeline one end is clamped in centre and led to by two pieces of first baffles 21
The bolt crossed across the first connecting hole 22 links together with ring flange.
First bindiny mechanism 3 is fixedly connected on one of first baffle 21, and the first bindiny mechanism 3 includes two sets
Pipe.
Second mobile mechanism 4 includes axle and two wheels, and axle uses round steel, and two wheels are connected to axle
Both ends.
Second clamping device 5 is fixedly connected on the top of the second mobile mechanism 4;Second clamping device 5 includes two pieces opposite
The second baffle 51 of setting, second baffle 51 use steel plate;The method of two corresponding pipelines is respectively equipped on every piece of second baffle 51
Second connecting hole 52 of blue disk upper flange hole site;The ring flange of the pipeline other end is clamped in centre by two piece of second connecting hole 52
And the bolt by passing through the second connecting hole 52 links together with ring flange.
Second bindiny mechanism 6 is fixedly connected on one of second baffle 51, and the second bindiny mechanism 6 includes two sets
Pipe.
The trolley for being used for transport pipeline further includes pulling rope, and pulling rope is connected on pipeline.
Trolley in the present embodiment for transport pipeline is suitble to the use when gallery transports, by the first clamping device 2, second
Clamping device 5 is connected with the ring flange of pipe ends respectively, and pulling rope is tied up on pipeline, pulls trolley fortune by pulling rope
Row.
Embodiment two
As shown in Fig. 2, Fig. 3, Fig. 5, for the trolley of transport pipeline, including trolley front and trolley rear portion, trolley front
Including first movement mechanism 1, the first clamping device 2, the first bindiny mechanism 3, trolley rear portion includes the second mobile mechanism 4, second
Clamping device 5, the second bindiny mechanism 6.
First movement mechanism 1 includes axle and two wheels, and axle uses round steel, and two wheels are connected to axle
Both ends.
First clamping device 2 is fixedly connected on the top of first movement mechanism 1;First clamping device 2 includes two pieces opposite
The first baffle 21 of setting, first baffle 21 use steel plate;The method of two corresponding pipelines is respectively equipped on every piece of first baffle 21
First connecting hole 22 of blue disk upper flange hole site;The ring flange of pipeline one end is clamped in centre and led to by two pieces of first baffles 21
The bolt crossed across the first connecting hole 22 links together with ring flange.
First bindiny mechanism 3 is fixedly connected on one of first baffle 21, and the first bindiny mechanism 3 includes two sets
Pipe.
Second mobile mechanism 4 includes two sleds, and sled is made of waste track, and two sleds interval that is parallel to each other is set
It sets.
Second clamping device 5 is fixedly connected on the top of the second mobile mechanism 4;Second clamping device 5 includes two pieces opposite
The second baffle 51 of setting, second baffle 51 use steel plate;The method of two corresponding pipelines is respectively equipped on every piece of second baffle 51
Second connecting hole 52 of blue disk upper flange hole site;The ring flange of the pipeline other end is clamped in centre by two piece of second connecting hole 52
And the bolt by passing through the second connecting hole 52 links together with ring flange.
Second bindiny mechanism 6 is fixedly connected on one of second baffle 51, and the second bindiny mechanism 6 includes two sets
Pipe.
The trolley for being used for transport pipeline further includes pulling rope, and pulling rope is connected on pipeline.
Trolley in the present embodiment for transport pipeline is suitble to the use in oblique lane transport, by the first clamping device 2, second
Clamping device 5 is connected with the ring flange of pipe ends respectively, and pulling rope is tied up on pipeline, pulls trolley fortune by pulling rope
Row.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this
Made any modifications, equivalent replacements, and improvements etc., should be included in the guarantor of the utility model within novel spirit and principle
Within the scope of shield.
Claims (10)
1. a kind of trolley for transport pipeline, it is characterised in that: including trolley front and trolley rear portion, trolley front includes the
One mobile mechanism (1), the first clamping device (2), trolley rear portion include the second mobile mechanism (4), the second clamping device (5);
The first movement mechanism (1) includes axle and two wheels, and two wheels are connected to the both ends of axle;Described
One clamping device (2) is fixedly connected on the first movement mechanism (1), and first clamping device (2) includes two pieces opposite
The first baffle (21) of setting;The ring flange of pipeline one end is clamped in centre by two pieces of first baffles (21);
Second mobile mechanism (4) uses rolling mechanism or sliding equipment;Second clamping device (5) is fixedly connected on institute
It states on the second mobile mechanism (4), second clamping device (5) includes two pieces of second baffles being oppositely arranged (51);Two piece
The ring flange of the pipeline other end is clamped in centre by two baffles (51).
2. being used for the trolley of transport pipeline as described in claim 1, it is characterised in that: set respectively on two pieces of first baffles (21)
There is the first connecting hole (22) of the ring flange upper flange hole site of corresponding pipeline, two pieces of first baffles (21) are by passing through described the
The attachment device of one connecting hole (22) and the ring flange of pipeline one end link together;It is respectively equipped on two pieces of second baffles (51)
The second connecting hole (52) of the ring flange upper flange hole site of corresponding pipeline, two pieces of second baffles (51) are by passing through described second
The attachment device of connecting hole (52) and the ring flange of the pipeline other end link together.
3. being used for the trolley of transport pipeline as claimed in claim 2, it is characterised in that: the attachment device uses bolt.
4. being used for the trolley of transport pipeline as described in claim 1, it is characterised in that: the trolley for being used for transport pipeline also wraps
The first bindiny mechanism (3), the second bindiny mechanism (6) are included, first bindiny mechanism (3) is fixedly connected on first clamping machine
On structure (2), second bindiny mechanism (6) is fixedly connected on second clamping device (5).
5. being used for the trolley of transport pipeline as claimed in claim 4, it is characterised in that: first bindiny mechanism (3), second
Bindiny mechanism (6) is all made of casing.
6. being used for the trolley of transport pipeline as described in claim 1, it is characterised in that: the trolley for being used for transport pipeline also wraps
Pulling rope is included, the pulling rope is connected on pipeline.
7. being used for the trolley of transport pipeline as described in claim 1, it is characterised in that: the vehicle of the first movement mechanism (1)
Axis uses round steel.
8. being used for the trolley of transport pipeline as described in claim 1, it is characterised in that: the first baffle (21), second gear
Plate (51) is all made of steel plate.
9. such as the described in any item trolleies for transport pipeline of claim 1-8, it is characterised in that: second mobile mechanism
It (4) include axle and two wheels, two wheels are connected to the both ends of axle.
10. such as the described in any item trolleies for transport pipeline of claim 1-8, it is characterised in that: second moving machine
Structure (4) includes two sleds, and two sleds, which are parallel to each other, is spaced setting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920025737.7U CN209336768U (en) | 2019-01-03 | 2019-01-03 | Trolley for transport pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920025737.7U CN209336768U (en) | 2019-01-03 | 2019-01-03 | Trolley for transport pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209336768U true CN209336768U (en) | 2019-09-03 |
Family
ID=67761139
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920025737.7U Active CN209336768U (en) | 2019-01-03 | 2019-01-03 | Trolley for transport pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209336768U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111675133A (en) * | 2020-07-07 | 2020-09-18 | 中国能源建设集团山西电力建设有限公司 | Pipeline lifting and pulling moving device and method in narrow space |
-
2019
- 2019-01-03 CN CN201920025737.7U patent/CN209336768U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111675133A (en) * | 2020-07-07 | 2020-09-18 | 中国能源建设集团山西电力建设有限公司 | Pipeline lifting and pulling moving device and method in narrow space |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209336768U (en) | Trolley for transport pipeline | |
CN107830243A (en) | A kind of natural gas line Construction Support device | |
CN105781590A (en) | Technology for disassembling negative rings of TBM (tunnel boring machine) arrival hole | |
CN202608816U (en) | Special tool car for pipeline transportation | |
CN203448243U (en) | Automatic oiling device for railroad sleeper bolt | |
CN205075715U (en) | Pipeline drag carriage | |
CN202348330U (en) | Anti-falling chain | |
CN210260641U (en) | Working face cable dragging device | |
CN104533471A (en) | Trackless carrier of heavy hydraulic support and trackless caging method of support | |
CN202832586U (en) | Hydraulic support dismantling device | |
CN202400104U (en) | Shuttle car linker for mine | |
CN205762959U (en) | The rearmounted dolly of seamless steel tube production perforating machine | |
CN208855633U (en) | A kind of restricted clearance pipeline conveying device | |
CN204078647U (en) | Electronic weighing type coal conveyor load-transfer device | |
CN203754347U (en) | Lifting hydraulic cart | |
CN207670432U (en) | A kind of kerbstone carrier | |
CN102079308B (en) | Curve transporting ropeway system | |
CN205762960U (en) | The trundle fast dismounting device of rearmounted dolly | |
CN206155278U (en) | Pipeline transport car based on steel wire goes up and down | |
CN2739055Y (en) | Mountain-field light-rail pipe-laying-out vehicle | |
CN205589265U (en) | Butt joint multiservice car when tuber pipe is transported | |
CN204524118U (en) | A kind of colliery metal downhand welding net working apparatus in length and breadth | |
CN208883429U (en) | A kind of city piping lane pipeline transportation trolley | |
CN208915190U (en) | A kind of transport device for construction site Secondary Transport large diameter pipeline | |
CN203833512U (en) | Remote control type automatic hoisting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |