A kind of lining of diversion tunnel two concrete intelligence curing system Download PDFInfo
- Publication number
- CN209212254U CN209212254U CN201821912418.XU CN201821912418U CN209212254U CN 209212254 U CN209212254 U CN 209212254U CN 201821912418 U CN201821912418 U CN 201821912418U CN 209212254 U CN209212254 U CN 209212254U
- Authority
- CN
- China
- Prior art keywords
- diversion tunnel
- connect
- serves
- curing system
- constant temperature
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
A kind of lining of diversion tunnel two concrete intelligence curing system, it includes constant temperature and humidity controller, constant temperature and humidity controller is connect by humidity sensor line with moisture probe, the data terminal of constant temperature and humidity controller is connect with relay input terminal, the output end of relay is connected by the input terminal of sensing line and A.C. contactor, the signal output end of A.C. contactor is connected by the signal input part of pump circuit control line and water pump, it further include main line, main line is three-port structure, first siphunculus road of three-port structure is connect with water inlet pipe, second siphunculus road of three-port structure is connect with water return pipeline, the triplate line of three-port structure is connect with outlet pipe, outlet pipe is equipped with atomizer, it further include that can close, open the closure gate of diversion tunnel.The purpose of this utility model is to solve existing two linings concrete in fog curing, and manpower intervention is more, spends human and material resources and serves as a contrast the not sufficiently effective technical problem of concrete curings to two.
Description
Technical field
The utility model relates to the linings of duck eye diameter diversion cavern two to conserve, and pour operation suitable for long range tunnel concrete
Journey belongs to duck eye diameter cavern con struction field, is adaptable to that the maintenances amounts such as the middle-size and small-size cavern of water conservancy and hydropower, diversion cavern are big, construction
Single engineering.
Background technique
It is widely applied recently as pump concrete, but construction personnel pays little attention to maintenance importance, not with mixed
It coagulates improving for technology of soil and deepens the understanding;Meanwhile it being influenced by factors such as technical level, quality mind, Costco Wholesales, concrete
The method that science is not taken in maintenance causes the common quality defects such as low, the durable difference of structural cracks, intensity often because maintenance is insufficient.According to
Investigation finds that number tunnel two big absolutely serves as a contrast strength grade of concrete and is difficult to reach the strength grade of design within fixed date.In tunnel
In the maintenance processes that hole two serves as a contrast, using large area wall showering curing, a large amount of water flows is caused to lose, waste water resource, and be not achieved
Good maintenance effect.After the completion of tunnel two serves as a contrast concreting, since area is big, battle line is long, and worker's maintenance operations are inconvenient,
Difficulty is big, causes most of two to serve as a contrast concrete curing deficiency.Therefore it is simple, easy to use and use water nowadays to lack a kind of structure
Few automatic maintenance system is measured, by setting monitoring device, fog curing device and tunnel plugging device, is realized to two lining coagulations
The real-time automatic maintenance of soil, keeps constant the humidity of two lining concrete and temperature, improves two lining concrete strengths, subtracts labour and throw
Enter, saves water resource.
Summary of the invention
The purpose of this utility model is to solve existing two linings concrete in fog curing, and manpower intervention is more, expends
Manpower and material resources and the technical problem not sufficiently effective to two lining concrete curings.
A kind of lining of diversion tunnel two concrete intelligence curing system, it includes constant temperature and humidity controller, constant temperature and humidity control
Instrument is connect by humidity sensor line with moisture probe, and the data terminal of constant temperature and humidity controller is connect with relay input terminal, relay
The output end of device is connected by the input terminal of sensing line and A.C. contactor, and the signal output end of A.C. contactor passes through water
The connection of the signal input part of pump circuit control line and water pump, further includes main line, and main line is three-port structure, and the of three-port structure
One siphunculus road is connect with water inlet pipe, the second siphunculus road of three-port structure is connect with water return pipeline, the triplate line of three-port structure
It is connect with outlet pipe, it further includes the closure gate that can close, open diversion tunnel that outlet pipe, which is equipped with atomizer,.
Above-mentioned constant temperature and humidity controller is connect by temperature sensor line with temp probe, and constant temperature and humidity controller can be shown in real time
Show the temperature and humidity value in diversion tunnel.
Including the return water gate valve being set on water return pipeline.
Including it is several can be to the bracket that outlet pipe is supported.
Several atomizers are set in qually spaced on outlet pipe.
Above-mentioned A.C. contactor is arranged in power distribution cabinet.
Above-mentioned bracket is tripod structure.
The spray head direction of above-mentioned atomizer is upward.
Fog curing of the above-mentioned atomizer for two lining concrete layers.
Above-mentioned two linings concrete layer outer layer is shotcrete layer.
By adopting the above technical scheme, following technical effect can be brought:
The utility model can be very by the coordinated of the mechanisms such as monitoring device, fog curing device, tunnel plugging device
Good realization keeps constant two lining concrete humidities and temperature the two lining real-time automatic maintenances of concrete humidity, improves two linings
Concrete strength reduces labour, saves water resource, and practicability is very strong, convenient for promoting the use of.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples:
Fig. 1 and Fig. 2 is longitudinal schematic view of facade structure of the utility model;
Fig. 3 is the utility model planar structure schematic diagram.
Specific embodiment
A kind of diversion tunnel two serves as a contrast concrete intelligence curing system as shown in Figure 1 to Figure 3, it includes constant temperature and humidity controller
13, constant temperature and humidity controller 13 is connect by humidity sensor line 12 with moisture probe 11, the data terminal of constant temperature and humidity controller 13
It is connect with 17 input terminal of relay, the output end of relay 17 is connected by the input terminal of sensing line 14 and A.C. contactor 18
It connects, the signal output end of A.C. contactor 18 is connect by pump circuit control line 19 with the signal input part of water pump 6, further includes
Main line, main line are three-port structure, and the first siphunculus road of three-port structure connect with water inlet pipe 7, the second siphunculus of three-port structure
Road is connect with water return pipeline 20, the triplate line of three-port structure is connect with outlet pipe 5, and outlet pipe 5 is equipped with atomizer 4,
It further include the closure gate 3 that can close, open diversion tunnel.
Using the above structure, in use, when the humidity that moisture probe 11 detects does not meet humidity set point, by wet
Degree sensing line 12 reaches constant temperature and humidity controller 13, and constant temperature and humidity controller 13 receives after signal communication number to relay 17, after
Electric appliance 17 passes through the A.C. contactor 18 sensed in the control power distribution cabinet 9 of line 14 after receiving signal, and A.C. contactor 18 controls water pump 6
Starting, water pump 6, which supplies water, conserves the generation water mist of atomizer 4 to two lining concrete to delivery hose 5, passes through return water gate valve
21 adjust 4 spray amount of atomizer.When humidity reaches setting value, communication No. 11 of moisture probe gives constant temperature and humidity controller 13, permanent
Communication number to relay 17, controlled after receiving signal by sensing line 14 by relay 17 after constant temperature and humidity controller 13 receives signal
Prepare the A.C. contactor 18 in electric cabinet 9, the control of A.C. contactor 18 stops water pump 6 and runs, when receiving ingredient signal again
After carry out subsequent cycle.
Including temp probe 15, temp probe 15 is connect by temperature sensor line 16 with constant temperature and humidity controller 13, constant temperature
Constant humidity controller 13 can temperature and humidity value in real-time display diversion tunnel.
Using the above structure, temp probe 15 is supported by communication No. 16 of temperature sensor line to the display of constant temperature and humidity controller 13
Closure gate 3 is manually closed when temperature is lower than maintenance value and carries out curing in airtight condition by the temperature under retaining ring border.
Wherein, in terms of the selection of instrument, constant temperature and humidity controller 13 is the digital display intelligent temperature of model Western method HC-05B
Humidity controller, the model DHT11 of moisture probe 11 are spent, temp probe 15 is TT-K-24 thermocouple probe, and water pump 6 is type
It number is pumped for the freq uency conversion supercharging of FUJ-WZB380, control power distribution cabinet is the positive safe control power distribution cabinet of model JXF-600.
It will be understood by those skilled in the art that above-mentioned electrical equipment belongs to technology well known to those skilled in the art, to their types
Number selection be not limited to the record of this specification, while those skilled in the art can select known hand according to on-site actual situations
Section is installed, adjusted and is dismantled to each electrical equipment.
Including the return water gate valve 21 being set on water return pipeline 20, pass through manual operation return water gate valve 21, adjustable mist
Change the spray amount of spray head 4.
The outlet pipe 5 is hose, and several brackets 10 can be supported outlet pipe 5, further, several atomizers
4 are set in qually spaced on outlet pipe 5.Using the above structure, the uniform and water-saving realization fog curing of energy.
Wherein, A.C. contactor 18 is arranged in power distribution cabinet 9.
The bracket 10 is tripod structure, and the spray head direction of atomizer 4 is upward.It, can be greatly using the class formation
Spraying covering surface is improved, preferably realizes the fog curing of two lining concrete layers 2.
It further, is shotcrete layer 1 in two lining 2 outer layers of concrete layer.
Claims (10)
1. a kind of diversion tunnel two serves as a contrast concrete intelligence curing system, it is characterised in that: it includes constant temperature and humidity controller (13),
Constant temperature and humidity controller (13) is connect by humidity sensor line (12) with moisture probe (11), the number of constant temperature and humidity controller (13)
It is connect according to end with relay (17) input terminal, the output end of relay (17) passes through sensing line (14) and A.C. contactor
(18) input terminal connection, the signal output end of A.C. contactor (18) pass through pump circuit control line (19) and water pump (6)
Signal input part connection, further includes main line, and main line is three-port structure, the first siphunculus road and water inlet pipe (7) of three-port structure
It connects, the second siphunculus road of three-port structure is connect with water return pipeline (20), the triplate line of three-port structure and outlet pipe (5) connect
It connects, it further includes the closure gate (3) that can close, open diversion tunnel that outlet pipe (5), which is equipped with atomizer (4),.
2. diversion tunnel two according to claim 1 serves as a contrast concrete intelligence curing system, it is characterised in that: the constant temperature is permanent
Wet controller (13) is connect by temperature sensor line (16) with temp probe (15), and constant temperature and humidity controller (13) can real-time display
Temperature and humidity value in diversion tunnel.
3. diversion tunnel two according to claim 1 or 2 serves as a contrast concrete intelligence curing system, it is characterised in that: including setting
The return water gate valve (21) being placed on water return pipeline (20).
4. diversion tunnel two according to claim 1 serves as a contrast concrete intelligence curing system, it is characterised in that: including it is several can
The bracket (10) that outlet pipe (5) is supported.
5. diversion tunnel two according to claim 1 or 4 serves as a contrast concrete intelligence curing system, it is characterised in that: if dry fog
Change spray head (4) to be set in qually spaced on outlet pipe (5).
6. diversion tunnel two according to claim 1 serves as a contrast concrete intelligence curing system, it is characterised in that: the exchange connects
Tentaculum (18) is arranged in power distribution cabinet (9).
7. diversion tunnel two according to claim 4 serves as a contrast concrete intelligence curing system, it is characterised in that: the bracket
It (10) is tripod structure.
8. diversion tunnel two described according to claim 1 or 2 or 4 or 6 serves as a contrast concrete intelligence curing system, it is characterised in that:
The spray head direction of the atomizer (4) is upward.
9. diversion tunnel two described according to claim 1 or 2 or 4 or 6 serves as a contrast concrete intelligence curing system, it is characterised in that:
Fog curing of the atomizer (4) for two linings concrete layer (2).
10. diversion tunnel two according to claim 9 serves as a contrast concrete intelligence curing system, it is characterised in that: two lining
Concrete layer (2) outer layer is shotcrete layer (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821912418.XU CN209212254U (en) | 2018-11-20 | 2018-11-20 | A kind of lining of diversion tunnel two concrete intelligence curing system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821912418.XU CN209212254U (en) | 2018-11-20 | 2018-11-20 | A kind of lining of diversion tunnel two concrete intelligence curing system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209212254U true CN209212254U (en) | 2019-08-06 |
Family
ID=67460481
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821912418.XU Active CN209212254U (en) | 2018-11-20 | 2018-11-20 | A kind of lining of diversion tunnel two concrete intelligence curing system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209212254U (en) |
-
2018
- 2018-11-20 CN CN201821912418.XU patent/CN209212254U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208981168U (en) | A kind of bridge pier abutment body intelligent spray curing system | |
CN203919328U (en) | The circulating automatic spray curing system in bridge prefabrication field | |
CN110173123A (en) | Concrete surface intelligent spray curing means and its control method | |
CN103696580A (en) | Vertical thin-walled mass concrete spray maintenance device and method thereof | |
CN104264995A (en) | Automatic spraying conservation system for high-rise building shear wall structure | |
CN109653205A (en) | A kind of mass concrete maintenance process and its automation maintenance of equipment | |
CN108005077B (en) | Device for controlling internal and external temperature difference of large-volume concrete of water delivery gallery | |
CN209212254U (en) | A kind of lining of diversion tunnel two concrete intelligence curing system | |
CN207869944U (en) | A kind of water saving irrigation device on lawn | |
CN104328898B (en) | A kind of external wall paints curing means | |
CN103147575B (en) | A kind of concrete column automatic spraying device and method | |
CN207549073U (en) | New pouring structure concrete automatic maintenance device | |
CN208996480U (en) | A kind of side wall concrete timing curing system with epidemic disaster control function | |
CN216690346U (en) | Integrated pouring construction structure of building house | |
CN207415655U (en) | Automate the concrete curing device of temperature-compensating | |
CN207011404U (en) | Highway greenbelt spray equipment | |
CN206428591U (en) | A kind of concrete curing device based on Hanging Basket | |
CN211113189U (en) | Bridge deck pavement automatic spraying health preserving system | |
CN207271477U (en) | A kind of prefabricated case beam spraying health promotion automatic control system | |
CN207392243U (en) | A kind of subway station side wall sprinkling curing system | |
CN206154492U (en) | Bury shower nozzle intelligence maintenance system | |
CN215168249U (en) | Outer wall automatic spray maintenance system | |
CN212927105U (en) | Concrete surface maintenance control system | |
CN214353192U (en) | Prefabricated T roof beam intelligence sprays maintenance system | |
CN212146920U (en) | Prefabricated T roof beam atmospheric control spraying system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |