A kind of city piping lane pipeline transportation trolley Download PDFInfo
- Publication number
- CN208883429U CN208883429U CN201821349550.4U CN201821349550U CN208883429U CN 208883429 U CN208883429 U CN 208883429U CN 201821349550 U CN201821349550 U CN 201821349550U CN 208883429 U CN208883429 U CN 208883429U
- Authority
- CN
- China
- Prior art keywords
- boom hoisting
- crossbeam
- pipeline
- piping lane
- shoulder pole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model relates to city piping lane technical field of construction more particularly to a kind of city piping lane pipeline transportation trolleies.Including gate trolley, boom hoisting support base, carrying pole type boom hoisting;The gate trolley includes gate car body and wheel, and gate car body includes crossbeam and vehicle frame, the both ends of crossbeam is fixed at the top of two vehicle frames, wheel is mounted on bottom of frame;Boom hoisting support base is fixed on crossbeam, and carrying pole type boom hoisting is fixed on boom hoisting support base;Carrying pole type boom hoisting includes shoulder pole and suspender, and suspender is fixed on shoulder pole both ends;Pipeline is hung on the suspender of carrying pole type boom hoisting and is transported, and pipeline is located at the lower section of crossbeam when transport, between two vehicle frames.The utility model structure is simple, easy to operate, solves the problems, such as that the pipeline-like goods transportation of the small spaces such as city piping lane is difficult, reduces labor intensity, improve pipeline transportation efficiency.
Description
Technical field
The utility model relates to city piping lane technical field of construction more particularly to a kind of city piping lane pipeline transportation trolleies.
Background technique
City piping lane is the comprehensive corridor of underground urban duct.A tunnel space is built in Urban Underground, by electric power, is led to
Letter, the various utilities pipelines such as combustion gas, heat supply, plumbing are integrated in one, and are equipped with special access hole, hoisting port and monitoring system,
Implement unified planning, Uniting, unified construction and management, is the important infrastructure and " lifeline " for ensureing city operations.
City piping lane can save a large amount of maintenance cost, therefore application now is also more and more extensive, but in the piping lane of city
When Pipe installing or replacement, due to narrow space in piping lane, Large-scale Hoisting is not available with transporting equipment, Gu pipeline transportation is tired
It is difficult.Pipeline generallys use the carrying of the means of transports such as trolley, gun carriage at present, but piping lane narrow space, can not evolutionary operation face, pipe
Entrucking and more difficulty of unloading when road transports.
Utility model content
For overcome the deficiencies in the prior art, the utility model provides a kind of city piping lane pipeline transportation trolley.Structure letter
It is single, it is easy to operate, it solves the problems, such as that the pipeline-like goods transportation of the small spaces such as city piping lane is difficult, reduces labor intensity, improve
Pipeline transportation efficiency.
In order to achieve the above object, the utility model is implemented with the following technical solutions:
A kind of city piping lane pipeline transportation trolley, including gate trolley, boom hoisting support base, carrying pole type boom hoisting;
The gate trolley includes gate car body and wheel, and gate car body includes crossbeam and vehicle frame, is fixed in crossbeam at the top of two vehicle frames
Both ends, wheel is mounted on bottom of frame;Boom hoisting support base is fixed on crossbeam, and carrying pole type boom hoisting is fixed on lifting
On device support base;Carrying pole type boom hoisting includes shoulder pole and suspender, and suspender is fixed on shoulder pole both ends;Pipeline is hung in carrying pole type and rises
It is transported on the suspender of device for hoisting, pipeline is located at the lower section of crossbeam when transport, between two vehicle frames.
Without crossbeam between two wheels of the gate trolley, crossbeam is located above wheel;Gate vehicle-width is less than city
Piping lane width, the distance between two vehicle frames are greater than pipe diameter, and the length of shoulder pole is greater than the length of pipeline to be replaced.
The suspender includes lifting lug, snap ring, wirerope and steel plate lifting suspension clamp, and lifting lug is fixed on shoulder pole both ends, snap ring peace
On lifting lug, wirerope one end is connected with snap ring, and the other end is connected with steel plate lifting suspension clamp.
The shoulder pole is cylinder, and boom hoisting support base includes pedestal and fixed plate, and pedestal is equipped with and is adapted to shoulder pole
Arc groove, shoulder pole is placed on pedestal, fixed by fixed plate and bolt.
Compared with prior art, the utility model has the beneficial effects that
(1) structure is simple, economic and practical.
(2) easy to operate, improve city piping lane pipeline transportation efficiency.
(3) without crossbeam between two wheels of gate trolley, crossbeam is located above wheel, and gate vehicle-width is managed less than city
Corridor width, pipeline is located at the lower section of crossbeam when transport, between two vehicle frames;Pipeline suitable for small spaces such as city piping lanes is transported
It is defeated.
(4) pipeline is hung on carrying pole type boom hoisting and is transported, and using lever principle, omits pipeline entrucking and ring of unloading
Section reduces pipeline transportation operation labor intensity, improves pipeline transportation efficiency.
(5) shoulder pole is bolted on boom hoisting support base, can replace the flat of different length according to duct length
Load, applied widely, shoulder pole is reusable, energy conservation and environmental protection.
Detailed description of the invention
Fig. 1 is the utility model structural representation front view;
Fig. 2 is the utility model structural representation side view;
Fig. 3 is state main view before the utility model lifts by crane;
Fig. 4 is that the utility model lifts by crane one main view of state;
Fig. 5 is that the utility model lifts by crane two main view of state;
Fig. 6 is the utility model travel position main view.
In figure: 1- crossbeam 2- vehicle frame 3- wheel 4- shoulder pole 5- lifting lug 6- snap ring 7- wirerope 8- steel plate hoisting hook
Press from both sides 9- pedestal 10- fixed plate 11- pipeline.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing:
As shown in Figure 1 and Figure 2, a kind of city piping lane pipeline transportation trolley, including gate trolley, boom hoisting support base, it is flat
Load formula boom hoisting.
Gate trolley includes gate car body and wheel 3, and gate car body is welded by crossbeam 1 and vehicle frame 2, and vehicle frame 2 is type
The rectangular frame structure that material is welded, crossbeam 1 are welded between two vehicle frames 2, are located at two vehicle frames, 2 top.Wheel 3 is set
There is shaft, shaft is mounted on 2 bottom of vehicle frame by bearing and bearing block, and the bottom of two vehicle frames 2 is respectively mounted a wheel 3.
Boom hoisting support base includes pedestal 9 and fixed plate 10.Pedestal 9 is welded on 1 top of crossbeam.Carrying pole type boom hoisting
Including shoulder pole 4 and suspender.Shoulder pole 4 is cylindrical structure, and pedestal 9 is equipped with the arc groove being adapted to shoulder pole 4, and shoulder pole 4 is placed
In the arc groove of pedestal 9, shoulder pole 4 is fixed on pedestal 9 by fixed plate 10 and bolt.
Connectionless crossbeam between two wheels 3 of gate trolley, crossbeam 1 are located at 3 top of wheel.Gate vehicle-width is less than
City piping lane width, the distance between two vehicle frames 2 are greater than 11 diameter of pipeline, and the length of shoulder pole 4 is greater than pipeline 11 to be replaced
Length.
Suspender includes lifting lug 5, snap ring 6, wirerope 7 and steel plate lifting suspension clamp 8, and lifting lug 5 is fixed on 4 both ends of shoulder pole, snap ring 6
It is mounted on lifting lug 5,7 one end of wirerope is connected with snap ring 6, and the other end is connected with steel plate lifting suspension clamp 8.
The course of work of the utility model is as follows:
Step 1: as shown in Figure 2 and Figure 3, push gate trolley as pipeline to be transported 11 at, make pipeline to be transported 11
Between two wheels 3, pushes gate trolley to 11 middle part of pipeline, suspender is made to be located at 11 both ends of pipeline to be transported.
Step 2: making shoulder pole 4 and vehicle frame 2 around the shaft axis of wheel 3 as shown in figure 4, firmly press the head of shoulder pole 4
Line rotation, the tube wall of pipeline 11 is clamped with the steel plate lifting suspension clamp 8 on 4 head of shoulder pole.
Step 3: as shown in figure 5, the tail portion for pushing shoulder pole 4 of exerting oneself, makes shoulder pole 4 and vehicle frame 2 around the shaft axis of wheel 3
Line rotation, the tube wall of 11 other end of pipeline is clamped with the steel plate lifting suspension clamp 8 with 4 tail portion of shoulder pole.
Step 4: the pipeline 11 for hanging head-tail is horizontal as shown in fig. 6, firmly pushing the head of shoulder pole 4, hang in this way
Pipeline 11 on shoulder pole 4 is detached from ground.
Step 5: pushing trolley, pipeline 11 is transported to designated position.
Step 6: firmly pressing the head of shoulder pole 4, rotate shoulder pole 4 and vehicle frame 2 around the shaft axis of wheel 3, it will be flat
The steel plate lifting suspension clamp 8 for carrying on a shoulder pole 4 heads unclamps, and the head of pipeline 11 is placed into ground, by the steel plate lifting suspension clamp of 4 tail portion of shoulder pole
8 unclamp, and the tail portion of pipeline 11 is placed into ground.
The utility model structure is simple, economical and practical.It is easy to operate, improve city piping lane pipeline transportation efficiency.Gate is small
Without crossbeam between two wheels 3 of vehicle, crossbeam is located at the top of wheel 3, and gate vehicle-width is less than city piping lane width, and when transport manages
Road 11 is located at the lower section of crossbeam 1, between two vehicle frames 2;Pipeline transportation suitable for small spaces such as city piping lanes.Pipeline 11 is hung
It is transported on carrying pole type boom hoisting, using lever principle, omits pipeline entrucking and link of unloading, reduce pipeline transportation and make
Industry labor intensity improves pipeline transportation efficiency.Shoulder pole 4 is bolted on boom hoisting support base, can be long according to pipeline
The shoulder pole 4 of degree replacement different length, applied widely, shoulder pole 4 is reusable, energy conservation and environmental protection.
Above embodiments are implemented under premised on technical solutions of the utility model, give detailed embodiment
With specific operating process, but the protection scope of the utility model is not limited to the above embodiments.Side used in above-described embodiment
Method is conventional method unless otherwise instructed.
Claims (4)
1. a kind of city piping lane pipeline transportation trolley, it is characterised in that: including gate trolley, boom hoisting support base, carrying pole type
Boom hoisting;The gate trolley includes gate car body and wheel, and gate car body includes crossbeam and vehicle frame, and two vehicle frames tops are solid
It connects at the both ends of crossbeam, wheel is mounted on bottom of frame;Boom hoisting support base is fixed on crossbeam, and carrying pole type boom hoisting is solid
It is scheduled on boom hoisting support base;Carrying pole type boom hoisting includes shoulder pole and suspender, and suspender is fixed on shoulder pole both ends;Pipeline is hung in
It is transported on the suspender of carrying pole type boom hoisting, pipeline is located at the lower section of crossbeam when transport, between two vehicle frames.
2. a kind of city piping lane pipeline transportation trolley according to claim 1, it is characterised in that: two wheels of the gate trolley it
Between without crossbeam, crossbeam is located above wheel;Gate vehicle-width is less than city piping lane width, and the distance between two vehicle frames are greater than
Pipe diameter, the length of shoulder pole are greater than the length of pipeline to be replaced.
3. a kind of city piping lane pipeline transportation trolley according to claim 1, it is characterised in that: the suspender include lifting lug, snap ring,
Wirerope and steel plate lifting suspension clamp, lifting lug are fixed on shoulder pole both ends, and snap ring is mounted on lifting lug, wirerope one end and snap ring phase
Even, the other end is connected with steel plate lifting suspension clamp.
4. a kind of city piping lane pipeline transportation trolley according to claim 1, it is characterised in that: the shoulder pole is cylinder, lifting
Device support base includes pedestal and fixed plate, and pedestal is equipped with the arc groove being adapted to shoulder pole, and shoulder pole is placed on pedestal, is led to
Fixed plate is crossed to fix with bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821349550.4U CN208883429U (en) | 2018-08-21 | 2018-08-21 | A kind of city piping lane pipeline transportation trolley |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821349550.4U CN208883429U (en) | 2018-08-21 | 2018-08-21 | A kind of city piping lane pipeline transportation trolley |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208883429U true CN208883429U (en) | 2019-05-21 |
Family
ID=66509440
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821349550.4U Active CN208883429U (en) | 2018-08-21 | 2018-08-21 | A kind of city piping lane pipeline transportation trolley |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208883429U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112249932A (en) * | 2020-09-18 | 2021-01-22 | 中国建筑第六工程局有限公司 | Height-adjustable's overhead hoist |
-
2018
- 2018-08-21 CN CN201821349550.4U patent/CN208883429U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112249932A (en) * | 2020-09-18 | 2021-01-22 | 中国建筑第六工程局有限公司 | Height-adjustable's overhead hoist |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205668579U (en) | A kind of Portable steel pipe mover | |
CN105384060A (en) | Lifting appliance suitable for lifting pipelines | |
CN202322177U (en) | Portable carrier for heavy electrical equipment | |
CN102363512B (en) | Portable heavy electrical equipment carrier | |
CN208883429U (en) | A kind of city piping lane pipeline transportation trolley | |
CN210566648U (en) | Installation device for directional sliding of large pipeline in limited space | |
CN208516838U (en) | Pipe installing handling device | |
CN203596541U (en) | Cable duct cover plate hoisting device | |
CN212609237U (en) | Dismounting and moving device for large valve | |
CN219565096U (en) | Single track hangs prevents swift current car arrester | |
CN203143946U (en) | Lifting device of pneumatic monorail crane | |
CN206797238U (en) | Electric pole rehandling draw-gear | |
CN103486330B (en) | Either inside high-altitude pipeline mounting construction method | |
CN108275579B (en) | Quick dismantling device for pipeline in tunnel | |
CN205745642U (en) | Large-diameter steel pipe distance passes through culvert pipe constructing device | |
CN213738242U (en) | Horizontal installation utility tool for internal parts of large tower | |
CN202201007U (en) | Hook barrel transporting vehicle | |
CN201702544U (en) | Variable-paddle bearing installing walking table of wind power generator | |
CN213171259U (en) | Multifunctional transport vehicle for aerial platform operation | |
CN210393550U (en) | Simple indoor pipeline carrying and installing trolley | |
CN203391894U (en) | Wire pole hauling device | |
CN203593016U (en) | Novel concrete pier carrying device | |
CN104773650B (en) | Tool used for overturning tire crane large beam | |
CN205170256U (en) | A there is rail loop wheel machine device for TBM tunnel construction | |