CN209260461U - High rail tire installs suspension and support ruggedized construction - Google Patents

High rail tire installs suspension and support ruggedized construction Download PDF

Info

Publication number
CN209260461U
CN209260461U CN201822046017.7U CN201822046017U CN209260461U CN 209260461 U CN209260461 U CN 209260461U CN 201822046017 U CN201822046017 U CN 201822046017U CN 209260461 U CN209260461 U CN 209260461U
Authority
CN
China
Prior art keywords
support
suspension
movable branching
mounting base
ruggedized construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822046017.7U
Other languages
Chinese (zh)
Inventor
张磊
陈松
王海滨
李九江
李木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shijiazhuang Tieyuan Engineering Consulting Co Ltd
Original Assignee
Shijiazhuang Tieyuan Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shijiazhuang Tieyuan Engineering Consulting Co Ltd filed Critical Shijiazhuang Tieyuan Engineering Consulting Co Ltd
Priority to CN201822046017.7U priority Critical patent/CN209260461U/en
Application granted granted Critical
Publication of CN209260461U publication Critical patent/CN209260461U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of high rail tires to install suspension and support ruggedized construction, it is related to technical field of rail traffic, including pedestal and suspension and support, the suspension and support is mounted on the top surface of pedestal, the mounting base that can move up and down adjusting is arranged on the suspension and support, there are two the movable branching rods for being supported on suspension and support two sides for side connection of the mounting base far from lifting rail tire, the movable branching rod upper end and mounting base are rotatablely connected, lower end is tilted to the direction far from suspension and support, and it contradicts in the sliding slot for being set to base-plates surface, the locking device for it to be locked with suspension and support is additionally provided in the mounting base.The utility model can enhance the fixing intensity of suspension and support, make suspension and support safer stabilization in use.

Description

High rail tire installs suspension and support ruggedized construction
Technical field
The utility model relates to technical field of rail traffic, reinforce knot more particularly, to a kind of high rail tire installation suspension and support Structure.
Background technique
High-speed rail high-speed railway, China national Railway Bureau is defined as: 250 kilometers/hour (containing reserved) are started in newly-built design And the above motor train unit train, 350 kilometers/hour of passenger traffic speed of passenger dedicated railway line.High-speed railway in train in addition to runing Reach outside certain speed standard, vehicle, roadbed, rail, operation require cooperation and promoted.Many countries all use non-fragment orbit, Such as the 2000 double-block type ballastless track systems technology of RHEDA of Germany.The general non-fragment orbit of China Railway High-speed.Non-fragment orbit by Rail, fastener, cell board composition, play damping, depressurization.Rail plate of non-fragment orbit itself is that concrete casting forms, and road Without rubble, rail, sleeper are directly layered on concrete rail plate base.Non-fragment orbit is the state-of-the-art track skill in the world today Art can reduce maintenance, reduce dust, beautify the environment.
Support hanger structure is widely used during high-speed rail construction, especially when high rail tire is installed, needs to pass through branch Hanger lifts rail tire to installation site, to complete the laying of rail tire.But the ruggedized construction of high-speed rail suspension and support in the prior art Consolidation effect is undesirable, and there are biggish security risks during lifting rail tire.
Utility model content
The purpose of the utility model is to provide a kind of high rail tires to install suspension and support ruggedized construction, can enhance suspension and support Fixing intensity makes suspension and support safer stabilization in use.
The above-mentioned purpose of utility model of the utility model has the technical scheme that
A kind of high rail tire installation suspension and support ruggedized construction, including pedestal and suspension and support, the suspension and support are mounted on pedestal Top surface on, be arranged with the mounting base that can move up and down adjusting on the suspension and support, the mounting base far from lifting rail tire one There are two the movable branching rod for being supported on suspension and support two sides, the movable branching rod upper end and mounting bases to be rotatablely connected for side connection, lower end It tilts, and is contradicted in the sliding slot for being set to base-plates surface to the direction far from suspension and support, be additionally provided with use in the mounting base In the locking device that it is locked with suspension and support.
It is arranged in mounting base by using above-mentioned technical proposal by the way that the mounting base slided up and down is arranged on suspension and support There is movable branching rod, the two sides that movable branching rod is located at suspension and support abut on the base, prevent suspension and support from making during the work time With shaking, movable branching rod setting is able to rotate adjusting, the supporting center of gravity of movable branching rod can be adjusted according to the weight of lifting, Increase supporting area, keeps the stable structure of suspension and support.
The utility model is further arranged to: the movable branching rod lower end setting can move the cunning adjusted in sliding slot Block, the movable branching rod and sliding block are rotatablely connected.
By using above-mentioned technical proposal, sliding block is set in movable branching rod lower end, is limited movable branching rod lower end by sliding block Make in sliding slot, prevent movable branching rod in sliding process sideslip or skidding and cause ruggedized construction unstable.
The utility model is further arranged to: the sliding block two sides are provided with the lug boss outwardly protruded, the sliding slot The groove with raised portion fits is arranged at intervals on two sidewalls.
By using above-mentioned technical proposal, sliding block can be stuck in some position in sliding slot by lug boss, avoid living The case where dynamic strut loosening has skidded, keeps the stabilization of ruggedized construction, in mobile movable branching rod, movable branching rod can be lifted Get up, sliding block is embedded into sliding slot, lug boss is corresponding with groove.
The utility model is further arranged to: two movable branching rods are symmetricly set on the two sides of suspension and support, and two Connection structure is set between a movable branching rod.
By using above-mentioned technical proposal, two movable branching rods are symmetrical arranged, and can guarantee the knot supported on both sides of suspension and support Structure is stablized, and support force is uniform, keeps suspension and support more stable, is connected by connection structure therebetween, can guarantee entirely to reinforce knot Structure is more stable.
The utility model is further arranged to: the connection structure includes multiple connections being rotatably connected on movable branching rod Strut, the connection strut on two movable branching rods are oppositely arranged, are rotatablely connected between two opposite connection struts.
It by using above-mentioned technical proposal, is connected between movable branching rod by connection strut, connection strut will not hinder to live The mobile adjusting of dynamic strut, while can also polymerize or open with the adjusting of movable branching rod, guarantee between two movable branching rods Connection relationship, keep ruggedized construction more stable.
The utility model is further arranged to: the connection strut lengths on each movable branching rod are gradually incremented by downwards, And it is arranged in parallel.
By using above-mentioned technical proposal, connects strut and be able to maintain motionless, form ladder structure, facilitate on staff Lower climbing repair apparatus.
The utility model is further arranged to: the mounting base is additionally provided with third activity branch far from the side of lifting rail tire Bar, the third movable branching rod and mounting base are rotatablely connected, and lower end is connected on base-plates surface.
By using above-mentioned technical proposal, by third movable branching rod to reinforcing is supported on rear side of suspension and support, into one Step enhances the stability and reinforcement ability of ruggedized construction.
The utility model is further arranged to: third movable branching rod lower end is also connected with sliding block, the third activity Base-plates surface below strut is provided with sliding slot.
By using above-mentioned technical proposal, movable branching rod lower end is limited in sliding slot by sliding block, prevents movable branching rod in cunning Sideslip or skidding during dynamic and cause ruggedized construction unstable.
The utility model is further arranged to: the locking device be across mounting base and the pin that is connect with suspension and support, The perforation of a row and bayonet fittings is provided on the suspension and support wall from top to bottom.
By using above-mentioned technical proposal, limitation fixation is carried out by position of the pin to mounting base, structure is simple, installation The position of seat is easy to adjust.
In conclusion the advantageous effects of the utility model are as follows:
1, the utility model can adjust the ruggedized construction of height by being arranged in suspension and support lower part, can be according to different Branch hoist amount adjusts the supporting height of C.G. of ruggedized construction, by movable branching rod in the extension elongation of pedestal, adjusts ruggedized construction Reinforcing area, make the safer stabilization of ruggedized construction.
2, movable branching rod lower end is moved using stage positioning, is stuck in sliding slot by sliding block, is made the state of movable branching rod It is more stable, better support action is played, guarantees that movable branching rod there are enough support strengths to suspension and support.
3, it is connected between movable branching rod by the movable branching rod of multiple length, enhances the tight of suspension and support two sides ruggedized construction Ruggedized construction is linked to be a closer stable entirety by close property, while to be also used as ladder practical for movable branching rod, facilitates work Make personnel's climbing, repair apparatus.
Detailed description of the invention
Fig. 1 is the schematic diagram of the utility model suspension and support ruggedized construction.
Fig. 2 is the partial enlarged view in Fig. 1 at A.
Fig. 3 is the structural schematic diagram at another visual angle of the utility model suspension and support ruggedized construction.
In figure, 1, pedestal;11, sliding slot;12, groove;2, suspension and support;21, it perforates;3, mounting base;4, movable branching rod;5, sliding Block;51, lug boss;6, strut is connected;7, third movable branching rod;8, pin.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
It referring to Fig.1, is a kind of high rail tire installation suspension and support ruggedized construction disclosed by the utility model, including 1 He of pedestal Suspension and support 2, pedestal 1 are the pedestal of total, are stably mounted on the ground of rail subgrade two sides, and suspension and support 2 is fixed vertically On the top surface of pedestal 1.
Suspension and support 2 is cylindrical bar, and upper part is arranged with the mounting base 3 that can be moved up and down, and mounting base 3 can be in suspension and support Up and down adjustment on 2, and limitation fixation is carried out by locking device aligned position.Locking device is across mounting base in the present embodiment 3 and the pin 8 that is connect with suspension and support 2, it is provided with a row from top to bottom on 2 wall of suspension and support and perforation 21 that pin 8 cooperates, installation The hole opposite with 21 positions of perforation is provided on seat 3, pin 8 passes through the hole in mounting base 3, penetrates into perforation 21, will install Seat 3 is fixed on a certain height on suspension and support 2, is provided with five perforation 21 opposing upper and lower, five perforation in the present embodiment altogether 21 are arranged at equal intervals, and the height of mounting base 3 is arranged to five grades.
It is arc panel on front side of mounting base 3, rear side is rectangular block, forms the hole that suspension and support 2 passes through therebetween.Mounting base 3 Side far from lifting rail tire is rear side, and there are two movable branching rod 4, the every sides one of movable branching rod 4 for the rear side both ends connection of mounting base 3 A, upper end and mounting base 3 are rotatablely connected, and lower end is tilted to the direction far from suspension and support 2, and are contradicted on the surface of pedestal 1, two Movable branching rod 4 is supported on the two sides of suspension and support 2.Two 4 length of movable branching rod are identical, and mounting height is identical, is symmetricly set on branch Connection structure is arranged between two movable branching rods 4 in the two sides of hanger 2, and two movable branching rods 4 are connected to become an entirety, Guarantee that entire ruggedized construction is more stable.
The lower end of two movable branching rods 4 is rotatably connected to a sliding block 5, and sliding block 5 is connected on the surface of pedestal 1, tool Body is connected in the sliding slot 11 being set on 1 surface of pedestal, and sliding slot 11 is rectangular slot, along moving for 4 lower end of movable branching rod Direction setting, the setting of sliding block 5 move in a straight line in sliding slot 11.
Referring to Fig. 2, sliding block 5 is the rectangular block wide with sliding slot 11, and two sides are provided with the lug boss 51 outwardly protruded, protrusion Portion 51 is also rectangular configuration, is arranged at intervals with five groups of grooves being oppositely arranged 12, the shape of groove 12 on the two sidewalls of sliding slot 11 Cooperate with lug boss 51, in mobile sliding block 5, lug boss 51 can be stuck in groove 12, sliding block 5 is subjected to limitation fixation, Anti- limited slip block 5 skids in stress.
Referring to Fig. 3, connection structure includes multiple connection struts 6 being rotatably connected on movable branching rod 4 in the present embodiment, and two Connection strut 6 on a movable branching rod 4 is oppositely arranged, and is connected between two opposite connection struts 6 by an articulated shaft rotation It connects.6 length of connection strut on each movable branching rod 4 is gradually incremented by downwards, after hinged axis connection, each movable branching rod Connection strut 6 on 4 is set in parallel, and articulated shaft is located on the same straight line of 2 rear side of suspension and support.Connect strut 6 Length meets the requirement of the maximum rotation distance of movable branching rod 4, and connection strut 6 is capable of forming a ladder structure, facilitates work Personnel's climbing.
Third movable branching rod 7,7 upper end of third movable branching rod and installation are additionally provided with after the separate lifting rail tire of mounting base 3 Seat 3 is rotatablely connected, and lower end is connected on 1 surface of pedestal.7 lower end of third movable branching rod is also connected with sliding block 5, third movable branching rod 1 surface of pedestal of 7 lower sections is provided with sliding slot 11, and 7 lower end of third movable branching rod is connected in sliding slot 11 also by sliding block 5.This reality Apply in example that the length of third movable branching rod 7 is identical as the length of movable branching rod 4, mounting height is identical.
The implementation principle of the present embodiment are as follows: suspension and support 2 and pedestal 1 are transported into the height lifted as needed to work-yard The weight of rail tire adjusts the height of mounting base 3, removes pin 8, sliding block 5 is taken out from sliding slot 11, adjust mounting base 3 To suitable height, plugs pin 8 and be fixed;Movable branching rod 4 is rotated by sliding block 5 is embedded into sliding slot 11, and lug boss 51 blocks It in groove 12, while rotating third movable branching rod 7 and being fixed, complete the fixation of entire ruggedized construction.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical Within novel protection scope.

Claims (9)

1. a kind of high rail tire installs suspension and support ruggedized construction, including pedestal (1) and suspension and support (2), suspension and support (2) installation On the top surface of pedestal (1), it is characterised in that: the mounting base (3) that can move up and down adjusting is arranged on the suspension and support (2), There are two the movable branching rod (4) for being supported on suspension and support (2) two sides, institutes for side connection of the mounting base (3) far from lifting rail tire It states movable branching rod (4) upper end and mounting base (3) is rotatablely connected, lower end is tilted to the direction far from suspension and support (2), and is contradicted and set It is placed in the sliding slot (11) on pedestal (1) surface, is additionally provided on the mounting base (3) solid for locking it with suspension and support (2) Fixed locking device.
2. high rail tire according to claim 1 installs suspension and support ruggedized construction, it is characterised in that: the movable branching rod (4) lower end setting can move the sliding block (5) adjusted in sliding slot (11), and the movable branching rod (4) and sliding block (5) rotation connect It connects.
3. high rail tire according to claim 2 installs suspension and support ruggedized construction, it is characterised in that: the sliding block (5) two Side is provided with the lug boss (51) outwardly protruded, is arranged at intervals on the two sidewalls of the sliding slot (11) and cooperates with lug boss (51) Groove (12).
4. high rail tire according to claim 1 installs suspension and support ruggedized construction, it is characterised in that: two activity branch Bar (4) is symmetricly set on the two sides of suspension and support (2), and connection structure is arranged between two movable branching rods (4).
5. high rail tire according to claim 4 installs suspension and support ruggedized construction, it is characterised in that: the connection structure packet Multiple connection struts (6) being rotatably connected on movable branching rod (4) are included, the connection strut (6) on two movable branching rods (4) is opposite It is arranged, is rotatablely connected between two opposite connection struts (6).
6. high rail tire according to claim 5 installs suspension and support ruggedized construction, it is characterised in that: each activity branch Connection strut (6) length on bar (4) is gradually incremented by downwards, and is arranged in parallel.
7. high rail tire according to claim 1 installs suspension and support ruggedized construction, it is characterised in that: the mounting base (3) Side far from lifting rail tire is additionally provided with third movable branching rod (7), and the third movable branching rod (7) and mounting base (3) rotate Connection, lower end is connected on pedestal (1) surface.
8. high rail tire according to claim 7 installs suspension and support ruggedized construction, it is characterised in that: the third activity branch Bar (7) lower end is also connected with sliding block (5), and pedestal (1) surface below the third movable branching rod (7) is provided with sliding slot (11).
9. high rail tire according to claim 1 installs suspension and support ruggedized construction, it is characterised in that: the locking device is Across mounting base (3) and the pin (8) that is connect with suspension and support (2), be provided with from top to bottom on suspension and support (2) wall row with The perforation (21) of pin (8) cooperation.
CN201822046017.7U 2018-12-06 2018-12-06 High rail tire installs suspension and support ruggedized construction Expired - Fee Related CN209260461U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822046017.7U CN209260461U (en) 2018-12-06 2018-12-06 High rail tire installs suspension and support ruggedized construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822046017.7U CN209260461U (en) 2018-12-06 2018-12-06 High rail tire installs suspension and support ruggedized construction

Publications (1)

Publication Number Publication Date
CN209260461U true CN209260461U (en) 2019-08-16

Family

ID=67562266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822046017.7U Expired - Fee Related CN209260461U (en) 2018-12-06 2018-12-06 High rail tire installs suspension and support ruggedized construction

Country Status (1)

Country Link
CN (1) CN209260461U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112682577A (en) * 2019-10-18 2021-04-20 江苏固泰建筑材料科技有限公司 Top-penetrating type finished product support and hanger

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112682577A (en) * 2019-10-18 2021-04-20 江苏固泰建筑材料科技有限公司 Top-penetrating type finished product support and hanger

Similar Documents

Publication Publication Date Title
KR101434911B1 (en) Reclamation of the linear adjusting form of a rail track configuration settings for the rail assembly equipment
US10654689B2 (en) Structure installation system with vehicle having hangers to support a wall
RU2641572C2 (en) Method of transforming of roller on basis of ballast to wheel on basis of plates
CN207282017U (en) A kind of traffic lights easy to repair
CN103410103B (en) Quick-beam change construction method for existing railway line of railroad
CN209260461U (en) High rail tire installs suspension and support ruggedized construction
CN103938552B (en) Steel truss arched bridge self-balancing cantilever construction method and the spacing bearing of main pier
KR101400302B1 (en) Height flexible transporter for hypothesis of bridge
CN103352710A (en) Suspension overturn type tunnel inverted arch formwork trolley and construction method thereof
CN113152306B (en) Small-radius large-gradient prefabricated T beam frame construction method
CN110195382A (en) Road structure and the method that track structure is lifted using the road structure
CN108677747A (en) Cable-stayed bridge plane rotation swivel construction method
CN103174078A (en) Variable road edge obstacle crossing device
CN203394540U (en) Suspension overturning inverted arch formwork trolley for tunnels
CN102616154A (en) Construction method for modifying head span of existing line of railway
CN109355986A (en) A kind of non-fragment orbit sedimentation regulation method based on rope saw cut
KR102161144B1 (en) Height-adjustable transporter for bridge construction and bridge construction method using it
WO2007053020A1 (en) Method and adjusting installation for producing a stretch of railway
CN206570844U (en) Combine spigot-and-socket anti-settling hoistway lid arrangement
JP6867249B2 (en) How to replace the floor slab and gantry crane
CN208701511U (en) A kind of row's formula tamping equipment
CN211446415U (en) Hydraulic cylinder support arm for track laying machine
CN109056475A (en) The construction method of kerbstone mounting structure
CN106758886B (en) A kind of method of the existing bridges and culverts structure of novel dismounting
CN213331130U (en) Simple and easy quick bow member erection equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190816

CF01 Termination of patent right due to non-payment of annual fee