CN209179010U - A kind of municipal pipeline crosses the building enclosure of foundation pit - Google Patents
A kind of municipal pipeline crosses the building enclosure of foundation pit Download PDFInfo
- Publication number
- CN209179010U CN209179010U CN201821244809.9U CN201821244809U CN209179010U CN 209179010 U CN209179010 U CN 209179010U CN 201821244809 U CN201821244809 U CN 201821244809U CN 209179010 U CN209179010 U CN 209179010U
- Authority
- CN
- China
- Prior art keywords
- building enclosure
- municipal pipeline
- foundation pit
- pile
- main body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Foundations (AREA)
Abstract
The utility model provides the building enclosure that a kind of municipal pipeline crosses foundation pit, including outside building enclosure and inside building enclosure;Wherein, outside building enclosure includes supporting main body and steel plate, and supporting main body is arranged along foundation pit periphery and the part in municipal pipeline periphery is opposite extends out and disconnect at municipal pipeline to form fracture, and fracture goes along with sb. to guard him region using steel plate reinforcement;Inside building enclosure includes drilled pile, rotary churning pile and crown beam, and drilled pile and rotary churning pile arrangement are fixed below municipal pipeline, and crown beam is set at the top of drilled pile and is connect by beams of concrete with supporting main body.The technical solution of the utility model, the bilayer combination gone along with sb. to guard him using outside building enclosure and drilling on inner side stake not only can be effectively to pipeline in-situ conservation, and does not influence it using function, has saved and has changed the expense of moving, the human cost of engineering;Meanwhile also ensuring safety compared with deep basal pit, and engineering risk is reduced, it is with good economic efficiency.
Description
Technical field
The utility model relates to the realm of building construction, and in particular to a kind of foundation pit supporting construction that pipeline crosses.
Background technique
When the municipal pipelines such as high-tension cable, major diameter rain sewage pipe culvert cross base pit engineering, due to changing the expense of moving, work
Phase, using the limitation of the conditions such as function, do not have and move the condition of changing, this is just necessarily required to carry out the municipal pipeline for crossing foundation pit former
Position protection, thus will cause certain influence to the integrality of the building enclosure of foundation pit, it is steady so as to cause the whole safety of foundation pit
Qualitative decline.Existing solution, which is usually building enclosure, crosses in pipeline and disconnects at position, by the soil body on the outside of foundation pit
The measures such as reinforcing, bell hole weld steel plate guarantee the safety of foundation pit and municipal pipeline.But when excavation of foundation pit depth it is larger, geology
In the case where complicated condition, such as the big sandy soil stratum of water penetration, deep silly stratum, just easily occur leak, gush mud,
The risks such as foundation pit deformation is excessive.In this regard, just needing to provide a kind of solution effect superior technique scheme.
Utility model content
The purpose of the utility model is to overcome disadvantage existing in the prior art, provide that a kind of structure is simple, protection pipe
The foundation pit enclosure structure that the good municipal pipeline of deep pit monitor stability crosses while line is unaffected.
To achieve the goals above, the technical solution adopted in the utility model is as follows:
A kind of municipal pipeline crosses the building enclosure of foundation pit, including outside building enclosure and inside building enclosure;Wherein, outside
Side wall protection structure includes supporting main body and steel plate, and supporting main body is arranged and is in the part phase on municipal pipeline periphery along foundation pit periphery
Fracture is formed to extending out and disconnecting at municipal pipeline, fracture goes along with sb. to guard him region using steel plate welded closure;Inside building enclosure
Including drilled pile, rotary churning pile and crown beam, drilled pile and rotary churning pile arrangement are fixed below municipal pipeline, and crown beam is set to drilled pile
It top and is connect with supporting main body by beams of concrete.
Further, drilled pile and rotary churning pile alternatively, sectionally are arranged.
Further, the arrangement total length of drilled pile and rotary churning pile is greater than the diameter of municipal pipeline.
Further, the vertical range of drilled pile and rotary churning pile apart from municipal pipeline is not less than 5m, meets construction requirement.
Further, beams of concrete and drilled pile top crown beam keep same absolute altitude.
Further, steel plate and supporting main body reinforcement welding, the closing drilled pile top above fracture of crown beam go along with sb. to guard him region.
The technical solution of the utility model, the bilayer combination gone along with sb. to guard him using outside building enclosure and drilling on inner side stake, not only
Can be effectively to pipeline in-situ conservation, and it is not influenced using function, it has saved and has changed the expense of moving, the human cost of engineering;Together
When, it also ensures the safety compared with deep basal pit, reduces engineering risk, it is with good economic efficiency.
Detailed description of the invention
Fig. 1 is the planar structure schematic diagram of the utility model.
Fig. 2 is the A-A cross-sectional view of the utility model.
Specific embodiment
The utility model will be further described with reference to the accompanying drawing.
Referring to attached drawing.The utility model is the bilayer combination structure of outside building enclosure and inside building enclosure.Wherein, outside
Side wall protection structure includes supporting main body 1 and steel plate 2.Supporting main body 1 is existing deep foundation pit supporting structure, such as deep-layer stirring water
Soil piling wall, hole-drilling interlocking pile, cast-in-place diaphram wall etc. can be specifically chosen according to different foundation pit situations.Supporting master
Body 1 is arranged along foundation pit walls and opposite extend out in the shape of a " convex " in the part in 3 periphery of municipal pipeline is that inside building enclosure reserves
Installation space.Supporting main body 1 disconnects forming fracture at municipal pipeline 3.Fracture is by municipal pipeline 3 and fracture goes along with sb. to guard him region
It is reinforced using 2 welded closure of steel plate.
Inside building enclosure includes drilled pile 4, rotary churning pile 5 and crown beam 6, and drilled pile 4 and rotary churning pile 5 are alternately arranged segmentation
It is arranged in 3 lower section of municipal pipeline, crown beam 6 is set to 4 top of drilled pile and connect by beams of concrete 7 with supporting main body 1, to bore
Hole stake 4 forms the double-deck supporting construction with supporting main body 1.Beams of concrete 7 guarantees same mark with the crown beam 6 for being set to 4 top of drilled pile
Height, steel plate 2 and 1 reinforcement welding of supporting main body, 6 or more the fracture of crown beam at 4 top of closing drilled pile go along with sb. to guard him region.
Specifically, drilled pile 4 and vertical range of the rotary churning pile 5 apart from municipal pipeline 3 are not less than 5m, and the arrangement of the two is total
Length should be greater than the diameter of municipal pipeline, to guarantee the stability of inside building enclosure.
It should be pointed out that the embodiments of the present invention are described above.However, the technical staff of art technology should manage
Solution, the present utility model is not limited to the above embodiments, only illustrates the principles of the present invention described in above-described embodiment,
There are many changes and improvements for the utility model also meeting under the premise of not departing from the scope of the utility model, these changes and improvements are all
It falls within the scope of the claimed invention.
Claims (6)
1. the building enclosure that a kind of municipal pipeline crosses foundation pit, it is characterised in that go along with sb. to guard him knot including outside building enclosure and inside
Structure;Wherein, the outside building enclosure includes supporting main body and steel plate, and the supporting main body is arranged along foundation pit periphery and is in city
The part on political affairs pipeline periphery is opposite to be extended out and disconnects forming fracture at the municipal pipeline, and the fracture goes along with sb. to guard him region use
Steel plate welded closure;The inside building enclosure includes drilled pile, rotary churning pile and crown beam, and the drilled pile and rotary churning pile arrange
It is fixed below the municipal pipeline, the crown beam is set at the top of the drilled pile and by beams of concrete and the supporting main body
Connection.
2. the building enclosure that a kind of municipal pipeline as described in claim 1 crosses foundation pit, it is characterised in that the drilled pile with
The rotary churning pile alternatively, sectionally arrangement.
3. the building enclosure that a kind of municipal pipeline as described in claim 1 crosses foundation pit, it is characterised in that the drilled pile with
The arrangement total length of the rotary churning pile is greater than the diameter of the municipal pipeline.
4. the building enclosure that a kind of municipal pipeline as described in claim 1 crosses foundation pit, it is characterised in that the drilled pile with
Vertical range of the rotary churning pile apart from the municipal pipeline is not less than 5m.
5. the building enclosure that a kind of municipal pipeline as described in claim 1 crosses foundation pit, it is characterised in that the beams of concrete
Same absolute altitude is kept with crown beam at the top of drilled pile.
6. the building enclosure that a kind of municipal pipeline as described in claim 1 crosses foundation pit, it is characterised in that the steel plate and branch
Main body reinforcement welding is protected, that closes the drilled pile top above fracture of crown beam goes along with sb. to guard him region.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821244809.9U CN209179010U (en) | 2018-08-03 | 2018-08-03 | A kind of municipal pipeline crosses the building enclosure of foundation pit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821244809.9U CN209179010U (en) | 2018-08-03 | 2018-08-03 | A kind of municipal pipeline crosses the building enclosure of foundation pit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209179010U true CN209179010U (en) | 2019-07-30 |
Family
ID=67358576
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821244809.9U Active CN209179010U (en) | 2018-08-03 | 2018-08-03 | A kind of municipal pipeline crosses the building enclosure of foundation pit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209179010U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111648373A (en) * | 2020-05-15 | 2020-09-11 | 中铁六局集团有限公司 | Excavation supporting construction process for water-rich deep foundation pit fender pile gap |
CN111851578A (en) * | 2020-07-15 | 2020-10-30 | 中铁第一勘察设计院集团有限公司 | Local top plate reverse building structure of subway station for moving and changing gravity flow pipe culvert and construction method |
-
2018
- 2018-08-03 CN CN201821244809.9U patent/CN209179010U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111648373A (en) * | 2020-05-15 | 2020-09-11 | 中铁六局集团有限公司 | Excavation supporting construction process for water-rich deep foundation pit fender pile gap |
CN111648373B (en) * | 2020-05-15 | 2021-11-09 | 中铁六局集团有限公司 | Excavation supporting construction process for water-rich deep foundation pit fender pile gap |
CN111851578A (en) * | 2020-07-15 | 2020-10-30 | 中铁第一勘察设计院集团有限公司 | Local top plate reverse building structure of subway station for moving and changing gravity flow pipe culvert and construction method |
CN111851578B (en) * | 2020-07-15 | 2021-12-07 | 中铁第一勘察设计院集团有限公司 | Construction method for local roof inverse building structure of subway station for moving and changing gravity flow pipe culvert |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013052B (en) | The construction method of steel sheet pile and open caisson Combined type underground garage parking | |
CN202689031U (en) | Deep foundation pit retaining and protecting retaining wall | |
CN102535441A (en) | Construction method of underground diaphragm wall | |
CN100510281C (en) | Semi-inverse construction method of super large diameter, ultra-burial depth storage pond | |
CN209179010U (en) | A kind of municipal pipeline crosses the building enclosure of foundation pit | |
CN109371980B (en) | Deep foundation pit enclosure construction method combining spray anchor reverse construction and punched pile | |
CN105780802A (en) | Jacket offshore wind turbine foundation with brackets and construction method thereof | |
CN104264663A (en) | Hard cutting construction technology for secant piles | |
CN110777809A (en) | Deep foundation pit combined support adjacent to existing building and construction method thereof | |
CN110359476A (en) | A kind of construction method of steel sheet-pile cofferdam inner support and drilled pile steel pile casting installation operation platform | |
CN104099946B (en) | Inspection-pit between a kind of Novel top pipeline section | |
CN108824471A (en) | A kind of deep water drift net multi-column pier foundation and its construction method | |
Gil-Martín et al. | Developments in excavation bracing systems | |
CN113738399A (en) | Underground excavation tunnel large pipe shed guide wall structure and construction method thereof | |
CN109594574A (en) | Large-scale push pipe open caisson reversed construction method based on the confined space | |
CN211008655U (en) | Underpass subway supporting structure | |
CN204825922U (en) | Interlock stake envelope | |
CN201078234Y (en) | Integral hydraulic pressure steel sheet piling curtain of vertical shaft construction overflowing sand bed | |
CN109989346A (en) | Bridge major diameter precast concrete tubular column basis and its construction method | |
CN209584855U (en) | Bridge major diameter precast concrete tubular column basis | |
CN103628485A (en) | Foundation-pit support structure construction process | |
CN107313434A (en) | A kind of deep basal pit oil cellar and its construction method | |
CN204080861U (en) | Inspection-pit between a kind of Novel top pipeline section | |
CN204570718U (en) | A kind of raft foundation with fluid pipeline path | |
CN209398380U (en) | A kind of prefabricated Fang Jing for oil/gas drilling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |