CN204753398U - Construction equipment of trompil template leaking stoppage - Google Patents

Construction equipment of trompil template leaking stoppage Download PDF

Info

Publication number
CN204753398U
CN204753398U CN201520440667.3U CN201520440667U CN204753398U CN 204753398 U CN204753398 U CN 204753398U CN 201520440667 U CN201520440667 U CN 201520440667U CN 204753398 U CN204753398 U CN 204753398U
Authority
CN
China
Prior art keywords
nut
template
perforate
putty
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520440667.3U
Other languages
Chinese (zh)
Inventor
周衍领
孙世豪
万鹏
章远方
王浩
耿冬梅
姚坤峰
纪博林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Railway No5 Institute Engineering Machinery Co Ltd
China Railway Fifth Survey and Design Institute Group Co Ltd
Original Assignee
Beijing Railway No5 Institute Engineering Machinery Co Ltd
China Railway Fifth Survey and Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Railway No5 Institute Engineering Machinery Co Ltd, China Railway Fifth Survey and Design Institute Group Co Ltd filed Critical Beijing Railway No5 Institute Engineering Machinery Co Ltd
Priority to CN201520440667.3U priority Critical patent/CN204753398U/en
Application granted granted Critical
Publication of CN204753398U publication Critical patent/CN204753398U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a construction equipment of trompil template leaking stoppage, this construction equipment includes trompil template, nut, bolt and putty, the trompil template includes nonworking face and working face, and the trompil template has the holing position who has good positioning, is provided with the trompil on holing position, the nut includes first end and second end, the holing position department of the nonworking face side that the second butt welding of nut connect in the trompil template, the bolt leaves certain clearance twist the nut from the first end of nut in between the wrong incoming end of bolt and the second of the nut end, trompil department in trompil template work face side is smeared to putty, putty for the face sand papering level and trompil template work face flushes. Using after the template construction drawing of patterns after this construction equipment leaking stoppage pier shaft and roof beam surface beautifully, not having boss and pit, outward appearance visual effect is good.

Description

The construction equipment of a kind of perforate template leak stopping
Technical field
The utility model relates to building engineering field, particularly relates to the construction equipment of a kind of perforate template leak stopping.
Background technology
At present, the construction in domestic large bridge pier shaft and beam portion, adopts steel form mostly.But in use, Cast-in-place concrete has lateral pressure to template to steel form, can cause the distortion of template; For preventing template deformation, often in template, lacing wire is established in boring, and the template after boring, as reused, certainly exists perforate Lost circulation problems.At present, because existing blocking method is bad to perforate process, after utilizing the template after leak stopping to pour into the concrete construction demoulding, often there are boss or pit in bridge pier shaft and beam surface, and appearance effect is undesirable.
Summary of the invention
The object of embodiment of the present utility model is intended to the deficiency and the defect that overcome existing perforate template blocking method, the utility model provides the construction equipment of a kind of perforate template leak stopping, leak stopping is carried out to the template of boring, template after leak stopping can reuse, after the template perfusion concrete construction demoulding after leak stopping, bridge pier shaft, beam portion or other cast-in-situ concrete structure are surperficial without boss or pit, surface aesthetic.
For solving the problem, the utility model provides the construction equipment of a kind of perforate template leak stopping, comprises perforate template, nut, bolt and putty; Perforate template comprises non-working surface and work plane, and perforate template has the position of opening of having good positioning, and position of opening is provided with perforate; Nut comprises first end and the second end, and the second end of nut is welded on the position with pores of the non-working surface side of perforate template; Bolt is screwed in nut from nut first end, and being screwed between end and the second end of nut of bolt leaves certain gap; Putty is put on the tapping of side, perforate shuttering work face, and the sand papering of putty face is smooth to be flushed with perforate shuttering work face.
According to an aspect of the present utility model, when bolt is screwed in nut, being screwed between end with the second end of nut of bolt at least leaves the distance of 2 pitch.
According to another aspect of the present utility model, the position with pores of the second end weld all around in the non-working surface side of perforate template of nut.
According to another aspect of the present utility model, putty glue, water, hydrated lime face stir and form.
According to another aspect of the present utility model, the internal diameter of nut is greater than the diameter of perforate.
According to another aspect of the present utility model, after putty wipes, smooth with sand papering, putty external surface flushes with shuttering work face.
By using the construction equipment of perforate template of the present utility model leak stopping, splitting after casement plate carries out leak stopping, can reuse it, after utilizing the template after leak stopping to pour into the concrete construction demoulding, pier shaft and beam surface do not have boss or pit, flat-satin, meets people to the specification of outward appearance and requirement attractive in appearance.
Accompanying drawing explanation
Fig. 1 is the perforate template shutoff lateral view of the utility model embodiment;
Fig. 2 is the perforate template shutoff plan view of the utility model embodiment.
Description of reference numerals:
1, perforate template 2, nut 3, bolt 4, putty
Detailed description of the invention
For making the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with detailed description of the invention also with reference to accompanying drawing, enter to be further described in detail to the utility model.Should be appreciated that, these describe just exemplary, and do not really want to limit scope of the present utility model.In addition, in the following description, the description to known features and technology is eliminated, to avoid unnecessarily obscuring concept of the present utility model.
Embodiment of the present utility model provides the construction equipment of a kind of perforate template leak stopping.Fig. 1 is the perforate template shutoff lateral view of the utility model embodiment; Fig. 2 is the perforate template shutoff plan view of the utility model embodiment.
As shown in Figure 1, 2, the utility model provides the construction equipment of a kind of perforate template leak stopping, comprises perforate template 1, nut 2, bolt 3 and putty 4; Perforate template 1 comprises non-working surface and work plane, and perforate template 1 has the position of opening of having good positioning, and position of opening is provided with perforate; Nut 2 comprises first end and the second end, and the second end of nut 2 is welded on the position with pores of the non-working surface side of perforate template 1; Bolt 3 is screwed in nut 2 from nut first end, and being screwed between end and the second end of nut 2 of bolt 3 leaves certain gap; Putty 4 is put on the tapping of perforate template 1 work plane side, and the sand papering of putty face is smooth to be flushed with perforate template 1 work plane.
Herein, bolt be screwed into end when referring to that bolt is screwed in nut, enter the one end in nut, accordingly, bolt also comprises the other end be in outside nut.
Preferably, when bolt 3 is screwed in nut 2, being screwed between end with the second end of nut 2 of bolt 3 at least leaves the distance of 2 pitch, neither twist neat by the end that is screwed into of bolt with the second end of nut, is screwed into also not by bolt the second end that end protrudes nut.
But, being screwed between end with the second end of nut of bolt leaves the distance of at least two pitch, in order to when the work plane of perforate template smears putty, a certain amount of smeared putty can be held into the face flushed with perforate shuttering work face after acquisition sand papering, the work plane of perforate template can not be protruded from, making the shuttering work face after shutoff smooth, when reusing, pit or boss can not be produced.
Further, the position with pores of the second end weld all around in the non-working surface side of perforate template of nut 2.Adopt the welding manner of weld all around, in the non-working surface contact portion of nut with apertured panel, around all weld, better, two parts are more firm for such welding effect.
In the present embodiment, putty 4 glue, water, hydrated lime face stir and form.Certainly, the configuration of putty is not limited to the combination of this cited several construction material, can carry out reasonably combined as required.
In the present embodiment, the internal diameter of nut 2 is greater than the diameter of perforate.The internal diameter of nut is greater than the diameter of perforate, effectively blocks perforate.
In the present embodiment, after putty wipes, smooth with sand papering, putty external surface flushes with shuttering work face.
The utility model also provides the construction method of a kind of perforate template leak stopping, for carrying out leak stopping to the perforate in template, comprises the steps:
1. perforate template comprises non-working surface and work plane, and nut comprises first end and the second end, after position of opening that perforate template is had good positioning, the second end of nut is welded on the position with pores of the non-working surface side of perforate template, in position with pores perforate;
2. be screwed in nut by bolt from nut first end, being screwed between end and the second end of nut of bolt leaves certain gap;
3. at the tapping of side, perforate shuttering work face, adopt putty to wipe one's face, adopt sand papering smooth after putty is dry, putty face is flushed with perforate shuttering work face;
4. by bolt be screwed into end be screwed to the second end of nut time, back down putty, bolt of back-outing, then can re-use the perforate of template.
Step 1. in, described perforate can perforate immediately after position with pores has good positioning position; Also can be position of opening of having good positioning, perforate again after welding top nut; Also can be the template that there is perforate.
Step 2. in, leave certain gap being screwed between end with the second end of nut of bolt, in order to be held into the face that a certain amount of putty flushes with shuttering work face afterwards to obtain polishing.
Step 3. in, putty face flushes with perforate shuttering work face, and the template after such leak stopping can reuse, and after the demoulding of pouring construction concrete, pier shaft and beam surface do not have boss or pit, flat-satin, specious.
In embodiment of the present utility model, when bolt is screwed in nut, being screwed between end with the second end of nut of bolt at least leaves the distance of 2 pitch, neither twist neat by the end that is screwed into of bolt with the second end of nut, is screwed into also not by bolt the second end that end protrudes nut.
But, being screwed between end with the second end of nut of bolt leaves the distance of at least two pitch, in order to when the work plane of perforate template smears putty, a certain amount of putty can be held into obtain the rear face flushed with perforate shuttering work face of polishing, the work plane of perforate template can not be protruded from, making the shuttering work face after shutoff smooth, when reusing, pit or boss can not be produced.
Preferably, the position with pores of the second end weld all around in the non-working surface side of perforate template of nut.Adopt the welding manner of weld all around, in the non-working surface contact portion of nut with apertured panel, around all weld, better, two parts are more firm for such welding effect.
In embodiment of the present utility model, putty glue, water, hydrated lime face stir and form.Certainly, putty is not limited to the combination of this several material, can arrange in pairs or groups as required.
In embodiment of the present utility model, the internal diameter of nut is greater than the diameter of perforate.The internal diameter of nut is greater than the diameter of perforate, can hold a certain amount of putty, forms the face effectively blocking perforate.
By construction equipment and the construction method of perforate template of the present utility model leak stopping, splitting after casement plate carries out leak stopping, can reuse it, after utilizing the template after leak stopping to pour into the concrete construction demoulding, pier shaft and beam surface do not have boss or pit, flat-satin, meets people to the specification of outward appearance and requirement attractive in appearance.
Last it is noted that above each embodiment is only in order to illustrate the technical solution of the utility model, be not intended to limit; Although be described in detail the utility model with reference to foregoing embodiments, those of ordinary skill in the art is to be understood that: it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein some or all of technical characteristic; And these amendments or replacement, do not make the essence of appropriate technical solution depart from the scope of each embodiment technical scheme of the utility model.

Claims (5)

1. a construction equipment for perforate template leak stopping, is characterized in that: comprise perforate template, nut, bolt and putty;
Perforate template comprises non-working surface and work plane, and perforate template has the position of opening of having good positioning, and position of opening is provided with perforate;
Nut comprises first end and the second end, and the second end of nut is welded on the position with pores of the non-working surface side of perforate template;
Bolt is screwed in nut from nut first end, and being screwed between end and the second end of nut of bolt leaves certain gap;
Putty is put on the tapping of side, perforate shuttering work face, and the sand papering of putty face is smooth to be flushed with perforate shuttering work face.
2. construction equipment according to claim 1, is characterized in that, when bolt is screwed in nut, being screwed between end with the second end of nut of bolt at least leaves the distance of 2 pitch.
3. construction equipment according to claim 1, is characterized in that, the position with pores of the second end weld all around in the non-working surface side of perforate template of nut.
4. construction equipment according to claim 1, is characterized in that, the internal diameter of nut is greater than the diameter of perforate.
5. construction equipment according to claim 1, is characterized in that, after putty wipes, smooth with sand papering, and putty external surface flushes with shuttering work face.
CN201520440667.3U 2015-06-24 2015-06-24 Construction equipment of trompil template leaking stoppage Withdrawn - After Issue CN204753398U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520440667.3U CN204753398U (en) 2015-06-24 2015-06-24 Construction equipment of trompil template leaking stoppage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520440667.3U CN204753398U (en) 2015-06-24 2015-06-24 Construction equipment of trompil template leaking stoppage

Publications (1)

Publication Number Publication Date
CN204753398U true CN204753398U (en) 2015-11-11

Family

ID=54468124

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520440667.3U Withdrawn - After Issue CN204753398U (en) 2015-06-24 2015-06-24 Construction equipment of trompil template leaking stoppage

Country Status (1)

Country Link
CN (1) CN204753398U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929050A (en) * 2015-06-24 2015-09-23 北京铁五院工程机械有限公司 Construction device and construction method for perforated formwork leakage stopping
CN111705957A (en) * 2020-06-28 2020-09-25 河南森宇建筑工程有限公司 High-strength shear wall and high-verticality construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929050A (en) * 2015-06-24 2015-09-23 北京铁五院工程机械有限公司 Construction device and construction method for perforated formwork leakage stopping
CN111705957A (en) * 2020-06-28 2020-09-25 河南森宇建筑工程有限公司 High-strength shear wall and high-verticality construction method

Similar Documents

Publication Publication Date Title
CN204983662U (en) To drawing screw rod and steel pipe framed bent combination unilateral formwork device
CN204753398U (en) Construction equipment of trompil template leaking stoppage
CN105064579A (en) Construction method guaranteeing pouring formation of toilet water-stop ridge platform
CN102367735B (en) Back-to-back waterstop installation equipment for tunnel construction joint
CN204492021U (en) The windproof fixture of standing seam roof slabs
CN103276673A (en) Reusable bridge rotation construction spherical hinge
CN202969967U (en) Temporary protecting device for once formed floor reserved hole
CN106223209B (en) A kind of buried anchor box and construction method of post-tensioned method prestressed concrete box beam construction
CN104929050A (en) Construction device and construction method for perforated formwork leakage stopping
CN204800838U (en) A built -up plate for parapet production
CN203583514U (en) Pre-buried structure of ultra-deep foundation bolt
CN204645627U (en) A kind of un-bonded prestressed steel strand Special hole mold
CN217420549U (en) Reusable concrete stubble blocking tool
CN203403679U (en) Inner fixing connector, not penetrating through beam bottom template, of pre-buried line pipe
CN105756341B (en) A kind of installation steps of hoistway formwork
CN104846753A (en) Bridge deck opening maintaining method
CN210067406U (en) Scaffold wall connecting piece
CN111411774A (en) Template structure for preventing construction joint dislocation and slurry leakage and construction method
CN217734830U (en) Ancient city wall attaches wall pouring type imitative rammed soil mould
CN209924425U (en) Easy-to-detach aluminum alloy top plate template
CN206110668U (en) Clear water concrete outseam strip
CN205000468U (en) Hole shutoff platform sling is reserved to pipeline
CN105544533A (en) Slab-pile wall digging pile retaining wall flitch plate
CN204804322U (en) Board construction equipment falls in instrument formula building
CN204876543U (en) Template for building engineering

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20151111

Effective date of abandoning: 20160706

C25 Abandonment of patent right or utility model to avoid double patenting