CN112682577A - Top-penetrating type finished product support and hanger - Google Patents

Top-penetrating type finished product support and hanger Download PDF

Info

Publication number
CN112682577A
CN112682577A CN201910998633.9A CN201910998633A CN112682577A CN 112682577 A CN112682577 A CN 112682577A CN 201910998633 A CN201910998633 A CN 201910998633A CN 112682577 A CN112682577 A CN 112682577A
Authority
CN
China
Prior art keywords
groove
grooves
hanger
finished product
snap ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910998633.9A
Other languages
Chinese (zh)
Inventor
田永林
蒋泓波
单志平
谢苏蒙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Gutai Building Materials Technology Co ltd
Original Assignee
Jiangsu Gutai Building Materials Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Gutai Building Materials Technology Co ltd filed Critical Jiangsu Gutai Building Materials Technology Co ltd
Priority to CN201910998633.9A priority Critical patent/CN112682577A/en
Publication of CN112682577A publication Critical patent/CN112682577A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a top-penetrating type finished product support hanger which comprises a hanging rod, wherein the hanging rod penetrates through a top plate, a fixing clamping ring penetrates through a through hole above the hanging rod, the fixing clamping ring is arranged in a triangular prism structure without edges, three clamping grooves are formed in three surfaces of the fixing clamping ring, three grooves are formed in the two grooves, the positions of the two grooves correspond to the two clamping grooves of the fixing clamping ring, an upper supporting rod is clamped between the two grooves and the two clamping grooves, the upper supporting rod is a solid steel pipe and is provided with three upper supporting rods, clamping grooves I are formed in the surfaces below the top plate and the hanging rod through fixing bolts, and a lower supporting rod is clamped between the clamping grooves I. The top and the below of roof that bracing piece and bottom suspension strut difference were gone up to this wear top formula finished product gallows are provided with threely, and the triangle structure has stability, is the very big improvement stability of jib like this in the top of roof and below.

Description

Top-penetrating type finished product support and hanger
Technical Field
The invention relates to the technical field of supports and hangers, in particular to a top penetrating type finished product support and hanger.
Background
The support and hanger frame is mainly used for steam-water pipelines or boiler equipment of a power plant, and thermal displacement and equipment devices thereof generated in the process of operation. And calculating the working and thermal displacement requirements of the determined spring support and hanger according to the stress condition of the pipeline. The supporting and hanging frame can be mainly divided into four categories; a spring support hanger, a pipe support hanger, a root support hanger and an accessory support hanger.
The existing support and hanger is usually fixed by bolts at the contact part below the hanger and a support plate, and completely depends on the pulling force between the support plate and the bolts, so that stable supporting force is lacked, and the danger coefficient is greatly increased.
Disclosure of Invention
The invention aims to provide a top-penetrating finished product support hanger to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme that the top penetrating type finished product support hanger comprises a hanging rod, wherein the hanging rod penetrates through a top plate, a fixing clamping ring penetrates through a through hole above the hanging rod, the fixing clamping ring is of a triangular prism structure without edges, three clamping grooves II are formed in three surfaces of the fixing clamping ring, three grooves II are formed in the grooves II, the positions of the grooves II correspond to the clamping grooves II of the fixing clamping ring, an upper supporting rod is clamped between the grooves II and the clamping grooves II, the upper supporting rod is a solid steel pipe and is provided with three upper supporting rods, clamping grooves I are formed in the surfaces below the top plate and the hanging rod through fixing bolts, and a lower supporting rod is clamped between the clamping grooves I.
Preferably, the fixing snap ring is of a vertical sliding structure.
Preferably, the cross sections of the end heads at the two ends of the upper supporting rod and the lower supporting rod are both of a frosted structure.
Preferably, the upper surface of the top plate is provided with a first groove and a second groove, the first groove is arranged on the outer ring of the suspender, a clamping block is arranged in the first groove, the clamping block is made of rubber, and the clamping block is of an annular step-shaped structure.
Preferably, the lower support rod is provided with three, and the lower support rod is not on same vertical line with last support rod, the lower support rod sets up to solid steel pipe.
Compared with the prior art, the invention has the beneficial effects that:
1. the top and the below of going up the roof that bracing piece and lower bracing piece are respectively are provided with threely, and the triangle structure has stability, is the very big improvement stability of jib like this in the top and the below of roof.
2. The fixed snap ring is arranged to be of a vertical sliding structure, so that the fixed snap ring can be conveniently detached by upwards sliding during maintenance.
3. The fixture block is made of rubber, and the fixture block is of an annular step-shaped structure, so that friction is increased, the hanger rod is prevented from slipping, and stability is further improved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic top view of the retaining ring of the present invention;
fig. 3 is a schematic diagram of a fixture block structure according to the present invention.
In the figure: 1. the lifting rod comprises a lifting rod body, 2, a fixed clamping ring, 3, an upper supporting rod body, 4, a clamping block, 5, a first groove, 6, a second groove, 7, a top plate, 8, a fixing bolt, 9, a first clamping groove, 10, a lower supporting rod body, 11, a second clamping groove, 12 and a through hole.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the invention easy to understand, the invention is further described with the specific embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, such as "connected," which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-3, the present invention provides a technical solution: a top-penetrating finished product supporting and hanging bracket comprises a hanging rod 1, a fixed snap ring 2, an upper supporting rod 3, a clamping block 4, a first groove 5, a second groove 6, a top plate 7, a fixed bolt 8, a first clamping groove 9, a lower supporting rod 10, a second clamping groove 11 and a through hole 12, wherein the hanging rod 1 penetrates through the top plate 7, the upper part of the suspender 1 penetrates through the fixed snap ring 2 from the through hole 12, the fixed snap ring 2 is arranged into a triangular prism structure without edges, three surfaces of the fixed snap ring 2 are provided with two clamping grooves 11, three grooves 6 are arranged, the positions of the two grooves 6 correspond to the two clamping grooves 11 of the fixed snap ring 2, an upper support rod 3 is clamped between the two grooves 6 and the two clamping grooves 11, the upper support rod 3 is a solid steel pipe, three upper support rods 3 are arranged, clamping grooves I9 are respectively arranged on the top plate 7 and the lower surface of the hanger rod 1 through fixing bolts 8, and lower support rods 10 are clamped between the clamping grooves I9;
the fixed clamping ring 2 is arranged to be of an up-and-down sliding structure; the sections of the end heads at the two ends of the upper support rod 3 and the lower support rod 10 are both provided with frosted structures;
a first groove 5 and a second groove 6 are formed in the upper surface of the top plate 7, the first groove 5 is formed in the outer ring of the suspender 1, a clamping block 4 is arranged in the first groove 5, the clamping block 4 is made of rubber, and the clamping block 4 is of an annular step-shaped structure;
the lower support rods 10 are three, the lower support rods 10 and the upper support rods 3 are not on the same vertical line, and the lower support rods 10 are solid steel pipes.
The working principle is as follows: before using this wear top formula finished product gallows, need carry out simple structure to whole antidetonation support and know, at first pass roof 7 with jib 1, again with fixed snap ring 2 cover in jib 1 top, then insert in recess two 6 with last bracing piece 3 bottom, the height of readjustment fixed snap ring 2, insert in draw-in groove two 11 of fixed snap ring 2 on the top of going up bracing piece 3, insert in recess 5 between jib 1 and the roof 7 with fixture block 4 after that, finally, utilize fixing bolt 8 to fix draw-in groove 9 on roof 7 and 1 below surface of jib, and can accomplish the installation work with lower support bar 10 inserts draw-in groove 9.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the invention can be made, and equivalents and modifications of some features of the invention can be made without departing from the spirit and scope of the invention.

Claims (5)

1. The utility model provides a wear a top formula finished product gallows, includes jib (1), its characterized in that: roof (7) is passed in jib (1), and jib (1) top passes fixed snap ring (2) from through-hole (12), fixed snap ring (2) set up to the triangular prism structure that does not have the edges and corners, and three faces of fixed snap ring (2) all are provided with draw-in groove two (11), recess two (6) are provided with threely, and the position of recess two (6) is corresponding with draw-in groove two (11) of fixed snap ring (2), it has last bracing piece (3) to block between recess two (6) and draw-in groove two (11), it sets up to solid steel pipe to go up bracing piece (3), and goes up bracing piece (3) and be provided with threely, roof (7) and jib (1) below surface all install draw-in groove (9) through fixing bolt (8), and block between draw-in groove one (9) has lower support bar (10).
2. The top-piercing finish hanger of claim 1 further comprising: the fixed snap ring (2) is of a vertical sliding structure.
3. The top-piercing finish hanger of claim 1 further comprising: the cross sections of the two end heads of the upper supporting rod (3) and the lower supporting rod (10) are all of frosted structures.
4. A ceiling-penetrating finished product hanger for a storage plate according to claim 1, wherein: the upper surface of the top plate (7) is provided with a first groove (5) and a second groove (6), the first groove (5) is arranged on the outer ring of the suspender (1), a clamping block (4) is arranged in the first groove (5), the clamping block (4) is made of rubber, and the clamping block (4) is of an annular step-shaped structure.
5. A ceiling-penetrating finished product hanger for a storage plate according to claim 1, wherein: the lower support rod (10) is provided with three, the lower support rod (10) and the upper support rod (3) are not on the same vertical line, and the lower support rod (10) is set to be a solid steel pipe.
CN201910998633.9A 2019-10-18 2019-10-18 Top-penetrating type finished product support and hanger Pending CN112682577A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910998633.9A CN112682577A (en) 2019-10-18 2019-10-18 Top-penetrating type finished product support and hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910998633.9A CN112682577A (en) 2019-10-18 2019-10-18 Top-penetrating type finished product support and hanger

Publications (1)

Publication Number Publication Date
CN112682577A true CN112682577A (en) 2021-04-20

Family

ID=75445158

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910998633.9A Pending CN112682577A (en) 2019-10-18 2019-10-18 Top-penetrating type finished product support and hanger

Country Status (1)

Country Link
CN (1) CN112682577A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2042491U (en) * 1988-11-01 1989-08-09 严彬 Composed ceiling with independent and stable structure
JPH0884505A (en) * 1994-09-16 1996-04-02 Yanmar Agricult Equip Co Ltd Rotary plowing machine
DE102008017607B3 (en) * 2008-04-06 2009-08-06 Arendt, Fritz, Dr. Modular assembled piece of furniture
CN202072413U (en) * 2011-05-25 2011-12-14 李云开 Lifting frame
CN104019285A (en) * 2014-06-18 2014-09-03 周紫阳 Adjustable pipeline support
CN204098322U (en) * 2014-10-20 2015-01-14 深圳瑞和建筑装饰股份有限公司 Smallpox counter support structure
CN207421522U (en) * 2017-11-20 2018-05-29 黑龙江日甲生科技有限公司 A kind of flexible antidetonation suspension and support of high ferro
CN208793983U (en) * 2018-09-19 2019-04-26 山东金惠新达智能制造科技有限公司 A kind of Portable dismountable open air dashboard cradle
CN209041771U (en) * 2018-11-21 2019-06-28 孚顿(上海)新型建材有限公司 A kind of comprehensive suspension and support of gate antidetonation
CN110005059A (en) * 2019-04-28 2019-07-12 芜湖裕优机械科技有限公司 A kind of quick-installed building connection steel construction
CN209260461U (en) * 2018-12-06 2019-08-16 石家庄铁源工程咨询有限公司 High rail tire installs suspension and support ruggedized construction
CN110258885A (en) * 2019-07-02 2019-09-20 长沙而道新能源科技有限公司 A kind of bidirectional stress truss floor support plate of green energy conservation

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2042491U (en) * 1988-11-01 1989-08-09 严彬 Composed ceiling with independent and stable structure
JPH0884505A (en) * 1994-09-16 1996-04-02 Yanmar Agricult Equip Co Ltd Rotary plowing machine
DE102008017607B3 (en) * 2008-04-06 2009-08-06 Arendt, Fritz, Dr. Modular assembled piece of furniture
CN202072413U (en) * 2011-05-25 2011-12-14 李云开 Lifting frame
CN104019285A (en) * 2014-06-18 2014-09-03 周紫阳 Adjustable pipeline support
CN204098322U (en) * 2014-10-20 2015-01-14 深圳瑞和建筑装饰股份有限公司 Smallpox counter support structure
CN207421522U (en) * 2017-11-20 2018-05-29 黑龙江日甲生科技有限公司 A kind of flexible antidetonation suspension and support of high ferro
CN208793983U (en) * 2018-09-19 2019-04-26 山东金惠新达智能制造科技有限公司 A kind of Portable dismountable open air dashboard cradle
CN209041771U (en) * 2018-11-21 2019-06-28 孚顿(上海)新型建材有限公司 A kind of comprehensive suspension and support of gate antidetonation
CN209260461U (en) * 2018-12-06 2019-08-16 石家庄铁源工程咨询有限公司 High rail tire installs suspension and support ruggedized construction
CN110005059A (en) * 2019-04-28 2019-07-12 芜湖裕优机械科技有限公司 A kind of quick-installed building connection steel construction
CN110258885A (en) * 2019-07-02 2019-09-20 长沙而道新能源科技有限公司 A kind of bidirectional stress truss floor support plate of green energy conservation

Similar Documents

Publication Publication Date Title
CN210920331U (en) Concatenation formula pipeline gallows
CN208292485U (en) TBM headstock turnniing over and lifting device
CN212338414U (en) Corridor gallows convenient to installation
CN112682577A (en) Top-penetrating type finished product support and hanger
CN104860189A (en) Adjustable sheet material lifting hook
CN212078774U (en) Load-bearing tripod
CN210623799U (en) Combined type support and hanger
CN210151984U (en) Be used for building antidetonation a gallows structure
CN214059609U (en) Pipe jacking pipe joint hoisting tool
CN214535093U (en) Stabilizing device of support hanger
CN216201185U (en) Purify engineering with a gallows of water supply pipe
CN220910685U (en) Pipeline support and hanger
CN216952032U (en) Clamping device for anti-seismic support hanger
CN208329560U (en) A kind of overhang scaffold
CN219493291U (en) Bearing structure capable of adjusting bias-loading displacement of high-temperature steam pipeline of thermal power plant
CN204295559U (en) A kind of OCTG rack
CN219470709U (en) Railway sound barrier stand column replacement device
CN212319332U (en) High altitude fan I-beam installing support and high altitude fan motor mounting structure
CN210106767U (en) Combined type anti-seismic support and hanger convenient to install
CN215721305U (en) Suspension type comprehensive support and hanger
CN213117784U (en) Low type straight line symmetry formula constant force spring gallows
CN219469456U (en) Socket joint formula reinforced concrete pipe hoist
CN110081265B (en) Anti-vibration support and hanger for nuclear power nuclear island with racks on flanges
CN218145381U (en) Pipeline hoist is used in water conservancy water and electricity construction
CN219954502U (en) Suspension assembly of water supply pipeline

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20210420

WD01 Invention patent application deemed withdrawn after publication