CN209292871U - A kind of steel construction temporary fastening device for large-scale bent cap free cantilever erection - Google Patents

A kind of steel construction temporary fastening device for large-scale bent cap free cantilever erection Download PDF

Info

Publication number
CN209292871U
CN209292871U CN201821848107.1U CN201821848107U CN209292871U CN 209292871 U CN209292871 U CN 209292871U CN 201821848107 U CN201821848107 U CN 201821848107U CN 209292871 U CN209292871 U CN 209292871U
Authority
CN
China
Prior art keywords
otic placode
steel
fastening device
temporary fastening
structure member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821848107.1U
Other languages
Chinese (zh)
Inventor
查义强
卫张震
金钱华
张玉富
吴建兵
李逸之
姚力
黄兵
黄杰
夏恺恺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Investment Construction Development Co Ltd Of Shanghai Highway
Shanghai Greenland Construction Group Co Ltd
Original Assignee
Investment Construction Development Co Ltd Of Shanghai Highway
Shanghai Greenland Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Investment Construction Development Co Ltd Of Shanghai Highway, Shanghai Greenland Construction Group Co Ltd filed Critical Investment Construction Development Co Ltd Of Shanghai Highway
Application granted granted Critical
Publication of CN209292871U publication Critical patent/CN209292871U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a kind of steel construction temporary fastening devices for large-scale bent cap free cantilever erection, it is characterized in that, steel construction temporary fastening device ontology is the cuboid steel structure member being assembled by several steel plates, the top of cuboid steel structure member is equipped with lifting lug, the front side wall of cuboid steel structure member is equipped with fining twisted steel anchor plate, the bottom of fining twisted steel anchor plate is equipped with sash plate, the rear wall of cuboid steel structure member is equipped with vertical stiffener, the left side of cuboid steel structure member is equipped with left side otic placode, one end end of left side otic placode is equipped with pin stick fixation hole, the right side of cuboid steel structure member is equipped with right side otic placode, one end end of right side otic placode also is provided with pin stick fixation hole, steel construction temporary fastening device is fixed on bent cap by pin stick fixation hole on the otic placode of the left and right sides and dedicated pin stick.The utility model realizes ultra-wide large size bent cap without support, the target without cast in situs, and easy construction, significant effect greatly shortens construction period.

Description

A kind of steel construction temporary fastening device for large-scale bent cap free cantilever erection
[technical field]
It is specifically a kind of for large-scale bent cap the utility model relates to be related to bent cap segment free cantilever erection technical field The temporary fastening device of free cantilever erection.
[background technique]
In the prior art, it is influenced by transporting and lifting condition, 200 tons or more of large-scale bent cap is difficult to disposable prefabricated peace It installs into.In previous engineering, often using method cast-in-place or that partial precast part is cast-in-place, need to set up temporary support simultaneously Poured in place concrete has an impact site traffic and surrounding enviroment, and construction period is relatively long.
[utility model content]
The purpose of the utility model is to overcome technical problem of the existing technology, in order to realize ultra-wide large size bent cap without Support, the target without cast in situs, provide a kind of steel construction temporary fastening device for large-scale bent cap free cantilever erection.
To achieve the above object, a kind of steel construction temporary fastening device for large-scale bent cap free cantilever erection is designed, including Steel construction temporary fastening device ontology, which is characterized in that the steel construction temporary fastening device ontology is spelled by several steel plates The top of the cuboid steel structure member dressed up, cuboid steel structure member is equipped with lifting lug, the front side of cuboid steel structure member Wall is equipped with fining twisted steel anchor plate, and the bottom of fining twisted steel anchor plate is equipped with sash plate, cuboid steel structure member Rear wall be equipped with vertical stiffener, the left side of cuboid steel structure member is equipped with left side otic placode, one end end of left side otic placode Equipped with pin stick fixation hole, the right side of cuboid steel structure member is equipped with right side otic placode, and one end end of right side otic placode also is provided with pin Stick fixation hole, steel construction temporary fastening device are fixed on bent cap by pin stick fixation hole on the otic placode of the left and right sides and dedicated pin stick On.
The left side otic placode is symmetrically set up with right side otic placode, and pin stick fixation hole side is equipped with stiffening plate.
The top of steel construction temporary fastening device is equipped with lifting lug, is connect using lifting lug with hoisting machine.
A kind of steel construction temporary fastening device and technique for large-scale bent cap free cantilever erection of the utility model, realizes Ultra-wide large size bent cap greatly shortens construction period without support, the target without cast in situs, easy construction, significant effect.
[Detailed description of the invention]
Fig. 1 is the device perspective view of the utility model
Fig. 2 is main view
Fig. 3 is rearview
Fig. 4 is otic placode structure chart
Fig. 5 is side view
Description of symbols in figure
Stick fixation hole, 6 right side ears are sold in 1 lifting lug, 2 fining twisted steel anchor plates, 3 sash plates, 4 left side otic placodes, 5 left sides Stick fixation hole, 8 vertical stiffeners, 9 fining twisted steel fixation holes are sold in plate, 7 right sides.
[specific embodiment]
The technical solution of the utility model is further elaborated now in conjunction with accompanying drawings and embodiments, it is believed that art technology It is clear for personnel.
As shown in Figs. 1-5, a kind of steel construction temporary fastening device for large-scale bent cap free cantilever erection, including steel construction face When fixed device noumenon, which is characterized in that the steel construction temporary fastening device ontology is the length being assembled by several steel plates Cube steel structure member, the top of cuboid steel structure member are equipped with lifting lug, and the front side wall of cuboid steel structure member is equipped with essence Screw-thread steel anchor plate is rolled, the bottom of fining twisted steel anchor plate is equipped with sash plate, the rear wall of cuboid steel structure member Equipped with vertical stiffener, the left side of cuboid steel structure member is equipped with left side otic placode, and one end end of left side otic placode is equipped with pin stick The right side of fixation hole, cuboid steel structure member is equipped with right side otic placode, and one end end of right side otic placode also is provided with pin stick fixation hole, Steel construction temporary fastening device is fixed on bent cap by pin stick fixation hole on the otic placode of the left and right sides and dedicated pin stick.
The left side otic placode is symmetrically set up with right side otic placode, and pin stick fixation hole side is equipped with stiffening plate.
The top of steel construction temporary fastening device is equipped with lifting lug, is connect using lifting lug with hoisting machine.
A kind of technique of the steel construction temporary fastening device for large-scale bent cap free cantilever erection, which is characterized in that will be large-scale Bent cap is divided into several small-sized bent cap segments, matches prefabricated construction, and the bent cap segment to free cantilever erection matches prefabricated complete in precasting yard At reserved pin hole is on each section bent cap segment to connect steel construction temporary fastening device;Steel construction temporary fastening device is pairs of It uses, one group of steel construction temporary fastening device is installed on assembled bent cap segment, another group of steel construction temporary fastening device peace Loaded on bent cap segment to be assembled, steel construction temporary fastening device passes through pin stick fixation hole on its left and right sides otic placode and dedicated Rigid pins stick is fixed on bent cap;Segment to be spelled is lifted to matching split state by steel construction temporary fastening device, uses epoxy It is glued seam.
The fining twisted steel of respective numbers is penetrated between a pair of of temporary fastening device, and jack is set in case tensioning; Multi-stage prestress fining twisted steel, while unloading hook step by step, until suspension hook unloads completely, boom segments are fixed temporarily completion;To After the completion of permanent prestressing tendon tensioning, a fining twisted steel is put, recycling and reusing is carried out to temporary fastening device.
When assembled boom segments, epoxy resin mortar is smeared in Mosaic face, the joint form is the vertical piece of corbel type.
Embodiment
The technique of the utility model is used for Shanghai S7 highway new construction, actively visits in the full precast assembly technical field of bridge Rope makes a breakthrough in the fields such as the high block construction of bent cap and buried anchor technique, abutment precast assembly technology.
Large-scale bent cap is divided into several small-sized segments by the technology, matches prefabricated construction, and Mosaic face uses epoxy glue seam, connects Slit formula is the vertical piece of corbel type.The miniaturization of segment is readily transported and lifts;Matching prefabricated construction may insure seam It is uniformly closely connected;Mosaic face can guarantee the quality and rapid construction of seam using performance of epoxy bonded.
The especially pioneering vertical piece of corbel type is effectively reduced without the difficulty of construction for supporting vertical piece and wind construction Danger, construction is simple is quick, and quality is easy to guarantee, through inquiring, not yet finds the application precedent for having such piece in the world at present, opens The beginning of industry is created.
In the design R&D process of section assembling bent cap, pass through analysis and multiple groups scaled model comparative test, designer Member continues to optimize the design drawing and arrangement and method for construction of bent cap, it is ensured that bent cap segment free cantilever erection according to test and result of study The application success of technology.
The successful installation of first batch of segment free cantilever erection bent cap indicates that this technology has been smoothly completed from theoretical, design, examination The conversion process that demonstration constructed and produced in batches construction to initial workpiece is tested, one phase of Jiang S7 highway, the second stage of the project and military project road are overhead It is promoted and applied on a large scale in the projects such as engineering.The maturation of the bent cap segment free cantilever erection technology especially vertical piece of corbel type Using to propulsion bridge prefabrication assembling members miniaturization and lightweight, cancellation support system, raising construction convenience and safety Degree reduces influence to traffic and suffers from positive and long-range meaning, also further to push building industrialization and all-round popularization Another solid technical foundation is laid using bridge prefabrication assembled technology, there is landmark meaning.

Claims (3)

1. a kind of steel construction temporary fastening device for large-scale bent cap free cantilever erection, including steel construction temporary fastening device sheet Body, which is characterized in that the steel construction temporary fastening device ontology is the cuboid steel construction structure being assembled by several steel plates Part, the top of cuboid steel structure member are equipped with lifting lug, and the front side wall of cuboid steel structure member is anchored equipped with fining twisted steel Plate, the bottom of fining twisted steel anchor plate are equipped with sash plate, and the rear wall of cuboid steel structure member, which is equipped with, vertically puts more energy into Plate, the left side of cuboid steel structure member are equipped with left side otic placode, and one end end of left side otic placode is equipped with pin stick fixation hole, cuboid The right side of steel structure member is equipped with right side otic placode, and one end end of right side otic placode also is provided with pin stick fixation hole, and steel construction is temporarily solid Determine device to be fixed on bent cap by pin stick fixation hole on the otic placode of the left and right sides and dedicated pin stick.
2. a kind of steel construction temporary fastening device for large-scale bent cap free cantilever erection as described in claim 1, feature exist In the left side otic placode is symmetrically set up with right side otic placode, and pin stick fixation hole side is equipped with stiffening plate.
3. a kind of steel construction temporary fastening device for large-scale bent cap free cantilever erection as described in claim 1, feature exist In the top of steel construction temporary fastening device is equipped with lifting lug, is connect using lifting lug with hoisting machine.
CN201821848107.1U 2018-04-12 2018-11-11 A kind of steel construction temporary fastening device for large-scale bent cap free cantilever erection Active CN209292871U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201820517406 2018-04-12
CN2018205174060 2018-04-12

Publications (1)

Publication Number Publication Date
CN209292871U true CN209292871U (en) 2019-08-23

Family

ID=67646328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821848107.1U Active CN209292871U (en) 2018-04-12 2018-11-11 A kind of steel construction temporary fastening device for large-scale bent cap free cantilever erection

Country Status (1)

Country Link
CN (1) CN209292871U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109468946A (en) * 2018-04-12 2019-03-15 上海公路投资建设发展有限公司 A kind of steel construction temporary fastening device and technique for large-scale bent cap free cantilever erection

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109468946A (en) * 2018-04-12 2019-03-15 上海公路投资建设发展有限公司 A kind of steel construction temporary fastening device and technique for large-scale bent cap free cantilever erection
CN109468946B (en) * 2018-04-12 2024-04-12 上海公路投资建设发展有限公司 Steel structure temporary fixing device and process for large-scale bent cap cantilever assembly

Similar Documents

Publication Publication Date Title
CN109183629B (en) Large cantilever bent cap prefabrication and assembly method
CN102605719B (en) Construction method for splicing and erecting concrete precast beam sections
CN109869164B (en) Construction method for pouring porous separation type tunnel by combined type hydraulic template trolley
CN105586867A (en) Installation method for over-length over-weight steel reinforcement cage
CN108423565B (en) The erection and Demolition Construction method of U-shaped twin beams gantry crane with hook
CN209292871U (en) A kind of steel construction temporary fastening device for large-scale bent cap free cantilever erection
CN114575589B (en) Construction method for electric hoist lifting formwork of steel reinforced concrete structural column
CN106988299B (en) The pay-off method of assembled steel reinforced cage descending frame and steel reinforcement cage
CN109468946A (en) A kind of steel construction temporary fastening device and technique for large-scale bent cap free cantilever erection
CN109989590B (en) Auxiliary fixing device for mounting roof overlong steel beam and hoisting method of steel beam
CN209039991U (en) A kind of great cantilever bent cap precast assembly structure
CN116837967A (en) Construction method of large-span cable-stayed truss structure
CN115125995B (en) Construction method for entrance and exit ring frames of assembled station
CN208563093U (en) A kind of segment free cantilever erection pier cap beam
CN106988344B (en) Construction method of assembled trolley for cast-in-place section of fabricated station
CN209292870U (en) A kind of girder pre-stressed reinforced bar stretching platform of preform lid
CN205531393U (en) Pier stud construction system
JPH04161566A (en) Constructing apparatus for large space building
CN207259935U (en) A kind of simple supported-to-continuous girder bridge built a bridge at once system
CN217711127U (en) High-altitude large-cantilever arc-shaped steel structure
CN218292772U (en) Civil engineering main part construction quick assembly disassembly template
CN216615504U (en) Temporary locking device for bridge folding
CN112922025B (en) Reverse construction method of underground structure
CN220166643U (en) Prefabricated box girder for expressway
CN107558729B (en) The rear pouring tape construction method that girder is built by the big area roof of post-cast strip

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant