CN209212726U - A kind of plane template of Fast Installation - Google Patents
A kind of plane template of Fast Installation Download PDFInfo
- Publication number
- CN209212726U CN209212726U CN201821790863.3U CN201821790863U CN209212726U CN 209212726 U CN209212726 U CN 209212726U CN 201821790863 U CN201821790863 U CN 201821790863U CN 209212726 U CN209212726 U CN 209212726U
- Authority
- CN
- China
- Prior art keywords
- slot
- plane template
- leakproof
- plane
- docking groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a kind of plane templates of Fast Installation, including plane template, Corner Link, preceding sealing and rear sealing, one end of plane template is provided with docking groove, the connection plate grafting that docking groove is fixedly connected with the other end of plane template, and night bolt is fixedly connected on the inner wall of docking groove, night bolt is plugged in the positioning jack of surface setting of connection plate, leakproof slot is provided on the end face of plane template where docking groove, the leakproof plate grafting that leakproof slot is fixedly connected with the plane template end of the other end, center slot is provided on the end face of plane template locating for leakproof slot, the spoiler grafting that center slot is fixedly connected with the other end of plane template;The utility model proposes plane template, change the connection type of conventional template, by splicing connect and fixed by night bolt, it is simple and convenient, improve the formwork efficiency of plane template.
Description
Technical field
The utility model relates to construction correlative technology field, specially a kind of plane template of Fast Installation.
Background technique
It needs to install plane template during construction, supporting is carried out to the concrete of casting, avoids concrete
It is deformed in process of setting;
In the prior art, it is bolted, installs slower between plane template;And traditional plane template is in stitching portion
Spillage phenomenon is easily caused, the casting quality of concrete is influenced, causes the waste of concrete;For this purpose, the utility model proposes one kind
The plane template of Fast Installation is for solving the above problems.
Utility model content
The purpose of this utility model is to provide a kind of plane templates of Fast Installation, to solve to mention in above-mentioned background technique
Out the problem of.
To achieve the above object, the utility model provides the following technical solutions: a kind of plane template of Fast Installation, including
Plane template, Corner Link, preceding sealing and rear sealing, one end of the plane template are provided with docking groove, the docking
The connection plate grafting that slot is fixedly connected with the other end of plane template, and be fixedly connected with spring on the inner wall of docking groove and insert
Pin, the night bolt are plugged in the positioning jack of surface setting of connection plate, the end of the plane template where docking groove
It is provided with leakproof slot on face, the leakproof plate grafting that the leakproof slot is fixedly connected with the plane template end of the other end,
It is provided with center slot on the end face of plane template locating for leakproof slot, the other end of the center slot and plane template is solid
Surely the spoiler grafting connected, plane template are provided with multiple, and two plane templates of corner are docked by Corner Link,
The plane template in rear and front end portion passes through preceding sealing respectively and rear sealing is blocked.
Preferably, the docking groove is in rectangular cylinder structure, and docking groove is provided with two groups, and two groups of docking grooves are inserted about center
Slot is symmetrical, and the night bolt inside docking groove is provided with two groups, and two groups of night bolts are distributed in two of docking groove relatively
Inner wall on, there are three the settings of every group of night bolt, and the plunger of night bolt is in frustum cone structure.
Preferably, the leakproof slot is in triangular prism structure, and there are two the settings of leakproof slot, and two leakproof slots are about in
Heart slot is symmetrical, and two leakproof slots are in the region between two docking grooves.
Preferably, the spoiler includes gear liquid block and liquid collecting block, keeps off liquid block and liquid collecting block is provided with multiple, multiple gears
Liquid block successively distributes alternately with liquid collecting block and is fixedly connected, and gear liquid block is in hemisphere structure, and liquid collecting block is fixed in two frustum cone structures
The column structure of connection, the diameter of the central diameter of liquid collecting block less than two end faces.
Preferably, a side surface of the Corner Link is provided with docking groove, leakproof slot and center slot, therewith
Connection plate, leakproof plate and spoiler are provided on vertical surface, the surface of preceding sealing is provided with docking groove, leakproof is inserted
Slot and center slot, the surface of rear sealing are provided with connection plate, leakproof plate and spoiler.
Compared with prior art, the utility model has the beneficial effects that
1. the utility model proposes plane template, change the connection type of conventional template, by splicing connection and by
Night bolt is fixed, simple and convenient, improves the formwork efficiency of plane template;
2. the utility model proposes plane template add mortar leakage prevention structure between two neighboring plane template, solve to pass
The spillage phenomenon of system plane template junction, improves the casting quality of concrete.
Detailed description of the invention
Fig. 1 is the utility model configuration schematic diagram;
Fig. 2 is seal structure schematic diagram after the utility model;
Fig. 3 is seal structure schematic diagram before the utility model.
In figure: plane template 1, docking groove 2, connection plate 3, night bolt 4, positioning jack 5, leakproof slot 6, leakproof are inserted
Plate 7, center slot 8, spoiler 9, Corner Link 10, preceding sealing 11, rear sealing 12.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of plane template of Fast Installation, including it is flat
Face die plate 1, Corner Link 10, preceding sealing 11 and rear sealing 12, one end of plane template 1 is provided with docking groove 2, docking groove
23 grafting of connection plate being fixedly connected with the other end of plane template 1, and be fixedly connected with spring on the inner wall of docking groove 2 and insert
Pin 4, night bolt 4 are plugged in the positioning jack 5 of surface setting of connection plate 3, the plane template 1 where docking groove 2
Leakproof slot 6 is provided on end face, the leakproof plate 7 that leakproof slot 6 is fixedly connected with 1 end of plane template of the other end is inserted
It connects, center slot 8 is provided on the end face of plane template 1 locating for leakproof slot 6, center slot 8 is another with plane template 1
Hold 9 grafting of spoiler that is fixedly connected, plane template 1 is provided with multiple, and two plane templates 1 of corner pass through corner connection
Part 10 docks, and the plane template 1 in rear and front end portion is blocked by preceding sealing 11 and rear sealing 12 respectively.
Further, docking groove 2 is in rectangular cylinder structure, and docking groove 2 is provided with two groups, and two groups of docking grooves 2 are about center
Slot 8 is symmetrical, and the night bolt 4 inside docking groove 2 is provided with two groups, and two groups of night bolts 4 are distributed in the two of docking groove 2
On a opposite inner wall, there are three every group of settings of night bolt 4, and the plunger of night bolt 4 is in frustum cone structure, connects plate 3
It is plugged on the inside of docking groove 2, meanwhile, connection plate 3 is plugged in positioning jack 5, and it is solid to play connection to two plane templates 1
Fixed effect, since the plunger of night bolt 4 is in frustum cone structure, firmly two plane templates 1 of outside withdrawing, can be realized two
The separation of plane template 1.
Further, leakproof slot 6 be in triangular prism structure, leakproof slot 6 setting there are two, two leakproof slots 6 about
Center slot 8 is symmetrical, and two leakproof slots 6 are in the region between two docking grooves 2, and leakproof plate 7 is plugged on anti-
Play the role of first of mortar leakage prevention to the junction of two plane templates 1 in the inside of leakage slot 6.
Further, spoiler 9 includes gear liquid block and liquid collecting block, keeps off liquid block and liquid collecting block is provided with multiple, multiple gears
Liquid block successively distributes alternately with liquid collecting block and is fixedly connected, and gear liquid block is in hemisphere structure, and liquid collecting block is fixed in two frustum cone structures
The column structure of connection, less than the diameter of two end faces, spoiler 9 is plugged on the interior of center slot 8 for the central diameter of liquid collecting block
Second mortar leakage prevention, the inner wall of gear the liquid block and center slot 8 of spoiler 9 are played the role of in portion, the junction of two plane templates 1
Contact, concrete penetrate into liquid collecting block from gear liquid block and are accumulated, and concrete need to could be leaked by multiple groups liquid collecting block and gear liquid block
Center slot 8 out improves the mortar leakage prevention performance of concrete.
Further, a side surface of Corner Link 10 is provided with docking groove 2, leakproof slot 6 and center slot 8,
Be provided with connection plate 3, leakproof plate 7 and spoiler 9 on surface normal thereto, Corner Link 10 to corner two
A plane template 1 is attached, and the surface of preceding sealing 11 is provided with docking groove 2, leakproof slot 6 and center slot 8, rear sealing
12 surface is provided with connection plate 3, leakproof plate 7 and spoiler 9, preceding sealing 11 and rear sealing 12 to the plane mould of end
Plate 1 carries out structure docking.
Working principle: in actual work, multiple plane templates 1 being docked from beginning to end, at this point, connection plate 3 is plugged on docking
The inside of slot 2, meanwhile, connection plate 3 is plugged in positioning jack 5, plays the role of being connected and fixed to two plane templates 1,
Since the plunger of night bolt 4 is in frustum cone structure, firmly two plane templates 1 of outside withdrawing, can be realized two plane templates 1
Separation, first of mortar leakage prevention is played to the junction of two plane templates 1 in the inside that leakproof plate 7 is plugged on leakproof slot 6
Effect, spoiler 9 are plugged on the inside of center slot 8, and second mortar leakage prevention is played the role of in the junction of two plane templates 1,
The gear liquid block of spoiler 9 is contacted with the inner wall of center slot 8, and concrete penetrates into liquid collecting block from gear liquid block and accumulated, coagulation
Soil need to could leak out center slot 8 by multiple groups liquid collecting block and gear liquid block, improve the mortar leakage prevention performance of concrete, and this is practical new
The plane template splicing that type proposes is simple and convenient, is suitble to promote the use of.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of plane template of Fast Installation, including plane template (1), Corner Link (10), preceding sealing (11) and after
Sealing (12), it is characterised in that: one end of the plane template (1) is provided with docking groove (2), the docking groove (2) and plane
Connection plate (3) grafting that the other end of template (1) is fixedly connected, and be fixedly connected with spring on the inner wall of docking groove (2) and insert
It sells (4), the night bolt (4) is plugged in the positioning jack (5) of surface setting of connection plate (3), where docking groove (2)
Plane template (1) end face on be provided with leakproof slot (6), the plane template (1) of the leakproof slot (6) and the other end is held
Leakproof plate (7) grafting that portion is fixedly connected is provided with center on the end face of plane template (1) locating for leakproof slot (6) and inserts
Slot (8), spoiler (9) grafting that the center slot (8) is fixedly connected with the other end of plane template (1), plane template (1)
It is provided with multiple, two plane templates (1) of corner pass through Corner Link (10) and dock, the plane template in rear and front end portion
(1) it is blocked respectively by preceding sealing (11) and rear sealing (12).
2. a kind of plane template of Fast Installation according to claim 1, it is characterised in that: the docking groove (2) is in square
Shape column structure, docking groove (2) are provided with two groups, and two groups of docking grooves (2) are symmetrical about center slot (8), docking groove (2)
Internal night bolt (4) is provided with two groups, and two groups of night bolts (4) are distributed on two opposite inner walls of docking groove (2),
There are three every group of night bolt (4) settings, and the plunger of night bolt (4) is in frustum cone structure.
3. a kind of plane template of Fast Installation according to claim 1, it is characterised in that: the leakproof slot (6) is in
Triangular prism structure, there are two leakproof slot (6) settings, and two leakproof slots (6) are symmetrical about center slot (8), and two
A leakproof slot (6) is in the region between two docking grooves (2).
4. a kind of plane template of Fast Installation according to claim 1, it is characterised in that: the spoiler (9) includes
Liquid block and liquid collecting block are kept off, liquid block is kept off and liquid collecting block is provided with multiple, multiple gear liquid blocks and liquid collecting block successively distribute alternately fixation
Connection, gear liquid block are in hemisphere structure, and liquid collecting block is in the column structure that two frustum cone structures are fixedly connected, and the center of liquid collecting block is straight
Diameter of the diameter less than two end faces.
5. a kind of plane template of Fast Installation according to claim 1, it is characterised in that: the Corner Link (10)
A side surface be provided with docking groove (2), leakproof slot (6) and center slot (8), the company of being provided on surface normal thereto
The surface of plugboard (3), leakproof plate (7) and spoiler (9), preceding sealing (11) is provided with docking groove (2), leakproof slot
(6) and center slot (8), the surface of rear sealing (12) are provided with connection plate (3), leakproof plate (7) and spoiler
(9)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821790863.3U CN209212726U (en) | 2018-11-01 | 2018-11-01 | A kind of plane template of Fast Installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821790863.3U CN209212726U (en) | 2018-11-01 | 2018-11-01 | A kind of plane template of Fast Installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209212726U true CN209212726U (en) | 2019-08-06 |
Family
ID=67457869
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821790863.3U Expired - Fee Related CN209212726U (en) | 2018-11-01 | 2018-11-01 | A kind of plane template of Fast Installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209212726U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110425202A (en) * | 2019-08-30 | 2019-11-08 | 东开盈装饰科技(佛山)有限公司 | A kind of connector and plate fitment connection structure and plate fitment assemble method |
-
2018
- 2018-11-01 CN CN201821790863.3U patent/CN209212726U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110425202A (en) * | 2019-08-30 | 2019-11-08 | 东开盈装饰科技(佛山)有限公司 | A kind of connector and plate fitment connection structure and plate fitment assemble method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209212726U (en) | A kind of plane template of Fast Installation | |
CN104032841A (en) | Method for treating horizontal construction joint of concrete wall | |
CN209477266U (en) | A kind of mold of battery bus | |
CN204122722U (en) | The die-casting system of dry dual clutch flow valve body | |
CN102121707A (en) | Air preheater for cast iron on high-head fins | |
CN205915478U (en) | Flange template | |
CN211194334U (en) | Forming die for grouting sleeve connection prefabricated shear wall | |
CN204628863U (en) | A kind of conduit pipe loop flange connector | |
CN107740383A (en) | A kind of light-weighted corrugated plating gate | |
CN208539499U (en) | Portable pre-buried electronic box support frame | |
CN208204393U (en) | A kind of teaching assembled architecture supporting apparatus | |
CN220888717U (en) | Retaining wall with steel structure for hydraulic engineering | |
CN213593180U (en) | Concrete formwork for hydraulic engineering construction | |
CN104589472A (en) | Cubic cement sample mold | |
CN207926122U (en) | A kind of architectural electricity pipeline system for crossing aseismatic joint | |
CN201661076U (en) | Combined type corner template | |
CN206666933U (en) | A kind of steel sleeper | |
CN219672114U (en) | Aluminum film plate joint stubble processing device | |
CN215288086U (en) | Hexagonal honeycomb inclined pipe for removing oil and suspended matters in sewage | |
CN205065104U (en) | Spray tube that can dismantle fast | |
CN220619889U (en) | Guard bar pouring template | |
CN204019709U (en) | A kind of concrete segment maintenance mould | |
CN213539382U (en) | Cross plug connector for shear wall pouring construction | |
CN203096763U (en) | Dedicated component for cable trench construction | |
CN213032833U (en) | Spray dust removal system for hydraulic engineering construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190806 Termination date: 20211101 |