CN209308068U - A kind of underground pipe arragement construction - Google Patents
A kind of underground pipe arragement construction Download PDFInfo
- Publication number
- CN209308068U CN209308068U CN201821892713.3U CN201821892713U CN209308068U CN 209308068 U CN209308068 U CN 209308068U CN 201821892713 U CN201821892713 U CN 201821892713U CN 209308068 U CN209308068 U CN 209308068U
- Authority
- CN
- China
- Prior art keywords
- water
- pipe
- underground pipe
- return
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/10—Geothermal energy
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model discloses a kind of underground pipe arragement constructions, comprising: the window well of underground pipe and ground library;Underground pipe is layed in the building site below building;Connection end of the underground pipe far from heat pump side runs through the window well ground of window well along the short transverse of building and is projected on window well ground.The utility model solves the problems, such as the influence to punch in the prior art by ground library side wall to retaining wall structure stress, and ground is not load-carrying members between floors, and ground, which punches, does not influence the structural strength of building.Underground pipe is just laid on the lower section of building when building does not start and builds in advance, then the ground Di Ku is formed in casting concrete, so that window well ground and underground pipe are consolidated, shape is integral, without punching, convenient for construction, it is easily achieved and is not increased the construction process of building, shortens the duration of building.
Description
Technical field
The utility model relates to underground pipe mounting technique field, espespecially a kind of underground pipe arragement construction.
Background technique
With the propulsion of green building state basic policy, more and more buildings use this kind of reproducible cleaning energy of earth source heat pump
Cooling and Heat Source of the source as air-conditioning system.
The underground pipe of existing earth source heat pump mainly enters window well by wearing side wall, needs to have many holes, a meeting on retaining wall
The load-bearing capacity of retaining wall is influenced, especially for multilayer the building in library, the influence that side wall punches to retaining wall structure stress
It is very big.Moreover, when peripheral supporting and window well side wall closer apart, underground pipe, which enters window well from side wall, very difficult to be applied
Work.Therefore, the underground pipe for how providing a kind of with being applicable in ground library especially multilayer building in library enters window well but does not influence to keep off
Earth wall construction and be easy to construct technology be those skilled in the art's problem urgently to be resolved.
Summary of the invention
The purpose of the utility model is to provide a kind of underground pipe arragement construction, solve in the prior art because ground library side wall is opened
Influence problem of the hole to retaining wall structure stress, and ground is not load-carrying members between floors, ground, which punches, not to be influenced to build
Build the structural strength of object;More preferably, underground pipe is just laid on the lower section of building when building does not start and builds in advance, then
When casting concrete forms the ground Di Ku, cast-in-place concrete surrounds underground pipe, will realize underground pipe after waiting concrete settings
Fixation so that window well ground and underground pipe are consolidated, shape is integral, without punching, convenient for construction, is easy to real
Construction process that is existing and not increasing building, shortens the duration of building.
The technical scheme that the utility model is provided is as follows:
A kind of underground pipe arragement construction, comprising:
The window well of underground pipe and ground library;
The underground pipe is layed in the building site below building;
The window well is run through along the short transverse of the building in connection end of the underground pipe far from heat pump side
Window well ground is simultaneously projected on window well ground.
In the technical program, underground pipe is introduced into window well from the ground in ground library, to solve in the prior art because of ground library
Side wall punches the influence problem to retaining wall structure stress, and ground is not load-carrying members between floors, and ground punches not
Influence the structural strength of building;More preferably, under underground pipe is just laid on building when building does not start and builds in advance
Side, then when casting concrete forms the ground Di Ku, cast-in-place concrete surrounds underground pipe, will realize after waiting concrete settings
The fixation of underground pipe, so that window well ground and underground pipe are consolidated, shape is integral, without punching, convenient for construction,
It is easily achieved and is not increased the construction process of building, shortens the duration of building.
It is further preferred that further including protection sleeve pipe, the protection sleeve pipe is sheathed on the outside of the connection end;It is described
Protection sleeve pipe runs through window well ground, is equipped with the steel plate for sealing water of radial extension the lateral wall week of the protection sleeve pipe, described to stop
Water steel plate is embedded in window well ground.
In the technical program, underground pipe is protected by protection sleeve pipe, avoids pouring ground Cush work in the process to underground pipe
It destroys, such as the installation and removal of concrete blinding, the ground Di Ku (including window well ground) concrete is right during flowing or smoothing
Its impact etc., ensure that the completeness and efficiency of underground pipe.More preferably, the setting of steel plate for sealing water can effectively avoid underground infiltration
The rising of water or structure condensed water and enter on ground library (or window well) ground, cause ground library moist or even ponding, influence interior
Environment, germ easy to breed influence the service life of building.
It is further preferred that further including seal ring, the both ends of the connection end are arranged with the seal ring respectively, described
Seal ring is embedded in window well ground.
In the technical program, the setting of seal ring effectively prevents the rising of seepage in underground or structure condensed water and enters ground
On library (or window well) ground, causes ground library moist or even ponding, influence indoor environment, germ easy to breed influences building
Service life.
It is further preferred that the underground pipe includes water supply underground pipe and return water underground pipe;The water supply underground pipe and machine
It is successively arranged water segregator and water supplying pipe along water (flow) direction between room, the water supplying pipe is equipped with the first valve;The return water ground line
It is successively arranged return pipe and water collector along water (flow) direction between the computer room, the return pipe is equipped with the second valve and balance
Valve.
In the technical program, the computer room in window well and ground library can pour completion in Di Ku or even building builds up it
After built, harmony is good, it is easy to accomplish and construction;More preferably, supplied water by valve and balanced valve and challenge heat pump and
The regulation of return water, strong operability are easy-to-use effective.
It is further preferred that the water supplying pipe and the return pipe are equipped with exhaust valve.
In the technical program, the air bubble that exhaust valve can in time in discharge line reduces fluid resistance, and avoid water
Power loss brings good user experience for the resident of building.
It is further preferred that the balanced valve is set between two second valves.
It is further preferred that the water supplying pipe include along short transverse arrangement multiple perpendicular water supplying pipes, horizontal water main and
Water supply branch pipe;One end of multiple perpendicular water supplying pipes is connect with the water segregator, the other end of multiple perpendicular water supplying pipes and institute
State horizontal water main's connection;The horizontal water main connect with multiple water supply branch pipes, multiple water supply branch pipes with it is described
Computer room connection.
It is further preferred that each described perpendicular water supplying pipe is equipped with first valve.
It is further preferred that the return pipe include along short transverse arrangement multiple perpendicular return pipes, horizontal return main and
Return branch;One end of multiple perpendicular return pipes is connect with the water segregator, the other end of multiple perpendicular return pipes and institute
State horizontal return main's connection;The horizontal return main connect with multiple return branch, multiple return branch with it is described
Computer room connection.
It is further preferred that each described perpendicular return pipe and each described return branch are equipped with one second valve.
A kind of underground pipe arragement construction provided by the utility model, can bring it is following at least one the utility model has the advantages that
1, in the utility model, underground pipe is introduced into window well from the ground in ground library, to solve in the prior art because of ground
Library side wall punches the influence problem to retaining wall structure stress, and ground is not load-carrying members between floors, and ground punches
The structural strength of building is not influenced;More preferably, underground pipe is just laid on building when building does not start and builds in advance
Lower section, then when casting concrete forms the ground Di Ku, cast-in-place concrete surrounds underground pipe, and waiting will be real after concrete settings
The fixation of existing underground pipe, so that window well ground and underground pipe are consolidated, shape is integral, without punching, convenient for applying
Work, it is easy to accomplish and do not increase the construction process of building, shorten the duration of building.
2, in the utility model, underground pipe is protected by protection sleeve pipe, avoids pouring ground Cush work in the process to underground pipe
Destruction, such as the installation and removal of concrete blinding, during the ground Di Ku (including window well ground) concrete is flowed or is smoothed
Impact etc. to it, ensure that the completeness and efficiency of underground pipe.More preferably, the setting of steel plate for sealing water can effectively avoid underground
Infiltration or the rising of structure condensed water and enter on ground library (or window well) ground, cause ground library moist or even ponding, influence interior
Environment, germ easy to breed influence the service life of building.
3, in the utility model, the computer room in window well and ground library can pour completion in Di Ku or even building is built up
It is built later, harmony is good, it is easy to accomplish and construction;More preferably, it is supplied water by valve and balanced valve and challenge heat pump
With the regulation of return water, strong operability, it is easy-to-use effectively.Exhaust valve can in time in discharge line air bubble, reduce stream
Body resistance, and hydraulic loss is avoided, good user experience is brought for the resident of building.
Detailed description of the invention
Below by clearly understandable mode, preferred embodiment is described with reference to the drawings, to the upper of underground pipe arragement construction
Characteristic, technical characteristic, advantage and its implementation is stated to be further described.
Fig. 1 is a kind of example structure schematic diagram of the underground pipe arragement construction of the utility model.
Drawing reference numeral explanation:
11. water supply underground pipe, 12. return water underground pipes, 13. water segregators, 141. perpendicular water supplying pipes, 142. horizontal water mains,
144. first valves, 15. water collectors, 151. perpendicular return pipes, 152. horizontal return mains, 153. return branch, 154. second valves,
155. balanced valves, 16. exhaust valves, 17. steel-plastic joints, 21. ground wells, 22. grooves, 23. backfills are husky, 31. protection sleeve pipes, and 311.
Steel plate for sealing water, 32. seal rings, 42. ground libraries, 411. window wells, 4111. window well ground, 412. computer rooms.
Specific embodiment
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, attached drawing will be compareed below
Illustrate specific embodiment of the present utility model.It should be evident that the accompanying drawings in the following description is only the one of the utility model
A little embodiments for those of ordinary skill in the art without creative efforts, can also be according to these
Attached drawing obtains other attached drawings, and obtains other embodiments.
To make simplified form, part relevant to the utility model is only schematically shown in each figure, they are simultaneously
Its practical structures as product is not represented.In addition, so that simplified form is easy to understand, have in some figures identical structure or
The component of function, only symbolically depicts one of those, or has only marked one of those.Herein, "one" is not
It only indicates " only this ", can also indicate the situation of " more than one ".Herein, it should be noted that unless otherwise bright
True regulation and restriction, term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, it can also
To be to be detachably connected, or be integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also
Indirectly connected through an intermediary, can be the connection inside two elements.For the ordinary skill in the art,
The concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
In example 1, as shown in Figure 1, a kind of underground pipe arragement construction, comprising: the window well of underground pipe and ground library 42
411;Underground pipe is layed in the building site below building;Height of connection end of the underground pipe far from heat pump side along building
Degree direction runs through the window well ground 4111 of window well 411 and is projected on window well ground 4111.In practical applications, buried in arrangement
Before pipe, for the ease of the construction of building, reduce because underground pipe there are due to make troubles to the construction of building, can be in building
It builds object land used and carries out the excavation of groove 22 and ground well 21, to realize the installation of underground line, groove 22 and ground well 21 are convenient for buried
The arrangement and installation of line, after underground line arranges, groove 22 is preferably filled with backfill sand 23, after carry out the construction of building again.
In practical applications, courtyard is 150 meters along the height of short transverse.
In example 2, as shown in Figure 1, further including protection sleeve pipe 31, protection sleeve pipe 31 on the basis of example 1
It is sheathed on the outside of connection end;Protection sleeve pipe 31 runs through window well ground 4111, the lateral wall week of protection sleeve pipe 31 is equipped with radial
The steel plate for sealing water 311 of extension, steel plate for sealing water 311 are embedded in window well ground 4111.In practical applications, protection sleeve pipe 31 is preferred
It is equipped with gap between underground pipe, to effectively avoid the transmitting of power, and then protects underground pipe.Protection sleeve pipe 31 can pass completely through
The ground Di Ku (i.e. window well ground 4111), can also partially pass through the ground Di Ku.It preferably, further include seal ring 32, connection end
The both ends at end are arranged with seal ring 32 respectively, and seal ring 32 is embedded in window well ground 4111.The setting of seal ring 32 effectively avoids
The rising of seepage in underground or structure condensed water and enter on the ground Di Ku (or window well ground 4111), cause ground library 42 moist,
Even ponding, influences indoor environment, germ easy to breed influences the service life of building.When protection sleeve pipe 31 and seal ring
32 when existing simultaneously, and seal ring 32 is preferably disposed between underground pipe and protection sleeve pipe 31, to realize underground pipe structural strength
Protection, and avoid ground library 42 moisture condensation and seeping phenomenon.Certainly, in practical applications, when 31 parts of protection sleeve pipe are embedded in
When window well ground 4111, then seal ring 32 can directly be contacted with the concrete for pouring window well ground 4111.
In the third embodiment, as shown in Figure 1, on the basis of embodiment one or two, underground pipe includes water supply underground pipe 11
With return water underground pipe 12;It is successively arranged water segregator 13 and water supplying pipe along water (flow) direction between water supply underground pipe 11 and computer room 412, is supplied
Water pipe is equipped with the first valve 144;Return pipe and water collector are successively arranged along water (flow) direction between return water ground line and computer room 412
15, return pipe is equipped with the second valve 154 and balanced valve 155.Preferably, water supplying pipe includes along the multiple perpendicular of short transverse arrangement
Water supplying pipe 141, horizontal water main 142 and water supply branch pipe;Wherein, one end of multiple perpendicular water supplying pipes 141 is connect with water segregator 13,
The other end of multiple perpendicular water supplying pipes 141 is connect with horizontal water main 142, and horizontal water main 142 connect with multiple water supply branch pipes, more
A water supply branch pipe is connected to computer room 412.Return pipe includes the multiple perpendicular return pipes 151 arranged along short transverse, horizontal return main
152 and return branch 153;Wherein, one end of multiple times water supplying pipes is connect with water collector 15, multiple perpendicular return pipes 151 it is another
End is connect with horizontal return main 152, and horizontal return main 152 connect with multiple return branch 153, multiple return branch 153 and machine
Room 412 is connected to.It is further preferred that each perpendicular water supplying pipe 141 is equipped with the first valve 144, and each horizontal water main 142
Equipped with exhaust valve 16;Each perpendicular return pipe 151 and each return branch 153 are equipped with the second valve 154, and two second
Balanced valve 155 is equipped between valve 154, each horizontal return main 152 is equipped with exhaust valve 16.In practical applications, can pass through
First valve 144 and the second valve 154 can realize the adjusting of water supply and water return amount, and balanced valve 155 can realize water supply and
The coordination of water return amount guarantees the normal operation of whole system.In practical applications, underground pipe is the construction ground for being embedded in building
Face, therefore pass through steel-plastic joint 17 for the ease of the connection of water supply underground pipe 11 and water supplying pipe, water supply underground pipe 11 and water supplying pipe
Connection (since underground pipe is plastics, and water supplying pipe is steel).For the ease of the connection of return water underground pipe 12 and return pipe, return water
Underground pipe 12 and return pipe pass through the connection of steel-plastic joint 17 (since underground pipe is plastics, and return pipe is steel).
It should be noted that above-described embodiment can be freely combined as needed.The above is only the utility model
Preferred embodiment, it is noted that for those skilled in the art, do not departing from the utility model principle
Under the premise of, several improvements and modifications can also be made, these improvements and modifications also should be regarded as the protection scope of the utility model.
Claims (10)
1. a kind of underground pipe arragement construction characterized by comprising
The window well of underground pipe and ground library;
The underground pipe is layed in the building site below building;
Connection end of the underground pipe far from heat pump side runs through the window well of the window well along the short transverse of the building
Ground is simultaneously projected on window well ground.
2. underground pipe arragement construction according to claim 1, which is characterized in that further include:
Protection sleeve pipe, the protection sleeve pipe are sheathed on the outside of the connection end;
The protection sleeve pipe runs through window well ground, is equipped with the water-stopping steel of radial extension the lateral wall week of the protection sleeve pipe
Plate, the steel plate for sealing water are embedded in window well ground.
3. underground pipe arragement construction according to claim 1, which is characterized in that further include:
The both ends of seal ring, the connection end are arranged with the seal ring respectively, and the seal ring is with being embedded in the window well
Face.
4. underground pipe arragement construction according to claim 1 to 3, it is characterised in that:
The underground pipe includes water supply underground pipe and return water underground pipe;
Water segregator and water supplying pipe are successively arranged along water (flow) direction between the water supply underground pipe and computer room, and the water supplying pipe is equipped with the
One valve;
It is successively arranged return pipe and water collector along water (flow) direction between the return water ground line and the computer room, the return pipe is set
There are the second valve and balanced valve.
5. underground pipe arragement construction according to claim 4, it is characterised in that:
The water supplying pipe and the return pipe are equipped with exhaust valve.
6. underground pipe arragement construction according to claim 4, it is characterised in that:
The balanced valve is set between two second valves.
7. underground pipe arragement construction according to claim 4, it is characterised in that:
The water supplying pipe includes multiple perpendicular water supplying pipes, horizontal water main and the water supply branch pipe along short transverse arrangement;
One end of multiple perpendicular water supplying pipes is connect with the water segregator, the other end of multiple perpendicular water supplying pipes and the horizontal confession
Supply mains's connection;
The horizontal water main connect with multiple water supply branch pipes, and multiple water supply branch pipes are connected to computer room.
8. underground pipe arragement construction according to claim 7, it is characterised in that:
Each described perpendicular water supplying pipe is equipped with first valve.
9. underground pipe arragement construction according to claim 4, it is characterised in that:
The return pipe includes multiple perpendicular return pipes, horizontal return main and the return branch along short transverse arrangement;
One end of multiple perpendicular return pipes is connect with the water segregator, the other end of multiple perpendicular return pipes with described horizontal time
Supply mains's connection;
The horizontal return main connect with multiple return branch, and multiple return branch are connected to computer room.
10. underground pipe arragement construction according to claim 9, it is characterised in that:
Each described perpendicular return pipe and each described return branch are equipped with one second valve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821892713.3U CN209308068U (en) | 2018-11-16 | 2018-11-16 | A kind of underground pipe arragement construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821892713.3U CN209308068U (en) | 2018-11-16 | 2018-11-16 | A kind of underground pipe arragement construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209308068U true CN209308068U (en) | 2019-08-27 |
Family
ID=67673373
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821892713.3U Active CN209308068U (en) | 2018-11-16 | 2018-11-16 | A kind of underground pipe arragement construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209308068U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109440815A (en) * | 2018-11-16 | 2019-03-08 | 上海朗绿建筑科技股份有限公司 | A kind of underground pipe method for arranging and structure |
-
2018
- 2018-11-16 CN CN201821892713.3U patent/CN209308068U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109440815A (en) * | 2018-11-16 | 2019-03-08 | 上海朗绿建筑科技股份有限公司 | A kind of underground pipe method for arranging and structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102777189B (en) | A kind of ultra-long tube curtain non-relay jacking construction device and method | |
CN208363127U (en) | A kind of retaining wall structure of combined type high-speed rail platform | |
CN110185844A (en) | Shallow earthing pipe-jacking with large diameter construction method | |
CN102535519A (en) | I-shaped steel joint structure for underground continuous wall and construction method for I-shaped steel joint structure | |
CN210164243U (en) | Wall bushing structure | |
CN107460882A (en) | A kind of retaining piles construction method of deep basal pit closing sealing | |
CN106704708B (en) | The supporting structure and its construction method of heat distribution pipeline in pipe gallery | |
CN103437779B (en) | The construction method of regulation tunnel lining pore gas flow | |
CN207739289U (en) | A kind of underground continuous wall water-stop connector | |
CN209308068U (en) | A kind of underground pipe arragement construction | |
CN206189454U (en) | Piping lane | |
CN207553133U (en) | A kind of underground pipe gallery structure | |
CN109440815A (en) | A kind of underground pipe method for arranging and structure | |
CN208136954U (en) | Precast splice type Pipe rack | |
CN106351235A (en) | Assembled type four-combined-round-steel-pipe concrete inner support structure and manufacturing method | |
CN110593918A (en) | Freezing method based tunnel connection channel pump house construction method | |
CN204199324U (en) | Connecting reinforcement cage i iron in construction of diaphragm wall | |
CN216405651U (en) | Prefabricated assembled concrete drainage inspection shaft structure | |
CN105697932A (en) | Water feed pipe construction structure capable of preventing flexible cast-iron drain pipe from leaking and water feed pipe construction technology | |
CN205875472U (en) | A concrete inside casing partition wall installation node for steel frame | |
CN209622218U (en) | Double spigot mouth RC pipejacking | |
CN211623450U (en) | Construction structure for treating water seepage of tunnel | |
CN212318012U (en) | Lining structure for tunnel and tunnel | |
CN110195599B (en) | Rigid anti-deflection rectangular jacking pipe connecting system and method thereof | |
CN106351234A (en) | Assembled type three-combined-round-steel-pipe concrete inner support structure and manufacturing method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |