CN209184122U - Guide vehicle for high pressure GIS conductor installation - Google Patents
Guide vehicle for high pressure GIS conductor installation Download PDFInfo
- Publication number
- CN209184122U CN209184122U CN201920179591.1U CN201920179591U CN209184122U CN 209184122 U CN209184122 U CN 209184122U CN 201920179591 U CN201920179591 U CN 201920179591U CN 209184122 U CN209184122 U CN 209184122U
- Authority
- CN
- China
- Prior art keywords
- rocker arm
- high pressure
- conductor
- guide vehicle
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004020 conductor Substances 0.000 title claims abstract description 93
- 238000009434 installation Methods 0.000 title claims abstract description 43
- 230000007246 mechanism Effects 0.000 claims abstract description 26
- 238000010586 diagram Methods 0.000 description 12
- 241001669679 Eleotris Species 0.000 description 7
- 238000013016 damping Methods 0.000 description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a kind of Guide vehicle for high pressure GIS conductor installation, including guiding vehicle frame, guiding vehicle frame is equipped with core-regulating mechanism, is fixed with support frame at the top of core-regulating mechanism, conductor clamps mechanism is fixed on support frame;The conductor clamps mechanism includes rocker arm support; rocker arm support is fixed with support frame; rocker arm support both ends have been respectively articulated with left rocker arm and right rocker arm; left rocker arm lower part and right rocker arm lower part are respectively equipped with the I type arc block and U-shaped arc block worked in coordination; slidably connects lifting pin through reset spring in the middle part of rocker arm support; lifting pin is slidably connected with I type arc block, and gag lever post is equipped in the middle part of lifting pin, and gag lever post is slidably connected with I type arc block and U-shaped arc block.The utility model has the advantages that easy to use and equipment installation effectiveness is high.
Description
Technical field
The utility model relates to a kind of auxiliary devices for the installation of GIS conductor, especially a kind of to be used for high pressure GIS conductor
The Guide vehicle of installation.
Background technique
The advantages that high-voltage combined electrical apparatus is compact-sized with its, space occupied is small, maintenance work is few obtains extensively in electric system
General application.The especially newest substation to put into operation, most domestic substation and intelligent station all use GIS device.Its
In, high pressure GIS device during installation, needs to dock longer conductor with GIS insulation basin stand, traditional high pressure GIS
The auxiliary tool of conductor installation has some limitations, and is mainly installed using sleeper additional high pressure GIS conductor;Installation
When, in conductor underlay sleeper, then conductor is slowly pushed into bus bar canister and is installed, after the installation is completed to conductor, uses iron wire
Sleeper is ticked.It is installed using sleeper additional high pressure GIS conductor, mechanization degree is lower, and the installation effectiveness of GIS device is lower,
And conductor length is long, weight weight, bus bar canister is enclosed construction again, and inner conductor can not be controlled flexibly when assembling, and is padded on sleeper
Conductor offset is generated easily in bus bar canister, it is possible to damage bus bar canister and conductor also will affect the installation effectiveness of equipment;By
Different in voltage class difference and producer's model, GIS outer dimension is also inconsistent, and same sleeper cannot pacify in each GIS device
General when dress, various sizes of GIS device needs to change the various sizes of sleeper of adjustment, needs more people to cooperate and completes assembly, using compared with
For inconvenience.
Therefore, the auxiliary tool of existing high pressure GIS conductor installation, there are inconvenient for use low with equipment installation effectiveness to ask
Topic.
Utility model content
The purpose of the utility model is to provide a kind of Guide vehicles for high pressure GIS conductor installation.The utility model
Have the advantages that easy to use and equipment installation effectiveness is high.
The technical solution of the utility model includes: it is used for the Guide vehicle of high pressure GIS conductor installation, including guiding vehicle frame, guiding
Vehicle frame is equipped with core-regulating mechanism, is fixed with support frame at the top of core-regulating mechanism, conductor clamps mechanism is fixed on support frame;It is described to lead
Body clamp system includes rocker arm support, and rocker arm support is fixed with support frame, and rocker arm support both ends have been respectively articulated with left rocker arm and the right side
Rocker arm, left rocker arm lower part and right rocker arm lower part are respectively equipped with the I type arc block and U-shaped arc block worked in coordination, warp in the middle part of rocker arm support
Reset spring slidably connects lifting pin, and lifting pin is slidably connected with I type arc block, and gag lever post, gag lever post are equipped in the middle part of lifting pin
It is slidably connected with I type arc block and U-shaped arc block.
Be previously described in the Guide vehicle of high pressure GIS conductor installation, the core-regulating mechanism includes sliding rack, sliding rack with
Guiding vehicle frame is slidably connected, and sliding rack one end is equipped with aligning handwheel, and the other end is connected with lifting fork, one support leg of lifting fork bottom
With guiding vehicle frame fix, another support leg and sliding rack are hinged, lifting fork top two sides fixed with support frame, support frame with lead
Body clamp system is fixed.
It is previously described in the Guide vehicle of high pressure GIS conductor installation, the I type arc block top surface and side have
One arc-shaped slot and the second arc-shaped slot, U-shaped arc block two sides are provided with third arc-shaped slot, and lifting pin is logical through the first arc
Slot, gag lever post run through the second arc-shaped slot and third arc-shaped slot.
It is previously described in the Guide vehicle of high pressure GIS conductor installation, the guiding bottom of frame is equipped with two pairs of pulleys, often
It is in splayed to pulley.
It is previously described in the Guide vehicle of high pressure GIS conductor installation, is all provided at the top of the left rocker arm and at the top of right rocker arm
There is holding to take turns.
It is previously described in the Guide vehicle of high pressure GIS conductor installation, idler wheel is equipped at the top of the lifting pin.
It is previously described in the Guide vehicle of high pressure GIS conductor installation, the holding wheel and idler wheel are rubber wheel.
It is previously described in the Guide vehicle of high pressure GIS conductor installation, the left rocker arm and right rocker arm are a pair, and two is left
It is fixed by the connecting rod between two right rocker arms between rocker arm.
It is previously described in the Guide vehicle of high pressure GIS conductor installation, spring retainer block is equipped with below the gag lever post.
It being previously described in the Guide vehicle of high pressure GIS conductor installation, the guiding bottom of frame is equipped with pull rod fixed block,
Through-hole is provided on pull rod fixed block.
Compared with prior art, the utility model is by being arranged conductor clamps mechanisms on the support frame, by conductor from
Press lifting pin again, moves down lifting pin and drive left rocker arm and right rocker arm clamping, realize the clamping of conductor, left rocker arm and right rocker arm
Holding wheel and conductor clamps after damping be greater than damping between pulley and bus bar canister so that pushing conductor that can allow guiding
Vehicle is moved into bus bar canister, using conductor self-weight clamping conductor, avoids the possibility that conductor generates offset in bus bar canister, protection
Conductor and bus bar canister, improve the installation effectiveness of equipment, and conductor is after reaching centre of location sets of holes, micro- lift conductor rear portion,
It moves up lifting pin under action of reset spring, holds wheel release conductor, easy to operate, easily-learned easily mastered tightly;By being oriented to
Core-regulating mechanism is set on vehicle frame, adjusts aligning handwheel, pushes lifting fork to move up and down on the basis of fixed pivot, to adjust
The center of conductor, can be tuned into consistent by the height of support frame upper conductor clamp system with the center of bus bar canister in advance, be applicable to
Various sizes of GIS device, it is applied widely, and adjust simply, it is easy to use, it is used cooperatively without more people.The utility model
Have the advantages that easy to use and equipment installation effectiveness is high.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
The sectional view of Fig. 2 the utility model;
Fig. 3 is the structural schematic diagram of the utility model conductor clamps mechanism;
Fig. 4 is the structural schematic diagram of the utility model core-regulating mechanism;
Fig. 5 is structural schematic diagram when the utility model is used;
Fig. 6 is the structural schematic diagram of the utility model conductor clamps gear grips conduit;
Fig. 7 is the structural schematic diagram that the utility model conductor clamps mechanism does not clamp conduit;
Fig. 8 is the structural schematic diagram of the left rocker arm of the utility model;
Fig. 9 is the structural schematic diagram of the right rocker arm of the utility model;
Figure 10 is the structural schematic diagram of the utility model rocker arm support;
Figure 11 is the structural schematic diagram of the utility model lifting pin;
Figure 12 is the structural schematic diagram of the utility model lifting fork;
Figure 13 is the structural schematic diagram of the utility model sliding rack.
The label in accompanying drawing is: 1- is oriented to vehicle frame, 2- pulley, 3- sliding rack, 4- aligning handwheel, 5- lifting fork, 6- support
Frame, 7- rocker arm support, the left rocker arm of 8-, the right rocker arm of 9-, 10-I type arc block 10,11-U type arc block, the first arc-shaped slot of 12-, 13-
Two arc-shaped slots, 14- third arc-shaped slot, 15- reset spring, 16- lifting pin, 17- gag lever post, 18- hold wheel, 19- rolling tightly
Wheel, 20- connecting rod, 21- pull rod fixed block, 22- spring retainer block, 23- conductor, 24- bus bar canister.
Specific embodiment
The utility model is further described with reference to the accompanying drawings and examples, but is not intended as to the utility model
The foundation of limitation.
Embodiment.It for the Guide vehicle of high pressure GIS conductor installation, constitutes as shown in figure 1 to figure 13, including Guide vehicle
Frame 1, guiding vehicle frame 1 are equipped with core-regulating mechanism, are fixed with support frame 6 at the top of core-regulating mechanism, are fixed with conductor clamps on support frame 6
Mechanism;The conductor clamps mechanism includes rocker arm support 7, and rocker arm support 7 and support frame 6 are fixed, and 7 both ends of rocker arm support are cut with scissors respectively
It is connected to left rocker arm 8 and right rocker arm 9, left 8 lower part of rocker arm and 9 lower part of right rocker arm are respectively equipped with the I type arc block 10 worked in coordination and U-shaped
Arc block 11,7 middle part of rocker arm support slidably connect lifting pin 16 through reset spring 15, and lifting pin 16 and the sliding of I type arc block 10 connect
It connects, gag lever post 17 is equipped in the middle part of lifting pin 16, gag lever post 17 and I type arc block 10 and U-shaped arc block 11 are slidably connected.Aligner
The height and position of conductor 23 is adjusted in structure, and Guide vehicle is made to can be suitably used for various sizes of GIS device, applied widely, and adjusts
Simply, easy to use, it is used cooperatively without more people;Conductor clamps mechanism can be avoided by 23 self-weight clamping conductor 23 of conductor
Conductor 23 generates the possibility of offset in bus bar canister 24, protects conductor 23 and bus bar canister 24, improves the installation effectiveness of equipment;
Reset spring 15 is convenient for the reset of lifting pin 16.
The core-regulating mechanism includes sliding rack 3, and sliding rack 3 is slidably connected with guiding vehicle frame 1, and 3 one end of sliding rack, which is equipped with, adjusts
Heart handwheel 4, the other end are connected with lifting fork 5, and 5 bottom of lifting fork, one support leg and guiding vehicle frame 1 are fixed, another support leg and cunning
Moving frame 3 is hinged, and 5 top two sides of lifting fork are fixed with support frame 6, and support frame 6 is fixed with conductor clamps mechanism.
10 top surface of I type arc block and side have the first arc-shaped slot 12 and the second arc-shaped slot 13, U-shaped arc block
11 two sides are provided with third arc-shaped slot 14, and lifting pin 16 runs through the first arc-shaped slot 12, and gag lever post 17 runs through the second arc
Through slot 13 and third arc-shaped slot 14.
1 bottom of guiding vehicle frame is equipped with two pairs of pulleys 2, and each pair of pulley 2 is in splayed.Pulley 2 exists convenient for Guide vehicle
Each pair of pulley 2 of movement in bus bar canister 24, splayed arrangement is more stable, easily facilitates Guide vehicle and moves in bus bar canister 24
It is dynamic, and pulley 2 is flexible glue pulley.
Holding wheel 18 is equipped at the top of 8 top of left rocker arm and right rocker arm 9.Conductor 23 can be held tightly by holding wheel 18 tightly, and not
Conductor 23 can be caused to damage.
Idler wheel 19 is equipped at the top of the lifting pin 16.Idler wheel 19 can support conductor 23, and will not cause to damage to conductor 23.
The holding wheel 18 and idler wheel 19 are rubber wheel.
The left rocker arm 8 and right rocker arm 9 are a pair, pass through between two right rocker arms 9 between two left rocker arms 8 and connect
Bar 20 is fixed.Connecting rod 20 is used to improve the fixing intensity between two left rocker arms 8 between two right rocker arms 9.
Spring retainer block 22 is equipped with below the gag lever post 17.Spring retainer block 22 can limit the position of reset spring 15.
1 bottom of guiding vehicle frame is equipped with pull rod fixed block 21, is provided with through-hole on pull rod fixed block 21.Pull rod fixed block 21
Guide vehicle is pulled out convenient for pull rod.
Working principle: in use, first placing conductor one end in the conductor clamps mechanism on support frame 6, by conductor 23
Self weight press lifting pin 16, move down lifting pin 16 and drive left rocker arm 8 and 9 clamping of right rocker arm, realize the clamping of conductor 23, it is left
The holding wheel 18 and the damping after the clamping of conductor 23 of rocker arm 8 and right rocker arm 9 are greater than the damping between pulley 2 and bus bar canister 24, from
And enable and push conductor 23 that Guide vehicle is allowed to move into bus bar canister 24, using 23 self-weight clamping conductor of conductor, avoid conductor
The possibility that offset is generated in bus bar canister, protects conductor and bus bar canister, improves the installation effectiveness of equipment;Then it will clip and lead
The Guide vehicle of body 23 is placed in bus bar canister 24, and the height and position of conductor 23 is adjusted using core-regulating mechanism, adjusts aligning handwheel 4,
It pushes lifting fork 5 to move up and down on the basis of fixed pivot, adjusts the height of 6 upper conductor clamp system of support frame, thus will
Conductor 23 and bus bar canister 24 arrange same center location;Then conductor 23 is pushed, moves Guide vehicle into bus bar canister 24, conductor
23 after reaching centre of location sets of holes, micro- 23 rear portion of lift conductor, moves up lifting pin 16 under the effect of reset spring 15, holds tightly
18 release conductor 23 of wheel, and pulled out Guide vehicle using the pull rod being fixed on pull rod fixed block 21, complete the positioning of conductor 23
Installation, easy to operate, easily-learned easily mastered.The utility model has the advantages that easy to use and equipment installation effectiveness is high.
Claims (10)
1. being used for the Guide vehicle of high pressure GIS conductor installation, it is characterised in that: including being oriented to vehicle frame (1), in guiding vehicle frame (1)
Equipped with core-regulating mechanism, core-regulating mechanism is fixed with support frame (6) on top, and support frame (6) is fixed with conductor clamps mechanism;It is described to lead
Body clamp system includes rocker arm support (7), and rocker arm support (7) and support frame (6) are fixed, and rocker arm support (7) both ends are respectively articulated with
There are left rocker arm (8) and right rocker arm (9), left rocker arm (8) lower part and right rocker arm (9) lower part are respectively equipped with the I type arc block worked in coordination
(10) and U-shaped arc block (11), rocker arm support (7) middle part slidably connect lifting pin (16), lifting pin through reset spring (15)
(16) it is slidably connected with I type arc block (10), is equipped with gag lever post (17) in the middle part of lifting pin (16), gag lever post (17) and I type arc block
(10) it is slidably connected with U-shaped arc block (11).
2. the Guide vehicle according to claim 1 for high pressure GIS conductor installation, it is characterised in that: the aligner
Structure includes sliding rack (3), and sliding rack (3) is slidably connected with guiding vehicle frame (1), and sliding rack (3) one end is equipped with aligning handwheel (4),
The other end is connected with lifting fork (5), and one support leg of lifting fork (5) bottom and guiding vehicle frame (1) are fixed, another support leg and sliding
Hingedly, two sides are fixed with support frame (6) at the top of lifting fork (5) for frame (3), and support frame (6) is fixed with conductor clamps mechanism.
3. the Guide vehicle according to claim 1 for high pressure GIS conductor installation, it is characterised in that: the I type arc block
(10) top surface and side have the first arc-shaped slot (12) and the second arc-shaped slot (13), and U-shaped arc block (11) two sides are equal
It is provided with third arc-shaped slot (14), lifting pin (16) runs through the first arc-shaped slot (12), and gag lever post (17) is logical through the second arc
Slot (13) and third arc-shaped slot (14).
4. the Guide vehicle according to claim 1 for high pressure GIS conductor installation, it is characterised in that: the Guide vehicle
Frame (1) bottom is equipped with two pairs of pulleys (2), and each pair of pulley (2) is in splayed.
5. the Guide vehicle according to claim 1 for high pressure GIS conductor installation, it is characterised in that: the left rocker arm
(8) holding wheel (18) is equipped at the top of top and right rocker arm (9).
6. the Guide vehicle according to claim 5 for high pressure GIS conductor installation, it is characterised in that: the lifting pin
(16) top is equipped with idler wheel (19).
7. the Guide vehicle according to claim 6 for high pressure GIS conductor installation, it is characterised in that: the holding wheel
(18) and idler wheel (19) is rubber wheel.
8. the Guide vehicle according to claim 1 for high pressure GIS conductor installation, it is characterised in that: the left rocker arm
(8) and right rocker arm (9) is a pair, is fixed by connecting rod (20) between two right rocker arms (9) between two left rocker arms (8).
9. the Guide vehicle according to claim 1 for high pressure GIS conductor installation, it is characterised in that: the gag lever post
(17) lower section is equipped with spring retainer block (22).
10. according to claim 1 to the Guide vehicle for being used for high pressure GIS conductor installation described in 9 any claims, feature
Be: the guiding vehicle frame (1) bottom is equipped with pull rod fixed block (21), and pull rod fixed block is provided with through-hole on (21).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920179591.1U CN209184122U (en) | 2019-01-31 | 2019-01-31 | Guide vehicle for high pressure GIS conductor installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920179591.1U CN209184122U (en) | 2019-01-31 | 2019-01-31 | Guide vehicle for high pressure GIS conductor installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209184122U true CN209184122U (en) | 2019-07-30 |
Family
ID=67379219
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920179591.1U Active CN209184122U (en) | 2019-01-31 | 2019-01-31 | Guide vehicle for high pressure GIS conductor installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209184122U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109659866A (en) * | 2019-01-31 | 2019-04-19 | 国家电网有限公司 | A kind of Guide vehicle for high pressure GIS conductor installation |
-
2019
- 2019-01-31 CN CN201920179591.1U patent/CN209184122U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109659866A (en) * | 2019-01-31 | 2019-04-19 | 国家电网有限公司 | A kind of Guide vehicle for high pressure GIS conductor installation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108000458A (en) | A kind of clamping device of automobile gauge | |
CN107971676B (en) | A kind of weld clamp method of automotive suspension control arm | |
CN109659866A (en) | A kind of Guide vehicle for high pressure GIS conductor installation | |
CN208992199U (en) | A kind of assistance platform for mechanical numerical control processing | |
CN209184122U (en) | Guide vehicle for high pressure GIS conductor installation | |
CN105966901B (en) | A kind of desk type water dispenser power assisting device | |
CN109443797A (en) | A kind of automotive sunshade panel linear motion durable test stand | |
CN209372429U (en) | A kind of automotive sunshade panel linear motion durable test stand | |
CN201224853Y (en) | Multifunctional electric control lifting appliance | |
CN202771950U (en) | Iron core assembling device of vertical coiled core transformer | |
CN109605114B (en) | Iron scrap recovery device for machining during manufacturing of automobile parts | |
CN206437599U (en) | A kind of manipulator for wheel rim flatness corrector | |
CN208895573U (en) | A kind of large-size numerical control machine support device | |
CN207192632U (en) | A kind of tower crane balances mounting assist support | |
CN208543161U (en) | A kind of air-conditioning duct fixer for machining | |
CN216004659U (en) | A equipment for packing of beating a roll for surface fabric | |
CN220001127U (en) | Gas spring folding device of lifting folding table | |
CN208826626U (en) | Automobile fixture manipulator | |
CN111863531B (en) | Relay terminal assembly production line | |
CN221240086U (en) | Improved cable bracket | |
CN219882253U (en) | Lamp pearl chip processing location structure | |
CN113843856B (en) | Moxa leaf separator | |
CN217667656U (en) | Plug embedding tool for plug insertion | |
CN219217289U (en) | Improved lifting frame | |
CN217180546U (en) | Electric fastening machine for sliding plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |