CN209249471U - Photovoltaic cell efficient welding device - Google Patents

Photovoltaic cell efficient welding device Download PDF

Info

Publication number
CN209249471U
CN209249471U CN201821677017.0U CN201821677017U CN209249471U CN 209249471 U CN209249471 U CN 209249471U CN 201821677017 U CN201821677017 U CN 201821677017U CN 209249471 U CN209249471 U CN 209249471U
Authority
CN
China
Prior art keywords
welding
belt line
clamping jaw
presser
photovoltaic cell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821677017.0U
Other languages
Chinese (zh)
Inventor
李华超
陈小慧
焦伟猛
周亮
张宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Chenzheng Solar Energy Equipment Co Ltd
Original Assignee
Suzhou Chenzheng Solar Energy Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Chenzheng Solar Energy Equipment Co Ltd filed Critical Suzhou Chenzheng Solar Energy Equipment Co Ltd
Priority to CN201821677017.0U priority Critical patent/CN209249471U/en
Application granted granted Critical
Publication of CN209249471U publication Critical patent/CN209249471U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Landscapes

  • Photovoltaic Devices (AREA)

Abstract

The utility model photovoltaic cell efficient welding device, including welding belt line, distribution are set to the manipulator of welding belt line two sides, draw strip welding mechanism, presser and welding mechanism;It is set with feed intake position, 2# of 1# in welding belt line to feed intake position, presser and welding mechanism are correspondingly arranged in the welding position set in welding belt line;Welding mechanism is set to the upper cover that presser is formed above presser.In the welding production of the cell piece and welding that carry out full wafer, within each duty cycle, on two full wafer cell pieces of every group of manipulator continuous transport to welding belt line;Within each duty cycle, every group of drawing strip welding mechanism is continuously finished the laying work of the welding of two full wafer cell pieces;Within each duty cycle, the every operation of every welding belt line is primary, completes the carrying movement of two full wafer cell piece process lengths;Within each duty cycle, every group welding area completes the welding of two full wafer cell pieces and welding.

Description

Photovoltaic cell efficient welding device
Technical field
The present invention relates to automatic producing technology and automated production equipment technical fields, in particular to photovoltaic group Part automatic producing technology, specifically, it shows a kind of photovoltaic cell efficient welding device.
Background technique
In solar photovoltaic assembly manufacturing process, the welding manner of cell piece and welding is mainly raw by the welding automated Device is produced to complete.During each cell piece is welded bunchiness by welding by welding production device, the paving of cell piece and welding If welding manner used by mode and welding process will directly affect the production efficiency of welding production device.Current weldering Process units is connect, following process is used:
1) within each duty cycle, every group of manipulator is only carried on full wafer cell piece to welding belt line;
2) within each duty cycle, every group of drawing strip welding mechanism only completes the laying work of the welding of a full wafer cell piece Make;
3) within each duty cycle, the every operation of every welding belt line is primary, also only completes a full wafer cell piece work The carrying of skill length acts;
4) within each duty cycle, every group welding area only completes the welding of a full wafer cell piece and welding.
There are the following problems for welding method at this stage:
1) welding manner of single full wafer cell piece, weldering needed for single full wafer cell piece are only completed in each duty cycle Connecing the time is the main bottleneck for restricting welding production device capbility and being promoted;
2) in order to meet welding process requirement, the time required for single full wafer cell piece and welding are welded together is not Can have no limits shortening, because in the welding process, the processes such as heating, thawing and cooling condensation of welding are required to one section The reasonable time just can guarantee welding quality;
3) processes such as heating, cooling in welding process can also cause expanded by heating and the cooling meat etc. of cell piece Process, endless shortening weld interval also result in cell piece because thermal shock is excessive and the exception such as crack, fracture occur.
Welding method production capacity at this stage simultaneously is lower, is unable to satisfy needed for quickly production.
Therefore, it is necessary to provide a kind of photovoltaic cell efficient welding device to solve the above problems.
Summary of the invention
An object of the present invention is to provide a kind of photovoltaic cell efficient welding device.
Technical solution is as follows:
A kind of photovoltaic cell efficient welding device, including welding belt line, distribution are set to welding belt line two sides Manipulator draws strip welding mechanism, presser and welding mechanism;
It is set with feed intake position, 2# of 1# in welding belt line to feed intake position, presser and welding mechanism are correspondingly arranged in welding The welding position set in belt line;Welding mechanism is set to the upper cover that presser is formed above presser.
Further, welding mechanism includes the plumb joint of liftable setting.
Further, manipulator realizes absorption, the release movement of cell piece by sucker;Cell piece takes from upstream supplied materials Material position is then carried mould group by servo and is completed to the 1# position switching action that position, 2# feed intake between position that feeds intake.
Further, welding belt line include by servo motor driving driving wheel, be correspondingly arranged with driving wheel it is driven The punching belt take turns, being wrapped in outside driving wheel and driven wheel, and punch to be provided with below belt and inhale vacuum supporting plate.
Further, drawing strip welding mechanism includes that the 1# driven by 1# servo drive motor draws welding clamping jaw, passes through 1# servo Driving motor driving, 1# draw welding clamping jaw to carry out duplicate back and forth movement along directive slide track;It further include that 2# servo drive motor drives Dynamic 2# draws welding clamping jaw, is driven by 2# servo drive motor, and it is duplicate round-trip that 2# draws welding clamping jaw to carry out along directive slide track Movement;1# draws welding clamping jaw to continue carrying and is routed to after drawing welding clamping jaw to realize the pull-out for setting the welding of length by 2# The 1# of welding belt line feeds intake position or 2# feeds intake position.
Further, presser includes the compensating squeeze head of elevating mechanism driving.
The second object of the present invention is to provide a kind of photovoltaic cell High Efficiency Welding Process, specifically comprise the following steps:
S1) within each duty cycle, on two full wafer cell pieces of every group of manipulator continuous transport to welding belt line;
S2) within each duty cycle, every group of drawing strip welding mechanism is continuously finished the laying of the welding of two full wafer cell pieces Work;
S3) within each duty cycle, the every operation of every welding belt line is primary, and it is long to complete two full wafer battery blade technolgies The carrying of degree acts;
S4) within each duty cycle, every group welding area completes the welding of two full wafer cell pieces and welding.
Compared with prior art, the beneficial effects of the present invention are:
1) efficient welding for not only realizing cell piece allows the production capacity of welder effectively to get rid of single full wafer battery Time restriction needed for piece welding procedure, than the production capacity that existing welding technique promotes 60%~80%;
2) guarantee that welding procedure quality, welding quality meet the related standard requirements of photovoltaic module;
3) it is the welding for completing two full wafer cell pieces within a duty cycle, can guarantee that welding production device has enough Time margin complete welding process, but the final weld interval that single full wafer battery is shared out equally when calculating production capacity will be straight Connect reduction;
4) time enough completes the processes such as the heating, thawing and cooling condensation of welding below plumb joint, also, Welding temperature can be realized by control modes such as PID it is mild climb and decline, allow cell piece in entire welding process to be held The thermal shock received is softer;
5) while effectively improving welding production device capbility, rosin joint can not only be effectively reduced, cross the abnormal weldings such as weldering, and And the risk that the exception such as crack, rupture occurs in the welding process for cell piece can also be effectively reduced.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is the structural schematic diagram for welding belt line.
Fig. 3 is the structural schematic diagram when plumb joint of welding mechanism lifts.
Fig. 4 is the structural schematic diagram when plumb joint of welding mechanism is fallen.
Fig. 5 is the structural schematic diagram of manipulator.
Fig. 6 is the structural schematic diagram for welding belt line.
Fig. 7 is the structural schematic diagram for drawing strip welding mechanism.
Fig. 8 is the structural schematic diagram of pressing.
Appended drawing reference in figure: 1 manipulator, 11 suckers, 12 servos carry mould group;
2 welding belt lines, 21 punching belts, 22 inhale vacuum supporting plate, and 23 servo drive motors, 24 driven wheels, 25 actively Wheel;
3 draw strip welding mechanism, and 31 1# draw welding clamping jaw, and 32 2# draw welding clamping jaw, 33 directive slide tracks, 34 1# servo-drives Motor, 35 2# servo drive motors;
4 pressers, 41 elevating mechanisms, 42 compensating squeeze heads;
5 welding mechanisms, 51 plumb joints;
100 1# feed intake position, and 200 2# feed intake position, 300 welding positions.
Specific embodiment
Embodiment 1:
The present embodiment shows a kind of photovoltaic cell efficient welding device;
Refering to fig. 1, in the present embodiment, manipulator 1, drawing strip welding mechanism 3, presser 4, welding mechanism 5 etc. are distributed in The two sides of same group welding belt line 2;
It feeds intake position referring to Fig.2, being respectively arranged with feed intake position 100,2# of 1# on two adjacent positions of welding belt line 2 200;Presser 4, welding mechanism 5 are located at the same position of welding 2 rear end of belt line, which is set as welding position 300;
In conjunction with shown in Fig. 2, Fig. 3 and Fig. 4, in space layout, presser 4 is soldered mechanism 5 and covers.For the ease of pressure The plumb joint 51 of the operations such as debugging, the cleaning of needle mechanism 4, welding mechanism 5 can lift.At work, welding mechanism 5 Plumb joint 51 then to put down.
In conjunction with shown in Fig. 1, Fig. 2 and Fig. 5, manipulator 1 realizes the movement such as absorption, release of cell piece by sucker 11;Electricity The piece position switching action that position, 2# feed intake position that feeds intake from the feeding position of upstream supplied materials to 1# in pond then carries mould group by servo 12 complete.
As shown in fig. 6, the distance that welding belt line 2 one beat of every operation is run drives 25 by servo drive motor 23 Driving wheel, 24 driven wheels are completed.It inhales vacuum supporting plate 22 and is located at 21 lower section of punching belt, support is played to punching belt 21.Battery Piece and welding can be also attracted on punching belt 21, the mutual position when punching the operation of belt 21, between cell piece and welding Setting will not shift.In the course of work, the distance that welding each duty cycle of belt line 2 is run is two full wafers The process length of cell piece.The purpose is to feed intake position for 1# and the cell piece finished and welding are put towards welding position in the position that feeds intake 2# 300 directions are carried.
As shown in fig. 7,1# draws welding clamping jaw 31 under the drive of 1# servo drive motor 34, carried out along directive slide track 33 Duplicate back and forth movement;2# draws welding clamping jaw 32 under the drive of 2# servo drive motor 35, carries out weight along directive slide track 33 Multiple back and forth movement.It is the pull-out movement for realizing the welding of setting length that 1#, which draws the main function of welding clamping jaw 31,;2# draws welding The main function of clamping jaw 32 is the welding caught 1# and welding clamping jaw 31 is drawn to pull out, and welding is continued to carry and is routed to welding The 1# of belt line 2 feeds intake position or 2# feeds intake position.When the welding that 1# draws welding clamping jaw 31 to pull out draws welding clamping jaw 32 to take away by 2# Afterwards, 1# draws welding clamping jaw 31 that will return along directive slide track 33, then carries out the pull-out movement of next root bead band.2# draws welding folder Pawl 32 it is every complete a root bead band laying work after, will be returned along directive slide track 33, into next root bead band clamping, continue to remove Fortune and laying work.
As shown in figure 8, the up and down of the compensating squeeze head 42 on presser 4 act under the drive of elevating mechanism 41 It completes.In the welding process, the elevating mechanism 41 of presser 4 is in decline state, allows compensating squeeze head 42 by cell piece and weldering Band is pushed down;After the completion of welding process, the elevating mechanism 41 of presser 4 is in raised configuration, allows compensating squeeze head 42 by battery Piece and welding release.
The present embodiment specific implementation process is as follows:
1) 1# feeds intake the laying of the welding and cell piece (referring both to the cell piece of full wafer herein) of position: the 1# draws welding clamping jaw After the welding for setting length is drawn out to setting position by 31,2# draws welding clamping jaw 32 to press from both sides the welding that 1# drawing welding clamping jaw 31 pulls out Firmly and continues to be carried to the 1# of welding belt line 2 and feed intake position.1# draws welding clamping jaw 31 that welding is passed to 2# and draws welding clamping jaw 32 Afterwards, 1# draws welding clamping jaw 31 that will return under the drive of 1# servo drive motor 34 along directive slide track 33, into next root bead band Pull-out carrying movement.When 2# draw welding clamping jaw 32 by welding be routed to 1# feed intake position after, the suction installed on the manipulator 1 Under the driving that servo carries mould group 12, the 1# that the cell piece to come from upstream transmission is put to welding belt line 2 is thrown disk 11 Material position.The cell piece when putting only by 2# drawing welding clamping jaw 32 be routed to 1# feed intake position welding a part of setting position It pushes down.Manipulator 1 complete 1# feed intake position the putting of cell piece after, 2# draws welding clamping jaw 32 will be in 2# servo drive motor 35 Drive under along directive slide track 33 return, into next root bead band clamping and carrying act;
2) 2# feeds intake the laying of the welding and cell piece (referring both to the cell piece of full wafer herein) of position: feeding intake the welding of position in 1# And after the completion of the laying of cell piece, after the 1# draws welding clamping jaw 31 that the welding for setting length is drawn out to setting position, 2# is drawn The welding that pulls out of 1# drawing welding clamping jaw 31 is clamped and continues to be carried to the 2# of welding belt line 2 and fed intake position by welding clamping jaw 32.Institute State 1# draw welding clamping jaw 31 by welding pass to 2# draw welding clamping jaw 32 after, 1# draw welding clamping jaw 31 again returned along directive slide track 33 It returns, the pull-out carrying into next root bead band acts.When 2# draw welding clamping jaw 32 by welding be routed to 2# feed intake position after, it is described Manipulator 1 feeds intake the 2# that the cell piece that sucker 11 is drawn puts welding belt line 2 position.2# is placed in feed intake the battery of position 2# drawing welding clamping jaw 32 is only routed to the feed intake a part of setting position of welding of position 2# and pushed down by piece.Also, 2# draws welding folder The 1# that pawl 32 is routed to feeds intake the welding of position, and a portion length can cover 1# and feed intake the upper table of cell piece that position has been put Face, the another part length cell piece that position has been put that can be fed intake by 2# are pressed onto lower surface.Tool hand 1 completes 2# and feeds intake the battery of position After the putting of piece, 2# draws welding clamping jaw 32 that will return along directive slide track 33, and the clamping and carrying into next root bead band act.
3) welding belt line 2 is run: described after 1# feeds intake position and 2# the feeds intake welding of position, cell piece is all launched Welding belt line 2 runs the distance of two full wafer cell piece process lengths under the drive of servo drive motor 23, and 1# is fed intake Position, 2# feed intake position put the welding finished and cell piece towards 300 position of welding mechanism position carry.The welding belt After line 2 is out of service, the position that feeds intake position, 2# that feeds intake the 1# returns to original state again, waits manipulator 1 and draws strip welding mechanism 3 in next duty cycle, and according to (1) of the implementation process, the movement of (2) step, cell piece, welding are successively put Feed intake position, the 2# of 1# for being put into welding belt line 2 feeds intake position.Time consumed by one duty cycle of the welding production device It is mainly made of (1) of above-mentioned implementation process, (2), (3) step, the production capacity of welding production device is also mainly by each operation week Time consumed by phase determines.During carrying out above-mentioned implementation process (1), the work of (2) step within each duty cycle, Pressing 4 and welding mechanism 5 will tell about pressing 4 and welding mechanism 5 at one also in the weld job for carrying out each period below Weld job process in duty cycle.
4) after welding belt line 2 is out of service, the elevating mechanism 41 of pressing 4 declines, while also driving compensating squeeze head 42 It moves downward, so that the welding for welding the carrying two full wafer cell pieces to come of belt line 2 and laying be pushed down simultaneously;Then, Welding mechanism 5 enters welding state.The heat of welding mechanism 5 is released by control modes such as PID, and realization two is whole The welding of piece cell piece and welding.After the completion of the welding of welding mechanism 5, the elevating mechanism 41 of pressing 4 is lifted, together When also band dynamic elasticity pressing 42 move upward therewith, the cell piece that finishes of welding and welding are discharged, entire welding process is complete At.
After the completion of welding process, welding belt line 2 is run, and welds the two full wafer cell pieces finished and welding is transferred out Welding position 300, newly laid two full wafer cell pieces and welding are conveyed into welding position 300 again.Then, pressing 4 and weldering Connection mechanism 5 enters next weld job period again.
Embodiment 2:
The description of embodiment 1 is that the minimum unit using single full wafer cell piece as cell piece is unfolded.But 1 institute of embodiment The scheme of displaying is not limited to a kind of specification of single full wafer cell piece, is completely suitable for the various cutting batteries of photovoltaic industry Piece, such as: the cutting cell piece of half cell piece, 1/3 cell piece and other specifications can refer to the present embodiment, show Half (or 1/3) cell piece in cutting cell piece is illustrated.
A kind of half (or 1/3) welding of battery film technique in cutting cell piece, includes the following steps:
1) within each duty cycle, every group of manipulator 1 is by the two or more half of continuous transport (or 1/3) cell piece Onto welding belt line 2;
2) within each duty cycle, every group of drawing strip welding mechanism 3 will be continuously finished two or more half (or 1/3) electricity The laying work of the welding of pond piece;
3) within each duty cycle, the every operation of every welding belt line 2 is primary, will complete two or more half (or 1/3) carrying of cell piece process length movement;
4) within each duty cycle, every group welding area as composed by pressing 4 and welding mechanism 5 will complete two or more The welding of a half (or 1/3) cell piece and welding.
Compared with prior art, what embodiment 1 was shown has the beneficial effect that
1) efficient welding for not only realizing cell piece allows the production capacity of welder effectively to get rid of single full wafer battery Time restriction needed for piece welding procedure, than the production capacity that existing welding technique promotes 60%~80%;
2) guarantee that welding procedure quality, welding quality meet the related standard requirements of photovoltaic module;
3) it is the welding for completing two full wafer cell pieces within a duty cycle, can guarantee that welding production device has enough Time margin complete welding process, but the final weld interval that single full wafer battery is shared out equally when calculating production capacity will be straight Connect reduction;
4) time enough completes the processes such as the heating, thawing and cooling condensation of welding below plumb joint, also, Welding temperature can be realized by control modes such as PID it is mild climb and decline, allow cell piece in entire welding process to be held The thermal shock received is softer;
5) while effectively improving welding production device capbility, rosin joint can not only be effectively reduced, cross the abnormal weldings such as weldering, and And the risk that the exception such as crack, rupture occurs in the welding process for cell piece can also be effectively reduced.
Compared with prior art, what embodiment 2 was shown has the beneficial effect that
1) efficient welding for not only realizing cell piece allows the production capacity of welder effectively to get rid of single cutting battery Time restriction needed for piece welding procedure, than the production capacity that existing welding technique promotes 60%~80%;
2) guarantee that welding procedure quality, welding quality meet the related standard requirements of photovoltaic module;
3) it is the welding for completing two or more cutting cell pieces within a duty cycle, can guarantee welding production device There is time enough surplus to complete welding process, but shares out equally the welding of single cutting cell piece when final accounting production capacity Time will directly be reduced;
4) time enough completes the processes such as the heating, thawing and cooling condensation of welding below plumb joint, also, Welding temperature can be realized by control modes such as PID it is mild climb and decline, allow in entire welding process and cut cell piece The thermal shock born is softer;
5) while effectively improving welding production device capbility, rosin joint can not only be effectively reduced, cross the abnormal weldings such as weldering, and And the risk that the exception such as crack, rupture occurs in the welding process for cutting cell piece can also be effectively reduced.
Above-described is only some embodiments of the present invention.For those of ordinary skill in the art, not Under the premise of being detached from the invention design, various modifications and improvements can be made, these belong to protection model of the invention It encloses.

Claims (7)

1. a kind of photovoltaic cell efficient welding device, it is characterised in that: including welding belt line, distribution is set to welding belt The manipulator of line two sides draws strip welding mechanism, presser and welding mechanism;
It is set with feed intake position, 2# of 1# in welding belt line to feed intake position, presser and welding mechanism are correspondingly arranged in welding belt The welding position set on line;Welding mechanism is set to the upper cover that presser is formed above presser.
2. a kind of photovoltaic cell efficient welding device according to claim 1, it is characterised in that: welding mechanism includes can Go up and down the plumb joint of setting.
3. a kind of photovoltaic cell efficient welding device according to claim 2, it is characterised in that: manipulator passes through sucker Realize absorption, the release movement of cell piece;Cell piece feeds intake the position that position, 2# feed intake position from the feeding position of upstream supplied materials to 1# It sets switching action and the completion of mould group is then carried by servo.
4. a kind of photovoltaic cell efficient welding device according to claim 3, it is characterised in that: welding belt line includes The driven wheel that is correspondingly arranged by the driving wheel of servo motor driving, with driving wheel is wrapped in beating outside driving wheel and driven wheel Hole belt, and punch to be provided with below belt and inhale vacuum supporting plate.
5. a kind of photovoltaic cell efficient welding device according to claim 4, it is characterised in that: draw strip welding mechanism include Welding clamping jaw is drawn by the 1# that 1# servo drive motor drives, is driven by 1# servo drive motor, 1# draws welding clamping jaw along guiding Sliding rail carries out duplicate back and forth movement.
6. a kind of photovoltaic cell efficient welding device according to claim 5, it is characterised in that: strip welding mechanism is drawn also to wrap The 2# for including the driving of 2# servo drive motor draws welding clamping jaw, is driven by 2# servo drive motor, and 2# draws welding clamping jaw along guiding Sliding rail carries out duplicate back and forth movement;Welding clamping jaw is drawn by 2# after the pull-out for the welding that 1# draws the realization of welding clamping jaw to set length The 1# for continuing to carry and be routed to welding belt line feeds intake position or 2# feeds intake position.
7. a kind of photovoltaic cell efficient welding device according to claim 6, it is characterised in that: presser includes rising The compensating squeeze head of descending mechanism driving.
CN201821677017.0U 2018-10-16 2018-10-16 Photovoltaic cell efficient welding device Active CN209249471U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821677017.0U CN209249471U (en) 2018-10-16 2018-10-16 Photovoltaic cell efficient welding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821677017.0U CN209249471U (en) 2018-10-16 2018-10-16 Photovoltaic cell efficient welding device

Publications (1)

Publication Number Publication Date
CN209249471U true CN209249471U (en) 2019-08-13

Family

ID=67525140

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821677017.0U Active CN209249471U (en) 2018-10-16 2018-10-16 Photovoltaic cell efficient welding device

Country Status (1)

Country Link
CN (1) CN209249471U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109175581A (en) * 2018-10-16 2019-01-11 苏州辰正太阳能设备有限公司 Photovoltaic cell efficient welding device and welding procedure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109175581A (en) * 2018-10-16 2019-01-11 苏州辰正太阳能设备有限公司 Photovoltaic cell efficient welding device and welding procedure

Similar Documents

Publication Publication Date Title
CN109175581A (en) Photovoltaic cell efficient welding device and welding procedure
CN102528203B (en) Semi-automatic single welding machine for solar cell slices
CN104785972B (en) Photovoltaic cell piece series welding device and method
CN205081131U (en) Full -automatic stitch welding of solar cell cluster machine
CN103692097B (en) A kind of Full-automatic welding method of photovoltaic panel and realize the photovoltaic panel automatic welding machine of said method
CN103182579A (en) Solar cell crystal silicon wafer series welding machine
CN202377632U (en) Series welding machine for solar cell crystal silicon wafers
CN202571518U (en) Semi-automatic single welding machine of solar cell
CN113629168B (en) Battery piece scribing series welding integrated equipment
CN108723653A (en) It is a kind of by back-contact welding of battery film at the string welding machine of battery strings
CN108807248B (en) Bonding equipment for bonding substrate welding strip and battery piece
CN207642649U (en) A kind of busbar cuts bonding machine automatically
CN113714707B (en) Bus bar welding machine and bus bar welding method
CN108161328A (en) High speed photovoltaic module production equipment and high speed photovoltaic module production method
CN108188568A (en) A kind of full-automatic stainless steel coil bonding machine
CN108838590A (en) A kind of solar battery sheet welding method and device
CN107363372A (en) Outlet box confluxes tape welding machine and welding method in half component
CN109502342B (en) Conveying device and method, conveying robot and series welding machine
CN209249471U (en) Photovoltaic cell efficient welding device
CN215988800U (en) Photovoltaic module and photovoltaic series welding equipment
CN207188954U (en) Outlet box confluxes tape welding machine in half component
CN217513161U (en) Single-cell welding equipment
CN208584119U (en) A kind of solar battery welding device
CN216441898U (en) Solar cell welding mechanism
EP4113636B1 (en) Device and method for repairing photovoltaic cell string

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant