CN209277281U - A kind of building Construction of Civil Engineering prefabricated construction - Google Patents

A kind of building Construction of Civil Engineering prefabricated construction Download PDF

Info

Publication number
CN209277281U
CN209277281U CN201821890835.9U CN201821890835U CN209277281U CN 209277281 U CN209277281 U CN 209277281U CN 201821890835 U CN201821890835 U CN 201821890835U CN 209277281 U CN209277281 U CN 209277281U
Authority
CN
China
Prior art keywords
stringer
crossbeam
reinforcing rib
prefabricated
prefabricated pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821890835.9U
Other languages
Chinese (zh)
Inventor
过华平
韩元元
牛骋程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821890835.9U priority Critical patent/CN209277281U/en
Application granted granted Critical
Publication of CN209277281U publication Critical patent/CN209277281U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Revetment (AREA)

Abstract

The utility model relates to technical field of civil engineering more particularly to a kind of building Construction of Civil Engineering prefabricated constructions, comprising: the first stringer, the first reinforcing rib, the second reinforcing rib, reinforcement, crossbeam;The prefabricated pile upper right outer wall is provided with the first fixed plate, and the first fixed plate is connected by bolt with prefabricated pile;The outer wall of first fixed plate is provided with crossbeam, and crossbeam is connected by welding manner with the first fixed plate;The two sides of the crossbeam are provided with reinforcement, and reinforcement is connected by fastening bolt with crossbeam;The adjacent side outer wall of the prefabricated pile outer right wall is provided with the first stringer, and one end that the first stringer passes through is connected by embedded mode with prefabricated pile;The utility model through the above structure on improvement, have the advantages that structure is simple, is easily installed, large carrying capacity, is unlikely to deform, thus the problem of effective solution existing apparatus and deficiency.

Description

A kind of building Construction of Civil Engineering prefabricated construction
Technical field
The utility model relates to technical field of civil engineering more particularly to a kind of building Construction of Civil Engineering are prefabricated assembled Structure.
Background technique
Prefabrication refers to prefabricated component building made of assemble in site;The advantages of this building is to build It is fast to make speed, climate conditionality is small, saves labour and construction quality can be improved, prefabrication is in early 20th century It begins to arouse people's interest, be realized finally to the sixties;The states such as English, method, the Soviet Union attempt first;Due to assembled The construction speed of building is fast, and lower production costs, promotes come all over the world rapidly.
In existing prefabricated construction, bonding land is located at beam-ends, and Liang Yuzhu is commonly made to rigidly connected form, but It is the outer wall due to joint located immediately at vertical posts, should go out often is least favorable stress interface, is easy to go beyond the limit of carrying energy Power causes to destroy, although steel construction have preferable energy dissipation capability, since bonding land is relatively weak, other positions compared with It is easy to produce destruction, thus it is more demanding to bonding land, and corresponding cost improves, uneconomical.
Utility model content
It is above-mentioned to solve the purpose of this utility model is to provide a kind of building Construction of Civil Engineering prefabricated construction The joint ability to bear proposed in background technique is poor, bearing capacity is limited, easily causes the problem of other positions destruction and deficiency.
The purpose of this utility model and effect are reached by technical solution in detail below:
A kind of building Construction of Civil Engineering prefabricated construction, comprising: the first stringer, the first reinforcing rib, second are reinforced Muscle, reinforcement, crossbeam, the second stringer, third reinforcing rib, connecting plate, prefabricated pile, the first fixed plate, the second fixed plate, fastening spiral shell Bolt, supporting rib;The prefabricated pile upper right outer wall is provided with the first fixed plate, and the first fixed plate passes through bolt and prefabricated pile It is connected;The outer wall of first fixed plate is provided with crossbeam, and crossbeam is connected by welding manner with the first fixed plate;Institute The two sides for stating crossbeam are provided with reinforcement, and reinforcement is connected by fastening bolt with crossbeam;The prefabricated pile outer right wall Adjacent side outer wall is provided with the first stringer, and one end that the first stringer passes through is connected by embedded mode with prefabricated pile; The top of first stringer is provided with connecting plate, and connecting plate is connected by welding manner with the first stringer;Described first The second stringer is provided on the left of stringer, and the second stringer is connected by connecting plate with prefabricated pile;First stringer and The second reinforcing rib is provided among two stringers, and the both ends of the second reinforcing rib pass through welding manner and the first stringer and second respectively Stringer is connected;The outer wall of first stringer is provided with the first reinforcing rib, and the both ends of the first reinforcing rib pass through welding manner It is connected with the first stringer and reinforcement;The outer wall of second stringer is provided with third reinforcing rib, and the two of third reinforcing rib End is connected by welding manner with the second stringer and reinforcement;The top of the prefabricated pile is provided with the second fixed plate, and Two fixed plates are connected by bolt-through prefabricated pile with connecting plate;The bottom side of the crossbeam is provided with supporting rib, and supporting rib Both ends by bolt respectively with the outer wall of crossbeam and prefabricated pile above be connected.
As advanced optimizing for the technical program, a kind of prefabricated assembled knot of building Construction of Civil Engineering of the utility model The upper interior of prefabricated pile described in structure offers rectangular recess, and between the width of rectangular recess and the first stringer and the second stringer Every being equidistant.
As advanced optimizing for the technical program, a kind of prefabricated assembled knot of building Construction of Civil Engineering of the utility model The upper surface at the end of the first stringer and the second stringer described in structure and lower surface pass through welding manner and are provided with connecting plate, and connect Plate passes through bolt with the first stringer and the second stringer and is connected with prefabricated pile.
As advanced optimizing for the technical program, a kind of prefabricated assembled knot of building Construction of Civil Engineering of the utility model First stringer and the second stringer described in structure are provided with two groups, and the first stringer and the second stringer are formula structure symmetrical above and below.
As advanced optimizing for the technical program, a kind of prefabricated assembled knot of building Construction of Civil Engineering of the utility model Crossbeam described in structure is provided with two, and crossbeam is bilateral symmetry formula structure setting.
As advanced optimizing for the technical program, a kind of prefabricated assembled knot of building Construction of Civil Engineering of the utility model First stringer and the second stringer described in structure and crossbeam are in crosswise, and crossbeam and supporting rib and prefabricated pile are in triangular shape.
As advanced optimizing for the technical program, a kind of prefabricated assembled knot of building Construction of Civil Engineering of the utility model First reinforcing rib described in structure and third reinforcing rib are in that upper and lower symmetrical structure is provided with four, and the first reinforcing rib and third are reinforced It is diamond shaped that muscle, which is overlooked,.
As advanced optimizing for the technical program, a kind of prefabricated assembled knot of building Construction of Civil Engineering of the utility model The setting of fastening bolt described in structure is N number of, and fastening bolt is uniformly distributed in triangular shape.
Due to the application of the above technical scheme, the utility model has the advantage that compared with prior art
1, a kind of building Construction of Civil Engineering prefabricated construction of the utility model is opened by the upper interior of prefabricated pile Setting equipped with rectangular recess, and the width of rectangular recess is equal with the spacing distance of the first stringer and the second stringer, and passes through First stringer and the connecting plate of the second stringer top side and bottom side are mutually fixed by bolt with prefabricated pile, wherein the first stringer and the The connecting plate of two stringer bottom sides is mutually fixed by expansion bolt with prefabricated pile, and the stability of the first stringer and the second stringer is increased And fastness.
2, a kind of building Construction of Civil Engineering prefabricated construction of the utility model passes through the first stringer and the second stringer Two groups of settings are provided with, the stability of device, the first reinforcing rib and third reinforcing rib is increased and is arranged in upper and lower symmetrical structure There are four, and it is diamond shaped that the first reinforcing rib and third reinforcing rib, which are overlooked, the first reinforcing rib and third reinforcing rib of top are in three Horn shape increases the fastness of the first stringer and the second stringer and crossbeam, meanwhile, the bottom side of crossbeam by supporting rib with it is prefabricated Stake is in triangular shape, increases the bearing capacity of crossbeam, and be unlikely to deform.
3, the utility model through the above structure on improvement, have that structure is simple, be easily installed, large carrying capacity, no Easily-deformable advantage, thus the problem of effective solution existing apparatus and deficiency.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the portion the A enlarged structure schematic diagram of the utility model;
Fig. 3 is first stringer of the utility model and the second stringer and prefabricated pile attachment structure schematic diagram;
Fig. 4 is the crossbeam and prefabricated pile attachment structure schematic diagram of the utility model.
In figure: the first stringer 1, the first reinforcing rib 2, the second reinforcing rib 3, reinforcement 4, crossbeam 5, the second stringer 6, third add Strengthening tendons 7, connecting plate 8, prefabricated pile 9, the first fixed plate 10, the second fixed plate 11, fastening bolt 12, supporting rib 13.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model provides a kind of building Construction of Civil Engineering prefabricated construction technical side referring to FIG. 1 to FIG. 4, Case:
A kind of building Construction of Civil Engineering prefabricated construction, comprising: the first stringer 1, the first reinforcing rib 2, second add Strengthening tendons 3, reinforcement 4, crossbeam 5, the second stringer 6, third reinforcing rib 7, connecting plate 8, prefabricated pile 9, the first fixed plate 10, second are solid Fixed board 11, fastening bolt 12, supporting rib 13;9 upper right outer wall of prefabricated pile is provided with the first fixed plate 10, and the first fixed plate 10 are connected by bolt with prefabricated pile 9;The outer wall of first fixed plate 10 is provided with crossbeam 5, and crossbeam 5 by welding manner with First fixed plate 10 is connected;The two sides of crossbeam 5 are provided with reinforcement 4, and reinforcement 4 passes through fastening bolt 12 and 5 phase of crossbeam Connection;The adjacent side outer wall of 9 outer right wall of prefabricated pile is provided with the first stringer 1, and one end for passing through of the first stringer 1 pass through it is embedding Enter mode to be connected with prefabricated pile 9;The top of first stringer 1 is provided with connecting plate 8, and connecting plate 8 passes through welding manner and the One stringer 1 is connected;The left side of first stringer 1 is provided with the second stringer 6, and the second stringer 6 passes through connecting plate 8 and prefabricated pile 9 It is connected;The second reinforcing rib 3 is provided among first stringer 1 and the second stringer 6, and the both ends of the second reinforcing rib 3 pass through respectively Welding manner is connected with the first stringer 1 and the second stringer 6;The outer wall of first stringer 1 is provided with the first reinforcing rib 2, and first The both ends of reinforcing rib 2 are connected by welding manner with the first stringer 1 and reinforcement 4;The outer wall of second stringer 6 is provided with third Reinforcing rib 7, and the both ends of third reinforcing rib 7 are connected by welding manner with the second stringer 6 and reinforcement 4;The top of prefabricated pile 9 End is provided with the second fixed plate 11, and the second fixed plate 11 is connected by bolt-through prefabricated pile 9 with connecting plate 8;Crossbeam 5 Bottom side is provided with supporting rib 13, and the both ends of supporting rib 13 are connected with the outer wall of crossbeam 5 and prefabricated pile 9 top respectively by bolt It connects.
Specifically, the upper interior of prefabricated pile 9 offers rectangular recess, and the width of rectangular recess and the first stringer 1 with The spacing distance of second stringer 6 is equal.
Specifically, the upper surface at the end of the first stringer 1 and the second stringer 6 and lower surface pass through welding manner and are provided with company Fishplate bar 8, and connecting plate 8 is connected by bolt with prefabricated pile 9 with the first stringer 1 and the second stringer 6.
Specifically, the first stringer 1 and the second stringer 6 are provided with two groups, and the first stringer 1 and the second stringer 6 are right up and down Title formula structure.
Specifically, crossbeam 5 is provided with two, and crossbeam 5 is bilateral symmetry formula structure setting.
Specifically, the first stringer 1 and the second stringer 6 and crossbeam 5 are in crosswise, and crossbeam and supporting rib 13 and prefabricated pile 9 In triangular shape.
Specifically, the first reinforcing rib 2 is provided with four in upper and lower symmetrical structure with third reinforcing rib 7, and first reinforces It is diamond shaped that muscle 2 and third reinforcing rib 7, which are overlooked,.
Specifically, fastening bolt 12 is arranged N number of, and fastening bolt 12 is uniformly distributed in triangular shape.
Specifically used method and effect:
When using the device, it will be opened up and the first stringer 1 and the second stringer above one end of prefabricated pile 9 by tool first The equal rectangular recess of 6 width, and rectangular recess is in symmetrical structure, then adds the first stringer 1 and the second stringer 6 by second Strengthening tendons 3 are connected, and reinforcement 4 is fixed on to the two sides of crossbeam 5 by fastening bolt 12, after being completed, prefabricated pile 9 is fixed It in position set in advance, and is fixed, the first stringer 1 and the second stringer 6 is then placed on by rectangle by hanging device It in groove, and is fixed by bolt and 9 phase of prefabricated pile, then crossbeam 5 is fixed with reinforcement 4 by bolt and 9 phase of prefabricated pile, finally The both ends of supporting rib 13 are fixed by bolt respectively at crossbeam 5 and 9 phase of prefabricated pile, are set by the first stringer 1 and the second stringer 6 Two groups of settings are equipped with, the stability of device is increased, the first reinforcing rib 2 is arranged with third reinforcing rib 7 in upper and lower symmetrical structure There are four, and it is diamond shaped, the first reinforcing rib 2 and third reinforcing rib 7 of top that the first reinforcing rib 2 is overlooked with third reinforcing rib 7 In triangular shape, the fastness of the first stringer 1 and the second stringer 2 and crossbeam 5 is increased, meanwhile, the bottom side of crossbeam 5 passes through support Muscle 13 and prefabricated pile 9 are in triangular shape, increase the bearing capacity of crossbeam 5, and be unlikely to deform.
In summary: a kind of building Construction of Civil Engineering prefabricated construction is opened by the upper interior of prefabricated pile Setting equipped with rectangular recess, and the width of rectangular recess is equal with the spacing distance of the first stringer and the second stringer, and passes through First stringer and the connecting plate of the second stringer top side and bottom side are mutually fixed by bolt with prefabricated pile, wherein the first stringer and the The connecting plate of two stringer bottom sides is mutually fixed by expansion bolt with prefabricated pile, and the stability of the first stringer and the second stringer is increased And fastness, two groups of settings are provided with by the first stringer and the second stringer, increase the stability of device, the first reinforcing rib with Third reinforcing rib is provided with four in upper and lower symmetrical structure, and it is diamond shaped that the first reinforcing rib and third reinforcing rib, which are overlooked, on The first reinforcing rib and third reinforcing rib of side are in triangular shape, increase the fastness of the first stringer and the second stringer and crossbeam, together When, the bottom side of crossbeam is in triangular shape by supporting rib and prefabricated pile, increases the bearing capacity of crossbeam, and be unlikely to deform, and is solved Having determined, joint ability to bear is poor, bearing capacity is limited, easily causes the problem of other positions destruction.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (8)

1. a kind of building Construction of Civil Engineering prefabricated construction, comprising: the first stringer (1), the first reinforcing rib (2), second Reinforcing rib (3), reinforcement (4), crossbeam (5), the second stringer (6), third reinforcing rib (7), connecting plate (8), prefabricated pile (9), One fixed plate (10), the second fixed plate (11), fastening bolt (12), supporting rib (13);It is characterized by: the prefabricated pile (9) Upper right outer wall is provided with the first fixed plate (10), and the first fixed plate (10) is connected by bolt with prefabricated pile (9);Institute The outer wall for stating the first fixed plate (10) is provided with crossbeam (5), and crossbeam (5) is connected by welding manner with the first fixed plate (10) It connects;The two sides of the crossbeam (5) are provided with reinforcement (4), and reinforcement (4) is connected by fastening bolt (12) with crossbeam (5) It connects;The adjacent side outer wall of prefabricated pile (9) outer right wall is provided with the first stringer (1), and the first stringer (1) pass through one End is connected by embedded mode with prefabricated pile (9);The top of first stringer (1) is provided with connecting plate (8), and connecting plate (8) it is connected by welding manner with the first stringer (1);It is provided with the second stringer (6) on the left of first stringer (1), and Second stringer (6) is connected by connecting plate (8) with prefabricated pile (9);It is set among first stringer (1) and the second stringer (6) It is equipped with the second reinforcing rib (3), and the both ends of the second reinforcing rib (3) pass through welding manner and the first stringer (1) and second vertical respectively Beam (6) is connected;The outer wall of first stringer (1) is provided with the first reinforcing rib (2), and the both ends of the first reinforcing rib (2) are logical Welding manner is crossed to be connected with the first stringer (1) and reinforcement (4);The outer wall of second stringer (6) is provided with third reinforcement Muscle (7), and the both ends of third reinforcing rib (7) are connected by welding manner with the second stringer (6) and reinforcement (4);It is described pre- The top of stake (9) processed is provided with the second fixed plate (11), and the second fixed plate (11) by bolt-through prefabricated pile (9) with connect Plate (8) is connected;The bottom side of the crossbeam (5) is provided with supporting rib (13), and the both ends of supporting rib (13) are distinguished by bolt It is connected with the outer wall of crossbeam (5) and prefabricated pile (9) top.
2. a kind of building Construction of Civil Engineering prefabricated construction according to claim 1, it is characterised in that: described pre- The upper interior of stake (9) processed offers rectangular recess, and the width of rectangular recess and the first stringer (1) and the second stringer (6) Spacing distance is equal.
3. a kind of building Construction of Civil Engineering prefabricated construction according to claim 1, it is characterised in that: described The upper surface and lower surface at the end of one stringer (1) and the second stringer (6) pass through welding manner and are provided with connecting plate (8), and even Fishplate bar (8) is connected by bolt with prefabricated pile (9) with the first stringer (1) and the second stringer (6).
4. a kind of building Construction of Civil Engineering prefabricated construction according to claim 1, it is characterised in that: described One stringer (1) and the second stringer (6) are provided with two groups, and the first stringer (1) and the second stringer (6) are formula structure symmetrical above and below.
5. a kind of building Construction of Civil Engineering prefabricated construction according to claim 1, it is characterised in that: the cross Beam (5) is provided with two, and crossbeam (5) is bilateral symmetry formula structure setting.
6. a kind of building Construction of Civil Engineering prefabricated construction according to claim 1, it is characterised in that: described One stringer (1) and the second stringer (6) and crossbeam (5) are in crosswise, and crossbeam and supporting rib (13) and prefabricated pile (9) are in triangle Shape.
7. a kind of building Construction of Civil Engineering prefabricated construction according to claim 1, it is characterised in that: described One reinforcing rib (2) and third reinforcing rib (7) are in that upper and lower symmetrical structure is provided with four, and the first reinforcing rib (2) adds with third It is diamond shaped that strengthening tendons (7), which are overlooked,.
8. a kind of building Construction of Civil Engineering prefabricated construction according to claim 1, it is characterised in that: described tight Fixing bolt (12) setting is N number of, and fastening bolt (12) is uniformly distributed in triangular shape.
CN201821890835.9U 2018-11-16 2018-11-16 A kind of building Construction of Civil Engineering prefabricated construction Expired - Fee Related CN209277281U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821890835.9U CN209277281U (en) 2018-11-16 2018-11-16 A kind of building Construction of Civil Engineering prefabricated construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821890835.9U CN209277281U (en) 2018-11-16 2018-11-16 A kind of building Construction of Civil Engineering prefabricated construction

Publications (1)

Publication Number Publication Date
CN209277281U true CN209277281U (en) 2019-08-20

Family

ID=67601630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821890835.9U Expired - Fee Related CN209277281U (en) 2018-11-16 2018-11-16 A kind of building Construction of Civil Engineering prefabricated construction

Country Status (1)

Country Link
CN (1) CN209277281U (en)

Similar Documents

Publication Publication Date Title
CN105735469B (en) A kind of part adhesive precast prestressed concrete frame structure
CN105133791A (en) Construction method for prefabricated thick plate steel rib concrete column variable cross-section transformation node structure
CN106759900A (en) Assembled architecture agent structure
CN108589971A (en) A kind of closed-section steel deck combined concrete shear wall connecting node and production method
CN108179809A (en) The connection method of assembled steel tendon concrete frame structure component
CN206538876U (en) Connecting node between novel fabricated steel plate concrete faced wall wall
CN107130715A (en) Teeth groove is poured after a kind of to be linked and packed the construction method of formula building roof system
CN108589923A (en) A kind of steel-frame structure of combination beam
CN106836484A (en) A kind of end plate assembled corrugated web occlusion beam column node connection device for recovering function
CN106677074A (en) Prefabricated combined corrugated steel web T girder bridge
CN107130734B (en) Corrugated plate dst Horizontal H-shaped structure beam and its construction method
CN207017484U (en) Reinforced precast reinforced concrete shear wall and structural system
CN102776829A (en) Steel pipe concrete combined truss bridge
CN104863267A (en) Novel beam column reinforced node with variable-thickness beam end flange
CN111395548A (en) Reinforced steel column and ECC concrete combined joint and construction method thereof
CN110512774A (en) A kind of the ALC stripe board internal partition wall and its construction method of super-high
CN209277281U (en) A kind of building Construction of Civil Engineering prefabricated construction
CN202913338U (en) Steel truss full-welded truss piece
CN207934185U (en) A kind of detachably prefabricated assembled concrete-filled steel square tubular column and girder steel combined joint
CN209227581U (en) Assembly concrete prismoid shaped basis and column steel connection structure
CN208650328U (en) Connecting node between a kind of assembling steel plate-Combined concrete wall wall
CN209114297U (en) Composite Steel-Concrete Bridges structure and combined bridge deck
CN110939217A (en) Profiled steel sheet shear wall with steel bar truss and construction method thereof
CN104032862B (en) Assembled girder steel seam line L shape mixing coupled wall and construction method thereof
CN212224233U (en) Reinforced steel column and ECC concrete combined node

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190820

Termination date: 20201116

CF01 Termination of patent right due to non-payment of annual fee