CN209261595U - Assembly concrete tunnel vault structure - Google Patents
Assembly concrete tunnel vault structure Download PDFInfo
- Publication number
- CN209261595U CN209261595U CN201821827417.5U CN201821827417U CN209261595U CN 209261595 U CN209261595 U CN 209261595U CN 201821827417 U CN201821827417 U CN 201821827417U CN 209261595 U CN209261595 U CN 209261595U
- Authority
- CN
- China
- Prior art keywords
- steel plate
- vertical
- horizontal
- concrete tunnel
- precast concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model provides a kind of assembly concrete tunnel vault structure, is formed by connecting by multiple groups precast concrete tunnel arch bar;Every group includes two pieces of precast concrete tunnel arch bars, and horizontal connection ribs is opposite, and two groups of adjacent precast concrete tunnel arch bars are that longer precast concrete tunnel arch bar is adjacent with shorter precast concrete tunnel arch bar;The center-line joint of the precast concrete tunnel arch bar of two adjacent groups is staggered.The utility model has the beneficial effects that template can be saved, improve execution conditions when production, raise labour productivity, accelerate construction progress, guarantees construction quality.The arch bar of no intermediate supports can be provided for large scale, large span, big sections of tunnel.
Description
Technical field
The utility model belongs to Impacts Evaluation of Urban Tunnel engineering field and urban operating mechanism technical field, more particularly to a kind of dress
With formula concrete tunnel vault construction.
Background technique
Urban transportation construction at present is like a raging fire, as country is pushed further into pipe gallery, sponge Urban strategy, China
Big and medium-sized cities will start the new round climax of underground engineering construction, and due to the scarcity of the underground space, to collection, " Urban Underground is comprehensive
The demand of the Urban Underground Complex of conjunction piping lane, Urban Underground expressway, urban underground construction space " is huge.
The exploitation and construction of Japan and the American-European underground space maintain the leading position, and advocate at first and propose underground city and city
The synthesization of city's underground space and three-dimensional utility strategies, nineteen ninety propose Tokyo Declaration: the Devoting Major Efforts To Developing underground space, start people
Class new cave period, International Tunnelling Association in 2010 expand to tunnel and underground space association and declare: 21 century is underground
The century in space.
To mark international metropolis, become extensive style, booth large flat bread urban development pattern into intensive, solid mode, to underground
Want space;Break through urban land, air, water source, greenery patches, the per capita constraint of the resource environments total amount such as city space, the energy, environment;
Sea, greening deficiency, real estate finance transition, old town are seen to traffic congestion, air dirt, noise pollution, visual pollution, city
The urban disease that the tricks such as vigor decline incur life carries out comprehensive improvement;Change made in China cultivates height leading in the world into Created in China
Hold industry cluster.
Cities of Foreign Countries underground space development is with a long history, mostly combines commercial facility with Large Underground transport hub and stops
Parking lot holds a variety of traffic forms in the underground space synthesis type presentation of one.In the world, Japan and America and Europe are in underground sky
Between exploitation and construction maintain the leading position, advocate and propose the synthesization and solid of underground city and urban underground space at first
Change utility strategies.Totally see have out when including many countries of underground space synthesis of multiple transportation modes or multiple functions
It is existing, there is not yet collection " Urban Underground pipe gallery, Urban Underground expressway, urban underground construction space " Urban Underground Complex
Type.Therefore, there is an urgent need to develop underground space synthesises, adapt to national green building and the strategy of sustainable development.
Utility model content
Utility model aims to solve the assembling problems of underground tunnel project, especially solution large span, big ruler
The assembly problem of degree, big sections of tunnel vault.
To achieve the goals above, the technical solution adopted in the utility model are as follows:
A kind of assembly concrete tunnel vault structure is formed by connecting by multiple groups precast concrete tunnel arch bar;Every group of packet
Two pieces of precast concrete tunnel arch bars are included, the horizontal connection ribs of two pieces of precast concrete tunnel arch bars is opposite, pre- in two sides
Concrete tunnel arch bar processed be bi-directionally connected installation big angle mouthful and circumferential horizontal connection installation notch are respectively adopted and are bolted;Its
In one piece of longer precast concrete tunnel arch bar precast concrete tunnel arch bar long 200 ~ 500mm shorter than another piece;
Two groups of adjacent precast concrete tunnel arch bars be longer precast concrete tunnel arch bar with it is shorter prefabricated
Concrete tunnel arch bar is adjacent;Two groups of adjacent precast concrete tunnel arch bars are by being bi-directionally connected the small angle mouthful of installation, Zong Xianglian
Installation notch are connect to be connected by screw bolts;Both ends are bi-directionally connected that installation small angle mouthful is corresponding, and intermediate being located at is longer prefabricated mixed
Solidifying soil tunnel arch bar is bi-directionally connected the small angle mouthful of installation and is bolted;
The center-line joint of the precast concrete tunnel arch bar of two adjacent groups is staggered.
Further, precast concrete tunnel arch bar mainly includes arch top plate, vertical connection reinforcement rib, horizontal company
Ribs is connect, installation big angle mouthful is bi-directionally connected, is bi-directionally connected the small angle mouthful of installation, is circumferential horizontal connection installation notch, longitudinally connected
Installation notch, circumferential vertical connection installation notch, screw hole, whole reinforcement steelframe, stress arc independence reinforcing bar, ring muscle,
Arch top plate is arc panel, and the circumferential connecting pin of two of plate, an end face is level, and other end is vertical;In water
Vertical connection reinforcement rib is respectively set in planar end surface, the two sides of plate, and the plane that vertical connection reinforcement rib is connect with horizontal end face is perpendicular
It faces directly;In vertical end face, horizontal connection ribs is respectively set in the two sides of plate, what horizontal connection ribs was connect with vertical end face
Plane is horizontal plane;
It is bi-directionally connected the small angle mouthful of installation in being respectively set for the both ends of vertical connection reinforcement rib, and opens up screw hole, wherein
Two vertical screw holes lead to horizontal end face, and a horizontal screw hole leads to vertical side end face;The two of horizontal connection ribs
Being respectively set for end is bi-directionally connected installation big angle mouthful, and opens up screw hole, and the horizontal screw hole of two of them leads to vertical end face, and one
Horizontal screw hole leads to vertical side end face;The circumferential vertical connection installation notch of setting between the small angle mouthful of installation are being bi-directionally connected,
And it opens up two vertical screw holes and leads to horizontal end face;Being bi-directionally connected between installation big angle mouthful, several circumferential horizontal connection peaces are set
Tankage mouth, and open up two vertical screw holes and lead to vertical end face;
It is being bi-directionally connected installation big angle mouthful and is being bi-directionally connected the corresponding position in the small angle mouthful of installation and circumferential horizontal connection peace
Elongated whole reinforcement steelframe is arranged in tankage mouth position corresponding with the vertical connection installation notch of circumferential direction, and entirety reinforces the perpendicular of steelframe
Straight connecting pin steel plate is located at the horizontal end face of plate;
Junction steel plate screw hole on the steel plate of vertical connecting pin is located between two stress arch steels of horizontal distribution;It is horizontal
Connecting pin steel plate is located at the vertical end face of plate, and the junction steel plate screw hole of horizontal connection end steel plate is located at two stress being distributed vertically
Between arch steel;Several stress arc independence reinforcing bars are respectively provided with integrally reinforcing the top and bottom between steelframe,
Several equally distributed ring muscle are set, and ring muscle is ring-type, reinforces steelframe, stress arc independence stirrup for whole
Firmly.
Further, the whole steelframe 1-10 that reinforces mainly includes stress arch steel 1-10-1, horizontal connection end steel
Plate 1-10-2, vertical connecting pin steel plate 1-10-3, junction steel plate screw hole 1-10-4, horizontal connection enhancing muscle 1-10-5, connect vertically
Enhancing muscle 1-10-6 is met,
4 stress arch steel 1-10-1 are arched ribs, are located at 4 corners, both ends respectively with horizontal connection
Steel plate 1-10-2 and vertical connecting pin steel plate 1-10-3 is held, connection type is welding;Flushconnection end steel plate 1-10-2 is vertical steel
Plate, at horizontal connection end, four interior angles of steel plate 1-10-2 open junction steel plate screw hole 1-10-4, in horizontal connection end steel plate 1-10-
Four horizontal connections are welded on 2 enhances muscle 1-10-5, wherein 2 horizontal connection enhancing muscle 1-10-5 and horizontal connection end steel plate 1-
The tie point of 10-2 is located at the tie point of 2 stress arch steel 1-10-1 of lower layer and horizontal connection end steel plate 1-10-2
Underface after level is overhanging and is folded upward at, and intersects respectively with upper layer stress arch steel 1-10-1;Another 2 horizontal connections
The tie point of enhancing muscle 1-10-5 and horizontal connection end steel plate 1-10-2 be located at the 2 stress arch steel 1-10-1 in upside with
The surface of the tie point of horizontal connection end steel plate 1-10-2, it is horizontal it is overhanging after and bend downward, and with lower layer's stress arc-shaped steel
Muscle 1-10-1 intersects respectively;
Vertical connecting pin steel plate 1-10-3 is horizontal steel plate, opens company in four interior angles of vertical connecting pin steel plate 1-10-3
Meet steel plate screw hole 1-10-4;
Four vertical connecting reinforcement 1-10-6 are welded on vertical connecting pin steel plate 1-10-3, wherein 2 vertical connections
The tie point of enhancing muscle 1-10-6 and vertical connecting pin steel plate 1-10-3 is located at 2 stress arch steel 1-10-1 on the inside of arc
With the inside of the tie point of vertical connecting pin steel plate 1-10-3, hand over respectively straight up and with outer layer stress arch steel 1-10-1
Fork;The tie point of another 2 vertical connecting reinforcement 1-10-6 and vertical connecting pin steel plate 1-10-3 is located at 2, the outside of arc
The outside of the tie point of stress arch steel 1-10-1 and vertical connecting pin steel plate 1-10-3, it is vertical it is overhanging after and bend inwards,
And intersect respectively with two vertical connecting reinforcement 1-10-6 of inside.
Beneficial effect
The utility model has the beneficial effects that template can be saved, improve execution conditions when production, improves labour production
Rate accelerates construction progress, and guarantees construction quality.No intermediate supports can be provided for large scale, large span, big sections of tunnel
Arch bar.
Detailed description of the invention
The assembly concrete tunnel vault structure in the utility model is described further with reference to the accompanying drawing:
Fig. 1 is assembly concrete tunnel vault structural plan schematic diagram;
Fig. 2 is the positive elevational schematic view of assembly concrete tunnel vault structure;
Fig. 3 is precast concrete tunnel arch bar floor map;
Fig. 4 is the positive elevational schematic view of precast concrete tunnel arch bar;
Fig. 5 is the main reinforcing bar configuration plane schematic diagram of precast concrete tunnel arch bar;
Fig. 6 is that arch bar main reinforcing bar in precast concrete tunnel configures positive elevational schematic view.
In figure: 1 is precast concrete tunnel arch bar;2 be bolt;
1-1 is arch top plate;1-2 is vertical connection reinforcement rib;1-3 is horizontal connection ribs;1-4 is to be bi-directionally connected peace
Fill big angle mouthful;1-5 is to be bi-directionally connected the small angle mouthful of installation;1-6 is circumferential horizontal connection installation notch;1-7 is longitudinally connected installation
Notch;1-8 is circumferential vertical connection installation notch;1-9 is screw hole;1-10 is whole reinforcement steelframe;1-10-1 is stress arc
Reinforcing bar;1-10-2 is horizontal connection end steel plate;1-10-3 is vertical connecting pin steel plate;1-10-4 is junction steel plate screw hole;1-11
For stress arc independence reinforcing bar;1-12 is ring muscle.
Specific embodiment:
In order to further illustrate the utility model, the utility model is retouched in detail with reference to the accompanying drawings and embodiments
It states, but they cannot be interpreted as to the restriction to scope of protection of the utility model.
Embodiment: a kind of assembly concrete tunnel vault structure, as shown in Fig. 1 ~ Fig. 6,
Assembly concrete tunnel vault structure is formed by connecting by multiple groups precast concrete tunnel arch bar 1;Every group includes two
The horizontal connection ribs 1-3 of block precast concrete tunnel arch bar 1, two pieces of precast concrete tunnel arch bars 1 is opposite, pre- in two sides
Bolt is respectively adopted in the installation big angle mouthful 1-4 and circumferential direction horizontal connection installation notch 1-6 that is bi-directionally connected of concrete tunnel arch bar 1 processed
2 connections;One of longer precast concrete tunnel arch bar 1 precast concrete tunnel arch bar 1 shorter than another piece is long by 200
~500mm;
Two groups of adjacent precast concrete tunnel arch bars 1 be longer precast concrete tunnel arch bar 1 with it is shorter pre-
Concrete tunnel arch bar 1 processed is adjacent;Two groups of adjacent precast concrete tunnel arch bars 1 by be bi-directionally connected the small angle mouthful 1-5 of installation,
Longitudinally connected installation notch 1-7 is connected using bolt 2;Both ends are bi-directionally connected that installation small angle mouthful 1-5 is corresponding, and intermediate is located at
Longer precast concrete tunnel arch bar 1 is bi-directionally connected the small angle mouthful 1-5 of installation and is connected by bolt 2;
The center-line joint of the precast concrete tunnel arch bar 1 of two adjacent groups is staggered.
Precast concrete tunnel arch bar 1 mainly includes arch top plate 1-1, vertical connection reinforcement rib 1-2, horizontal connection
Ribs 1-3, it is bi-directionally connected installation big angle mouthful 1-4, is bi-directionally connected the small angle mouthful 1-5 of installation, circumferential horizontal connection installation notch 1-
6, longitudinally connected installation notch 1-7, circumferential vertical connection installation notch 1-8, screw hole 1-9, whole reinforcement steelframe 1-10, stress arc
Shape independence reinforcing bar 1-11, ring muscle 1-12,
Arch top plate 1-1 is arc panel, and the circumferential connecting pin of two of plate, an end face is level, and other end is vertical;?
Vertical connection reinforcement rib 1-2 is respectively set in horizontal end face, the two sides of plate, what vertical connection reinforcement rib 1-2 was connect with horizontal end face
Plane is vertical plane;In vertical end face, the two sides of plate are respectively set horizontal connection ribs 1-3, horizontal connection ribs 1-3 with
The plane of vertical end face connection is horizontal plane;
It is bi-directionally connected the small angle mouthful 1-5 of installation in being respectively set for the both ends of vertical connection reinforcement rib 1-2, and opens up screw hole
1-9, the vertical screw hole 1-9 of two of them lead to horizontal end face, and a horizontal screw hole 1-9 leads to vertical side end face;In level
Being respectively set for the both ends of connection reinforcement rib 1-3 is bi-directionally connected installation big angle mouthful 1-4, and opens up screw hole 1-9, two of them water
Flat screw hole 1-9 leads to vertical end face, and a horizontal screw hole 1-9 leads to vertical side end face;It is being bi-directionally connected the small angle mouthful of installation
Circumferential vertical connection installation notch 1-8 is set between 1-5, and opens up two vertical screw hole 1-9 and leads to horizontal end face;In two-way company
It connects and several circumferential horizontal connection installation notch 1-6 is set between the 1-4 of installation big angle mouthful, and open up two vertical screw hole 1-9 and lead to
Vertical end face;
The position corresponding with the small angle mouthful 1-5 of installation is bi-directionally connected big angle mouthful 1-4 and circumferential level are installed being bi-directionally connected
The position corresponding with circumferential connection installation notch 1-8 vertically connection installation notch 1-6 is arranged elongated entirety and reinforces steelframe 1-10,
The whole vertical connecting pin steel plate 1-10-3 for reinforcing steelframe 1-10 is located at the horizontal end face of plate;
Junction steel plate screw hole 1-10-4 on vertical connecting pin steel plate 1-10-3 is located at two stress arcs of horizontal distribution
Between reinforcing bar 1-10-1;Horizontal connection end steel plate 1-10-2 is located at the vertical end face of plate, the company of horizontal connection end steel plate 1-10-2
Steel plate screw hole 1-10-4 is met to be located between two stress arch steel 1-10-1 being distributed vertically;Integrally reinforce steelframe 1-10 it
Between top and bottom be respectively provided with several stress arc independence reinforcing bar 1-11,
Several equally distributed ring muscle 1-12 are set, and ring muscle 1-12 is ring-type, reinforces steelframe 1-10, stress arc for whole
Shape independence reinforcing bar 1-11 is waled.
It is described it is whole reinforce steelframe 1-10 mainly include stress arch steel 1-10-1, horizontal connection end steel plate 1-10-2,
Vertical connecting pin steel plate 1-10-3, junction steel plate screw hole 1-10-4, horizontal connection enhance muscle 1-10-5, vertical connecting reinforcement 1-
10-6,
4 stress arch steel 1-10-1 are arched ribs, are located at 4 corners, both ends respectively with horizontal connection
Steel plate 1-10-2 and vertical connecting pin steel plate 1-10-3 is held, connection type is welding;Horizontal connection end steel plate 1-10-2 is vertical
Steel plate, at horizontal connection end, four interior angles of steel plate 1-10-2 open junction steel plate screw hole 1-10-4, in horizontal connection end steel plate 1-
Four horizontal connections are welded on 10-2 enhances muscle 1-10-5, wherein 2 horizontal connection enhancing muscle 1-10-5 and horizontal connection end steel
The tie point of plate 1-10-2 is located at the connection of lower layer 2 stress arch steel 1-10-1 and horizontal connection end steel plate 1-10-2
The underface of point after level is overhanging and is folded upward at, and intersects respectively with upper layer stress arch steel 1-10-1;Another 2 levels
The tie point of connecting reinforcement 1-10-5 and horizontal connection end steel plate 1-10-2 is located at the 2 stress arch steel 1- in upside
The surface of the tie point of 10-1 and horizontal connection end steel plate 1-10-2, it is horizontal it is overhanging after and bend downward, and with lower layer's stress
Arch steel 1-10-1 intersects respectively;
Vertical connecting pin steel plate 1-10-3 is horizontal steel plate, opens company in four interior angles of vertical connecting pin steel plate 1-10-3
Meet steel plate screw hole 1-10-4;
Four vertical connecting reinforcement 1-10-6 are welded on vertical connecting pin steel plate 1-10-3, wherein 2 vertical connections
The tie point of enhancing muscle 1-10-6 and vertical connecting pin steel plate 1-10-3 is located at 2 stress arch steel 1-10-1 on the inside of arc
With the inside of the tie point of vertical connecting pin steel plate 1-10-3, hand over respectively straight up and with outer layer stress arch steel 1-10-1
Fork;The tie point of another 2 vertical connecting reinforcement 1-10-6 and vertical connecting pin steel plate 1-10-3 is located at 2, the outside of arc
The outside of the tie point of stress arch steel 1-10-1 and vertical connecting pin steel plate 1-10-3, it is vertical it is overhanging after and bend inwards,
And intersect respectively with two vertical connecting reinforcement 1-10-6 of inside.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art
For art personnel, without departing from the principle of this utility model, several improvements and modifications can also be made, these improve and
Retouching also should be regarded as the protection scope of the utility model.
Claims (3)
1. a kind of assembly concrete tunnel vault structure, it is characterised in that: connected by multiple groups precast concrete tunnel arch bar (1)
It forms;Every group includes two pieces of precast concrete tunnel arch bars (1), and the horizontal connection of two pieces of precast concrete tunnel arch bars (1) adds
Strong rib (1-3) is bi-directionally connected installation big angle mouthful (1-4) and circumferential direction level relatively, in two sides precast concrete tunnel arch bar (1)
Bolt (2) connection is respectively adopted in connection installation notch (1-6);One of longer precast concrete tunnel arch bar (1) is than another
Long 200 ~ the 500mm of one piece shorter of precast concrete tunnel arch bar (1);
Two groups of adjacent precast concrete tunnel arch bars (1) be longer precast concrete tunnel arch bar (1) with it is shorter pre-
Concrete tunnel arch bar (1) processed is adjacent;Two groups of adjacent precast concrete tunnel arch bars (1) are by being bi-directionally connected the small angle mouthful of installation
(1-5), longitudinally connected installation notch (1-7) are connected using bolt (2);Both ends are bi-directionally connected the small angle mouthful (1-5) of installation relatively
It answers, intermediate being bi-directionally connected positioned at longer precast concrete tunnel arch bar (1) is installed small angle mouthful (1-5) and connected by bolt (2)
It connects;
The center-line joint of the precast concrete tunnel arch bar (1) of two adjacent groups is staggered.
2. assembly concrete tunnel vault structure according to claim 1, it is characterised in that: the precast concrete tunnel
Road arch bar (1) mainly includes arch top plate (1-1), vertical connection reinforcement rib (1-2), horizontal connection ribs (1-3), two-way company
Installation big angle mouthful (1-4) is connect, the small angle mouthful (1-5) of installation is bi-directionally connected, is circumferential horizontal connection installation notch (1-6), longitudinally connected
Installation notch (1-7), circumferential vertical connection installation notch (1-8), screw hole (1-9), whole reinforcement steelframe (1-10), stress arc
Independent reinforcing bar (1-11), ring muscle (1-12),
Arch top plate (1-1) is arc panel, and the circumferential connecting pin of two of plate, an end face is level, and other end is vertical;In water
Vertical connection reinforcement rib (1-2) is respectively set in planar end surface, the two sides of plate, and vertical connection reinforcement rib (1-2) connect with horizontal end face
Plane be vertical plane;In vertical end face, horizontal connection ribs (1-3), horizontal connection ribs is respectively set in the two sides of plate
The plane that (1-3) is connect with vertical end face is horizontal plane;
It is bi-directionally connected the small angle mouthful (1-5) of installation in being respectively set for the both ends of vertical connection reinforcement rib (1-2), and opens up screw hole
(1-9), the vertical screw hole of two of them (1-9) lead to horizontal end face, and a horizontal screw hole (1-9) leads to vertical side end face;
It is bi-directionally connected installation big angle mouthful (1-4) in being respectively set for the both ends of horizontal connection ribs (1-3), and opens up screw hole (1-
9), the horizontal screw hole of two of them (1-9) leads to vertical end face, and a horizontal screw hole (1-9) leads to vertical side end face;Double
Circumferential vertical connection installation notch (1-8) of setting between small angle mouthful (1-5) is installed to connection, and opens up two vertical screw hole (1-
9) horizontal end face is led to;Being bi-directionally connected between installation big angle mouthful (1-4), several circumferential horizontal connection installation notch (1- are set
6) it, and two vertical screw holes (1-9) is opened up leads to vertical end face;
The corresponding position of small angle mouthful (1-5) and circumferential level are installed being bi-directionally connected to install big angle mouthful (1-4) and be bi-directionally connected
Connection installation notch (1-6) and the corresponding position of circumferential vertical connection installation notch (1-8) are arranged elongated entirety and reinforce steelframe
(1-10), the whole vertical connecting pin steel plate (1-10-3) for reinforcing steelframe (1-10) are located at the horizontal end face of plate;
Junction steel plate screw hole (1-10-4) on vertical connecting pin steel plate (1-10-3) is located at two stress arcs of horizontal distribution
Between reinforcing bar (1-10-1);Horizontal connection end steel plate (1-10-2) is located at the vertical end face of plate, horizontal connection end steel plate (1-10-
2) junction steel plate screw hole (1-10-4) is located between two stress arch steels (1-10-1) being distributed vertically;Integrally adding
Top and bottom between strong steelframe (1-10) are respectively provided with several stress arc independence reinforcing bars (1-11),
Several equally distributed ring muscle (1-12) are set, and ring muscle (1-12) is ring-type, reinforces steelframe (1-10), stress for whole
Arc independence reinforcing bar (1-11) is waled.
3. assembly concrete tunnel vault structure according to claim 2, it is characterised in that: the whole reinforcement steelframe
(1-10) mainly includes stress arch steel (1-10-1), horizontal connection end steel plate (1-10-2), vertical connecting pin steel plate (1-
10-3), junction steel plate screw hole (1-10-4), horizontal connection enhance muscle (1-10-5), vertical connecting reinforcement (1-10-6),
4 stress arch steels (1-10-1) are arched ribs, are located at 4 corners, both ends respectively with horizontal connection end
Steel plate (1-10-2) and vertical connecting pin steel plate (1-10-3), connection type are welding;Flushconnection end steel plate (1-10-2) is perpendicular
Straight steel plate opens junction steel plate screw hole (1-10-4) in four interior angles of horizontal connection end steel plate (1-10-2), at horizontal connection end
Four horizontal connections enhancing muscle (1-10-5) is welded on steel plate (1-10-2), wherein 2 horizontal connections enhancings muscle (1-10-5) with
The tie point of horizontal connection end steel plate (1-10-2) is located at 2 stress arch steels (1-10-1) of lower layer and horizontal connection end
The underface of the tie point of steel plate (1-10-2), it is horizontal it is overhanging after and be folded upward at, and with upper layer stress arch steel (1-10-
1) intersect respectively;The tie point of another 2 horizontal connections enhancing muscle (1-10-5) and horizontal connection end steel plate (1-10-2) distinguishes position
It is horizontal outer in the surface of the stress arch steel (1-10-1) of upside 2 and the tie point of horizontal connection end steel plate (1-10-2)
It after stretching and bends downward, and intersects respectively with lower layer stress arch steel (1-10-1);
Vertical connecting pin steel plate (1-10-3) is horizontal steel plate, opens company in four interior angles of vertical connecting pin steel plate (1-10-3)
Meet steel plate screw hole (1-10-4);
Four vertical connecting reinforcements (1-10-6) are welded on vertical connecting pin steel plate (1-10-3), wherein 2 vertical connections
The tie point of enhancing muscle (1-10-6) and vertical connecting pin steel plate (1-10-3) is located at 2 stress arch steels on the inside of arc
The inside of the tie point of (1-10-1) and vertical connecting pin steel plate (1-10-3), straight up and with outer layer stress arch steel
(1-10-1) intersects respectively;The tie point of another 2 vertical connecting reinforcements (1-10-6) and vertical connecting pin steel plate (1-10-3)
It is located at the outer of 2, the outside stress arch steel (1-10-1) of arc and the tie point of vertical connecting pin steel plate (1-10-3)
Side, it is vertical it is overhanging after and bend inwards, and intersect respectively with two vertical connecting reinforcements (1-10-6) of inside.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821827417.5U CN209261595U (en) | 2018-11-07 | 2018-11-07 | Assembly concrete tunnel vault structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821827417.5U CN209261595U (en) | 2018-11-07 | 2018-11-07 | Assembly concrete tunnel vault structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209261595U true CN209261595U (en) | 2019-08-16 |
Family
ID=67553886
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821827417.5U Active CN209261595U (en) | 2018-11-07 | 2018-11-07 | Assembly concrete tunnel vault structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209261595U (en) |
-
2018
- 2018-11-07 CN CN201821827417.5U patent/CN209261595U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106436758B (en) | Prefabricated assembled concrete subway station | |
CN106368240B (en) | Prefabricated assembled concrete subway station and its method of construction | |
CN206174146U (en) | Assembly type structure's assembly node | |
CN206971471U (en) | One kind interval steel pipe and combined concrete shear wall system | |
CN206189463U (en) | Prefabricated assembled concrete subway station | |
CN209261595U (en) | Assembly concrete tunnel vault structure | |
CN109322677A (en) | Precast concrete tunnel arch bar | |
CN209129622U (en) | Precast concrete tunnel arch bar | |
CN203603525U (en) | Reinforcing structure with clamp plate girder and clamp plate column externally arranged for stone structure | |
CN109296384A (en) | Assembly concrete tunnel vault structure | |
CN204590326U (en) | A kind of wallboard erects dress syndeton and uses the house of this structure | |
CN103498572B (en) | The construction method of the additional clamping plate beam of stone structure and clamping plate post ruggedized construction | |
CN209260760U (en) | A kind of subway station precast concrete side wall panel | |
CN206016048U (en) | Assemble type concrete slab | |
CN109695257A (en) | A kind of assembly concrete multikeyway vault construction | |
CN204491661U (en) | Upper arch prestressed structure pin-connected panel underground pipe gallery | |
CN206408743U (en) | A kind of assembly concrete node | |
CN109296000A (en) | A kind of subway station precast concrete side wall panel | |
CN206554116U (en) | A kind of alternating expression underground traffic piping lane vehicle in and out port structure | |
CN110258637A (en) | A kind of underground general space cellular construction | |
CN106193685A (en) | Prefabricated assembled communications equipment room structure | |
CN205364171U (en) | Forming die of prefabricated net roof beam | |
CN208088564U (en) | A kind of box compound shear wall of triangle steel | |
CN110144946A (en) | A kind of underground space structure beam slab linked system | |
CN206408643U (en) | A kind of three circular cross section Urban Underground Complexes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191224 Address after: 518054 9 / F, block B, phase I, sunshine science and technology innovation center, Nanshan community, Nanshan street, Nanshan District, Shenzhen City, Guangdong Province Patentee after: Shenzhen Gangchuang Building Material Co., Ltd. Address before: Hunnan Hunnan Road Shenyang city Liaoning province 110168 No. 9 Patentee before: Shenyang Building Univ. |
|
TR01 | Transfer of patent right |