CN209585139U - A kind of shallow foundation rectifying of leaned building ruggedized construction - Google Patents

A kind of shallow foundation rectifying of leaned building ruggedized construction Download PDF

Info

Publication number
CN209585139U
CN209585139U CN201822189041.6U CN201822189041U CN209585139U CN 209585139 U CN209585139 U CN 209585139U CN 201822189041 U CN201822189041 U CN 201822189041U CN 209585139 U CN209585139 U CN 209585139U
Authority
CN
China
Prior art keywords
shallow foundation
transverse slat
building
fixedly connected
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822189041.6U
Other languages
Chinese (zh)
Inventor
查海明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201822189041.6U priority Critical patent/CN209585139U/en
Application granted granted Critical
Publication of CN209585139U publication Critical patent/CN209585139U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a kind of shallow foundation rectifying of leaned building ruggedized constructions, it is related to building structure correcting and then reinforcing technical field, the shallow foundation rectifying of leaned building ruggedized construction, including shallow foundation building, the side of the shallow foundation building is fixedly connected with the first fixed transverse slat, the shallow foundation building is fixedly connected with the second fixed transverse slat far from the side of the first fixed transverse slat, and the bottom that the described first fixed transverse slat and second fix transverse slat is fixedly connected to fixed vertical plate.The shallow foundation rectifying of leaned building ruggedized construction, by the way that the first positioning plate is arranged, pass through the adjustment to hydraulic stem later, hydraulic stem is set to push the first support plate, support frame and the second support plate that clamping is fixed to shallow foundation building, tentatively inclined shallow foundation building can be reinforced, by the internal whorl connection support threaded rod in the first positioning plate, the second positioning plate, the first support plate, support frame and the second support plate, further reinforcing can be done to shallow foundation building.

Description

A kind of shallow foundation rectifying of leaned building ruggedized construction
Technical field
The utility model relates to building structure correcting and then reinforcing technical field, specially a kind of shallow foundation rectifying of leaned building is reinforced Structure.
Background technique
Building is the general name of building and structures, is people to meet social life needs, utilizes grasped object Matter technological means, and the artificial environment created with certain scientific law, geomantic omen theory and aesthetic principle, some run-off the straights Building, often exist simultaneously foundation bearing capacity and be unsatisfactory for the problem of requiring, rectifying of leaned building method generally comprises soil digging Rectifying method, precipitation facture, pressing Ioad rectifying method and cut-off pillar and jacking method etc., above-mentioned method has one in construction usage Fixed deficiency, and existing strengthening mechanism is not easy to installing and dismounting, and fixed effect is not sufficiently stable.
Currently, the existing ruggedized construction for shallow foundation rectifying of leaned building, inconvenient for use, it is unfavorable for promoting the use of.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of shallow foundation rectifying of leaned building ruggedized construction, solves The existing ruggedized construction for shallow foundation rectifying of leaned building, it is inconvenient for use, it is unfavorable for the problem of promoting the use of.
(2) technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs:
A kind of shallow foundation rectifying of leaned building ruggedized construction, including shallow foundation building, the side of the shallow foundation building It is fixedly connected with the first fixed transverse slat, the shallow foundation building is fixedly connected with second far from the side of the first fixed transverse slat and consolidates Determine transverse slat, the bottom that the described first fixed transverse slat and second fix transverse slat is fixedly connected to fixed vertical plate, and described second is fixed The first positioning plate is fixedly connected at the top of transverse slat, the side at the top of the described first fixed transverse slat is fixedly connected with the second positioning Plate, the side of second positioning plate are fixedly connected with hydraulic stem, and the one end of the hydraulic stem far from the second positioning plate is fixed to be connected It is connected to the first support plate, first support plate is fixedly connected with support frame far from the side of hydraulic stem, and support frame as described above is separate The side of first support plate is fixedly connected with the second support plate.
Optionally, the inside of first positioning plate, the second positioning plate, the first support plate, support frame and the second support plate The first threaded hole is offered, the internal screw thread of first threaded hole is connected with support threaded rod.
Optionally, the second threaded hole is offered at the top of the described second fixed transverse slat.
Optionally, first positioning plate offers third threaded hole close to the side of the second fixed transverse slat,.
Optionally, fixing bolt, second spiral shell are threaded with inside second threaded hole and third threaded hole The quantity of pit, third threaded hole and fixing bolt is several.
Optionally, the fixed vertical plate is fixed on the inside of soil layer.
Optionally, the position of second threaded hole and third threaded hole corresponds to each other.
(3) beneficial effect
The utility model provides a kind of shallow foundation rectifying of leaned building ruggedized construction, have it is following the utility model has the advantages that
(1), shallow foundation rectifying of leaned building ruggedized construction, on the one hand, by fixing the at the top of the first fixed transverse slat One positioning plate makes hydraulic stem push the first support plate, support frame and the second support plate to shallow later by the adjustment to hydraulic stem Clamping is fixed in foundation construction object, can tentatively reinforce to inclined shallow foundation building, on the other hand, by the The internal whorl connection of one positioning plate, the second positioning plate, the first support plate, support frame and the second support plate supports threaded rod, energy So that the device is done further reinforcing to shallow foundation building, further improve the fixed effect of the device, enhances the device Practicability.
(2), shallow foundation rectifying of leaned building ruggedized construction, by the bottom of the first fixed transverse slat and the second fixed transverse slat It is fixedly connected with fixed vertical plate, and fixed vertical plate is made to go deep into soil layer, the first fixed transverse slat and second is can be improved and fixes transverse slat Stability keeps the stability of device entirety more preferable, and then achievees the purpose that improve the device fixed effect.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the schematic cross-sectional view of the utility model;
Fig. 3 is the perspective view of the explosion of the utility model second fixed transverse slat and the first positioning plate.
In figure: 1- shallow foundation building, the fixed transverse slat of 2- first, the fixed transverse slat of 3- second, 4- fixed vertical plate, 5- first are fixed Position plate, the second positioning plate of 6-, 7- hydraulic stem, the first support plate of 8-, 9- support frame, the second support plate of 10-, the first screw thread of 11- Hole, 12- support threaded rod, the second threaded hole of 13-, 14- third threaded hole, 15- fixing bolt, 16- soil layer.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", " length ", " width Degree ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside", " suitable The orientation or positional relationship of the instructions such as hour hands ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " is orientation based on the figure Or positional relationship, be merely for convenience of describing the present invention and simplifying the description, rather than the device of indication or suggestion meaning or Element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as the limit to the utility model System.
In the present invention unless specifically defined or limited otherwise, term " setting ", " connected ", " connects " installation " Connect ", the terms such as " fixation " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection;It can be machine Tool connection;It can be directly connected, it can also be indirectly connected through an intermediary.For those of ordinary skill in the art and Speech, can understand the concrete meaning of above-mentioned term in the present invention as the case may be.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more of the features.The meaning of " plurality " is two or two in the description of the present invention, More than, unless otherwise specifically defined.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution:
The side of a kind of shallow foundation rectifying of leaned building ruggedized construction, including shallow foundation building 1, shallow foundation building 1 is solid Surely it is connected with the first fixed transverse slat 2, shallow foundation building 1 is fixedly connected with second far from the side of the first fixed transverse slat 2 and fixes The bottom of transverse slat 3, the first fixed transverse slat 2 and the second fixed transverse slat 3 is fixedly connected to fixed vertical plate 4, the second fixed transverse slat 3 Top is fixedly connected with the first positioning plate 5, and the side at the top of the first fixed transverse slat 2 is fixedly connected with the second positioning plate 6, and second The side of positioning plate 6 is fixedly connected with hydraulic stem 7, and hydraulic stem 7 is fixedly connected with the first support far from one end of the second positioning plate 6 Plate 8, the first support plate 8 are fixedly connected with support frame 9 far from the side of hydraulic stem 7, support frame 9 far from the first support plate 8 one Side is fixedly connected with the second support plate 10, by fixing the first positioning plate 5 at the top of the first fixed transverse slat 2, later by pair The adjustment of hydraulic stem 7, make hydraulic stem 7 push the first support plate 8, support frame 9 and the second support plate 10 to shallow foundation building 1 into Row fixes to clamp, and can tentatively reinforce to inclined shallow foundation building 1.
A kind of optional technical solution as the utility model: the first positioning plate 5, the second positioning plate 6, the first support plate 8, The inside of support frame 9 and the second support plate 10 offers the first threaded hole 11, and the internal screw thread of the first threaded hole 11 is connected with branch Threaded rod 12 is supportted, what the first positioning plate 5, the second positioning plate 6, the first support plate 8, support frame 9 and the second support plate 10 formed consolidates Determine clamping device and be arranged one group every one to two meters on shallow foundation building 1, by the first positioning plate 5, the second positioning plate 6, the first support plate 8, support frame 9 and the internal whorl of the second support plate 10 connect support threaded rod 12, can make the device pair Shallow foundation building 1 does further reinforcing, further improves the fixed effect of the device, enhances the practicability of the device.
A kind of optional technical solution as the utility model: the top of the second fixed transverse slat 3 offers the second threaded hole 13。
A kind of optional technical solution as the utility model: the first positioning plate 5 is close to the side of the second fixed transverse slat 3 Offer third threaded hole 14.
A kind of optional technical solution as the utility model: the 14 equal spiral shell in inside of the second threaded hole 13 and third threaded hole Line is connected with fixing bolt 15, and the quantity of the second threaded hole 13, third threaded hole 14 and fixing bolt 15 is several.
A kind of optional technical solution as the utility model: fixed vertical plate 4 is fixed on the inside of soil layer 16, by The bottom of one fixed transverse slat 2 and the second fixed transverse slat 3 is fixedly connected with fixed vertical plate 4, and fixed vertical plate 4 is made to go deep into soil layer 16, The stability that can be improved the first fixed transverse slat 2 and the second fixed transverse slat 3, keeps the stability of device entirety more preferable, Jin Erda To the purpose for improving the device fixed effect.
A kind of optional technical solution as the utility model: the position phase of the second threaded hole 13 and third threaded hole 14 It is mutually corresponding.
In conclusion the shallow foundation rectifying of leaned building ruggedized construction, in use, user, on the one hand, by solid first The first positioning plate 5 is fixed at the top for determining transverse slat 2, later by the adjustment to hydraulic stem 7, hydraulic stem 7 is made to push the first support plate 8, clamping is fixed to shallow foundation building 1 in support frame 9 and the second support plate 10, can tentatively build to inclined shallow foundation It builds object 1 to be reinforced, on the other hand, by the first positioning plate 5, the second positioning plate 6, the first support plate 8, support frame 9 and the The internal whorl connection support threaded rod 12 of two support plates 10, can make the device do shallow foundation building 1 and further add Gu further improving the fixed effect of the device, enhance the practicability of the device, by the first fixed transverse slat 2 and second The bottom of fixed transverse slat 3 is fixedly connected with fixed vertical plate 4, and fixed vertical plate 4 is made to go deep into soil layer 16, and it is fixed horizontal to can be improved first The stability of plate 2 and the second fixed transverse slat 3, keeps the stability of device entirety more preferable, and then reaches and improve the fixed effect of the device The purpose of fruit.
It should be noted that in the present invention unless specifically defined or limited otherwise, fisrt feature is in the second spy It can be that the first and second features directly contact or the first and second features are connect indirectly by intermediary "above" or "below" sign Touching.Moreover, fisrt feature can be above the second feature " above ", " above " and " above " fisrt feature right above second feature or Oblique upper, or first feature horizontal height is merely representative of higher than second feature.Fisrt feature second feature " under ", " lower section " " following " can be fisrt feature and be directly under or diagonally below the second feature, or is merely representative of first feature horizontal height and is less than Second feature.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (7)

1. a kind of shallow foundation rectifying of leaned building ruggedized construction, including shallow foundation building (1), it is characterised in that:
The side of the shallow foundation building (1) is fixedly connected with first fixed transverse slat (2), and the shallow foundation building (1) is remote Side from first fixed transverse slat (2) is fixedly connected with second fixed transverse slat (3), and described first fixed transverse slat (2) and second are consolidated The bottom for determining transverse slat (3) is fixedly connected to fixed vertical plate (4), and the is fixedly connected at the top of second fixed transverse slat (3) The side of one positioning plate (5), the top of described first fixed transverse slat (2) is fixedly connected with the second positioning plate (6), and described second is fixed The side of position plate (6) is fixedly connected with hydraulic stem (7), and the hydraulic stem (7) is fixedly connected far from the one end of the second positioning plate (6) Have the first support plate (8), first support plate (8) is fixedly connected with support frame (9) far from the side of hydraulic stem (7), described Support frame (9) is fixedly connected with the second support plate (10) far from the side of the first support plate (8).
2. a kind of shallow foundation rectifying of leaned building ruggedized construction according to claim 1, which is characterized in that
First positioning plate (5), the second positioning plate (6), the first support plate (8), support frame (9) and the second support plate (10) Inside offers the first threaded hole (11), and the internal screw thread of first threaded hole (11) is connected with support threaded rod (12).
3. a kind of shallow foundation rectifying of leaned building ruggedized construction according to claim 1, which is characterized in that
The second threaded hole (13) are offered at the top of described second fixed transverse slat (3).
4. a kind of shallow foundation rectifying of leaned building ruggedized construction according to claim 1, which is characterized in that
First positioning plate (5) offers third threaded hole (14) close to the side of second fixed transverse slat (3).
5. a kind of shallow foundation rectifying of leaned building ruggedized construction according to claim 3, which is characterized in that
It is threaded with fixing bolt (15) inside second threaded hole (13) and third threaded hole (14), second spiral shell The quantity of pit (13), third threaded hole (14) and fixing bolt (15) is several.
6. a kind of shallow foundation rectifying of leaned building ruggedized construction according to claim 1, which is characterized in that
The fixed vertical plate (4) is fixed on the inside of soil layer (16).
7. a kind of shallow foundation rectifying of leaned building ruggedized construction according to claim 3, which is characterized in that
The position of second threaded hole (13) and third threaded hole (14) corresponds to each other.
CN201822189041.6U 2018-12-25 2018-12-25 A kind of shallow foundation rectifying of leaned building ruggedized construction Expired - Fee Related CN209585139U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822189041.6U CN209585139U (en) 2018-12-25 2018-12-25 A kind of shallow foundation rectifying of leaned building ruggedized construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822189041.6U CN209585139U (en) 2018-12-25 2018-12-25 A kind of shallow foundation rectifying of leaned building ruggedized construction

Publications (1)

Publication Number Publication Date
CN209585139U true CN209585139U (en) 2019-11-05

Family

ID=68378935

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822189041.6U Expired - Fee Related CN209585139U (en) 2018-12-25 2018-12-25 A kind of shallow foundation rectifying of leaned building ruggedized construction

Country Status (1)

Country Link
CN (1) CN209585139U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960787A (en) * 2022-05-31 2022-08-30 南京海骏绿建科技有限公司 Construction device and method for leveling plant foundation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960787A (en) * 2022-05-31 2022-08-30 南京海骏绿建科技有限公司 Construction device and method for leveling plant foundation

Similar Documents

Publication Publication Date Title
CN209585139U (en) A kind of shallow foundation rectifying of leaned building ruggedized construction
CN208907272U (en) A kind of assembly building block of adjustable length
CN209260702U (en) A kind of assembly concrete prefabricated pile
CN209384274U (en) A kind of adjustable well lid of height with flap-type splicing pedestal
CN208749122U (en) A kind of teaching assembled architecture functional support frame
CN211145569U (en) Mounting bracket of building component
CN203603021U (en) Asymmetrical arch rib structure adaptive to widened bridge floor
CN208870381U (en) A kind of civil construction bracket
CN207348219U (en) A kind of prefabricated assembled concrete frame
CN206971383U (en) A kind of H profile steel structural supporter
CN110805316A (en) Container assembly type frame steel assembly structure house
CN206784837U (en) A kind of municipal construction spatula
CN209163049U (en) A kind of construction by building element connection locking
CN214659055U (en) Old building is reformed transform and is used interior wall top reinforcement device
CN209427925U (en) A kind of detachable construction elevator attached wall connection structure
CN207484309U (en) A kind of road and bridge crack bracing means
CN209723245U (en) A kind of steel structure column feet connecting structure
CN208738786U (en) A kind of mine shearer anti-skid cable splint
CN205063321U (en) Building cross fastener
CN217412247U (en) Stud bending device
CN219175842U (en) Building engineering template fixing device
CN208668451U (en) A kind of single column pylon foundation module maincenter part structure
CN218216467U (en) Reinforced cable bridge
CN208040847U (en) A kind of stainless steel tube convenient for connection
CN204590319U (en) Precast shear wall secured adjusted bar

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191105

Termination date: 20201225