CN209243720U - A kind of shuttle shape contraction type anchor structure - Google Patents
A kind of shuttle shape contraction type anchor structure Download PDFInfo
- Publication number
- CN209243720U CN209243720U CN201822094202.3U CN201822094202U CN209243720U CN 209243720 U CN209243720 U CN 209243720U CN 201822094202 U CN201822094202 U CN 201822094202U CN 209243720 U CN209243720 U CN 209243720U
- Authority
- CN
- China
- Prior art keywords
- annulus
- shuttle
- contraction type
- connect
- anchor structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
A kind of shuttle shape contraction type anchor structure belongs to slope retaining and pile foundation anchorage technology field.The shuttle shape contraction type anchor structure, including anchor rod main body, sleeve and multiple shuttle arms, one end of anchor rod main body is equipped with threaded portion, the threaded portion is connect with nut, the other end of anchor rod main body is arranged with the first annulus, anchor rod main body passes through sleeve, sleeve includes perforated steel plate, hollow pipe and the second annulus, one end of the hollow pipe is connect with perforated steel plate, the other end of hollow pipe is connect with the second annulus, second annulus is disposed in proximity to the side of the first annulus, perforated steel plate is set to the side far from the first annulus, one end of shuttle arm is connect with the first annulus, the other end of shuttle arm is connect with the second annulus.The shuttle shape contraction type anchor structure, recoverable are directly contacted with Rock And Soil without slip casting, and production method and mode of operation are simple, easily construct, anchor force height.
Description
Technical field
The utility model relates to slope retaining and pile foundation anchorage technology field, in particular to a kind of shuttle shape contraction type anchor pole knot
Structure.
Background technique
With the rapid development of infrastructure, anchor pole plays Rock And Soil reinforcing as a kind of efficiently anchorage element
Key effect brings convenience to engineering construction.Rock And Soil primary stress field balance after excavation is broken and causes to tie in construction
Structure unstability, new stress field, which is formed, to be needed to reach stable by external force, and the anchor force of anchor pole is most normal as new stress field balance
The features such as a kind of external force seen, anchor pole are easily constructed since self construction is simple, and use scope is extensive is widely used at side slope
The construction sites such as reason, bridge, underground space engineering, Tunnel Engineering, coal mining roadway support, accelerate project progress and save
Construction time and cost.
Existing anchor pole is many kinds of but most of there is not recyclable etc. technical problems, and especially anchor pole is for a long time in rock
Corroded in soil not can be carried out replacement cause anchoring property weaken, strength reduction, to engineering from now on use and maintenance causes
Some potential safety problems, most of conventional anchor require to increase anchoring effect to slip casting is carried out in drilling.
Conventional anchor process in production and use is more, larger with material aspect waste, does not meet environmentally protective theory.
Summary of the invention
It cannot be recycled to solve anchor pole of the existing technology, anchor pole is caused to anchor in ground by corrosion for a long time
The problems such as power decline, anchor pole make and are complicated for operation, the utility model provides a kind of shuttle shape contraction type anchor structure, can be recycled
Using, directly contacted with Rock And Soil without slip casting, be able to solve conventional anchor corrode in ground for a long time brought by anchor
Gu the problem of power declines, production method and mode of operation are simple, easily construction, anchor force is high.
To achieve the goals above, the technical solution of the utility model is:
A kind of shuttle shape contraction type anchor structure, including anchor rod main body, sleeve and multiple shuttle arms;
One end of the anchor rod main body is equipped with threaded portion, and the threaded portion is connect with nut, another end cap of anchor rod main body
Equipped with the first annulus, anchor rod main body passes through sleeve;
The sleeve includes perforated steel plate, hollow pipe and the second annulus, and one end of the hollow pipe is connect with perforated steel plate,
The other end of hollow pipe is connect with the second annulus, and the second annulus is disposed in proximity to the side of the first annulus, and perforated steel plate is set to
Side far from the first annulus;
One end of the shuttle arm is connect with the first annulus, and the other end of shuttle arm is connect with the second annulus.
The anchor rod main body is solid steel column.
The shuttle arm includes two steel pipes and hinge joint, and two steel pipes pass through the connection of hinge joint.
Two steel pipes are rectangular steel tube.
The hinge joint is pin shaft, and one end that two steel pipes are connect with pin shaft respectively can be rotated around pin shaft.
The shuttle arm and the first annulus and the second annulus pass through articulated connection.
The hollow pipe and perforated steel plate and the second annulus pass through welded connecting.
The nut is high strength nut.
First annulus and the second annulus are respectively provided with hinged slot.
A kind of application method of above-mentioned shuttle shape contraction type anchor structure, comprising the following steps:
Step 1: being punched in construction working face, aperture is greater than sleeve diameter 10-15mm, and the depth in hole is by anchor pole master
The length of body determines;
Step 2: shuttle shape contraction type anchor structure is put into beaten hole, after perforated steel plate is close to the soil body, by tightening
Nut pushes sleeve to strut shuttle arm, and anchoring is completed;
Step 3: closing up shuttle arm when recycling or replacement shuttle shape contraction type anchor structure by unscrewing nut, being returned
It receives or replaces.
The utility model has the beneficial effects that
The shuttle shape contraction type anchor structure of the utility model is anchored using tightening nut and strut shuttle arm, after shuttle arm struts
Squeeze with the soil body and form crush resistance, is directly contacted with Rock And Soil without slip casting, spiral shell is passed through according to ground volume property
Mother controls the size in shuttle shape face to change anchor force, tightens degree according to nut to change the extruding force of anchor pole and the soil body, thus
So that the anchoring property of shuttle shape contraction type anchor structure is reached maximization, improve anchoring effect, enhances the stability of the soil body;Shuttle
Shape contraction type anchor structure solves the problems, such as that conventional anchor corrodes anchor force decline in ground for a long time based on the characteristics of contraction;
The replacement of anchor pole is carried out by shrinking shuttle arm;Shuttle shape contraction type anchor structure is easily constructed, anchor force is strong, simple structure, in weak soil
It is more preferable with anchoring effect in soft rock mass.
Detailed description of the invention
Fig. 1 is the stereoscopic schematic diagram of shuttle shape contraction type anchor structure provided by the utility model;
Fig. 2 is the elevational schematic view of shuttle shape contraction type anchor structure provided by the utility model;
Fig. 3 is that shuttle shape contraction type anchor structure provided by the utility model anchors elevation preceding or after the recovery.
Wherein,
1- anchor rod main body;2- nut;3- perforated steel plate;4- sleeve;The second annulus of 5-;6- shuttle arm;7- cuts with scissors joint;8- first
Annulus;9- cuts with scissors slot
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describing, it is clear that described embodiment is only a part of the embodiment of the utility model, rather than all
Embodiment.In the description of the present invention, it should be noted that term "inner", "outside" " both ends ", " one end ", " another
The orientation or positional relationship of the instructions such as end " is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of describing this reality
It is described with novel with simplified, rather than the device or element of indication or suggestion meaning must have a particular orientation, with specific
Orientation construction and operation, therefore should not be understood as limiting the present invention.In addition, term " first ", " second " are only used for
Purpose is described, relative importance is not understood to indicate or imply.Term " being provided with ", " connection " etc., shall be understood in a broad sense,
Such as " connection ", it may be fixed connection or may be dismantle connection, or integral connection;It can be mechanical connection, it can also
To be electrical connection;It can be directly connected, the company inside two elements can also be can be indirectly connected through an intermediary
It is logical.For the ordinary skill in the art, above-mentioned term in the present invention specific can be understood with concrete condition
Meaning.
Of the existing technology in order to solve the problems, such as, as shown in Figure 1 to Figure 3, the utility model provides a kind of shuttle shape receipts
Contracting formula anchor structure, including anchor rod main body 1, sleeve 4 and multiple shuttle arms 6;
One end of anchor rod main body 1 is equipped with threaded portion, and threaded portion connect with nut 2, and the other end of anchor rod main body 1 is arranged with the
One annulus 8, anchor rod main body 1 pass through sleeve 4;
Sleeve 4 includes perforated steel plate 3, hollow pipe and the second annulus 5, and one end of hollow pipe is connect with perforated steel plate 3, hollow
The other end of pipe is connect with the second annulus 5, and the second annulus 5 is disposed in proximity to the side of the first annulus 8, and perforated steel plate 3 is set to
Side far from the first annulus 8;
One end of shuttle arm 6 is connect with the first annulus 8, and the other end of shuttle arm 6 is connect with the second annulus 5.
In the present embodiment, as shown in Figure 1, anchor rod main body 1 is solid steel column, anchor rod main body 1 and the fixed company of the first annulus 8
It connects, the screw thread being equipped in the anchor rod main body 1 adjacent with the inside of sleeve 4, i.e., the length of threaded portion is according to practical anchor situation
It determines.Hollow pipe and perforated steel plate 3 and the second annulus 5 are by being welded to connect, the preferably circular perforated steel plate of perforated steel plate 3,
Because circular contact area is big, the effect for improving anchor force is best, and the bore dia of perforated steel plate 3 is greater than the straight of anchor rod main body 1
Diameter, less than the outer diameter of nut 2.Nut 2 is disposed adjacent with the perforated steel plate 3 of sleeve 4, and nut 2 is high strength nut, by tightening
Nut 2 drives anchor rod main body 1 to stretch out, and to the thrust that shuttle arm 6 one is inside under the blocking of sleeve 4, shuttle arm 6 is in this thrust
It is softened under effect, that is to say, that push sleeve 4 to strut shuttle arm 6 by tightening nut 2.
Shuttle arm 6 includes two steel pipes and hinge joint 7, and two steel pipes are connected by hinge joint 7.Two steel pipes are square bar
Pipe, hinge joint 7 are pin shaft, and one end that two steel pipes are connect with pin shaft respectively can be rotated around pin shaft, shuttle arm 6 and the first annulus 8
Pass through articulated connection with the second annulus 5.In the present embodiment, the frictional force of rectangular steel tube is best, and the frictional force of rectangular steel tube is good
In the frictional force of the steel pipe of the other shapes such as circle, the first annulus 8 and the second annulus 5 are respectively provided with hinged slot 9, make the two of shuttle arm 6
Root steel pipe is preferably hinged with the first annulus 8 and the second annulus 5.
A kind of application method of above-mentioned shuttle shape contraction type anchor structure, comprising the following steps:
Step 1: being punched in construction working face, aperture is greater than 4 diameter 10-15mm of sleeve, and the depth in hole is by anchor pole master
The length of body 1 determines;
Step 2: shuttle shape contraction type anchor structure is put into beaten hole, after perforated steel plate 3 is close to the soil body, by twisting
Tight nut 2 pushes sleeve 4 to strut shuttle arm 6, and anchoring is completed;
Step 3: closing up shuttle arm 6 when recycling or replacement shuttle shape contraction type anchor structure by unscrewing nut 2, carrying out
Recycling or replacement.
In the present embodiment, the depth in hole is longer than the length of anchor rod main body 1.When anchoring, as shown in figure 3, by before anchoring
Shuttle shape contraction type anchor structure is put into beaten hole, perforated steel plate 3 be close to the soil body after, by tighten nut 2 push sleeve 4 from
And shuttle arm 6 is strutted, the distracted extruding force of shuttle arm 6 is determined according to the case where anchoring soil body, and anchoring is completed as shown in Figure 1.Work as recycling
It is recycled or is replaced by unscrewing nut 2 when perhaps replacing shuttle shape contraction type anchor structure, shuttle shape contraction type after the recovery
Anchor structure is as shown in Figure 3.Infringement of the anchor pole for a long time in the soil body by water and pH value is corroded, and component performance decline causes
Anchor force decline, the shuttle shape contraction type anchor structure of the utility model is replaced using its recyclable advantage, by anchor force
Bad anchor pole is extracted, and a new shuttle shape contraction type anchor structure is installed at original hole, eliminates the operation of punching
Avoid waste caused by waste anchor rods in the prior art stay in the soil body, waste anchor rods recycle out after become give up into
It is precious.When the gib for pile foundation, existing anchor pole requires slip casting, just loses after the gib that it completes pile foundation
It, which is worth but has infused one entirety of slurry and pile foundation formation due to anchor pole, causes to recycle, and has stayed in and has caused to waste in the soil body, and
The shuttle shape contraction type anchor structure of the utility model may be recovered utilizations after the completion of carrying out gib to pile foundation, saving at
This, reduces resource waste.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this
Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model
Within the scope of shield.
Claims (9)
1. a kind of shuttle shape contraction type anchor structure, which is characterized in that including anchor rod main body, sleeve and multiple shuttle arms;
One end of the anchor rod main body is equipped with threaded portion, and the threaded portion is connect with nut, and the other end of anchor rod main body is arranged with
First annulus, anchor rod main body pass through sleeve;
The sleeve includes perforated steel plate, hollow pipe and the second annulus, and one end of the hollow pipe is connect with perforated steel plate, hollow
The other end of pipe is connect with the second annulus, and the second annulus is disposed in proximity to the side of the first annulus, and perforated steel plate is set to separate
The side of first annulus;
One end of the shuttle arm is connect with the first annulus, and the other end of shuttle arm is connect with the second annulus.
2. shuttle shape contraction type anchor structure according to claim 1, which is characterized in that the anchor rod main body is single solid steel
Column.
3. shuttle shape contraction type anchor structure according to claim 1, which is characterized in that the shuttle arm include two steel pipes and
Joint is cut with scissors, two steel pipes pass through the connection of hinge joint.
4. shuttle shape contraction type anchor structure according to claim 3, which is characterized in that two steel pipes are square bar
Pipe.
5. shuttle shape contraction type anchor structure according to claim 3, which is characterized in that the hinge joint be pin shaft, two
One end that steel pipe is connect with pin shaft respectively can be rotated around pin shaft.
6. shuttle shape contraction type anchor structure according to claim 1, which is characterized in that the shuttle arm and the first annulus and
Two annulus pass through articulated connection.
7. shuttle shape contraction type anchor structure according to claim 1, which is characterized in that the hollow pipe and perforated steel plate and
Second annulus passes through welded connecting.
8. shuttle shape contraction type anchor structure according to claim 1, which is characterized in that the nut is high strength nut.
9. shuttle shape contraction type anchor structure according to claim 1, which is characterized in that first annulus and the second annulus
It is respectively provided with hinged slot.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822094202.3U CN209243720U (en) | 2018-12-13 | 2018-12-13 | A kind of shuttle shape contraction type anchor structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822094202.3U CN209243720U (en) | 2018-12-13 | 2018-12-13 | A kind of shuttle shape contraction type anchor structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209243720U true CN209243720U (en) | 2019-08-13 |
Family
ID=67532861
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822094202.3U Expired - Fee Related CN209243720U (en) | 2018-12-13 | 2018-12-13 | A kind of shuttle shape contraction type anchor structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209243720U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109306697A (en) * | 2018-12-13 | 2019-02-05 | 辽宁工程技术大学 | A kind of shuttle shape contraction type anchor structure and its application method |
CN112523209A (en) * | 2020-11-25 | 2021-03-19 | 中国建筑第五工程局有限公司 | Anchoring connector for anchor rod |
-
2018
- 2018-12-13 CN CN201822094202.3U patent/CN209243720U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109306697A (en) * | 2018-12-13 | 2019-02-05 | 辽宁工程技术大学 | A kind of shuttle shape contraction type anchor structure and its application method |
CN112523209A (en) * | 2020-11-25 | 2021-03-19 | 中国建筑第五工程局有限公司 | Anchoring connector for anchor rod |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109306697A (en) | A kind of shuttle shape contraction type anchor structure and its application method | |
US11268383B2 (en) | Type of energy-absorbing rock bolt device with umbrella-shaped structure | |
CN109236337A (en) | The arrow anchor pole and its application method of multisection type clamping slip casting anchoring | |
CN103104270A (en) | Shear type expansion anchor rod and extension application thereof | |
CN211397620U (en) | Recoverable expanding anchor rod | |
CN209243720U (en) | A kind of shuttle shape contraction type anchor structure | |
CN203515598U (en) | Tunnel supporting structure bridged active fault | |
CN109972538B (en) | Steel plate inner filling material combined reinforced concrete bridge structure and construction technology | |
CN105822332B (en) | A kind of mining frictional energy-absorbing impact preventing anchor rod of stepping down | |
CN107288671A (en) | Reinforcing soft broken coal rock body bores the integrated extensible anchor pole of envelope note and its construction method | |
CN203905973U (en) | Mining downhole recycling device for anchor rods | |
CN206538676U (en) | A kind of utilization split column technology exempts from seismic Damage high-speed railway bridge pier | |
CN103806446B (en) | Internally-supporting expansion type anchor rod | |
CN109723481B (en) | Stock tray and end thick liquid stopper integral type structure | |
CN2568815Y (en) | Strengthening slip casting anchor stock | |
CN103147772B (en) | Method for supporting steel strip connecting bridge of arch-shaped soft rock roadway with large section | |
CN208441092U (en) | A kind of Rock And Soil locking type reinforcing anchor pole | |
CN206941799U (en) | The prestressing force assembling type node construction of beam-ends friction energy-dissipating | |
CN106480880B (en) | Recoverable soil nailing and the construction method for using recoverable soil nail | |
CN105155680A (en) | Self-opening blind eye bolt anchor device | |
CN208777759U (en) | A kind of building reconstruction bracing means | |
CN208633857U (en) | A kind of frictional drainage anchor rod of fibrous material | |
CN106761841A (en) | Working face tailgate fractured coal grouting reinforcement method | |
JP2004225411A (en) | Anchoring bolt device for bridge pier or the like | |
CN208455618U (en) | A kind of airport roadbed anchor rope protection structure of easy repairing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190813 Termination date: 20211213 |
|
CF01 | Termination of patent right due to non-payment of annual fee |