CN209195449U - A kind of slip casting structure in floating plate railway roadbed tunnel - Google Patents

A kind of slip casting structure in floating plate railway roadbed tunnel Download PDF

Info

Publication number
CN209195449U
CN209195449U CN201822147057.0U CN201822147057U CN209195449U CN 209195449 U CN209195449 U CN 209195449U CN 201822147057 U CN201822147057 U CN 201822147057U CN 209195449 U CN209195449 U CN 209195449U
Authority
CN
China
Prior art keywords
floating plate
protection sleeve
sleeve pipe
slip casting
railway roadbed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822147057.0U
Other languages
Chinese (zh)
Inventor
吴俊�
刘富
郭建生
宫寅
陶佳元
孙成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Shanghai Design Institute Group Co Ltd
Original Assignee
China Railway Shanghai Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Shanghai Design Institute Group Co Ltd filed Critical China Railway Shanghai Design Institute Group Co Ltd
Priority to CN201822147057.0U priority Critical patent/CN209195449U/en
Application granted granted Critical
Publication of CN209195449U publication Critical patent/CN209195449U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to tunneling technique fields; more particularly to a kind of slip casting structure in floating plate railway roadbed tunnel; it is characterized by: being provided with protection sleeve pipe on the plate body of the floating plate; the protection sleeve pipe is connected and fixed with the floating plate, and grouting port corresponding with the protection sleeve pipe position is offered on the tunnel duct piece;The Grouting Pipe passes through the protection sleeve pipe on the floating plate and is connected with the grouting port, is provided with seepage-proofing gasket between the protection sleeve pipe and the Grouting Pipe.The utility model has the advantages that: structure is simple, floating plate energy free floating;Slurries are avoided to penetrate between floating plate and floating plate substrate;Good damping result;Prevent Grouting Pipe from hitting with protection sleeve pipe;Realize that railway roadbed construction carries out slip casting operation again after the completion.

Description

A kind of slip casting structure in floating plate railway roadbed tunnel
Technical field
The utility model relates to the slip casting structures in tunneling technique field more particularly to a kind of floating plate railway roadbed tunnel.
Background technique
As railway roadbed is on active service for a long time or based on genetic defects existing when building, is easy to happen solid concrete roabed structure Sink, sinking degree and sinking development speed rise year by year.In addition, underground mining, cross project construction, surrounding enviroment variation and The factors such as regional subsidence are also the major reason for causing ballast bed structure to sink.Railway roadbed sinking constitutes shadow to the even running of train It rings, seriously jeopardizes traffic safety.
To control tunnel subsidence, pre-buried setting section of jurisdiction injected hole in the every ring shield duct piece of shield tunnel passes through section of jurisdiction slip casting Hole can efficiently control tunnel subsidence to slip casting under shield duct piece.But if solid concrete roabed will be covered using solid concrete roabed Section of jurisdiction injected hole keeps section of jurisdiction injected hole ineffective.
The phenomenon that covering injected hole for railway roadbed, occurs also opening up in the corresponding position of floating plate railway roadbed on the market logical Hole, and injected hole is put into through-hole and injected hole, it realizes slip casting operation, is easier to penetrate into using slurries when the technological means slip casting In the gap of railway roadbed and section of jurisdiction, so that floating plate railway roadbed cannot achieve effectiveness in vibration suppression.
Summary of the invention
The purpose of this utility model is to provide a kind of note in floating plate railway roadbed tunnel according to above-mentioned the deficiencies in the prior art Structure is starched, by the way that corresponding slip casting structure is arranged on floating plate, it is ensured that the installation of floating plate ballast bed structure and slip casting operation it Between be independent of each other, can both go on smoothly.
The utility model aim realization is completed by following technical scheme:
A kind of slip casting structure in floating plate railway roadbed tunnel, including floating plate and tunnel duct piece, the floating plate are erected at institute State the inner wall of tunnel duct piece, it is characterised in that: protection sleeve pipe, the protection sleeve pipe and institute are provided on the plate body of the floating plate It states floating plate to be connected and fixed, grouting port corresponding with the protection sleeve pipe position is offered on the tunnel duct piece;The note It starches the protection sleeve pipe of the pipe on the floating plate and is connected with the grouting port, the protection sleeve pipe and the slip casting Seepage-proofing gasket is provided between pipe.
The injected hole is threadedly coupled with Grouting Pipe composition.
The protection sleeve pipe runs through the floating plate.
Sealing element is equipped between the floating plate and the inner wall of the tunnel duct piece.
The sealing element is rubber weather strip.
The bottom of the floating plate is equipped with floating plate substrate, and the floating plate substrate is fixed on the interior of the tunnel duct piece Wall offers the position of through-hole, the position of the through-hole and the grouting port and the protection sleeve pipe in the floating plate substrate Set corresponding, the Grouting Pipe passes through the through-hole, and the floating plate is erected in the substrate by spring.
Gutter is offered in the substrate.
The utility model has the advantages that: structure is simple, floating plate energy free floating;Avoid slurries penetrate into floating plate with it is floating Between plate substrate;Good damping result;Prevent Grouting Pipe from hitting with protection sleeve pipe;Realize that railway roadbed construction is infused again after the completion Starch operation.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the top view of Fig. 1.
Specific embodiment
The utility model feature and other correlated characteristics are described in further detail by embodiment below in conjunction with attached drawing, In order to the understanding of technical staff of the same trade:
As shown in Figs. 1-2,1-14 is marked to respectively indicate in figure are as follows: floating plate 1, floating plate substrate 2, tunnel duct piece 3, slip casting Mouth 4, protection sleeve pipe 5, Grouting Pipe 6, seepage-proofing gasket 7, rubber weather strip 8, through-hole 9, spring 10, gutter 11, rail 12, fastener 13, railway roadbed 14.
Embodiment: the slip casting structure in the floating plate railway roadbed tunnel in the present embodiment, it is ensured that remained to after the completion of the construction of railway roadbed 14 Go on smoothly slip casting operation.
As shown in Figure 1, the slip casting structure includes railway roadbed 14 and tunnel duct piece 3, railway roadbed 14 includes floating plate 1 and floating plate base Bottom 2.
As shown in Figure 1, 2, wherein rail 12 is fixed on floating plate 1 by fastener 13, and rail 12 is used to guide train Wheel advances, and bears the pressure of wheel and pressure is transferred to floating plate 1.Fastener 13 is for connecting rail 12 and floating plate 1.Column Vehicle and rail 12, which are hit, generates vibration, and floating plate 1 bears the pressure for the wheel that the transmitting of rail 12 comes and eliminates in intrinsic frequency Vibration.
Floating plate 1 is erected in floating plate substrate 2 by spring 10, and pressure is passed to spring 10 by floating plate 1.Spring 10 It bears pressure and pressure is passed into floating plate substrate 2 and the generated vibration of when train of decaying passes through.Floating plate substrate 2 is used To bear pressure.Floating plate substrate 2 is fixed on the inner wall of tunnel duct piece 3, so that floating plate substrate 2 and tunnel duct piece 3 are linked as one Body structure, and smooth supporting surface is provided for floating plate 1.
Grouting port 4 is offered on tunnel duct piece 3, and through-hole 9, the size and location of grouting port 4 are offered in floating plate substrate 2 It is corresponding with the size and location of through-hole 9, it is that channel is reserved in the slip casting operation in later period.Protection sleeve pipe 5 is embedded in floating plate 1, For protection sleeve pipe 5 in being vertically arranged and running through floating plate 1, the position of protection sleeve pipe 5 is corresponding with the position of through-hole 9, makees for slip casting Industry reserves channel, it is ensured that can still provide for slip casting operation after the completion of the construction of railway roadbed 14.
Grouting Pipe 6 protrudes into protection sleeve pipe 5, protrudes into grouting port 4 after penetrating through-hole 9, after the completion of the construction of railway roadbed 14, leads to Crossing Grouting Pipe 6 will be in the gap of slurries injection tunnel pipelines 3 and soil layer.Grouting Pipe 6 is connected with grouting port 4, prevents slip casting process In, the position of Grouting Pipe 6 shifts.There are gaps between protection sleeve pipe 5 and Grouting Pipe 6, it is ensured that floating plate 1 can exist always It floats up and down under the action of spring 10, reduces vibration.Seepage-proofing gasket is provided in gap between protection sleeve pipe 5 and Grouting Pipe 6 7, since seepage-proofing gasket 7 has deformability, both can ensure that the free floating of floating plate 1, moreover it is possible to avoid due to floating plate 1 from Protection sleeve pipe 5 is caused to be hit with Grouting Pipe 6 by floating, moreover it is possible to when carrying out slip casting operation, prevent slurries from protection sleeve pipe 5 It is flowed into the gap between floating plate 1 and floating plate substrate 2 in gap between Grouting Pipe 6, further ensures that 1 energy of floating plate Realize free floating.
As shown in Figure 1, being equipped with the rubber weather strip 8 as sealing element, rubber seal between floating plate 1 and tunnel duct piece 3 Item 8 is adverse effect of the entrance to 1 performance of floating plate in order to avoid usually rubbish and dust.Floating plate substrate 2 is equipped with row Ditch 11 further ensures that existing without ponding in railway roadbed 14 and tunnel duct piece 3 for the water in floating plate substrate 2 to be concentrated discharge As.
Floating plate 1 and floating plate substrate 2 are cast-in-place structural, convenient for determining the position of protection sleeve pipe 5 with through-hole 9.
Protection sleeve pipe 5 can be fixed with the reinforcement welding in floating plate 1, realize the precise positioning of protection sleeve pipe 5.
The implementation steps of the present embodiment:
1) grouting port 4 is set on tunnel duct piece 3;Cast in situs floating plate base after gutter 11 and through-hole 9 is arranged in formwork erection Bottom 2;Spring 10 is placed on to the upper surface of floating plate substrate 2 before the concrete hardening of floating plate substrate 2;
2) after the concrete hardening of floating plate substrate 2, protection sleeve pipe 5 and the reinforcing bar binding in floating plate 1 are integrated After structure, formwork erection pours floating plate 1;
3) rail 12 is fixed on floating plate 1 by fastener 13;
4) rubber weather strip 8 is set in the gap of floating plate 1 and 3 inner wall of tunnel duct piece;
5) Grouting Pipe 6 is protruded into protection sleeve pipe 5, through-hole 9 and grouting port 4, and rotate Grouting Pipe 6 make Grouting Pipe 6 with The composition of grouting port 4 is threadedly engaged;
6) seepage-proofing gasket 7 is filled in the gap of Grouting Pipe 4 and protection sleeve pipe 5;
7) nut cap is arranged at the top of Grouting Pipe 6 after slip casting in the slip casting into Grouting Pipe 4.
The present embodiment is in the specific implementation: the quantity and position of grouting port 4 can be adjusted according to requirement of engineering, only Need to guarantee to be disposed with protective case corresponding with 4 quantity of grouting port, position composition on floating plate 1 and floating plate substrate 2 Pipe 5.
Steel pipe can be used in protection sleeve pipe 5, and protection sleeve pipe 5 can also be higher by the upper surface of floating plate 1, and height difference is no more than 20mm, The setting position of protection sleeve pipe 5 should avoid spring 10.
It should be noted that avoiding protection sleeve pipe 5, gutter 11 appropriate can be deviated toward side in gutter 11.
Although above embodiments are elaborated referring to conception and embodiment of the attached drawing to the utility model aim, But those skilled in the art will realize that still may be used in the case where no disengaging claim limits the precondition of range It will not repeat them here with making various modifications and variations to the utility model.

Claims (6)

1. a kind of slip casting structure in floating plate railway roadbed tunnel, including floating plate and tunnel duct piece, the floating plate is erected at described The inner wall of tunnel duct piece, it is characterised in that: be provided with protection sleeve pipe on the plate body of the floating plate, the protection sleeve pipe with it is described Floating plate is connected and fixed, and grouting port corresponding with the protection sleeve pipe position is offered on the tunnel duct piece;The slip casting The protection sleeve pipe of the pipe on the floating plate is simultaneously connected with the grouting port, the protection sleeve pipe and the Grouting Pipe Between be provided with seepage-proofing gasket.
2. a kind of slip casting structure in floating plate railway roadbed tunnel according to claim 1, it is characterised in that: the protection sleeve pipe Through the floating plate.
3. a kind of slip casting structure in floating plate railway roadbed tunnel according to claim 1, it is characterised in that: the floating plate with Sealing element is equipped between the inner wall of the tunnel duct piece.
4. a kind of slip casting structure in floating plate railway roadbed tunnel according to claim 3, it is characterised in that: the sealing element is Rubber weather strip.
5. a kind of slip casting structure in floating plate railway roadbed tunnel according to claim 1, it is characterised in that: the floating plate Bottom is equipped with floating plate substrate, and the floating plate substrate is fixed on the inner wall of the tunnel duct piece, opens in the floating plate substrate Equipped with through-hole, the position of the through-hole is corresponding with the position of the grouting port and the protection sleeve pipe, and the Grouting Pipe is worn The through-hole is crossed, the floating plate is erected in the substrate by spring.
6. a kind of slip casting structure in floating plate railway roadbed tunnel according to claim 5, it is characterised in that: opened in the substrate Equipped with gutter.
CN201822147057.0U 2018-12-20 2018-12-20 A kind of slip casting structure in floating plate railway roadbed tunnel Active CN209195449U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822147057.0U CN209195449U (en) 2018-12-20 2018-12-20 A kind of slip casting structure in floating plate railway roadbed tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822147057.0U CN209195449U (en) 2018-12-20 2018-12-20 A kind of slip casting structure in floating plate railway roadbed tunnel

Publications (1)

Publication Number Publication Date
CN209195449U true CN209195449U (en) 2019-08-02

Family

ID=67429900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822147057.0U Active CN209195449U (en) 2018-12-20 2018-12-20 A kind of slip casting structure in floating plate railway roadbed tunnel

Country Status (1)

Country Link
CN (1) CN209195449U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111878119A (en) * 2020-07-08 2020-11-03 上海地铁维护保障有限公司工务分公司 Subway tunnel ballast bed pipe piece wall post-grouting method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111878119A (en) * 2020-07-08 2020-11-03 上海地铁维护保障有限公司工务分公司 Subway tunnel ballast bed pipe piece wall post-grouting method
CN111878119B (en) * 2020-07-08 2022-03-18 上海地铁维护保障有限公司工务分公司 Subway tunnel ballast bed pipe piece wall post-grouting method

Similar Documents

Publication Publication Date Title
CN105927272B (en) Bottom plate anchors restricted type tunnel lining structure
CN104452809B (en) A kind of super shallow tunnel cover and cut construction method
CN204266220U (en) A kind of plugging device of precipitation well in foundation pit
CN101270582B (en) Method for setting bracing column in underground cavity
CN103556579A (en) Box culvert pushing construction method integrating comprehensive grouting, pressure maintaining and pipe roof support
CN209339169U (en) A kind of precipitation well in foundation pit plugging device
CN105240024A (en) Parallel shield tunneling method for extended construction of subway station
CN108412506A (en) Ground fissure region tunnel lining structure based on shield tunnel and its construction method
CN209195449U (en) A kind of slip casting structure in floating plate railway roadbed tunnel
CN107965327A (en) Arcuately tunnel bottom liner structure and its drainage system
CN207568626U (en) A kind of tunnel structure for expansive stratum
CN208040386U (en) A kind of ground fissure region tunnel lining structure based on shield tunnel
CN202116993U (en) Slope collapse rock prevention open-cut tunnel structure for multi-line unequal-altitude railways
CN112012763A (en) Construction method of double-layer primary support multi-arch tunnel structure
CN105240023B (en) A kind of method of Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station
CN208564549U (en) A kind of tunneling close range down river and bearing pipe constructing device
CN208293630U (en) A kind of structural system of the antiseismic liquefaction uplifting in subway station
CN209837116U (en) Drainage structure suitable for underground subway station main part and undercut auxiliary structure interface movement joint
CN208073501U (en) Foundation base type is without inverted arch type tunnel lining structure and its drainage system
CN102900026B (en) Tunnel excavation location reinforces the construction method of overhead abutment protection bridge floor
CN214887086U (en) Slope debris flow guide-discharge type open cut tunnel structure
CN109024621A (en) The compound retaining wall supporting construction of embankment high slope tubular pole and its construction method
CN209704560U (en) Build the scaffolding structure that an ultra shallow buries Large Underground space
CN108194096A (en) Foundation base type is without inverted arch type tunnel lining structure and its drainage system
CN211340802U (en) Combined supporting structure for viaduct bridge piles in subway foundation pit excavation adjacent area

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant