CN209308068U - A kind of underground pipe arragement construction - Google Patents

A kind of underground pipe arragement construction Download PDF

Info

Publication number
CN209308068U
CN209308068U CN201821892713.3U CN201821892713U CN209308068U CN 209308068 U CN209308068 U CN 209308068U CN 201821892713 U CN201821892713 U CN 201821892713U CN 209308068 U CN209308068 U CN 209308068U
Authority
CN
China
Prior art keywords
water
pipe
underground pipe
return
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821892713.3U
Other languages
Chinese (zh)
Inventor
黄家敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Green Building Polytron Technologies Inc
Original Assignee
Shanghai Green Building Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Green Building Polytron Technologies Inc filed Critical Shanghai Green Building Polytron Technologies Inc
Priority to CN201821892713.3U priority Critical patent/CN209308068U/en
Application granted granted Critical
Publication of CN209308068U publication Critical patent/CN209308068U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/10Geothermal energy

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a kind of underground pipe arragement constructions, comprising: the window well of underground pipe and ground library;Underground pipe is layed in the building site below building;Connection end of the underground pipe far from heat pump side runs through the window well ground of window well along the short transverse of building and is projected on window well ground.The utility model solves the problems, such as the influence to punch in the prior art by ground library side wall to retaining wall structure stress, and ground is not load-carrying members between floors, and ground, which punches, does not influence the structural strength of building.Underground pipe is just laid on the lower section of building when building does not start and builds in advance, then the ground Di Ku is formed in casting concrete, so that window well ground and underground pipe are consolidated, shape is integral, without punching, convenient for construction, it is easily achieved and is not increased the construction process of building, shortens the duration of building.

Description

A kind of underground pipe arragement construction
Technical field
The utility model relates to underground pipe mounting technique field, espespecially a kind of underground pipe arragement construction.
Background technique
With the propulsion of green building state basic policy, more and more buildings use this kind of reproducible cleaning energy of earth source heat pump Cooling and Heat Source of the source as air-conditioning system.
The underground pipe of existing earth source heat pump mainly enters window well by wearing side wall, needs to have many holes, a meeting on retaining wall The load-bearing capacity of retaining wall is influenced, especially for multilayer the building in library, the influence that side wall punches to retaining wall structure stress It is very big.Moreover, when peripheral supporting and window well side wall closer apart, underground pipe, which enters window well from side wall, very difficult to be applied Work.Therefore, the underground pipe for how providing a kind of with being applicable in ground library especially multilayer building in library enters window well but does not influence to keep off Earth wall construction and be easy to construct technology be those skilled in the art's problem urgently to be resolved.
Summary of the invention
The purpose of the utility model is to provide a kind of underground pipe arragement construction, solve in the prior art because ground library side wall is opened Influence problem of the hole to retaining wall structure stress, and ground is not load-carrying members between floors, ground, which punches, not to be influenced to build Build the structural strength of object;More preferably, underground pipe is just laid on the lower section of building when building does not start and builds in advance, then When casting concrete forms the ground Di Ku, cast-in-place concrete surrounds underground pipe, will realize underground pipe after waiting concrete settings Fixation so that window well ground and underground pipe are consolidated, shape is integral, without punching, convenient for construction, is easy to real Construction process that is existing and not increasing building, shortens the duration of building.
The technical scheme that the utility model is provided is as follows:
A kind of underground pipe arragement construction, comprising:
The window well of underground pipe and ground library;
The underground pipe is layed in the building site below building;
The window well is run through along the short transverse of the building in connection end of the underground pipe far from heat pump side Window well ground is simultaneously projected on window well ground.
In the technical program, underground pipe is introduced into window well from the ground in ground library, to solve in the prior art because of ground library Side wall punches the influence problem to retaining wall structure stress, and ground is not load-carrying members between floors, and ground punches not Influence the structural strength of building;More preferably, under underground pipe is just laid on building when building does not start and builds in advance Side, then when casting concrete forms the ground Di Ku, cast-in-place concrete surrounds underground pipe, will realize after waiting concrete settings The fixation of underground pipe, so that window well ground and underground pipe are consolidated, shape is integral, without punching, convenient for construction, It is easily achieved and is not increased the construction process of building, shortens the duration of building.
It is further preferred that further including protection sleeve pipe, the protection sleeve pipe is sheathed on the outside of the connection end;It is described Protection sleeve pipe runs through window well ground, is equipped with the steel plate for sealing water of radial extension the lateral wall week of the protection sleeve pipe, described to stop Water steel plate is embedded in window well ground.
In the technical program, underground pipe is protected by protection sleeve pipe, avoids pouring ground Cush work in the process to underground pipe It destroys, such as the installation and removal of concrete blinding, the ground Di Ku (including window well ground) concrete is right during flowing or smoothing Its impact etc., ensure that the completeness and efficiency of underground pipe.More preferably, the setting of steel plate for sealing water can effectively avoid underground infiltration The rising of water or structure condensed water and enter on ground library (or window well) ground, cause ground library moist or even ponding, influence interior Environment, germ easy to breed influence the service life of building.
It is further preferred that further including seal ring, the both ends of the connection end are arranged with the seal ring respectively, described Seal ring is embedded in window well ground.
In the technical program, the setting of seal ring effectively prevents the rising of seepage in underground or structure condensed water and enters ground On library (or window well) ground, causes ground library moist or even ponding, influence indoor environment, germ easy to breed influences building Service life.
It is further preferred that the underground pipe includes water supply underground pipe and return water underground pipe;The water supply underground pipe and machine It is successively arranged water segregator and water supplying pipe along water (flow) direction between room, the water supplying pipe is equipped with the first valve;The return water ground line It is successively arranged return pipe and water collector along water (flow) direction between the computer room, the return pipe is equipped with the second valve and balance Valve.
In the technical program, the computer room in window well and ground library can pour completion in Di Ku or even building builds up it After built, harmony is good, it is easy to accomplish and construction;More preferably, supplied water by valve and balanced valve and challenge heat pump and The regulation of return water, strong operability are easy-to-use effective.
It is further preferred that the water supplying pipe and the return pipe are equipped with exhaust valve.
In the technical program, the air bubble that exhaust valve can in time in discharge line reduces fluid resistance, and avoid water Power loss brings good user experience for the resident of building.
It is further preferred that the balanced valve is set between two second valves.
It is further preferred that the water supplying pipe include along short transverse arrangement multiple perpendicular water supplying pipes, horizontal water main and Water supply branch pipe;One end of multiple perpendicular water supplying pipes is connect with the water segregator, the other end of multiple perpendicular water supplying pipes and institute State horizontal water main's connection;The horizontal water main connect with multiple water supply branch pipes, multiple water supply branch pipes with it is described Computer room connection.
It is further preferred that each described perpendicular water supplying pipe is equipped with first valve.
It is further preferred that the return pipe include along short transverse arrangement multiple perpendicular return pipes, horizontal return main and Return branch;One end of multiple perpendicular return pipes is connect with the water segregator, the other end of multiple perpendicular return pipes and institute State horizontal return main's connection;The horizontal return main connect with multiple return branch, multiple return branch with it is described Computer room connection.
It is further preferred that each described perpendicular return pipe and each described return branch are equipped with one second valve.
A kind of underground pipe arragement construction provided by the utility model, can bring it is following at least one the utility model has the advantages that
1, in the utility model, underground pipe is introduced into window well from the ground in ground library, to solve in the prior art because of ground Library side wall punches the influence problem to retaining wall structure stress, and ground is not load-carrying members between floors, and ground punches The structural strength of building is not influenced;More preferably, underground pipe is just laid on building when building does not start and builds in advance Lower section, then when casting concrete forms the ground Di Ku, cast-in-place concrete surrounds underground pipe, and waiting will be real after concrete settings The fixation of existing underground pipe, so that window well ground and underground pipe are consolidated, shape is integral, without punching, convenient for applying Work, it is easy to accomplish and do not increase the construction process of building, shorten the duration of building.
2, in the utility model, underground pipe is protected by protection sleeve pipe, avoids pouring ground Cush work in the process to underground pipe Destruction, such as the installation and removal of concrete blinding, during the ground Di Ku (including window well ground) concrete is flowed or is smoothed Impact etc. to it, ensure that the completeness and efficiency of underground pipe.More preferably, the setting of steel plate for sealing water can effectively avoid underground Infiltration or the rising of structure condensed water and enter on ground library (or window well) ground, cause ground library moist or even ponding, influence interior Environment, germ easy to breed influence the service life of building.
3, in the utility model, the computer room in window well and ground library can pour completion in Di Ku or even building is built up It is built later, harmony is good, it is easy to accomplish and construction;More preferably, it is supplied water by valve and balanced valve and challenge heat pump With the regulation of return water, strong operability, it is easy-to-use effectively.Exhaust valve can in time in discharge line air bubble, reduce stream Body resistance, and hydraulic loss is avoided, good user experience is brought for the resident of building.
Detailed description of the invention
Below by clearly understandable mode, preferred embodiment is described with reference to the drawings, to the upper of underground pipe arragement construction Characteristic, technical characteristic, advantage and its implementation is stated to be further described.
Fig. 1 is a kind of example structure schematic diagram of the underground pipe arragement construction of the utility model.
Drawing reference numeral explanation:
11. water supply underground pipe, 12. return water underground pipes, 13. water segregators, 141. perpendicular water supplying pipes, 142. horizontal water mains, 144. first valves, 15. water collectors, 151. perpendicular return pipes, 152. horizontal return mains, 153. return branch, 154. second valves, 155. balanced valves, 16. exhaust valves, 17. steel-plastic joints, 21. ground wells, 22. grooves, 23. backfills are husky, 31. protection sleeve pipes, and 311. Steel plate for sealing water, 32. seal rings, 42. ground libraries, 411. window wells, 4111. window well ground, 412. computer rooms.
Specific embodiment
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, attached drawing will be compareed below Illustrate specific embodiment of the present utility model.It should be evident that the accompanying drawings in the following description is only the one of the utility model A little embodiments for those of ordinary skill in the art without creative efforts, can also be according to these Attached drawing obtains other attached drawings, and obtains other embodiments.
To make simplified form, part relevant to the utility model is only schematically shown in each figure, they are simultaneously Its practical structures as product is not represented.In addition, so that simplified form is easy to understand, have in some figures identical structure or The component of function, only symbolically depicts one of those, or has only marked one of those.Herein, "one" is not It only indicates " only this ", can also indicate the situation of " more than one ".Herein, it should be noted that unless otherwise bright True regulation and restriction, term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, it can also To be to be detachably connected, or be integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also Indirectly connected through an intermediary, can be the connection inside two elements.For the ordinary skill in the art, The concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
In example 1, as shown in Figure 1, a kind of underground pipe arragement construction, comprising: the window well of underground pipe and ground library 42 411;Underground pipe is layed in the building site below building;Height of connection end of the underground pipe far from heat pump side along building Degree direction runs through the window well ground 4111 of window well 411 and is projected on window well ground 4111.In practical applications, buried in arrangement Before pipe, for the ease of the construction of building, reduce because underground pipe there are due to make troubles to the construction of building, can be in building It builds object land used and carries out the excavation of groove 22 and ground well 21, to realize the installation of underground line, groove 22 and ground well 21 are convenient for buried The arrangement and installation of line, after underground line arranges, groove 22 is preferably filled with backfill sand 23, after carry out the construction of building again. In practical applications, courtyard is 150 meters along the height of short transverse.
In example 2, as shown in Figure 1, further including protection sleeve pipe 31, protection sleeve pipe 31 on the basis of example 1 It is sheathed on the outside of connection end;Protection sleeve pipe 31 runs through window well ground 4111, the lateral wall week of protection sleeve pipe 31 is equipped with radial The steel plate for sealing water 311 of extension, steel plate for sealing water 311 are embedded in window well ground 4111.In practical applications, protection sleeve pipe 31 is preferred It is equipped with gap between underground pipe, to effectively avoid the transmitting of power, and then protects underground pipe.Protection sleeve pipe 31 can pass completely through The ground Di Ku (i.e. window well ground 4111), can also partially pass through the ground Di Ku.It preferably, further include seal ring 32, connection end The both ends at end are arranged with seal ring 32 respectively, and seal ring 32 is embedded in window well ground 4111.The setting of seal ring 32 effectively avoids The rising of seepage in underground or structure condensed water and enter on the ground Di Ku (or window well ground 4111), cause ground library 42 moist, Even ponding, influences indoor environment, germ easy to breed influences the service life of building.When protection sleeve pipe 31 and seal ring 32 when existing simultaneously, and seal ring 32 is preferably disposed between underground pipe and protection sleeve pipe 31, to realize underground pipe structural strength Protection, and avoid ground library 42 moisture condensation and seeping phenomenon.Certainly, in practical applications, when 31 parts of protection sleeve pipe are embedded in When window well ground 4111, then seal ring 32 can directly be contacted with the concrete for pouring window well ground 4111.
In the third embodiment, as shown in Figure 1, on the basis of embodiment one or two, underground pipe includes water supply underground pipe 11 With return water underground pipe 12;It is successively arranged water segregator 13 and water supplying pipe along water (flow) direction between water supply underground pipe 11 and computer room 412, is supplied Water pipe is equipped with the first valve 144;Return pipe and water collector are successively arranged along water (flow) direction between return water ground line and computer room 412 15, return pipe is equipped with the second valve 154 and balanced valve 155.Preferably, water supplying pipe includes along the multiple perpendicular of short transverse arrangement Water supplying pipe 141, horizontal water main 142 and water supply branch pipe;Wherein, one end of multiple perpendicular water supplying pipes 141 is connect with water segregator 13, The other end of multiple perpendicular water supplying pipes 141 is connect with horizontal water main 142, and horizontal water main 142 connect with multiple water supply branch pipes, more A water supply branch pipe is connected to computer room 412.Return pipe includes the multiple perpendicular return pipes 151 arranged along short transverse, horizontal return main 152 and return branch 153;Wherein, one end of multiple times water supplying pipes is connect with water collector 15, multiple perpendicular return pipes 151 it is another End is connect with horizontal return main 152, and horizontal return main 152 connect with multiple return branch 153, multiple return branch 153 and machine Room 412 is connected to.It is further preferred that each perpendicular water supplying pipe 141 is equipped with the first valve 144, and each horizontal water main 142 Equipped with exhaust valve 16;Each perpendicular return pipe 151 and each return branch 153 are equipped with the second valve 154, and two second Balanced valve 155 is equipped between valve 154, each horizontal return main 152 is equipped with exhaust valve 16.In practical applications, can pass through First valve 144 and the second valve 154 can realize the adjusting of water supply and water return amount, and balanced valve 155 can realize water supply and The coordination of water return amount guarantees the normal operation of whole system.In practical applications, underground pipe is the construction ground for being embedded in building Face, therefore pass through steel-plastic joint 17 for the ease of the connection of water supply underground pipe 11 and water supplying pipe, water supply underground pipe 11 and water supplying pipe Connection (since underground pipe is plastics, and water supplying pipe is steel).For the ease of the connection of return water underground pipe 12 and return pipe, return water Underground pipe 12 and return pipe pass through the connection of steel-plastic joint 17 (since underground pipe is plastics, and return pipe is steel).
It should be noted that above-described embodiment can be freely combined as needed.The above is only the utility model Preferred embodiment, it is noted that for those skilled in the art, do not departing from the utility model principle Under the premise of, several improvements and modifications can also be made, these improvements and modifications also should be regarded as the protection scope of the utility model.

Claims (10)

1. a kind of underground pipe arragement construction characterized by comprising
The window well of underground pipe and ground library;
The underground pipe is layed in the building site below building;
Connection end of the underground pipe far from heat pump side runs through the window well of the window well along the short transverse of the building Ground is simultaneously projected on window well ground.
2. underground pipe arragement construction according to claim 1, which is characterized in that further include:
Protection sleeve pipe, the protection sleeve pipe are sheathed on the outside of the connection end;
The protection sleeve pipe runs through window well ground, is equipped with the water-stopping steel of radial extension the lateral wall week of the protection sleeve pipe Plate, the steel plate for sealing water are embedded in window well ground.
3. underground pipe arragement construction according to claim 1, which is characterized in that further include:
The both ends of seal ring, the connection end are arranged with the seal ring respectively, and the seal ring is with being embedded in the window well Face.
4. underground pipe arragement construction according to claim 1 to 3, it is characterised in that:
The underground pipe includes water supply underground pipe and return water underground pipe;
Water segregator and water supplying pipe are successively arranged along water (flow) direction between the water supply underground pipe and computer room, and the water supplying pipe is equipped with the One valve;
It is successively arranged return pipe and water collector along water (flow) direction between the return water ground line and the computer room, the return pipe is set There are the second valve and balanced valve.
5. underground pipe arragement construction according to claim 4, it is characterised in that:
The water supplying pipe and the return pipe are equipped with exhaust valve.
6. underground pipe arragement construction according to claim 4, it is characterised in that:
The balanced valve is set between two second valves.
7. underground pipe arragement construction according to claim 4, it is characterised in that:
The water supplying pipe includes multiple perpendicular water supplying pipes, horizontal water main and the water supply branch pipe along short transverse arrangement;
One end of multiple perpendicular water supplying pipes is connect with the water segregator, the other end of multiple perpendicular water supplying pipes and the horizontal confession Supply mains's connection;
The horizontal water main connect with multiple water supply branch pipes, and multiple water supply branch pipes are connected to computer room.
8. underground pipe arragement construction according to claim 7, it is characterised in that:
Each described perpendicular water supplying pipe is equipped with first valve.
9. underground pipe arragement construction according to claim 4, it is characterised in that:
The return pipe includes multiple perpendicular return pipes, horizontal return main and the return branch along short transverse arrangement;
One end of multiple perpendicular return pipes is connect with the water segregator, the other end of multiple perpendicular return pipes with described horizontal time Supply mains's connection;
The horizontal return main connect with multiple return branch, and multiple return branch are connected to computer room.
10. underground pipe arragement construction according to claim 9, it is characterised in that:
Each described perpendicular return pipe and each described return branch are equipped with one second valve.
CN201821892713.3U 2018-11-16 2018-11-16 A kind of underground pipe arragement construction Active CN209308068U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821892713.3U CN209308068U (en) 2018-11-16 2018-11-16 A kind of underground pipe arragement construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821892713.3U CN209308068U (en) 2018-11-16 2018-11-16 A kind of underground pipe arragement construction

Publications (1)

Publication Number Publication Date
CN209308068U true CN209308068U (en) 2019-08-27

Family

ID=67673373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821892713.3U Active CN209308068U (en) 2018-11-16 2018-11-16 A kind of underground pipe arragement construction

Country Status (1)

Country Link
CN (1) CN209308068U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440815A (en) * 2018-11-16 2019-03-08 上海朗绿建筑科技股份有限公司 A kind of underground pipe method for arranging and structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440815A (en) * 2018-11-16 2019-03-08 上海朗绿建筑科技股份有限公司 A kind of underground pipe method for arranging and structure

Similar Documents

Publication Publication Date Title
CN102777189B (en) A kind of ultra-long tube curtain non-relay jacking construction device and method
CN208363127U (en) A kind of retaining wall structure of combined type high-speed rail platform
CN110185844A (en) Shallow earthing pipe-jacking with large diameter construction method
CN102535519A (en) I-shaped steel joint structure for underground continuous wall and construction method for I-shaped steel joint structure
CN210164243U (en) Wall bushing structure
CN107460882A (en) A kind of retaining piles construction method of deep basal pit closing sealing
CN106704708B (en) The supporting structure and its construction method of heat distribution pipeline in pipe gallery
CN103437779B (en) The construction method of regulation tunnel lining pore gas flow
CN207739289U (en) A kind of underground continuous wall water-stop connector
CN209308068U (en) A kind of underground pipe arragement construction
CN206189454U (en) Piping lane
CN207553133U (en) A kind of underground pipe gallery structure
CN109440815A (en) A kind of underground pipe method for arranging and structure
CN208136954U (en) Precast splice type Pipe rack
CN106351235A (en) Assembled type four-combined-round-steel-pipe concrete inner support structure and manufacturing method
CN110593918A (en) Freezing method based tunnel connection channel pump house construction method
CN204199324U (en) Connecting reinforcement cage i iron in construction of diaphragm wall
CN216405651U (en) Prefabricated assembled concrete drainage inspection shaft structure
CN105697932A (en) Water feed pipe construction structure capable of preventing flexible cast-iron drain pipe from leaking and water feed pipe construction technology
CN205875472U (en) A concrete inside casing partition wall installation node for steel frame
CN209622218U (en) Double spigot mouth RC pipejacking
CN211623450U (en) Construction structure for treating water seepage of tunnel
CN212318012U (en) Lining structure for tunnel and tunnel
CN110195599B (en) Rigid anti-deflection rectangular jacking pipe connecting system and method thereof
CN106351234A (en) Assembled type three-combined-round-steel-pipe concrete inner support structure and manufacturing method