CN104032841A - Treatment method for horizontal construction joint of concrete walls - Google Patents

Treatment method for horizontal construction joint of concrete walls Download PDF

Info

Publication number
CN104032841A
CN104032841A CN201410312484.3A CN201410312484A CN104032841A CN 104032841 A CN104032841 A CN 104032841A CN 201410312484 A CN201410312484 A CN 201410312484A CN 104032841 A CN104032841 A CN 104032841A
Authority
CN
China
Prior art keywords
concrete wall
construction joint
horizontal construction
template
split bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410312484.3A
Other languages
Chinese (zh)
Inventor
张鹏飞
张生雨
李平旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201410312484.3A priority Critical patent/CN104032841A/en
Publication of CN104032841A publication Critical patent/CN104032841A/en
Pending legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention relates to a treatment method for a horizontal construction joint of concrete walls. The treatment method comprises the steps that (1) when the pre-cast concrete wall is constructed, a split bolt is embedded into the portion 150 mm away from the construction joint to be reserved, and meanwhile, the upper portion of the pre-cast concrete wall is cast to form a concave top surface; (2) a formwork of the pre-cast concrete wall is removed, a line is snapped at the two ends of the concrete concave top surface, the two ends are ground flat through an angle grinder to remove burrs, and double-faced adhesive tape is stuck to the portion, between the horizontal construction joint and the split bolt, of the pre-cast concrete wall; (3) a connecting formwork is installed, the lower half portion of the connecting formwork is fixed to the spit bolt, and a row of split bolts are additionally arranged on the upper half portion, 150 mm away from the horizontal construction joint, of the formwork; (4) a formwork of the post-cast concrete wall is installed above the connecting formwork, and then treatment of the horizontal construction joint of the concrete walls is completed. The method is easy to implement and reasonable in design, saves time and labor and effectively improves the construction quality of concrete.

Description

The processing method of concrete wall horizontal construction joint
Technical field
The invention belongs to concrete wall construction field, especially a kind of processing method of concrete wall horizontal construction joint.
Background technology
In building operations, cast-in-place concrete wall is a kind of common member, especially some public buildings are as library, museum, conference and exhibition center etc., it is thick and tall and big that concrete wall often design, and construction quality requires high, when construction, be once difficult to moulding by casting, at this moment just need to stay and establish horizontal construction joint at twice or repeatedly cast.If horizontal construction joint place deals with improperly, when wall construction, there will be the phenomenons such as swollen mould, stream slurry, faulting of slab ends in the above, affect normally carrying out of concrete construction quality and later process.Way be in the past below concrete wall body construction complete after, form removal, install according to a conventional method top wall form, not firm in the reinforcing of horizontal construction joint, cause the problems referred to above.Or below wall form do not remove, continue top template and install and construct, the disposable input amount of template is large like this, cannot have enough to meet the need.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, a kind of processing method of concrete wall horizontal construction joint is provided, this processing method is simple to operate, reasonable in design, time saving and energy saving, has effectively improved concrete construction quality.
The present invention solves its technical problem and is achieved through the following technical solutions:
A processing method for concrete wall horizontal construction joint, its processing method comprises the steps:
(1), in the time of the first fluid concrete wall of construction, apart from staying the pre-buried split bolt of the 150mm of constuction joint place of establishing, simultaneously by first fluid concrete wall top cast formation spill end face;
, the template of removing first fluid concrete wall, polish at concrete spill end face two ends snap the line and with angle grinding machine, remove burr, and paste double faced adhesive tape on the first fluid concrete metope between horizontal construction joint and pre-buried split bolt;
, install connect template, template Lower Half and pre-buried split bolt are fixed, the first half adds row's split bolt again, also apart from horizontal construction joint 150mm;
, connect install above template after the template of fluid concrete wall, concrete wall horizontal construction joint is disposed.
Advantage of the present invention and beneficial effect are:
The processing method of these concrete wall horizontal construction joint, (1) its processing method comprise the steps:, in the time of the first fluid concrete wall of construction, apart from staying the pre-buried split bolt of the 150mm of constuction joint place of establishing, the top cast of first fluid concrete wall is formed to spill end face simultaneously; , the template of removing first fluid concrete wall, polish at concrete spill end face two ends snap the line and with angle grinding machine, remove burr, and paste double faced adhesive tape on the first fluid concrete metope between horizontal construction joint and pre-buried split bolt; , install connect template, template Lower Half and pre-buried split bolt are fixed, the first half adds row's split bolt again, also apart from horizontal construction joint 150mm; (4), connecting the template of above template, rear fluid concrete wall being installed, concrete wall horizontal construction joint is disposed, the present invention is mainly by adding double split bolt at constuction joint place, and first fluid concrete face is carried out to thin portion and processed to avoid seam crossing to occur running pulp, faulting of slab ends, uneven phenomenon, the present invention is simple to operate, reasonable in design, time saving and energy saving, effectively improve concrete construction quality.
Brief description of the drawings
Fig. 1 is concrete wall horizontal construction joint construction schematic diagram of the present invention.
Detailed description of the invention
Below by specific embodiment, the invention will be further described, and following examples are descriptive, is not determinate, can not limit protection scope of the present invention with this.
A processing method for concrete wall horizontal construction joint, its processing method comprises the steps:
(1), in the time of the first fluid concrete wall 1 of construction, apart from staying the pre-buried split bolt 2 of the 150mm of constuction joint place of establishing, simultaneously by first fluid concrete wall top cast formation spill end face 6;
, the template of removing first fluid concrete wall, polish at concrete spill end face two ends snap the line and with angle grinding machine, remove burr, and paste double faced adhesive tape 3 on the first fluid concrete metope between horizontal construction joint and pre-buried split bolt; Be conducive to install connect when template tight with the laminating of first cast wall;
, install connect template 4, template Lower Half and pre-buried split bolt are fixed, the first half adds row's split bolt again, also apart from horizontal construction joint 150mm; Connect template and will select the template that rigidity is large to make, with the double split bolt guarantee of work simultaneously template indeformable;
, connect install above template after the template of fluid concrete wall 5, concrete wall horizontal construction joint is disposed.Carry out postorder wall construction.

Claims (1)

1. a processing method for concrete wall horizontal construction joint, is characterized in that: this processing method comprises the steps:
(1), in the time of the first fluid concrete wall of construction, apart from staying the pre-buried split bolt of the 150mm of constuction joint place of establishing, simultaneously by first fluid concrete wall top cast formation spill end face;
, the template of removing first fluid concrete wall, polish at concrete spill end face two ends snap the line and with angle grinding machine, remove burr, and paste double faced adhesive tape on the first fluid concrete metope between horizontal construction joint and pre-buried split bolt;
, install connect template, template Lower Half and pre-buried split bolt are fixed, the first half adds row's split bolt again, also apart from horizontal construction joint 150mm;
, connect install above template after the template of fluid concrete wall, concrete wall horizontal construction joint is disposed.
CN201410312484.3A 2014-07-02 2014-07-02 Treatment method for horizontal construction joint of concrete walls Pending CN104032841A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410312484.3A CN104032841A (en) 2014-07-02 2014-07-02 Treatment method for horizontal construction joint of concrete walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410312484.3A CN104032841A (en) 2014-07-02 2014-07-02 Treatment method for horizontal construction joint of concrete walls

Publications (1)

Publication Number Publication Date
CN104032841A true CN104032841A (en) 2014-09-10

Family

ID=51463813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410312484.3A Pending CN104032841A (en) 2014-07-02 2014-07-02 Treatment method for horizontal construction joint of concrete walls

Country Status (1)

Country Link
CN (1) CN104032841A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019656A (en) * 2015-08-07 2015-11-04 山东金城建设有限公司 Construction method for floor system concrete post-cast strip suspended formwork
CN107542170A (en) * 2016-12-22 2018-01-05 深圳建业工程集团股份有限公司 A kind of cast in situ ferroconcrete wall or beam construction joint surface construction method
CN111305399A (en) * 2020-03-24 2020-06-19 福建省永泰建筑工程公司 Basement outer wall post-cast strip system and construction method thereof
CN111411774A (en) * 2020-04-27 2020-07-14 五冶集团上海有限公司 Template structure for preventing construction joint dislocation and slurry leakage and construction method
CN113789949A (en) * 2021-08-26 2021-12-14 黑龙江省建工集团有限责任公司 Construction method for splicing templates without horizontal construction joints

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08144522A (en) * 1994-11-17 1996-06-04 Taisei Corp Bottom successive jointing part form of inversely placing concrete
JPH11131502A (en) * 1997-10-29 1999-05-18 Toyota Soken Co Ltd Molding method of concrete basement
CN2921135Y (en) * 2006-04-07 2007-07-11 上海捷特防水技术有限公司 Special concrete crack induction strip for concrete construction joint
CN102409701A (en) * 2011-08-12 2012-04-11 天津二十冶建设有限公司 Concrete wall construction joint processing method and structure
CN102777031A (en) * 2012-08-06 2012-11-14 中国建筑第六工程局有限公司 Construction method of template with no split bolt hole
CN202530763U (en) * 2011-08-29 2012-11-14 浙江城建建设集团有限公司 Cast-in-place concrete structure deformation joint formwork construction device
CN203160283U (en) * 2013-02-22 2013-08-28 中国建筑材料科学研究总院 Construction of horizontal construction joints of underground building waterproof outer walls

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08144522A (en) * 1994-11-17 1996-06-04 Taisei Corp Bottom successive jointing part form of inversely placing concrete
JPH11131502A (en) * 1997-10-29 1999-05-18 Toyota Soken Co Ltd Molding method of concrete basement
CN2921135Y (en) * 2006-04-07 2007-07-11 上海捷特防水技术有限公司 Special concrete crack induction strip for concrete construction joint
CN102409701A (en) * 2011-08-12 2012-04-11 天津二十冶建设有限公司 Concrete wall construction joint processing method and structure
CN202530763U (en) * 2011-08-29 2012-11-14 浙江城建建设集团有限公司 Cast-in-place concrete structure deformation joint formwork construction device
CN102777031A (en) * 2012-08-06 2012-11-14 中国建筑第六工程局有限公司 Construction method of template with no split bolt hole
CN203160283U (en) * 2013-02-22 2013-08-28 中国建筑材料科学研究总院 Construction of horizontal construction joints of underground building waterproof outer walls

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
兹留柱,齐建忠,梁晓威: "浅谈混凝土外墙剪力墙施工缝施工质量的控制", 《科技信息》 *
李汝引: "浅谈混凝土外墙剪力墙施工缝施工质量的控制", 《建筑与装饰》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019656A (en) * 2015-08-07 2015-11-04 山东金城建设有限公司 Construction method for floor system concrete post-cast strip suspended formwork
CN105019656B (en) * 2015-08-07 2017-04-12 山东金城建设有限公司 Construction method for floor system concrete post-cast strip suspended formwork
CN107542170A (en) * 2016-12-22 2018-01-05 深圳建业工程集团股份有限公司 A kind of cast in situ ferroconcrete wall or beam construction joint surface construction method
CN111305399A (en) * 2020-03-24 2020-06-19 福建省永泰建筑工程公司 Basement outer wall post-cast strip system and construction method thereof
CN111411774A (en) * 2020-04-27 2020-07-14 五冶集团上海有限公司 Template structure for preventing construction joint dislocation and slurry leakage and construction method
CN113789949A (en) * 2021-08-26 2021-12-14 黑龙江省建工集团有限责任公司 Construction method for splicing templates without horizontal construction joints

Similar Documents

Publication Publication Date Title
CN104032841A (en) Treatment method for horizontal construction joint of concrete walls
CN205444885U (en) Adopt wall body negative and positive angle construction structures of little steel mould of combination
CN201933782U (en) Sealing strip for edge joint of cast-in-situ concrete formworks
CN103452319A (en) Chiseling-free device for concrete splicing interface and construction method for chiseling-free device
CN204552104U (en) A kind of flooring aluminum alloy building template form removal instrument
CN202672726U (en) Splicing structure of fair-faced concrete pouring formworks
CN204753398U (en) Construction equipment of trompil template leaking stoppage
CN206277487U (en) A kind of piping lane mould
CN203669378U (en) Casting device used for necking of constructional column top and large-section beam column
CN208545972U (en) Template leakproof pull rod for concreting
CN201276843Y (en) Internal corner adapter for wall beam template
CN203669341U (en) Combined angle steel mold for concrete pouring faces with different elevations
CN104047429B (en) A kind of method for improving construction work concrete seam quality
CN203271148U (en) Novel automatic steering device for concrete delivery pump pipeline
CN205291221U (en) Prefabricated mould of concrete guardrail
CN207808036U (en) Trapezoidal special prefabricated board makes shaping equipment
CN205777500U (en) A kind of for secondary structure constructional column stigma concrete shaping mould plate
CN205313960U (en) Easy operation platform of shake, make level, quick travel is integrated
CN205444884U (en) Wallboard for civil engineering
CN209723593U (en) A kind of sizing indent for wall form
CN202483172U (en) Large steel mould splicing device
CN204983177U (en) AP1000 nuclear power engineering template is to drawing screw rod hole shutoff piece
CN204609907U (en) A kind of steel form carrier flexibility overlap joint template
CN204728692U (en) A kind of engineering inner corner trim mould formwork erecting structure
CN204199703U (en) Shear wall interlayer connects a batch tool-type steel bracket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140910

RJ01 Rejection of invention patent application after publication