CN209246804U - Meteorology rocket bomb transmitting frame auxiliary device - Google Patents

Meteorology rocket bomb transmitting frame auxiliary device Download PDF

Info

Publication number
CN209246804U
CN209246804U CN201821397311.6U CN201821397311U CN209246804U CN 209246804 U CN209246804 U CN 209246804U CN 201821397311 U CN201821397311 U CN 201821397311U CN 209246804 U CN209246804 U CN 209246804U
Authority
CN
China
Prior art keywords
frame
track
fixed plate
casing
auxiliary device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821397311.6U
Other languages
Chinese (zh)
Inventor
颜海
史文平
王少文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821397311.6U priority Critical patent/CN209246804U/en
Application granted granted Critical
Publication of CN209246804U publication Critical patent/CN209246804U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Meteorology rocket bomb transmitting frame auxiliary device, by upper frame, lower frame, casing, cover axis, oblique fulcrum bar, rubber tire, fixed plate, jack, track, align bolt, cross bar, vertical tube, short transversal pipe is formed, it is connected among the front end of upper frame with jack upper end, jack lower end is connected by vertical tube with cross bar, the both ends of cross bar are connected with lower frame front respectively, set axis passes through casing and connect with the rear end of upper frame, track is fixed on above frame, the both ends for the front end short transversal pipe that contraposition bolt is fixed on track are connected with track rear end, the upper end of oblique fulcrum bar is connected with casing, lower end is connected with fixed plate, there is the fixed plate of welding in the quadrangle of lower frame respectively, fixed plate is mounted below rubber tire.Have the characteristics that design is reasonable, structure is simple and convenient to operate, is time saving and energy saving, mechanical movement balance, the long mechanical service life in effective court of a feudal ruler, the meteorology rocket bomb transmitting frame auxiliary device that labour degree is greatly reduced.

Description

Meteorology rocket bomb transmitting frame auxiliary device
Technical field
The utility model relates to meteorological professional skill fields, are specifically exactly meteorological rocket bomb transmitting frame auxiliary dress It sets.
Background technique
Rocket bomb transmitting purposes in meteorological technical field is very extensive.Its main function has two aspects: first is that purification Sky eliminates haze, provides good environment for people's lives;Second is that effectively realize rain making and eliminate hail, containment Severe natural weather environment establishes good external condition for the good harvest of agricultural production.But rocket bomb transmitting frame is in practical behaviour During work, there is four major problems: 1. large labor intensities.Meteorological rocket bomb transmitting frame weighs 400 kilograms, needs 4 --- 6 people's shoulders draw back to shoulder and carry on this machinery on picking-up vehicle, could effectively operate.Also this machinery is carried off after operation is complete, is put It is saved in storage.2. being unfavorable for machine maintenance, the service life of rocket bomb transmitting frame is shortened.Regular carrying, to its machine Tool maintenance is very unfavorable.3. affecting the precision of rocket bomb transmitting frame.Conventional is manual handling, in operation, meeting The vibration for causing instrument leads to the instrument in use, bringing certain deviation.4. timeliness is not strong.Its rocket bomb transmitting process In, there is very strong timeliness.The hail mitigation and when the artificial rain operation of Plain in mountain area, requires timeliness very high.Based on above-mentioned factor, It is mechanical it is necessary to design a kind of novel auxiliary, with reach better use, in time, protection rocket bomb transmitting device smoothly makees Industry.
Summary of the invention
The utility model engineering goods can effectively overcome deficiency existing for above-mentioned patented technology, provide a kind of with design Rationally, structure is simple and convenient to operate, is time saving and energy saving, mechanical movement balance, the long mechanical service life in effective court of a feudal ruler, effectively realizing Semi-mechanization operation during the rack-mounted fortune of rocket bomb transmitting is greatly reduced the meteorological of the features such as labour degree of workpeople and uses Rocket bomb transmitting frame auxiliary device.
The technical purpose of the utility model is achieved in that meteorological rocket bomb transmitting frame auxiliary device, is by upper ledge Frame, lower frame, casing, set axis, oblique fulcrum bar, rubber tire, fixed plate, jack, track, contraposition bolt, cross bar, vertical tube, short transversal pipe It is formed, is connected among the front end of upper frame with jack upper end, jack lower end is connected by vertical tube with cross bar, cross bar Both ends be connected respectively with lower frame front, set axis pass through casing connect with the rear end of upper frame, track is fixed on frame Above, contraposition bolt is fixed on the front end of track, and the both ends of short transversal pipe are connected with track rear end, the upper end of oblique fulcrum bar and casing Be connected, lower end is connected with fixed plate, there is the fixed plate of welding in the quadrangle of lower frame respectively, and fixed plate is mounted below glue Wheel.
Material used by the upper frame, lower frame, oblique fulcrum bar, cross bar, casing, vertical tube, short transversal pipe is hollow steel Pipe;
Material used by the set axis is solid steel column;
The upper frame, lower frame, oblique fulcrum bar, cross bar, casing diameter be equal;
The diameter of the vertical tube, short transversal pipe is equal;
The diameter of the set axis is slightly less than the internal diameter of casing, and can enter casing to cover axis is advisable, and is activity between the two 's;
The upper frame is made of the long steel pipe of three band silk mouths, two band silk mouth short steel pipes, four elbows, band silk The long steel pipe of mouth, band silk mouth short steel pipes are all to tighten to be welded and fixed again by silk mouth and elbow;
Two short steel pipes with silk mouth are located at the rear inside of upper frame;
The lower frame is made of four band long steel pipes of silk mouth and four elbows, and the band long steel pipe of silk mouth and elbow are logical Silk rolling mouth is tightened to be welded and fixed again;
Long 20 centimetres of long steel pipe or more of the long steel pipe of the lower frame than upper frame;
The oblique fulcrum bar has two, installs in splayed, and upper end is fixed by welding on casing, and lower end is fixedly welded On fixed plate;
The jack upper end is directly fixedly connected by welding among the front end of upper frame, lower end and riser upper end It is fixedly connected by welding, vertical tube lower end is fixedly connected by welding in the centre of cross bar;
After the described set axis is inserted into the short steel pipes of upper back-end framework, then fixed using welding manner;
The fixed plate is fixedly welded on lower frame quadrangle, and there are four holes for brill on every block of plate, for fixing rubber tire;
There are four the rubber tires, is fixed by screw and fixed plate;
There is fixed wheel anti-skid device on the rubber tire;
The effect of the jack is the lifting height that upper frame front end is adjusted using hydraulic stem and fuel outlet valve;
The track uses channel steel material, has two, is installed in parallel in above frame, with picking-up vehicle track above In parallel;
Spacing between two tracks is consistent with the track on picking-up vehicle;
The track is fixed on above frame using welding connecting mode, the two sides above upper frame;
The short transversal pipe is fixed on track rear inside using welding connecting mode at track rear end, both ends;
The both ends of the cross bar and lower frame front are using the connection type being welded and fixed;
Working principle of the utility model is: mainly realizing that the semi-machine of this auxiliary device is turned into using the movement of rubber tire Industry;According to the levelness on operation ground and the requirement of operation, using jack hydraulic bar and drain the oil on valve regulation upper ledge frame front end The height of face track realizes that this auxiliary device track is effectively docked with track fixed on picking-up vehicle, to reach the mesh of operation 's.
The utility model has the beneficial effects that 1. manufacturing costs are low.According to measuring and calculating, an easy auxiliary device, it is only necessary to flower Take 400 yuan or so.2. alleviating labour degree.If being all needs 4 in real work without this auxiliary device --- 6 labor Power could be completed.3. docking is accurate.This auxiliary device has just fully taken into account this point in design.Above picking-up vehicle Track on track and this auxiliary device is in parastate.4. rapidly and efficiently.When rocket bomb transmitting operation, when having very strong Effect property.If manual handling is docked, time-consuming, the best period for also missing hail mitigation and increasing rain artificially is unfavorable for operation.
Detailed description of the invention
Fig. 1 is that the structural schematic diagram of the utility model doubles as Figure of abstract
Fig. 2 is the structural schematic diagram of frame on the utility model
Fig. 3 is the utility model casing, covers axis, the mounting structure schematic diagram of tilted supporter, fixed plate
In figure: frame on 1., 2. lower frames, 3. casings, 4. sets of axis, 5. oblique fulcrum bars, 6. rubber tires, 7. fixed plates, 8. very heavy Top, 9. tracks, 10. contraposition bolts, 11. cross bars, 12. elbows, the long steel pipe of 13. band silk mouths, 14. band silk mouth short steel pipes, 15. are erected Pipe, 16. short transversal pipes
Specific embodiment
Meteorology rocket bomb transmitting frame auxiliary device is by upper frame (1), lower frame (2), casing (3), covers axis (4), oblique It is strut (5), rubber tire (6), fixed plate (7), jack (8), track (9), contraposition bolt (10), cross bar (11), vertical tube (15), short Transverse tube (16) is formed, and is connected among the front end of upper frame (1) with jack (8) upper end, jack (8) lower end passes through vertical tube (15) it is connected with cross bar (11), the both ends of cross bar (11) are connected with lower frame (2) front respectively, and set axis (4) passes through casing (3) it is connect with the rear end of upper frame (1), track (9) is fixed on frame (1) above, and contraposition bolt (10) is fixed on track (9) Front end, the both ends of short transversal pipe (16) are connected with track (9) rear end, the upper end of oblique fulcrum bar (5) is connected with casing (3), under End is connected with fixed plate (7), and there is the fixed plate (7) of welding in the quadrangle of lower frame (2) respectively, and fixed plate (7) is mounted below Rubber tire (6).
Its work step is as follows:
1. this auxiliary device is pulled out from safe-deposit vault, it is moved to behind picking-up vehicle;
2. according to the horizontality on ground, the hydraulic stem by jack (8) and valve regulation upper ledge frame (1) front end of draining the oil Height connect because the set axis (4) in casing (3) is fixedly welded mode with upper frame (1) use, covers axis (4) with upper frame (1) front end rises and rotates in casing (3);Because track (9) rear end is fixed on the short steel pipes (14) of restocking frame (1), Also it rotates therewith.The upper and lower side of oblique fulcrum bar (5) is connected with casing (3) and fixed plate (7), at this point, oblique fulcrum bar (5) plays Important supporting role.
3. when the track (9) on this auxiliary device is matched by contraposition bolt (10) with picking-up vehicle upper rail completely, After anti-skid device on fixed rubber tire (6), by the rocket bomb transmitting frame on this auxiliary device, pass through track (9) transport to pick up It can operation after on track on vehicle.
After completing rocket bomb transmitting task, same principle transports the rocket bomb transmitting frame on picking-up vehicle by track On the defeated track (9) to this auxiliary device, realize that rocket bomb transmitting frame is separated with picking-up vehicle, then be dragged in library and properly protected Pipe.

Claims (4)

1. meteorology rocket bomb transmitting frame auxiliary device is by upper frame (1), lower frame (2), casing (3), set axis (4), tiltedly branch Bar (5), rubber tire (6), fixed plate (7), jack (8), track (9), contraposition bolt (10), cross bar (11), vertical tube (15), hyphen Pipe (16) is formed, it is characterised in that: is connected among the front end of upper frame (1) with jack (8) upper end, under jack (8) End is connected by vertical tube (15) with cross bar (11), and the both ends of cross bar (11) are connected with lower frame (2) front respectively, covers axis (4) it passes through casing (3) to connect with the rear end of upper frame (1), track (9) is fixed on frame (1) above, and contraposition bolt (10) is solid It is scheduled on the front end of track (9), the both ends of short transversal pipe (16) are connected with track (9) rear end, the upper end of oblique fulcrum bar (5) and casing (3) be connected, lower end is connected with fixed plate (7), there are the fixed plate (7) of welding, fixed plate in the quadrangle of lower frame (2) respectively (7) rubber tire (6) are mounted below.
2. meteorological according to claim 1 use rocket bomb transmitting frame auxiliary device, it is characterised in that: upper frame (1) is by three The root long steel pipe of band silk mouth (13), two bands silk mouth short steel pipes (14), four elbows (12) are formed, the band long steel pipe of silk mouth (13), Band silk mouth short steel pipes (14) is all to tighten to be welded and fixed again with elbow (12) by silk mouth.
Meteorological use rocket bomb transmitting frame auxiliary device 3. according to claim 1, it is characterised in that: lower frame (2) be by The four bands long steel pipe of silk mouth (13) and four elbows (12) are formed, and the band long steel pipe of silk mouth (13) and elbow (12) are twisted by silk mouth Tightly it is welded and fixed again.
4. meteorological rocket bomb transmitting frame auxiliary device according to claim 1, it is characterised in that: oblique fulcrum bar (5) has two Root is installed in splayed, and upper end is fixed by welding on casing (3), and lower end is fixedly welded on fixed plate (7) above.
CN201821397311.6U 2018-08-23 2018-08-23 Meteorology rocket bomb transmitting frame auxiliary device Expired - Fee Related CN209246804U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821397311.6U CN209246804U (en) 2018-08-23 2018-08-23 Meteorology rocket bomb transmitting frame auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821397311.6U CN209246804U (en) 2018-08-23 2018-08-23 Meteorology rocket bomb transmitting frame auxiliary device

Publications (1)

Publication Number Publication Date
CN209246804U true CN209246804U (en) 2019-08-13

Family

ID=67517283

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821397311.6U Expired - Fee Related CN209246804U (en) 2018-08-23 2018-08-23 Meteorology rocket bomb transmitting frame auxiliary device

Country Status (1)

Country Link
CN (1) CN209246804U (en)

Similar Documents

Publication Publication Date Title
CN104126463B (en) A kind of regulatable artificially-simulated rainfall device
CN203523436U (en) Ecological greenhouse
CN102953090B (en) Bottom air inlet type purification system
CN105197849A (en) Multifunctional rail operating car for greenhouse
CN214482417U (en) Ecological restoration greening component for mine
CN204047414U (en) A kind of regulatable artificially-simulated rainfall device
CN209246804U (en) Meteorology rocket bomb transmitting frame auxiliary device
CN102168548A (en) Exploitation measuring device and method of coal bed gas well
CN203111921U (en) Manual track transporting device used in solar greenhouse
CN206251687U (en) A kind of solar photovoltaic green-house
CN206664655U (en) A kind of civil construction pipeline rack
CN206165369U (en) Waterflooding plant experiment in cultivation automatic water feeding device
CN206196499U (en) A kind of photovoltaic agricultural greenhouse support
CN204762596U (en) Solar energy vapour -pressure type irrigation equipment
CN208908759U (en) A kind of highway planting isolation strip water-saving irrigation device
CN208016473U (en) A kind of photovoltaic agricultural greenhouse with Combined frame
CN204368517U (en) Earthworm amino acid Water soluble fertilizer Fabricating machinery
CN213686227U (en) SF6Automatic control trolley device for electrified air supplement of equipment
CN204785046U (en) Integrated module piping lane system
CN204508626U (en) A kind of connection survey portable activity support
CN210491904U (en) Green house remote monitoring system
CN209511588U (en) It is a kind of to push up the collection system sent under suction
CN209185286U (en) A kind of drip irrigation zone limit is laid with the test device of distance and uniformity of irrigation water appilcation
CN208187725U (en) A kind of hydraulic type mechanical load of photovoltaic module test device
CN208929474U (en) A kind of pipeline production cutter device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190813

Termination date: 20200823