CN209196300U - Wall feed-through pipeline waterproof construction - Google Patents

Wall feed-through pipeline waterproof construction Download PDF

Info

Publication number
CN209196300U
CN209196300U CN201821902960.7U CN201821902960U CN209196300U CN 209196300 U CN209196300 U CN 209196300U CN 201821902960 U CN201821902960 U CN 201821902960U CN 209196300 U CN209196300 U CN 209196300U
Authority
CN
China
Prior art keywords
pipeline
waterproof
wall feed
steel plate
water string
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821902960.7U
Other languages
Chinese (zh)
Inventor
龚锦
郑明君
陈连健
唐龙勇
龚思齐
周海山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201821902960.7U priority Critical patent/CN209196300U/en
Application granted granted Critical
Publication of CN209196300U publication Critical patent/CN209196300U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model provides a kind of wall feed-through pipeline waterproof construction, comprising: water string, the water string are embedded in wallboard;First steel plate is set to the side that meets water of the wallboard, is sheathed on outside the wall feed-through pipeline and is tightly connected with the wall feed-through pipeline, connect with the end part seal of the water string;Second steel plate is set to the land side of the wallboard, is sheathed on outside the wall feed-through pipeline and is tightly connected with the wall feed-through pipeline, the end abutment with the water string;Waterproof material is filled in the cavity that the inner sidewall of first steel plate, second steel plate, the lateral wall of the wall feed-through pipeline and the water string is surrounded.Wall feed-through pipeline waterproof construction provided by the utility model solves the waterproof problem with wallboard junction by water string, solves the waterproof problem between wall feed-through pipeline and water string further through the mode of filling waterproof material, enhances the waterproof performance of wallboard.

Description

Wall feed-through pipeline waterproof construction
Technical field
The utility model relates to construction waterproof technical fields, specifically, being a kind of wall feed-through pipeline waterproof construction.
Background technique
In construction, when pipeline passes through the wallboard of underground structure, due to by wall feed-through pipeline and periphery concrete Cohere the influence of the factors such as ability, the flexible of pipeline, malformation, wall feed-through pipeline periphery connecing between the two with concrete Seam just becomes the weak link of waterproof.
Utility model content
The technical problem to be solved by the present invention is to provide a kind of wall feed-through pipeline waterproof constructions, enhance the waterproofness of wallboard Energy.
In order to solve the above technical problems, the utility model provides a kind of wall feed-through pipeline waterproof construction, comprising:
Water string, the water string are embedded in wallboard, are welded at least on the outer wall in the water string middle section One of seal ring;
Wall feed-through pipeline is sheathed in the water string and through the wallboard;
First steel plate is set to the side that meets water of the wallboard, be sheathed on the wall feed-through pipeline it is outer and with the wall feed-through pipeline It is tightly connected, is connect with the end part seal of the water string;
Second steel plate is set to the land side of the wallboard, be sheathed on the wall feed-through pipeline it is outer and with the wall feed-through pipeline It is tightly connected, the end abutment with the water string;
Waterproof material is filled in first steel plate, second steel plate, the lateral wall of the wall feed-through pipeline and described anti- In the cavity that the inner sidewall of jacket pipe is surrounded.
It further, further include annular convex on second steel plate, the protrusion is sheathed in the water string simultaneously It is threadedly coupled with the water string.
Further, also pad is equipped with sealing ring between second steel plate and the end of the water string.
Further, first steel plate and the wall feed-through pipeline are welded to connect, and are welded with the end of the water string Connection.
Further, the waterproof material is waterproofing unction or bitumastic.
Further, further includes:
First waterproof roll is set to the side that meets water of the wallboard, is covered on first steel plate and the wall feed-through pipeline Junction and first edges of plate at;
Second waterproof roll is covered on the wallboard and is overlapped on first waterproof roll;
Sealant is plugged in second waterproof roll and first waterproof roll lap-joint.
Further, first waterproof roll be wet-laying 1.5mm thickness Macromolecular self-adhesive membrane waterproof roll, described second Waterproof roll is dry-laid 1.5mm thickness Macromolecular self-adhesive membrane waterproof roll.
Further, the amount of lap of first waterproof roll and second waterproof roll is 50 ~ 100mm.
Further, the amount of lap of first waterproof roll and second waterproof roll is 70mm.
Wall feed-through pipeline waterproof construction provided by the utility model solves the waterproof with wallboard junction by water string Problem solves the waterproof problem between wall feed-through pipeline and water string further through the mode of filling waterproof material, enhances wall The waterproof performance of plate.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model wall feed-through pipeline waterproof construction embodiment one;
Fig. 2 is Fig. 1 left view;
Fig. 3 is the enlarged drawing of partial view A in Fig. 1;
Fig. 4 is the structural schematic diagram of the utility model wall feed-through pipeline waterproof construction embodiment two.
In figure, 1. wallboards, 2. water strings, 201. seal rings, 202. main bodys, 3. first steel plates, 4. second steel plates, 401. Protrusion, 5. first weld seams, 6. second weld seams, 7. third weld seams, 8. wall feed-through pipelines, 9. waterproof materials, 10. sealing rings, 11. first Waterproof roll, 12. second waterproof rolls, 13. sealants.
Specific embodiment
The utility model is described in further detail in the following with reference to the drawings and specific embodiments, so that those skilled in the art The utility model may be better understood and can be practiced, but illustrated embodiment is not as the restriction to the utility model.
Embodiment one:
A kind of wall feed-through pipeline waterproof construction, as shown in Figure 1 and 2, comprising:
Water string 2, the water string 2 are embedded in wallboard 1, and the water string includes main body 202 and sealing one Road seal ring 201, seal ring 201 are welded on the outer wall in 202 middle section of main body;
Wall feed-through pipeline 8 is sheathed in the water string 2 and through the wallboard 1;
First steel plate 3, is set to the side that meets water of the wallboard 1, and the side that meets water refers to that wallboard 1 towards ponding side, is sheathed on institute It states outside wall feed-through pipeline 8 and is tightly connected with the wall feed-through pipeline 8, is connect with the end part seal of the water string 2, specifically, First steel plate 3 is welded to connect with wall feed-through pipeline 8 and simultaneously forms the second weld seam 6, is welded to connect with the end of water string 2 and forms the One weld seam 5;
Second steel plate 4 is set to the land side of the wallboard 1, be sheathed on the wall feed-through pipeline 8 it is outer and with the wall pipe Road 8 is tightly connected, the end abutment with the water string 2, and specifically, the second steel plate 4 is welded to connect with wall feed-through pipeline 8 and shape At third weld seam 7;
Waterproof material 9 is filled in first steel plate 3, second steel plate 4, the lateral wall of the wall feed-through pipeline 8 and institute It states in the cavity that the inner sidewall of water string 2 is surrounded, specifically, waterproof material 9 can be waterproofing unction or bitumastic.
Construction method: it is passed through at wallboard 1 in wall feed-through pipeline 8, pre-embedded water-proof sleeve tube 2, wherein seal ring on water string 2 201 should be fully welded tightly with ontology 202, and 201 quantity of seal ring presses design code, when installing wall feed-through pipeline 8, first by wall feed-through pipeline 8 Across water string 2, position dimension is found accurately by figure, is fixed temporarily, then in the side that meets water with the first steel plate 3 by waterproof jacket Pipe 2 and wall feed-through pipeline 8 weld, then are filled up from land side by the gap between water string 2 and wall feed-through pipeline 8 with waterproof material 9 Afterwards, it is blocked tightly with the second steel plate 4.
In one optional embodiment of the present embodiment, as shown in figure 3, further including annular convex on second steel plate 4 401, the protrusion 401 is sheathed in the water string 2 and is threadedly coupled with the water string 2.Second steel plate 4 is installed When, protrusion 401 can be first passed through and tighten the second steel plate 4, make its push against water string 2 end, then by the second steel plate 4 with wear Wall coil road 8 is welded to connect.It is, of course, also possible to protrusion 401 is sheathed on 2 outside of water string and is threadedly coupled with water string 2, Or groove is opened up on the second steel plate 4, it is threadedly coupled by groove with water string 2.
In one optional embodiment of the present embodiment, as shown in figure 3, the end of second steel plate 4 and the water string 2 Also pad is equipped with sealing ring 10 between portion, enhances the leakproofness between the second steel plate 4 and the end of water string 2, further waterproof.
Embodiment two:
The present embodiment is that the further improvement of embodiment one increases the first waterproof roll on the basis of example 1 With the second waterproof roll and sealant, to further enhance waterproof performance.
As shown in figure 4,
First waterproof roll 11 is set to the side that meets water of the wallboard 1, be covered on first steel plate 3 with it is described through walls The junction of pipeline 8 and the edge of first steel plate 3;
Second waterproof roll 12 is covered on the wallboard 1 and is overlapped on first waterproof roll 11;
Sealant 13 is plugged in second waterproof roll 12 and 11 lap-joint of the first waterproof roll.
Wherein, first waterproof roll 11 is wet-laying 1.5mm thickness Macromolecular self-adhesive membrane waterproof roll, and described second is anti- Water coiled material 12 is dry-laid 1.5mm thickness Macromolecular self-adhesive membrane waterproof roll.
The amount of lap of first waterproof roll 11 and second waterproof roll 12 is 50 ~ 100mm, it is preferable that described The amount of lap of first waterproof roll 11 and second waterproof roll 12 is 70mm.
The rest part of the present embodiment is the same as example 1, and details are not described herein again.
The protection scope of the utility model is not limited thereto.Those skilled in the art are in the utility model on the basis of institute The equivalent substitute or transformation of work, both are within the protection scope of the present invention.The protection scope of the utility model is wanted with right It asks subject to book.

Claims (9)

1. a kind of wall feed-through pipeline waterproof construction characterized by comprising
Water string, the water string are embedded in wallboard, are welded on the outer wall in the water string middle section at least together Seal ring;
Wall feed-through pipeline is sheathed in the water string and through the wallboard;
First steel plate is set to the side that meets water of the wallboard, is sheathed on outside the wall feed-through pipeline and seals with the wall feed-through pipeline Connection, connect with the end part seal of the water string;
Second steel plate is set to the land side of the wallboard, is sheathed on outside the wall feed-through pipeline and seals with the wall feed-through pipeline Connection, the end abutment with the water string;
Waterproof material is filled in the lateral wall and the waterproof jacket of first steel plate, second steel plate, the wall feed-through pipeline In the cavity that the inner sidewall of pipe is surrounded.
2. wall feed-through pipeline waterproof construction as described in claim 1, which is characterized in that further include cyclic annular convex on second steel plate Portion, the protrusion are sheathed in the water string and are threadedly coupled with the water string.
3. wall feed-through pipeline waterproof construction as described in claim 1, which is characterized in that second steel plate and the water string End between also pad be equipped with sealing ring.
4. wall feed-through pipeline waterproof construction as described in claim 1, which is characterized in that first steel plate and the wall feed-through pipeline It is welded to connect, is welded to connect with the end of the water string.
5. wall feed-through pipeline waterproof construction as described in claim 1, which is characterized in that the waterproof material is waterproofing unction or drip Green matizhi.
6. wall feed-through pipeline waterproof construction as described in claim 1, which is characterized in that further include:
First waterproof roll is set to the side that meets water of the wallboard, is covered on the company of first steel plate and the wall feed-through pipeline It connects at place and first edges of plate;
Second waterproof roll is covered on the wallboard and is overlapped on first waterproof roll;
Sealant is plugged in second waterproof roll and first waterproof roll lap-joint.
7. wall feed-through pipeline waterproof construction as claimed in claim 6, which is characterized in that first waterproof roll is wet-laying 1.5mm thickness Macromolecular self-adhesive membrane waterproof roll, second waterproof roll are dry-laid 1.5mm thickness Macromolecular self-adhesive membrane waterproof Coiled material.
8. wall feed-through pipeline waterproof construction as claimed in claim 6, which is characterized in that first waterproof roll and described second The amount of lap of waterproof roll is 50 ~ 100mm.
9. wall feed-through pipeline waterproof construction as claimed in claim 8, which is characterized in that first waterproof roll and described second The amount of lap of waterproof roll is 70mm.
CN201821902960.7U 2018-11-19 2018-11-19 Wall feed-through pipeline waterproof construction Active CN209196300U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821902960.7U CN209196300U (en) 2018-11-19 2018-11-19 Wall feed-through pipeline waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821902960.7U CN209196300U (en) 2018-11-19 2018-11-19 Wall feed-through pipeline waterproof construction

Publications (1)

Publication Number Publication Date
CN209196300U true CN209196300U (en) 2019-08-02

Family

ID=67424700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821902960.7U Active CN209196300U (en) 2018-11-19 2018-11-19 Wall feed-through pipeline waterproof construction

Country Status (1)

Country Link
CN (1) CN209196300U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110513541A (en) * 2019-08-30 2019-11-29 中国建筑第八工程局有限公司 Pipeline waterproof construction through walls and its construction method for outsourcing splash guard exterior wall
RU218420U1 (en) * 2023-03-27 2023-05-25 Магсумзян Галимзянович Харисов FIXED SUPPORT FOR HEATING AND WATER SUPPLY PIPELINES

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110513541A (en) * 2019-08-30 2019-11-29 中国建筑第八工程局有限公司 Pipeline waterproof construction through walls and its construction method for outsourcing splash guard exterior wall
CN110513541B (en) * 2019-08-30 2024-03-12 中国建筑第八工程局有限公司 Waterproof structure of through-wall pipeline for outer wall covered by waterproof board and construction method of waterproof structure
RU218420U1 (en) * 2023-03-27 2023-05-25 Магсумзян Галимзянович Харисов FIXED SUPPORT FOR HEATING AND WATER SUPPLY PIPELINES

Similar Documents

Publication Publication Date Title
CN204060729U (en) Tunnel waterproofing construction
CN204530780U (en) The water proof structure of underground-structure deformation joint
CN108316944A (en) A kind of prefabrication and assembly construction push pipe waterproof system
CN108316347A (en) The assembled underground pipe gallery and its waterproof method of partitioning waterproofing
CN209196300U (en) Wall feed-through pipeline waterproof construction
CN103741695A (en) Embedded grouting pipe installed on waterstop and grouting method
CN204781016U (en) Gasbag formula open trench tunnel movement joint seal structure
CN207419882U (en) It is new to wear roof pipeline flashing loop device
CN206941661U (en) A kind of antipriming for corner waterproof construction
CN208152086U (en) The assembled underground pipe gallery of partitioning waterproofing
CN108756953B (en) Waterproof and drainage system with secondary lining shield tunnel
CN205804636U (en) A kind of basement waterproofing overlapping body of wall
CN208763072U (en) A kind of submerged tunnel side wall waterproof structure for deformation seams
CN209196301U (en) Group manages waterproof construction through walls
CN103628899B (en) Retain CRD median septum and be welded with water flange construction technology
CN106759525A (en) Rich water sand-pebble layer underground engineering deformation joint structure and its construction method
CN207598253U (en) A kind of prefabrication and assembly construction push pipe waterproof system
CN207003602U (en) Urban discharging pipeline anti-leakage structure
CN213598736U (en) Waterproof system for cable wall-penetrating pipeline
CN202580321U (en) Waterproof structure of through-wall pipe
CN206360713U (en) A kind of two pass seam waterproof device with segment bolt connector box duct pieces of shield tunnel
CN106368215B (en) Pre-buried slip casting pipe assembly
CN211548112U (en) Splice joint structure of waterproof layer
CN104278699A (en) Underground engineering deformation joint waterproof technology
CN209873861U (en) Sealing device for lap joint of steel corrugated plate pipe gallery plates

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant