CN209260583U - Suspension bridge wide cut concrete stiffening girder cable crane turns installation structure - Google Patents
Suspension bridge wide cut concrete stiffening girder cable crane turns installation structure Download PDFInfo
- Publication number
- CN209260583U CN209260583U CN201822061008.5U CN201822061008U CN209260583U CN 209260583 U CN209260583 U CN 209260583U CN 201822061008 U CN201822061008 U CN 201822061008U CN 209260583 U CN209260583 U CN 209260583U
- Authority
- CN
- China
- Prior art keywords
- beam section
- construction
- installation
- cable crane
- stiffened
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型涉及工程领域,尤其涉及悬索桥宽幅混凝土加劲梁缆索吊转体安装施工结构。所述运梁平车顺桥向运输加劲梁段上起吊平台,缆索吊机起重绳下方安装旋转吊具,旋转吊具下方连接待安装加劲梁段,缆索吊机带梁纵移到安装位置,旋转吊具带动下方加劲梁段悬空平转90°后,提升安装在吊索上,安装后的加劲梁段间设置临时连接件,保持梁段稳定。有益效果:该悬索桥宽幅混凝土加劲梁缆索吊转体安装施工方法适用于大跨径悬索桥宽幅混凝土加劲梁、宽幅钢加劲梁安装施工。改善了施工环境,提高了生产效率,并极大地降低了成本,施工安全可靠,且工程质量易于保证,效益显著,效果良好。
The utility model relates to the field of engineering, in particular to a construction structure for installation and construction of a cable hoisting swivel body of a wide-width concrete stiffening beam of a suspension bridge. The beam transport flat car lifts the platform along the bridge to transport the stiffened beam section, and installs a rotating sling under the hoisting rope of the cable crane, and connects the stiffening beam section to be installed under the rotating sling, and moves the cable crane with the girder longitudinally to the installation position. The rotating sling drives the lower stiffening beam section to rotate horizontally by 90° in the air, and then lifts and installs it on the sling. Temporary connectors are set between the installed stiffening beam sections to keep the beam section stable. Beneficial effects: the installation and construction method of the cable hanger swivel body of the wide-width concrete stiffening beam of the suspension bridge is suitable for the installation and construction of the wide-width concrete stiffening beam and the wide-width steel stiffening beam of the long-span suspension bridge. The construction environment is improved, the production efficiency is increased, and the cost is greatly reduced. The construction is safe and reliable, and the project quality is easy to guarantee. The benefit is remarkable and the effect is good.
Description
技术领域technical field
本实用新型涉及工程领域,尤其涉及悬索桥宽幅混凝土加劲梁缆索吊转体安装施工结构。The utility model relates to the field of engineering, in particular to a construction structure for installation and construction of a cable hoisting swivel body of a wide-width concrete stiffening beam of a suspension bridge.
背景技术Background technique
近些年来,随着西南地区一些“溜索改桥”项目的实施,悬索桥作为跨越能力最强的桥型大量建设,该类扶贫工程项目为了节省造价,多采用性价比更优的混凝土加劲梁,而混凝土加劲梁为了改善吊索锚固区的受力,在两端加宽加厚,宽幅式加劲梁段无法横向通过门式框架结构的主塔,顺桥向运输后梁段在主跨又转体困难,加之单吊索混凝土加劲梁安装过程稳定性极差。In recent years, with the implementation of some "cable-to-bridge" projects in Southwest China, suspension bridges, as the type of bridge with the strongest spanning capacity, have been constructed in large numbers. In order to save costs, this type of poverty alleviation projects mostly use concrete stiffened beams with better cost performance. In order to improve the stress of the anchorage area of the sling, the concrete stiffening beam is widened and thickened at both ends. The wide-width stiffened beam section cannot pass through the main tower of the portal frame structure horizontally. After being transported along the bridge, the beam section turns again at the main span. In addition, the installation process of the single-sling concrete stiffened beam is extremely poor in stability.
实用新型内容Utility model content
实用新型的目的:为了提供一种效果更好的悬索桥宽幅混凝土加劲梁缆索吊转体安装施工结构和方法,具体目的见具体实施部分的多个实质技术效果。Purpose of the utility model: In order to provide a better effect suspension bridge wide concrete stiffened girder cable hoist installation construction structure and method, the specific purpose see multiple substantive technical effects in the specific implementation part.
为了达到如上目的,本实用新型采取如下技术方案:In order to achieve the above object, the utility model takes the following technical solutions:
悬索桥宽幅混凝土加劲梁缆索吊转体安装施工结构,其特征在于,施工机构包含运梁平车,运梁平车能够将加劲梁段运输到起吊平台上、还包含缆索吊机,所述的缆索吊机能够在缆索吊机主索上行进,缆索吊机起重绳下方安装旋转吊具,所述的旋转吊具能够转动,旋转吊具下方伸出悬挂结构,该悬挂结构能够绑定加劲梁段。The installation and construction structure of the cable crane swivel body of the wide-width concrete stiffened beam of the suspension bridge is characterized in that the construction mechanism includes a beam transport flat car, which can transport the stiffened beam section to the lifting platform, and also includes a cable crane. The machine can travel on the main cable of the cable crane, and a rotating spreader is installed under the hoisting rope of the cable crane. The rotating spreader can rotate, and a suspension structure protrudes from the bottom of the rotating spreader, and the suspension structure can bind the stiffening beam section .
本实用新型进一步技术方案在于,所述的旋转吊具包含钢梁平台、钢梁平台上安装有旋转轴以及轴承,旋转轴下方连接万向铰;万向铰伸出,通过钢丝绳以及挂钩连接着钢吊架,钢吊架能吊装加劲梁段;所述的钢梁平台边侧安装有一个卷扬机,该卷扬机的钢丝绳缠绕在旋转轴上,拉动钢丝绳能够让旋转轴带动加劲梁段整体转动。The further technical solution of the present invention is that the rotating hoist includes a steel beam platform, a rotating shaft and a bearing are installed on the steel beam platform, and a universal hinge is connected under the rotating shaft; the universal hinge extends out and is connected by a wire rope and a hook A steel hanger, the steel hanger can hoist the stiffened beam section; a hoist is installed on the side of the steel beam platform, and the steel wire rope of the hoist is wound on the rotating shaft, and pulling the wire rope can make the rotating shaft drive the stiffened beam section to rotate as a whole.
本实用新型进一步技术方案在于,所述的加劲梁段逐片安装,相邻两段加劲梁段通过临时连接件能够连接起来;临时连接件和两个加劲梁段伸出的吊环耳板铰接连接。The further technical scheme of the utility model is that the stiffened beam sections are installed one by one, and two adjacent stiffened beam sections can be connected through a temporary connector; .
悬索桥宽幅混凝土加劲梁缆索吊转体安装施工方法,所述运梁平车1顺桥向运输加劲梁段2上起吊平台4,缆索吊机5起重绳下方安装旋转吊具6,旋转吊具6下方连接待安装加劲梁段2,缆索吊机5带梁纵移到安装位置,旋转吊具6带动下方加劲梁段2悬空平转90°后,提升安装在吊索8上,安装后的加劲梁段间设置临时连接件7,保持梁段稳定。The installation and construction method of the cable crane swivel body of the wide concrete stiffened beam of the suspension bridge, the beam transport flat car 1 transports the stiffened beam section 2 along the bridge to lift the platform 4, and the cable crane 5 installs a rotating spreader 6 under the hoisting rope, and the rotating spreader The lower part of 6 is connected to the stiffening beam section 2 to be installed. The cable crane 5 moves the beam longitudinally to the installation position. Temporary connectors 7 are set between the stiffened beam sections to keep the beam sections stable.
本实用新型进一步技术方案在于,所述运梁平车1顺桥向运输加劲梁段2,从门式框架混凝土主塔3的两塔肢间通过,上起吊平台4,起吊平台长21米、宽9米,采用贝雷梁搭设,上铺工20a横向分配梁,再铺设2cm厚钢板形成平台。The further technical scheme of the utility model is that the beam transport flat car 1 transports the stiffened beam section 2 along the bridge, passes between the two tower limbs of the portal frame concrete main tower 3, and goes on the lifting platform 4, which is 21 meters long and wide. 9 meters, built with Bailey beams, 20a horizontal distribution beams on the upper paving, and then laying 2cm thick steel plates to form a platform.
本实用新型进一步技术方案在于,所述加劲梁段2,采用收紧缆索吊机起重绳的方式,提升到设计位置后安装在相应的吊索8上。The further technical solution of the utility model is that the stiffened beam section 2 is installed on the corresponding sling 8 after being lifted to the design position by tightening the hoisting rope of the cable crane.
本实用新型进一步技术方案在于,所述的加劲梁段2安装后,与上一加劲梁段间设置临时连接件7,纵向连接,采用铰接的形式,在安装过程中,既能保持梁段稳定,又可适应梁段间的微转动。The further technical solution of the utility model is that, after the stiffened beam section 2 is installed, a temporary connector 7 is arranged between the stiffened beam section and the previous stiffened beam section, and the longitudinal connection is in the form of a hinged joint. During the installation process, the beam section can be kept stable. , and can adapt to the micro-rotation between beam segments.
本实用新型进一步技术方案在于,包括以下更具体的步骤:The further technical solution of the utility model is to include the following more specific steps:
1.运输加劲梁:将加劲梁段顺桥向装在运梁平车上,从引桥上运输加劲梁段从门式框架混凝土主塔的两塔肢间通过,并运输到起吊平台上,起吊平台长21米、宽9米,采用贝雷梁搭设,上铺工20a横向分配梁,再铺设2cm厚钢板形成平台;1. Transport the stiffened beam: install the stiffened beam section along the bridge direction on the beam transport flat car, transport the stiffened beam section from the approach bridge, pass between the two tower limbs of the portal frame concrete main tower, and transport it to the lifting platform, which is 21 meters long Meters, 9 meters wide, built with Bailey beams, 20a horizontal distribution beams on the upper paving, and then laying 2cm thick steel plates to form a platform;
2.安装缆索吊机:在桥位处安装缆索吊机,缆索吊机起重绳下方配置一个旋转吊具,主要包含一个锻制的万向铰,旋转吊具采用电气化全自动控制,可按顺或逆时针方向平转90°,完成空中转体的工序;2. Install the cable crane: install the cable crane at the bridge position, and configure a rotating spreader under the lifting rope of the cable crane, which mainly includes a forged universal joint. Rotate 90° clockwise or counterclockwise to complete the process of air rotation;
3.梁段起吊:旋转吊具下方采用钢丝绳连接在待安装加劲梁段的吊环上,收紧起重绳从平台上起吊;3. Lifting of the beam section: the lower part of the rotating hoist is connected to the lifting ring of the stiffened beam section to be installed with a steel wire rope, and the hoisting rope is tightened to lift from the platform;
4.梁段纵移:开动牵引卷扬机,缆索吊机带梁纵移到安装位置;4. Longitudinal movement of the beam section: start the traction winch, and the cable crane moves the beam to the installation position;
5.梁段转体:旋转吊具带动下方加劲梁段悬空平转90°,成为加劲梁段设计状态的横桥向;5. Swivel of the beam section: the rotating sling drives the suspended stiffened beam section below to rotate 90° horizontally, becoming the transverse direction of the stiffened beam section in the design state;
6.梁段提升:收紧缆索吊机起重绳,提升加劲梁段到设计位置后安装在相应的悬索桥吊索上;6. Lifting of the beam section: Tighten the hoisting rope of the cable crane, lift the stiffened beam section to the design position and install it on the corresponding suspension bridge suspension cable;
7.梁段安装及临时连接:加劲梁段安装后,与上一梁段间设置临时连接件纵向连接,采用铰接的形式,在安装过程中,既能保持梁段稳定,又可适应线形变化引起的梁段间微转动;7. Beam section installation and temporary connection: After the stiffened beam section is installed, a temporary connection piece is installed between the previous beam section and the vertical connection is adopted in the form of a hinged joint. During the installation process, the beam section can be kept stable and the line shape can be adapted. The micro-rotation between beam segments caused by
本实用新型进一步技术方案在于,所述的临时连接件一端焊接在后安装梁段上,另一端铰接在先安装加劲梁段的预埋耳板上,铰接端开圆孔后采用M27高强螺栓连接。The further technical solution of the utility model is that one end of the temporary connector is welded on the post-installation beam section, and the other end is hinged on the pre-embedded ear plate of the stiffening beam section installed first, and the hinged end is opened with a round hole and then connected by M27 high-strength bolts .
本实用新型进一步技术方案在于,在步骤7前,第一片加劲梁段安装后,在主缆上挂设4根Φ36mm钢丝绳,连接到第一片加劲梁段上,维持本体的平衡。The further technical solution of the present invention is that, before step 7, after the first stiffening beam section is installed, four Φ36mm steel wire ropes are hung on the main cable and connected to the first stiffening beam section to maintain the balance of the body.
采用如上技术方案的本实用新型,相对于现有技术有如下有益效果:该悬索桥宽幅混凝土加劲梁缆索吊转体安装施工方法适用于大跨径悬索桥宽幅混凝土加劲梁、宽幅钢加劲梁安装施工。本实用新型替代了以往采用驳船水运、在江面定位后起吊安装,需投入大型船舶、建设装运码头,水上作业受大风、水位严重制约,作业环境差、功效低、成本高等,改善了施工环境,提高了生产效率,并极大地降低了成本,施工安全可靠,且工程质量易于保证,效益显著,效果良好。The utility model adopting the above technical scheme has the following beneficial effects compared with the prior art: the installation and construction method of the cable crane swivel body of the wide concrete stiffened beam of the suspension bridge is suitable for the wide concrete stiffened beam and the wide steel stiffened beam of the long-span suspension bridge Installation and construction. The utility model replaces the previous use of barge water transport, hoisting and installation after positioning on the river surface, requiring large ships to be built, and the construction of a shipping dock. Water operations are severely restricted by strong winds and water levels, and the operating environment is poor, low in efficiency, and high in cost. The construction environment is improved. The production efficiency is improved, the cost is greatly reduced, the construction is safe and reliable, and the engineering quality is easy to guarantee, and the benefit is remarkable and the effect is good.
附图说明Description of drawings
为了进一步说明本实用新型,下面结合附图进一步进行说明:In order to further illustrate the utility model, further describe below in conjunction with accompanying drawing:
图1为本实用新型预组装部分的结构示意图;Fig. 1 is the structural representation of the pre-assembled part of the utility model;
图2为本实用新型施工方法的加劲梁段转体后示意图;Fig. 2 is the schematic diagram after the stiffening beam section of construction method of the present invention rotates;
图3为本实用新型施工方法加劲梁段安装的结构示意图;Fig. 3 is the structural representation of the installation of the stiffening beam section of the construction method of the present utility model;
图4为本实用新型施工方法加劲梁段临时连接示意图;Fig. 4 is the temporary connection schematic diagram of stiffening beam section of construction method of the present utility model;
图5为旋转吊具的具体结构图;其中:1运梁平车;2加劲梁段;3悬索桥主塔;4起吊平台;5缆索吊机;6旋转吊具;7临时连接件;8吊索;9缆索吊机主索;10梁体运输方向;61.钢吊架;62.挂钩;63.钢梁平台;64.旋转轴以及轴承;65.卷扬机钢丝绳;66.动力卷扬机;67.万向铰。Fig. 5 is a specific structural diagram of the rotating spreader; among them: 1 beam transport flat car; 2 stiffening beam section; 3 suspension bridge main tower; 4 lifting platform; 5 cable crane; 6 rotating spreader; ;9 Cable crane main cable; 10 Beam transportation direction; 61. Steel hanger; 62. Hook; 63. Steel beam platform; 64. Rotary shaft and bearing; 65. Hoist wire rope; to the hinge.
具体实施方式Detailed ways
下面结合附图和具体实施方式,进一步阐明本实用新型,应理解下述具体实施方式仅用于说明本实用新型而不用于限制本实用新型的范围。在本实用新型的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”、“顶”、“底”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。The utility model will be further explained below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the following specific embodiments are only used to illustrate the utility model and are not intended to limit the scope of the utility model. In the description of the present utility model, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" , "Top", "Bottom" and other indicated orientations or positional relationships are based on the orientations or positional relationships shown in the drawings, which are only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying the referred device or element Must have a specific orientation, be constructed and operate in a specific orientation, and therefore should not be construed as limiting the invention. In addition, unless otherwise clearly stipulated and limited, the terms "mounted", "connected" and "connected" should be interpreted in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical A connection can also be an electrical connection; it can be a direct connection or an indirect connection through an intermediary, and it can be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model in specific situations.
本专利提供多种并列方案,不同表述之处,属于基于基本方案的改进型方案或者是并列型方案。每种方案都有自己的独特特点。This patent provides a variety of parallel schemes, and the different expressions belong to the improved scheme based on the basic scheme or the parallel scheme. Each scheme has its own unique characteristics.
方案一:Option One:
悬索桥宽幅混凝土加劲梁缆索吊转体安装施工方法,其特征在于,包含运梁平车1、起吊平台4、缆索吊机5、旋转吊具6及临时连接件7,所述运梁平车1顺桥向运输加劲梁段2上起吊平台4,缆索吊机5起重绳下方安装旋转吊具6,旋转吊具6下方连接待安装加劲梁段2,缆索吊机5带梁纵移到安装位置,旋转吊具6带动下方加劲梁段2悬空平转90°后,提升安装在吊索8上,安装后的加劲梁段间设置临时连接件7,保持梁段稳定。The installation and construction method of the cable crane swivel body of the wide-width concrete stiffened beam of the suspension bridge is characterized in that it includes a beam transport flat car 1, a lifting platform 4, a cable crane 5, a rotating spreader 6 and a temporary connector 7, and the beam transport flat car 1 along Lift the platform 4 on the stiffening beam section 2 in the bridge direction transport, install the rotating hoist 6 under the hoisting rope of the cable crane 5, connect the stiffening beam section 2 to be installed under the hoisting rope of the cable hoist 5, and move the girder longitudinally to the installation position with the cable hoist 5 After the rotating hoisting device 6 drives the lower stiffening beam section 2 to hang in the air and rotate 90°, it is lifted and installed on the sling 8, and a temporary connector 7 is set between the installed stiffening beam sections to keep the beam section stable.
所述运梁平车1顺桥向运输加劲梁段2,从门式框架混凝土主塔3的两塔肢间通过,上起吊平台4,起吊平台长21米、宽9米,采用贝雷梁搭设,上铺工20a横向分配梁,再铺设2cm厚钢板形成平台。The beam transport flat car 1 transports the stiffened beam section 2 along the bridge, passes between the two tower limbs of the portal frame concrete main tower 3, and lifts the platform 4. The lifting platform is 21 meters long and 9 meters wide, and is erected by Bailey beams. , The upper paving worker 20a distributes beams horizontally, and then lays 2cm thick steel plates to form a platform.
所述缆索吊机5的起重绳下方安装一个旋转吊具6,旋转吊具全自动控制,可按顺或逆时针方向平转90°,完成空中转体的工序。A rotating sling 6 is installed below the hoisting rope of the cable crane 5, and the rotating sling is fully automatic controlled, and can be rotated 90° in a clockwise or counterclockwise direction to complete the process of rotating the body in the air.
所述旋转吊具6下方连接待安装加劲梁段2,从起吊平台4起吊后,缆索吊机5带梁纵移到安装位置。The underside of the rotating hoist 6 is connected to the stiffening beam section 2 to be installed, and after lifting from the lifting platform 4, the cable crane 5 moves longitudinally with the beam to the installation position.
所述旋转吊具6带动下方加劲梁段2悬空平转90°,成加劲梁段设计状态的横桥向。The rotating hanger 6 drives the lower stiffening beam section 2 to rotate horizontally by 90° in the air to form the transverse bridge direction of the design state of the stiffening beam section.
所述加劲梁段2,采用收紧缆索吊机起重绳的方式,提升到设计位置后安装在相应的吊索8上。The stiffening beam section 2 is installed on the corresponding sling 8 after being lifted to the design position by tightening the hoisting rope of the cable crane.
所述的加劲梁段2安装后,与上一梁段间设置临时连接件7纵向连接,采用铰接的形式,在安装过程中,既能保持梁段稳定,又可适应梁段间的微转动。After the stiffened beam section 2 is installed, it is longitudinally connected with the previous beam section by setting a temporary connector 7 in the form of a hinge, which can not only keep the beam section stable, but also adapt to the micro-rotation between the beam sections during the installation process. .
方案二:Option II:
悬索桥宽幅混凝土加劲梁缆索吊转体安装施工方法,其特征在于,包括以下步骤:The method for installing and constructing the cable-suspended body of a wide-width concrete stiffened beam of a suspension bridge is characterized in that it comprises the following steps:
1.运输加劲梁:将加劲梁段顺桥向装在运梁平车上,从引桥上运输加劲梁段从门式框架混凝土主塔的两塔肢间通过,并运输到起吊平台上,起吊平台长21米、宽9米,采用贝雷梁搭设,上铺工20a横向分配梁,再铺设2cm厚钢板形成平台。1. Transport the stiffened beam: install the stiffened beam section along the bridge direction on the beam transport flat car, transport the stiffened beam section from the approach bridge, pass between the two tower limbs of the portal frame concrete main tower, and transport it to the lifting platform, which is 21 meters long meters and 9 meters wide, it is erected with Bailey beams, with 20a horizontal distribution beams on the upper paving, and then laying 2cm thick steel plates to form a platform.
2.安装缆索吊机:在桥位处安装缆索吊机,缆索吊机起重绳下方配置一个旋转吊具,主要包含一个锻制的万向铰,旋转吊具采用电气化全自动控制,可按顺或逆时针方向平转90°,完成空中转体的工序。2. Install the cable crane: install the cable crane at the bridge position, and configure a rotating spreader under the lifting rope of the cable crane, which mainly includes a forged universal joint. Rotate 90° clockwise or counterclockwise to complete the process of body rotation in the air.
3.梁段起吊:旋转吊具下方采用钢丝绳连接在待安装加劲梁段的吊环上,收紧起重绳从平台上起吊。3. Lifting of the beam section: the lower part of the rotating hoist is connected to the lifting ring of the stiffened beam section to be installed with a steel wire rope, and the hoisting rope is tightened to lift from the platform.
4.梁段纵移:开动牵引卷扬机,缆索吊机带梁纵移到安装位置。4. Longitudinal movement of the beam section: start the traction hoist, and the cable crane moves the beam longitudinally to the installation position.
5.梁段转体:旋转吊具带动下方加劲梁段悬空平转90°,成为加劲梁段设计状态的横桥向。5. Swivel of the beam section: the rotating sling drives the suspended stiffened beam section below to rotate 90° horizontally, becoming the transverse direction of the stiffened beam section in the design state.
6.梁段提升:收紧缆索吊机起重绳,提升加劲梁段到设计位置后安装在相应的悬索桥吊索上。6. Lifting of the beam section: Tighten the hoisting rope of the cable crane, lift the stiffened beam section to the design position and install it on the corresponding suspension bridge suspension cable.
7.梁段安装及临时连接:加劲梁段安装后,与上一梁段间设置临时连接件纵向连接,采用铰接的形式,在安装过程中,既能保持梁段稳定,又可适应线形变化引起的梁段间微转动。7. Beam section installation and temporary connection: After the stiffened beam section is installed, a temporary connection piece is installed between the previous beam section and the vertical connection is adopted in the form of a hinged joint. During the installation process, the beam section can be kept stable and the line shape can be adapted. The resulting micro-rotation between the beam segments.
8.从跨中开始向两主塔方向逐段、对称安装加劲梁段,在安装过程中两侧不平衡梁段不得超过1片,直至完成全桥合拢。8. Install the stiffening beam sections symmetrically section by section from the mid-span to the direction of the two main towers. During the installation process, the unbalanced beam section on both sides shall not exceed one piece until the whole bridge is closed.
本实用新型进一步技术方案在于,所述的临时连接件采用双[28a型钢加工,长2米,一端焊接在后安装梁段上,另一端铰接在先安装梁段的预埋耳板上,铰接端开圆孔后采用M27高强螺栓连接。The further technical solution of the utility model is that the temporary connector is processed by double [28a steel, 2 meters long, one end is welded on the post-installed beam section, and the other end is hinged on the pre-embedded lug plate of the previously installed beam section, hinged After opening the round hole, use M27 high-strength bolts to connect.
本实用新型进一步技术方案在于,在步骤7前,跨中第一片加劲梁段安装后,还需在主缆上挂设4根Φ36mm钢丝绳,连接到第一片加劲梁段上,以维持本体的平衡。The further technical solution of the present invention is that, before step 7, after the installation of the first stiffening beam section in the mid-span, four Φ36mm steel wire ropes need to be hung on the main cable and connected to the first stiffening beam section to maintain the body balance.
所述的旋转吊具(6)包含钢梁平台、旋转轴、万向铰、旋转动力卷扬机、挂钩,旋转轴穿过钢梁平台中心,上端旋转轴上缠绕钢丝绳,启动3t动力卷扬机,通过收放钢丝绳使旋转轴实现转动,下端连接万向铰,挂钩连接于下方钢吊架上,钢吊架通过多根钢丝绳绑定加劲梁段。The rotating spreader (6) includes a steel beam platform, a rotating shaft, a universal hinge, a rotating power hoist, and a hook. Put the steel wire rope to make the rotating shaft rotate, the lower end is connected to the universal hinge, the hook is connected to the steel hanger below, and the steel hanger is bound to the stiffening beam section through multiple steel wire ropes.
本实用新型开创性地,以上各个效果独立存在,还能用一套结构完成上述施工结果的结合。The utility model is groundbreaking, the above effects exist independently, and a set of structures can be used to complete the combination of the above construction results.
本悬索桥宽幅混凝土加劲梁缆索吊转体安装施工方法简化工序,安装、操作便捷,拆除容易,工效高,工程质量易于控制,经过生产测试,本实用新型所采用的悬索桥宽幅混凝土加劲梁缆索吊转体安装施工方法与传统的码头出梁、驳船水运安装各项指标对比结果如下表:The installation and construction method of the wide concrete stiffening beam cable hoisting body of the suspension bridge simplifies the process, the installation and operation are convenient, the dismantling is easy, the work efficiency is high, and the engineering quality is easy to control. After production tests, the suspension bridge wide concrete stiffening beam cables used in the utility model The comparison results of various indicators between the installation and construction method of the crane swivel and the traditional beam out of the wharf and barge water transport installation are as follows:
备注:节约工期28天,每天20人,共560工日,每工日300元,共计560×300=168000元。Remarks: The construction period is saved by 28 days, 20 people per day, a total of 560 working days, 300 yuan per working day, a total of 560×300=168,000 yuan.
总的来说:本实用新型涉及工程领域,尤其涉及一种悬索桥宽幅混凝土加劲梁缆索吊转体安装施工方法。包含运梁平车、起吊平台、缆索吊机、旋转吊具及临时连接件,所述运梁平车运输加劲梁段上起吊平台,缆索吊机起重绳下方设置旋转吊具,旋转吊具下方连接加劲梁段,缆索吊机带梁纵移到安装位置,旋转吊具带动下方加劲梁段悬空平转90°后,提升安装,安装后的加劲梁段间设置临时连接件,保持梁段稳定。该悬索桥宽幅混凝土加劲梁缆索吊转体安装施工方法用于悬索桥加劲梁安装施工。本实用新型一举解决了悬索桥宽幅预应力混凝土加劲梁无法横向通过门式框架结构的主塔、梁段在主跨转体困难、单吊索混凝土加劲梁安装过程稳定性差的难题,替代了以往采用驳船水运、在江面定位后起吊安装,需投入大型船舶、建设装运码头,水上作业受大风、水位严重制约,作业环境差、功效低、成本高等,改善了施工环境,提高了生产效率,并极大地降低了成本,施工安全可靠,且工程质量易于保证,效益显著,效果良好。In general: the utility model relates to the engineering field, in particular to a method for installing and constructing a cable-suspended swivel body of a wide-width concrete stiffening beam of a suspension bridge. It includes a beam transport flat car, a lifting platform, a cable crane, a rotating sling and temporary connectors. The beam transporting flat car transports the stiffening beam section on the lifting platform, and a rotating sling is set under the hoisting rope of the cable crane, and the rotating sling is connected below For the stiffened beam section, the cable crane moves the beam vertically to the installation position, and the rotating sling drives the lower stiffened beam section to be suspended in the air and rotates 90° horizontally, then it is lifted and installed. Temporary connectors are set between the installed stiffened beam sections to keep the beam section stable. The installation and construction method of the cable hanger swivel body of the wide-width concrete stiffening beam of the suspension bridge is used for the installation and construction of the stiffening beam of the suspension bridge. The utility model solves the problem that the wide-width prestressed concrete stiffened beam of the suspension bridge cannot pass through the main tower of the portal frame structure horizontally, the beam section is difficult to rotate in the main span, and the stability of the single-sling concrete stiffened beam is poor in the installation process, replacing the previous ones. The use of barge water transportation, lifting and installation after positioning on the river surface requires investment in large ships and construction of shipping docks. Water operations are severely restricted by strong winds and water levels. The operating environment is poor, the efficiency is low, and the cost is high. The construction environment has been improved, and the production efficiency has been improved. The cost is greatly reduced, the construction is safe and reliable, and the project quality is easy to guarantee, and the benefit is remarkable and the effect is good.
经过比对,明显可得知,本实用新型所述的悬索桥宽幅混凝土加劲梁缆索吊转体安装施工方法,在生产效率、施工时间、成本上大大优越于对比方案,且成桥后的桥面线形、主缆线形、索股应力均满足规范指标的要求。After comparison, it is obvious that the installation and construction method of the wide concrete stiffened beam cable hoisting body of the suspension bridge described in the utility model is greatly superior to the comparison scheme in terms of production efficiency, construction time and cost, and the bridge after completion Surface alignment, main cable alignment, and cable strand stress all meet the requirements of specification indicators.
以上显示和描述了本实用新型的基本原理、主要特征和本实用新型的优点。本领域的技术人员应该了解本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的范围内。The basic principles, main features and advantages of the present utility model have been shown and described above. Those skilled in the art should understand that the utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model There will be various changes and improvements, and these changes and improvements all fall within the scope of the claimed protection.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822061008.5U CN209260583U (en) | 2018-12-10 | 2018-12-10 | Suspension bridge wide cut concrete stiffening girder cable crane turns installation structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822061008.5U CN209260583U (en) | 2018-12-10 | 2018-12-10 | Suspension bridge wide cut concrete stiffening girder cable crane turns installation structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209260583U true CN209260583U (en) | 2019-08-16 |
Family
ID=67562560
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201822061008.5U Expired - Fee Related CN209260583U (en) | 2018-12-10 | 2018-12-10 | Suspension bridge wide cut concrete stiffening girder cable crane turns installation structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209260583U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109440660A (en) * | 2018-12-10 | 2019-03-08 | 中交四公局第五工程有限公司 | Suspension bridge wide cut concrete stiffening girder cable crane turns installation structures and methods |
| CN111636291A (en) * | 2020-05-22 | 2020-09-08 | 中铁上海工程局集团有限公司 | A recyclable door-type steel cover beam pre-embedded device |
-
2018
- 2018-12-10 CN CN201822061008.5U patent/CN209260583U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109440660A (en) * | 2018-12-10 | 2019-03-08 | 中交四公局第五工程有限公司 | Suspension bridge wide cut concrete stiffening girder cable crane turns installation structures and methods |
| CN111636291A (en) * | 2020-05-22 | 2020-09-08 | 中铁上海工程局集团有限公司 | A recyclable door-type steel cover beam pre-embedded device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101225638A (en) | Installation Method of Prestressed Concrete Stiffened Box Girder of Ground Anchored Suspension Bridge | |
| CN207891749U (en) | A steel box girder hanger | |
| CN101559905A (en) | Deck unit erection gantry | |
| CN111997842B (en) | A kind of installation method of tower and main engine of floating double-wind turbine wind turbine | |
| CN109440660A (en) | Suspension bridge wide cut concrete stiffening girder cable crane turns installation structures and methods | |
| CN103882812A (en) | Construction method for midspan main beams of cable-stayed bridge | |
| CN104803303B (en) | A kind of single movable-arm floor mast with rock type counter-jib | |
| CN205474862U (en) | Wet seam template operation platform of portable case roof beam | |
| CN110562850A (en) | Overall hoisting system and method for the main tower | |
| CN111039194A (en) | Super-large crane final assembly process | |
| CN110304588B (en) | Gate hoisting construction method used in narrow operation space | |
| CN115522460A (en) | A method for hoisting stiffening beams of suspension bridges | |
| CN105484168A (en) | Rotary hoisting equipment for stiffening beam of suspension bridge and erecting method of stiffening beam | |
| CN1330829C (en) | Integrated hoisting method and special slings for steel pipe concrete flexible cable arch bridge | |
| CN209194361U (en) | A kind of fixed structure of suspension cable bridge section lifting hoisting platform | |
| CN112850488A (en) | Method for overturning steel pipe pile of fixed-boom crane ship | |
| CN207844841U (en) | A kind of great diameter and long pile cages decentralization suspender | |
| CN214783346U (en) | Counterweight type mounting system of main beam | |
| CN105317031B (en) | A kind of ship lift main equipment room bridge main beam hanging method | |
| CN205114897U (en) | That climbs formula braced system in tower built -in is put has bad luck device certainly | |
| CN204569237U (en) | A kind of oscillating type pole equilibrium arm | |
| CN202967862U (en) | Lifting appliance for beam channel reinforcement cage | |
| CN116988683A (en) | A remote control electric double rocker arm pole for tower assembly | |
| CN111749141B (en) | A bridge deck rotation system and installation method | |
| CN211496634U (en) | Main tower integral hoisting system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190816 |