CN209260702U - A kind of assembly concrete prefabricated pile - Google Patents

A kind of assembly concrete prefabricated pile Download PDF

Info

Publication number
CN209260702U
CN209260702U CN201821560943.XU CN201821560943U CN209260702U CN 209260702 U CN209260702 U CN 209260702U CN 201821560943 U CN201821560943 U CN 201821560943U CN 209260702 U CN209260702 U CN 209260702U
Authority
CN
China
Prior art keywords
tubular pole
installation part
offers
fixedly connected
slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821560943.XU
Other languages
Chinese (zh)
Inventor
黄嘉亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821560943.XU priority Critical patent/CN209260702U/en
Application granted granted Critical
Publication of CN209260702U publication Critical patent/CN209260702U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of assembly concrete prefabricated piles, it is related to concrete tubular pile technical field, the assembly concrete prefabricated pile, including the first tubular pole, second tubular pole, installation part and fixing piece, the both ends of first tubular pole and the second tubular pole have been respectively fixedly connected with installation part and fixing piece, first tubular pole and the second tubular pole are fixedly connected by installation part with fixing piece, one middle side part of the installation part offers slot, multiple installing ports are offered at the one side edge of the installation part, the inside of the installing port offers rotation slot, the rotation slot offers fixing groove far from one end of installing port, the front surface of the rotation slot offers slideway.One end of the assembly concrete prefabricated pile, one end of the first tubular pole and the second tubular pole passes through installation part respectively and the cooperation of fixing piece is fixed, and facilitates the assembly between multiple tubular poles by installation part and fixing piece, and structure is simple, easy for installation, stable connection.

Description

A kind of assembly concrete prefabricated pile
Technical field
The utility model relates to concrete tubular pile technical field, specially a kind of assembly concrete prefabricated pile.
Background technique
There are rectangle or circle etc. in the section of traditional precast reinforced concrete pile, although these section forms are relatively easy Production, but it is more using the concrete amount of the precast reinforced concrete piles of these cross sectional shapes, so that the self weight of stake is also corresponding It is larger, while the bearing capacity of the frictional force, stake around stake and the breakout capacity of stake are also not ideal enough, do not reach best effective Fruit, and prefabricated concrete pipe pile needs more piece pipe of concrete pile cutoff to form, and current docking mode is welding mostly, although than It is more stable, but working strength is larger, the quality of welding is not sufficiently stable, and there are some potential safety problemss.
One kind disclosed in 207685821 U of Chinese utility model patent ublic specification of application CN is concrete prefabricated Tubular pole, the concrete precast pipe pile, although the mounting means can be attached installation by way of non-solder, by grouting and Bolt makes to connect more stable, but the structure is in actual use, and connection is excessively complicated, and the dismounting of tubular pole is inconvenient, and It needs to consume a large amount of time before construction, influences the overall progress of operation.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of assembly concrete prefabricated pile, solves existing , dismounting inconvenient with assembly efficiency low problem complicated for concrete precast pile assembly connection.
(2) technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs:
A kind of assembly concrete prefabricated pile, comprising: the first tubular pole, the second tubular pole, installation part and fixing piece;
The both ends of first tubular pole and the second tubular pole have been respectively fixedly connected with installation part and fixing piece, first tubular pole It is fixedly connected by installation part with fixing piece with the second tubular pole;
One middle side part of the installation part offers slot, and multiple installations are offered at the one side edge of the installation part Mouthful, the inside of the installing port offers rotation slot, and the rotation slot offers fixing groove far from one end of installing port, and described turn The front surface of dynamic slot offers slideway;
Multiple connecting columns, the one end of the connecting column far from installation part are fixedly connected at the one side edge of the installation part It is fixedly connected with clamping block, the upper surface of the clamping block offers threaded hole, and the bottom of the threaded hole is fixedly connected with spiral shell It is female;
Multiple fixation holes are offered on the outside of the installation part, the inside of the fixation hole offers fixed channel, described Fixed channel one end and fixing groove far from fixation hole are interconnected.
Optionally, the structure of first tubular pole and the second tubular pole is identical, the length of first tubular pole and the second tubular pole It is equal.
Optionally, the slot is ring structure, and the plate is annular hollow structure.
Optionally, the slot is adapted with plate, and the inner surface of the slot is fixedly connected with gasket.
Optionally, the installing port, rotation slot and fixing groove are interconnected, and the connecting column is adapted with slideway.
Optionally, the quantity of the installing port is no less than four, and four installing ports are circle with the central point of installation part The distribution of heart circular array.
Optionally, the quantity of the clamping block and the quantity of installing port are equal, the quantity phase of the fixation hole and fixing groove Deng the fixation hole is correspondingly arranged with fixing groove.
(3) beneficial effect
The utility model provides a kind of assembly concrete prefabricated pile, have it is following the utility model has the advantages that
(1), assembly concrete prefabricated pile, on the one hand, one end of the first tubular pole and one end of the second tubular pole lead to respectively The cooperation for crossing installation part and fixing piece is fixed, and facilitates the assembly between multiple tubular poles, structure by installation part and fixing piece Simply, easy for installation, stable connection.
(2), on the other hand the assembly concrete prefabricated pile during installation, can be facilitated by the cooperation of slot and plate Installation part and fixing piece are positioned, then by adjusting by the inside of clamping block insertion installing port, by rotating clockwise Clamping block is transferred to the inside of fixing groove by the second tubular pole, then sequentially passes through fixation hole, fixed channel and screw thread by screw rod Hole, and be fixedly connected with the first tubular pole with the second tubular pole by nut, screw rod is located at fixation hole far from one end of nut at this time Inside, the side of screw rod and the side of fixation hole are concordant, do not influence the normal use of tubular pole.
Detailed description of the invention
Fig. 1 is the first tube pile structure schematic diagram of the utility model;
Fig. 2 is that the installation part structure side of the utility model cuts open schematic diagram;
Fig. 3 is the anchor structure schematic elevation view of the utility model;
Fig. 4 is A plot structure enlarged diagram in Fig. 3 of the utility model;
Fig. 5 is the fixation hole configurations schematic diagram of the utility model;
Fig. 6 is that schematic diagram is cutd open in the fixed slot configurations side of the utility model.
In figure: the first tubular pole of 1-, the second tubular pole of 2-, 3- installation part, 4- fixing piece, 5- slot, 6- installing port, 7- rotation Slot, 8- fixing groove, 9- slideway, 10- plate, 11- connecting column, 12- clamping block, 13- threaded hole, 14- nut, 15- fixation hole, 16- fixes channel.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", " length ", " width Degree ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside", " suitable The orientation or positional relationship of the instructions such as hour hands ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " is orientation based on the figure Or positional relationship, be merely for convenience of describing the present invention and simplifying the description, rather than the device of indication or suggestion meaning or Element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as the limit to the utility model System.
In the present invention unless specifically defined or limited otherwise, term " setting ", " connected ", " connects " installation " Connect ", the terms such as " fixation " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection;It can be machine Tool connection;It can be directly connected, it can also be indirectly connected through an intermediary.For those of ordinary skill in the art and Speech, can understand the concrete meaning of above-mentioned term in the present invention as the case may be.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more of the features.The meaning of " plurality " is two or two in the description of the present invention, More than, unless otherwise specifically defined.
Fig. 1-6 is please referred to, the utility model provides a kind of technical solution:
A kind of assembly concrete prefabricated pile, comprising: the first tubular pole 1, the second tubular pole 2, installation part 3 and fixing piece 4, first The cooperation that one end of tubular pole 1 and one end of the second tubular pole 2 pass through installation part 3 and fixing piece 4 respectively is fixed, and passes through installation part 3 and fixing piece 4 facilitate the assembly between multiple tubular poles, structure is simple, easy for installation, stable connection;
The both ends of first tubular pole 1 and the second tubular pole 2 have been respectively fixedly connected with installation part 3 and fixing piece 4,1 He of the first tubular pole Second tubular pole 2 is fixedly connected by installation part 3 with fixing piece 4;
One middle side part of installation part 3 offers slot 5, during installation, can conveniently pair by the cooperation of slot 5 and plate 10 Installation part 3 and fixing piece 4 are positioned, and multiple installing ports 6 are offered at the one side edge of installation part 3, and the inside of installing port 6 is opened Equipped with rotation slot 7, rotation slot 7 offers fixing groove 8 far from one end of installing port 6, and the front surface of rotation slot 7 offers slideway 9;
Multiple connecting columns 11 are fixedly connected at the one side edge of installation part 3, the one end of connecting column 11 far from installation part 3 is solid Surely it is connected with clamping block 12, by adjusting clamping block 12 to be inserted into the inside of installing port 6, by rotating clockwise the second tubular pole 2, clamping block 12 is transferred to the inside of fixing groove 8, fixation hole 15, fixed channel 16 and threaded hole are then sequentially passed through by screw rod 13, and be fixedly connected with the first tubular pole 1 with the second tubular pole 2 by nut 14, the upper surface of clamping block 12 offers threaded hole 13, The bottom of threaded hole 13 is fixedly connected with nut 14;
The outside of installation part 3 offers multiple fixation holes 15, by screw rod that the first tubular pole 1 and the second tubular pole 2 is fixed After connection, screw rod is located at the inside of fixation hole 15 far from one end of nut 14, and the side of screw rod is concordant with the side of fixation hole 15, The inside for not influencing the normal use fixation hole 15 of tubular pole offers fixed channel 16, fixes one of channel 16 far from fixation hole 15 End is interconnected with fixing groove 8.
A kind of optional technical solution as the utility model:
First tubular pole 1 is identical with the structure of the second tubular pole 2, the equal length of the first tubular pole 1 and the second tubular pole 2.
A kind of optional technical solution as the utility model:
Slot 5 is ring structure, and plate 10 is annular hollow structure.
A kind of optional technical solution as the utility model:
Slot 5 is adapted with plate 10, and the inner surface of slot 5 is fixedly connected with gasket, makes the company of slot 5 Yu plate 10 It connects more stable.
A kind of optional technical solution as the utility model:
Installing port 6, rotation slot 7 and fixing groove 8 are interconnected, and connecting column 11 is adapted with slideway 9, by connecting column 11 and The cooperation of slideway 9, when clamping block 12 being made to be transferred to fixing groove 8, installation part 3 still keeps being bonded with fixing piece 4.
A kind of optional technical solution as the utility model:
The quantity of installing port 6 is no less than four, and four installing ports 6 are using the central point of installation part 3 as center of circle circular array Distribution.
A kind of optional technical solution as the utility model:
The quantity of clamping block 12 is equal with the quantity of installing port 6, and fixation hole 15 is equal with the quantity of fixing groove 8, fixation hole 15 are correspondingly arranged with fixing groove 8, are inserted into four installing ports 6 after rotating and are fixed respectively by four clamping blocks 12, make the first pipe Stake 1 and the second tubular pole 2 connect more stable.
To sum up, assembly concrete prefabricated pile, in use, user is by the both ends of the first tubular pole 1 and the second tubular pole 2 Installation part 3 and fixing piece 4 is respectively welded in both ends, is assembled by installation part 3 and fixing piece 4 between tubular pole, by slot 5 with Plate 10 positions installation part 3 and fixing piece 4, then by adjusting keeping clamping block 12 corresponding with installing port 6, will be clamped Block 12 is inserted into the inside of installing port 6, and by rotating clockwise the second tubular pole 2, clamping block 12 is transferred to the inside of fixing groove 8, this When threaded hole 13 it is corresponding with fixed channel 16, fixation hole 15, fixation channel 16 and threaded hole are then sequentially passed through by screw rod 13, and be fixedly connected with the first tubular pole 1 with the second tubular pole 2 by nut 14, screw rod is located at solid far from one end of nut 14 at this time Determine the inside in hole 15, the side of screw rod is concordant with the side of fixation hole 15, will not influence the normal use of tubular pole.
It should be noted that in the present invention unless specifically defined or limited otherwise, fisrt feature is in the second spy It can be that the first and second features directly contact or the first and second features are connect indirectly by intermediary "above" or "below" sign Touching.Moreover, fisrt feature can be above the second feature " above ", " above " and " above " fisrt feature right above second feature or Oblique upper, or first feature horizontal height is merely representative of higher than second feature.Fisrt feature second feature " under ", " lower section " " following " can be fisrt feature and be directly under or diagonally below the second feature, or is merely representative of first feature horizontal height and is less than Second feature.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (5)

1. a kind of assembly concrete prefabricated pile characterized by comprising the first tubular pole (1), the second tubular pole (2), installation part (3) and fixing piece (4);
The both ends of first tubular pole (1) and the second tubular pole (2) have been respectively fixedly connected with installation part (3) and fixing piece (4), described First tubular pole (1) is fixedly connected by installation part (3) with fixing piece (4) with the second tubular pole (2);
One middle side part of the installation part (3) offers slot (5), offers at the one side edge of the installation part (3) multiple The inside of installing port (6), the installing port (6) offers rotation slot (7), the one end of the rotation slot (7) far from installing port (6) It offers fixing groove (8), the front surface of the rotation slot (7) offers slideway (9);
It is fixedly connected with multiple connecting columns (11) at the one side edge of the installation part (3), the connecting column (11) is far from installation One end of part (3) is fixedly connected with clamping block (12), and the upper surface of the clamping block (12) offers threaded hole (13), the spiral shell The bottom of pit (13) is fixedly connected with nut (14);
It is offered multiple fixation holes (15) on the outside of the installation part (3), the inside of the fixation hole (15) offers fixed logical Road (16), the fixed channel (16) one end and fixing groove (8) far from fixation hole (15) are interconnected;
The slot (5) is adapted with plate (10), and the inner surface of the slot (5) is fixedly connected with gasket;
The slot (5) is ring structure, and the plate (10) is annular hollow structure.
2. a kind of assembly concrete prefabricated pile according to claim 1, it is characterised in that:
First tubular pole (1) is identical with the structure of the second tubular pole (2), the length of first tubular pole (1) and the second tubular pole (2) It is equal.
3. a kind of assembly concrete prefabricated pile according to claim 1, it is characterised in that:
The installing port (6), rotation slot (7) and fixing groove (8) are interconnected, and the connecting column (11) is adapted with slideway (9).
4. a kind of assembly concrete prefabricated pile according to claim 1, it is characterised in that:
The quantity of the installing port (6) is no less than four, and four installing ports (6) are using the central point of installation part (3) as the center of circle Circular array distribution.
5. a kind of assembly concrete prefabricated pile according to claim 1, it is characterised in that:
The quantity of the clamping block (12) is equal with the quantity of installing port (6), the quantity of the fixation hole (15) and fixing groove (8) Equal, the fixation hole (15) is correspondingly arranged with fixing groove (8).
CN201821560943.XU 2018-09-25 2018-09-25 A kind of assembly concrete prefabricated pile Expired - Fee Related CN209260702U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821560943.XU CN209260702U (en) 2018-09-25 2018-09-25 A kind of assembly concrete prefabricated pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821560943.XU CN209260702U (en) 2018-09-25 2018-09-25 A kind of assembly concrete prefabricated pile

Publications (1)

Publication Number Publication Date
CN209260702U true CN209260702U (en) 2019-08-16

Family

ID=67552979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821560943.XU Expired - Fee Related CN209260702U (en) 2018-09-25 2018-09-25 A kind of assembly concrete prefabricated pile

Country Status (1)

Country Link
CN (1) CN209260702U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111926801A (en) * 2020-07-08 2020-11-13 湖南映晟交通建设工程有限公司 Sand-free large-hole concrete hollow pipe pile composite foundation treatment construction method
CN113309076A (en) * 2021-06-23 2021-08-27 高创建工股份有限公司 Mechanically-connected prefabricated special-shaped pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111926801A (en) * 2020-07-08 2020-11-13 湖南映晟交通建设工程有限公司 Sand-free large-hole concrete hollow pipe pile composite foundation treatment construction method
CN113309076A (en) * 2021-06-23 2021-08-27 高创建工股份有限公司 Mechanically-connected prefabricated special-shaped pile
CN113309076B (en) * 2021-06-23 2024-04-16 高创建工股份有限公司 Mechanical connection prefabricated special-shaped pile

Similar Documents

Publication Publication Date Title
CN209260702U (en) A kind of assembly concrete prefabricated pile
CN107060357B (en) The bracing device of Assembled wall panels
CN209562068U (en) One kind being used for Electric Design cable bearer
CN207812843U (en) A kind of reinforcing bar connector
CN209215094U (en) A kind of operating device for anti-float anchor rod detection
CN209555959U (en) A kind of civil engineering Combined concrete ground pilum
CN201713805U (en) Wave stiffening plate hollow steel pipe pile
CN210917964U (en) Building structure post reinforcing bar continuous-connection auxiliary support
CN209585109U (en) The assembled piping lane of pile wall interaction
CN209491554U (en) A kind of fixture for clamping wheel hub of wind turbine
CN105625749A (en) Steel pipe scaffold early-demounting component and device
CN211622625U (en) Template strutting arrangement is used in building engineering construction
CN209585139U (en) A kind of shallow foundation rectifying of leaned building ruggedized construction
CN211057804U (en) Foundation pit supporting structure
CN109577371A (en) The assembled piping lane of pile wall interaction
CN220985261U (en) Temporary power cable supporting assembly
CN208965381U (en) A kind of road gap-grouting device
CN208775404U (en) A kind of T beam anti-tipping apparatus
CN208235983U (en) A kind of vertical concrete structure curing means
CN209652923U (en) A kind of Novel road bridge consolidation of pile device
CN207436080U (en) A kind of assembled consolidates base support
CN206873496U (en) Inspection shaft structure is used in a kind of municipal administration
CN208201879U (en) A kind of foundation pit supporting construction
CN215441883U (en) Novel anti-falling ground anchor rod structure for electric power
CN215238995U (en) Hydraulic engineering strutting arrangement for pipe connection with function of rectifying

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190816

Termination date: 20200925