CN209169825U - A kind of live working tools that multi-thread folder is general - Google Patents

A kind of live working tools that multi-thread folder is general Download PDF

Info

Publication number
CN209169825U
CN209169825U CN201920024132.6U CN201920024132U CN209169825U CN 209169825 U CN209169825 U CN 209169825U CN 201920024132 U CN201920024132 U CN 201920024132U CN 209169825 U CN209169825 U CN 209169825U
Authority
CN
China
Prior art keywords
hook
arm
side plate
lead
working tools
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920024132.6U
Other languages
Chinese (zh)
Inventor
金涛
章玮
石霄峰
陈胜科
薛阳
孙伟
徐云炯
马振宇
向新宇
章姝俊
莫俊雄
焦建立
单永生
姜新华
陈永明
杨晓翔
金涌涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai University of Electric Power
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
University of Shanghai for Science and Technology
Original Assignee
Shanghai University of Electric Power
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai University of Electric Power, Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical Shanghai University of Electric Power
Priority to CN201920024132.6U priority Critical patent/CN209169825U/en
Application granted granted Critical
Publication of CN209169825U publication Critical patent/CN209169825U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model provides a kind of live working tools and its application method that multi-thread folder is general, the general live working tools of multi-thread folder include installation side plate, the installation side plate is equipped with opposite and telescopic upper hook arm and lower hook arm up and down, be additionally provided in installation side plate can elastic telescopic lead raker, lead raker is between upper hook arm and lower hook arm.By two lead rakers with spring come anchor leg, then wire clamp is opened by upper and lower two band stretchable hook arms of spring, so that wire clamp opening significantly reduces the error rate and deviation ratio of wire clamp installation, facilitates the operation in real work to maximum.In addition the utility model is encapsulated using insulating materials, and external protection shell, and protection shell protection hook and internal components can preferably improve safety coefficient, it is ensured that the safety of staff from collision cause damage.

Description

A kind of live working tools that multi-thread folder is general
Technical field
The utility model belongs to electric power tool field, and in particular to a kind of live working tools that multi-thread folder is general.
Background technique
As power supply safety and stable requirement is continuously improved in the continuous development and social demand of power technology, safety Operation is more and more important for each power technology industry, wherein the installation wire clamp of safety is a very important building ring Section, aerial lift device with insulated arm medial potential working method is widely used in 10kV distribution line operation field at present, and operator uses former Beginning tool manually completes livewire work task.It there is following defect:
1, large labor intensity, low efficiency, automatization level are low;
2, operator directly contacts high-voltage conducting wires, there is very big security risk;
3, the protection of artificial live-working safety, masking require very strict, slightly will appear short circuit current without paying attention to, cause Great safety accident causes human casualty accident.
Utility model content
The purpose of the utility model is to provide a kind of live working tools that multi-thread folder is general, to overcome above-mentioned technology to lack It falls into.
For this purpose, the utility model provides a kind of live working tools that multi-thread folder is general, including installation side plate, it is described Installation side plate is equipped with opposite and telescopic upper hook arm and lower hook arm up and down, and being additionally provided in the installation side plate can elastic telescopic Lead raker, the lead raker is between the upper hook arm and the lower hook arm.
Further, the upper hook arm is identical with the lower hook arm configuration, is by the first rod piece, the first spring, second Rod piece is sequentially connected composition, first rod piece far from one end of first spring be fixed on the installation side plate and with it is described The plate face of installation side plate forms angle, and second rod piece is that at least one bending part, end are equipped in the middle part of rod piece equipped with flat mouth The structure of hook, and the upper flat mouth hook for hooking arm is opposite with the lower hook flat mouth hook of arm and set.
Preferably, it there are two the lead raker is set, is made of second spring and C-shaped hook, the one of the second spring The plate face of the installation side plate is fixed at end, and the other end connects C-shaped hook.
Further, described two lead rakers are mounted on the same plate face of the installation side plate, opposite with the plate face Another plate face of the installation side plate connecting elements for attended operation insulating bar is installed;
Further, described in upper first rod piece for hooking arm and lower first rod piece for hooking arm tilts be fixed in respectively In the two side walls opposing upper and lower of installation side plate, and first rod piece and the installation side plate are equipped with the lead raker Plate face between be equipped with gusset.
Preferably, the connecting elements is the plate structure that upper and lower surfaces are equipped with column.
Further, the outer wall of the outer wall of the flat mouth hook and the C-shaped hook is respectively connected with pull ring.
Further, it is packaged with insulating sheath respectively on the flat mouth hook and the C-shaped hook.
Further, the general live working tools of multi-thread folder further include protection shell, the protection shell respectively with The outer wall of the installation side plate, the upper outer wall for hooking arm and the lower outer wall fitting for hooking arm.
Preferably, the bottom surface of the protection shell offers arc-shaped opening, visible described through the arc-shaped opening Lower hook arm.
The utility model has the beneficial effects that the live working tools that this multi-thread folder provided by the utility model is general, By two lead rakers with spring come fixing clamper, line is then opened by upper and lower two band stretchable hook arms of spring Folder, so that wire clamp opening significantly reduces the error rate and deviation ratio of wire clamp installation, facilitate in real work to maximum Operation.In addition the utility model is encapsulated using insulating materials, and external protection shell, protection shell protection hook and inside Device causes damage from collision, can preferably improve safety coefficient, it is ensured that the safety of staff.
For the above content of the utility model can be clearer and more comprehensible, preferred embodiment is cited below particularly, and in conjunction with attached drawing, make Detailed description are as follows.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the general live working tools of multi-thread folder.
Fig. 2 is the structural schematic diagram of the general live working tools of the multi-thread folder with protection shell and insulating sheath.
Fig. 3 is the top view of the general live working tools of the multi-thread folder with protection shell and insulating sheath.
Fig. 4 is the perspective view of the general live working tools of the multi-thread folder with protection shell and insulating sheath.
Fig. 5 is the schematic diagram of penetrating cable clamp.
Description of symbols:
1. installation side plate;Arm is hooked on 201.;202. lower hook arms;3. protecting shell;4. penetrating cable clamp;5. lead raker;6. First rod piece;7. the first spring;8. the second rod piece;9. second spring;10.C shape hook;11. connecting elements;12. gusset;13. Pull ring;14. arc-shaped opening;15. lead;16. lead port;
801. bending part;802. flat mouth hooks.
Specific embodiment
The embodiments of the present invention is illustrated by particular specific embodiment below, those skilled in the art can be by this theory The bright revealed content of book understands other advantages and effect of the utility model easily.
It should be noted that in the present invention, the upper and lower, left and right in figure are considered as multi-thread described in this specification Press from both sides the upper and lower, left and right of general live working tools.
The illustrative embodiments of the utility model are introduced referring now to the drawings, however, the utility model can use many Different forms is implemented, and is not limited to the embodiment described herein, and to provide these embodiments be in order at large and complete Open the utility model entirely, and the scope of the utility model is sufficiently conveyed to person of ordinary skill in the field.For The term in illustrative embodiments being illustrated in the accompanying drawings not is the restriction to the utility model.In the accompanying drawings, identical Cells/elements use identical appended drawing reference.
Unless otherwise indicated, term (including scientific and technical terminology) used herein has person of ordinary skill in the field It is common to understand meaning.Further it will be understood that with the term that usually used dictionary limits, should be understood as and its The context of related fields has consistent meaning, and is not construed as Utopian or too formal meaning.
First embodiment:
A kind of live working tools that multi-thread folder is general are present embodiments provided, as shown in Figure 1, include installation side plate 1, The installation side plate 1 is equipped with opposite and telescopic upper hook arm 201 and lower hook arm 202 up and down, also sets in the installation side plate 1 Have can elastic telescopic lead raker 5, the lead raker 5 is between the upper hook arm 201 and the lower hook arm 202.
The course of work or working principle of the general live working tools of multi-thread folder are as follows:
In power industry, wire clamp is many kinds of, the live working tools for illustrating the utility model protection for convenience Structure and working principle, the present embodiment is by taking penetrating cable clamp 4 as an example, and the structure of penetrating cable clamp 4 is as shown in figure 5, specifically, work Penetrating cable clamp 4 is inverted (nut is downward, as shown in Figure 3) and is put into the general livewire work work of the multi-thread folder of the utility model by personnel It in utensil, that is, is put into and hooks between arm 201 and lower hook arm 202, lead 15 is passed through to the lead port 16 of penetrating cable clamp 4, then Extension lead raker 5 catches on lead 15, i.e., lead 15 is fixed, then catches on wear respectively by upper hook arm 201 and lower hook arm 202 Another of thorn wire clamp 4 is used to clamp the opening of bus, and stretches and hook arm 201 and lower hook arm 202, and opening is drawn to maximum And maintain, staff lifts live working tools by insulating tool and carries out extracting bus, after extracting bus, twists The nut of tight penetrating cable clamp 4, penetrating cable clamp 4 has been fixed on bus at this time, then chooses out lead raker 5 with insulating tool, So that lead raker 5 is detached from lead 15, then so that upper hook arm 201 and lower hook arm 202 is detached from penetrating cable clamp 4 with insulating tool, electrification is made Industry Work tool is removed, and completes the installation of the penetrating cable clamp 4 under livewire work.
It should be strongly noted that the present embodiment is to illustrate that the multi-thread folder of the utility model is general by taking penetrating cable clamp 4 as an example Live working tools specific structure, it is not limited to this, since the live working tools of the utility model can It freely stretches, current power transmission route commonly all kinds of wire clamps can be fixed, so that the electrification that the multi-thread folder of the utility model is general The requirement of operation Work tool realization versatility.
Second embodiment:
A kind of live working tools that multi-thread folder is general are present embodiments provided, as shown in Figure 1, include installation side plate 1, The installation side plate 1 is equipped with opposite and telescopic upper hook arm 201 and lower hook arm 202 up and down, also sets in the installation side plate 1 Have can elastic telescopic lead raker 5, the lead raker 5 is between the upper hook arm 201 and the lower hook arm 202.
As shown in Figure 1 and Figure 4, the upper hook arm 201 is identical with 202 structures of the lower hook arm, be by the first rod piece 6, First spring 7, the second rod piece 8 are sequentially connected composition, and first rod piece 6 is fixed on institute far from one end of first spring 7 It states installation side plate 1 and forms angle with the plate face of the installation side plate 1, second rod piece 8 is to be equipped at least one in the middle part of rod piece A bending part 801, end be equipped with flat mouth hook 802 structure, and it is described it is upper hook arm 201 the flat mouth hook 802 with it is described The lower flat mouth hook 802 for hooking arm 202 is opposite and sets.
Particularly, upper hook arm 201 and lower hook arm 202 can be with elastic telescopic and can be with multi-angle regulation, specifically, upper hook arms 201 and lower hook arm 202 be by being realized with flowering structure:
Preferably, installation side plate 1 is rectangular plate-like structure shown in Fig. 1, the one of upper the first rod piece 6 for hooking arm 201 End and it is lower hook arm 202 the first rod piece 6 one end be individually fixed in installation side plate 1 top and bottom sidewall and up and down relatively, by It is identical with the lower structure for hooking arm 202 in upper hook arm 201, it is upper to hook the first of arm 201 for the above hook arm 201 in order to briefly explain Rod piece 6 tilts the obtuse-angulate angle of plate face with installation side plate 1 upwards, and the first rod piece 6, the first spring 7, the second rod piece 8 are sequentially Connection, it should be strongly noted that the sector structure of the angle that is made of two bars of the second rod piece 8 in obtuse angle, such as Fig. 4 institute Showing, the end of the second rod piece 8 is the flat mouth hook 802 for catching on the opening of penetrating cable clamp 4, in use, the second rod piece 8 is pulled, Under the elastic force of the first spring 7, the second rod piece 8 can be adjusted to suitable position, to facilitate flat mouth hook 802 to catch on puncture The opening of wire clamp 4.
3rd embodiment:
On the basis of the first embodiment or the second embodiment, preferably, as shown in Fig. 2, the lead raker 5 is equipped with It two, being made of second spring 9 and C-shaped hook 10, the plate face of the installation side plate 1 is fixed in one end of the second spring 9, The other end connects C-shaped hook 10.
Since the lead 15 in the lead port 16 of penetrating cable clamp 4 has certain length, in order to keep balancing and ensure The stability of lead 15 pulls C-shaped hook 10, and under the elastic force of second spring 9, two C-shaped hooks 10 stretch out to catch on simultaneously to be drawn Line 15, lead 15 can pull after being fixed and hook arm 201 and the progress next step operation of lower hook arm 202.
Fourth embodiment:
On the basis of 3rd embodiment, as shown in Figure 2 and Figure 4, described two lead rakers 5 are mounted on the installation Another plate face of the same plate face of side plate 1, the installation side plate 1 opposite with the plate face is equipped with for attended operation insulating bar Connecting elements 11;
Preferably, it adjusts for convenience and hooks arm 201 and the lower angle for hooking arm 202, upper first rod piece for hooking arm 201 6 and lower first rod piece 6 for hooking arm 202 tilt be fixed in the two side walls opposing upper and lower of the installation side plate 1 respectively, In order to improve the intensity of the first rod piece 6 during stretching, first rod piece 6 and the installation side plate 1 are equipped with described draw Gusset 12 is equipped between the plate face of line raker 5.
Connecting elements 11 is used for attended operation insulating bar, specifically, hooking arm 201 in stretching when installing penetrating cable clamp 4 With lower hook arm 202, the opening of penetrating cable clamp 4 is drawn to after maximum, staff is connected by operation insulating bar and connecting elements 11 It connects and lifts live working tools and carry out extracting bus, after extracting bus, tighten the nut of penetrating cable clamp 4, puncture at this time Wire clamp 4 has been fixed on bus, chooses out lead raker 5 with insulating tool, make lead raker 5 be detached from lead 15, then with insulate Tool makes to hook arm 201 and lower hook arm 202 is detached from penetrating cable clamp 4, and live working tools are removed, and are completed under livewire work The installation of penetrating cable clamp 4.
5th embodiment:
On the basis of fourth embodiment, preferably, as shown in figure 4, the connecting elements 11 is upper surface and following table Face is equipped with the plate structure of column.Operation insulating bar can be plugged on by connecting elements 11 in attended operation insulating bar On the column of upper and lower surfaces, it is ensured that the bonding strength of connecting elements 11 and operation insulating bar.
Sixth embodiment:
On the basis of 3rd embodiment, as shown in Figure 1, Figure 2 and Figure 4, the outer wall and the C of the flat mouth hook 802 The outer wall of shape hook 10 is respectively connected with pull ring 13.
The setting of pull ring 13 is that upper hook arm 201, lower hook arm 202 and lead raker 5 are chosen exoneration in order to facilitate staff From penetrating cable clamp 4, specifically:
Penetrating cable clamp 4 is inverted into the multi-thread of (as shown in figures 1 and 3, nut is downward) the utility model by staff It presss from both sides in general live working tools, that is, is put into and hooks between arm 201 and lower hook arm 202, lead 15 is passed through into penetrating cable clamp 4 Lead port 16, then extension lead raker 5 catches on lead 15 by C-shaped hook 10, i.e., lead 15 is fixed, then passes through It is upper hook arm 201 and the lower flat mouth hook 802 for hooking arm 202 catch on respectively penetrating cable clamp 4 another for clamping opening for bus Mouth, and stretch and hook arm 201 and lower hook arm 202, opening is drawn to maximum and maintained, staff connects insulating bar Then connecting elements 11 lifts live working tools by insulating bar and carries out extracting bus, after extracting bus, so The nut of penetrating cable clamp 4 is tightened afterwards, and penetrating cable clamp 4 has been fixed on bus at this time, is hooked insulating bar with band and is chosen out lead raker 5 On pull ring 13, make lead raker 5 be detached from lead 15, then with band hook insulating bar choose out hook arm 201 pull ring 13 and lower hook arm 202 pull ring 13 makes to hook arm 201 and lower hook arm 202 is detached from penetrating cable clamp 4, and live working tools are removed, and complete electrification The installation of penetrating cable clamp 4 under operation.
Therefore, pull ring 13, which had both facilitated, chooses lead raker 5, upper hook arm 201 and lower hook arm 202 from penetrating cable clamp 4, while The safety that can guarantee staff makes it carry out livewire work under the environment that insulate.
7th embodiment:
On the basis of 3rd embodiment, insulation shield is packaged on the flat mouth hook 802 and the C-shaped hook 10 respectively Set.The general live working tools of multi-thread folder further include protection shell 3, the protection shell 3 respectively with the installation side plate 1 Outer wall, it is described it is upper hook arm 201 outer wall and it is described it is lower hook arm 202 outer wall fitting.
It should be noted that insulating sheath can be with safeguard work personnel in operation lead raker 5, upper hook arm 201 and lower hook When arm 202 makes its corresponding flat mouth hook 802 and C-shaped hook 10 catches on the opening of lead 15 or penetrating cable clamp 4, it is ensured that be Operation, the safety of further safeguard work personnel under insulation environment.
Protection shell 3 is then to protect live working tools, especially internal components to cause damage from collision, so that electric Power staff can be in operation under conductive environment, it is ensured that work about electric power personnel safety.
Herein it should be strongly noted that the present embodiment is preferably, protect the structure of shell 3 as shown in Fig. 2, it is divided into Upper and lower two parts, upper and lower two-part structure is identical, respectively to protect upper hook arm 201 and lower hook arm 202, with the protection of the upper half For shell 3, by taking direction shown in Fig. 2 as an example, the protection shell 3 of the upper half be by two identical and shapes with it is upper It hooks the similar ㄇ shape shell of 201 shape of arm and splices composition, as shown in Fig. 2, two ㄇ shape shells are arranged side by side, and short side face is all connected to Installation side plate 1, the upper arm 201 that hooks are placed between the long side face set relatively, and the purpose of such setting is in protection livewire work work The device of appliance internal is outer from colliding, while will not interfere and hook arm 201 and the lower elastic telescopic for hooking arm 202.
8th embodiment:
On the basis of seven embodiments, as shown in figure 3, the bottom surface of the protection shell 3 offers arc-shaped opening 14, Through the 14 visible lower hook arms 202 of the arc-shaped opening.Arc-shaped opening 14 is the spiral shell for tightening penetrating cable clamp 4 for convenience Mother does not influence the operation that bolt is tightened.
9th embodiment:
It present embodiments provides a kind of application method of live working tools that multi-thread folder is general: wire clamp is inverted into In the general live working tools of (as shown in figure 3, the nut of wire clamp is in bottom) multi-thread folder, make line clip nut close to lower hook Then lead 15 is passed through the lead port 16 of wire clamp by arm 202, utilize the pull ring that the lead raker 5 is provoked with hook insulating bar 13, so that the C-shaped hook 10 of two lead rakers 5 is caught on lead 15 respectively until anchor leg 15, recycles band to hook insulating bar and choose The upper pull ring 13 for hooking arm 201 and the lower pull ring 13 for hooking arm 202 are played, port adjacent with lead port 16 on wire clamp is made Opening draw and to maximum and keep, insulating bar is then connected into connecting elements 11, staff passes through insulating bar act It plays the general live working tools of multi-thread folder and extracts bus, after extracting bus, then tighten the nut on wire clamp, consolidate wire clamp It is scheduled on bus, provokes the pull ring 13 on the C-shaped hook 10 of the lead raker 5 using with hook insulating bar, keep lead raker 5 de- From lead 15, the upper pull ring 13 for hooking arm 201 and the lower pull ring 13 for hooking arm 202 finally are provoked using with hook insulating bar, So that the upper hook arm 201 and the lower hook arm 202 is detached from wire clamp, removes the general live working tools of multi-thread folder.
In conclusion live working tools and its application method that this multi-thread folder provided by the utility model is general, By two lead rakers with spring come fixing clamper, line is then opened by upper and lower two band stretchable hook arms of spring Folder, so that wire clamp opening significantly reduces the error rate and deviation ratio of wire clamp installation, facilitate in real work to maximum Operation.In addition the utility model is encapsulated using insulating materials, and external protection shell, protection shell protection hook and inside Device causes damage from collision, can preferably improve safety coefficient, it is ensured that the safety of staff.
Exemplified as above is only to the utility model for example, not constituting to the protection scope of the utility model Limitation, it is all to be belonged within the protection scope of the utility model with the same or similar design of the utility model.The present embodiment The well-known components and common structure or conventional means of the component and the structure category industry that do not describe in detail, are not chatted one by one here It states.

Claims (9)

1. a kind of live working tools that multi-thread folder is general, it is characterised in that: including installation side plate (1), the installation side plate (1) it is equipped with opposite and telescopic upper hook arm (201) and lower hook arm (202) up and down, being additionally provided on the installation side plate (1) can The lead raker (5) of elastic telescopic, the lead raker (5) be located at the upper hook arm (201) and the lower hook arm (202) it Between.
2. the general live working tools of multi-thread folder as described in claim 1, it is characterised in that: the upper hook arm (201) It is identical with lower hook arm (202) structure, it is that group is sequentially connected by the first rod piece (6), the first spring (7), the second rod piece (8) At, first rod piece (6) far from one end of first spring (7) be fixed on the installation side plate (1) and with the installation The plate face of side plate (1) forms angle, and second rod piece (8) is to set in the middle part of rod piece equipped at least one bending part (801), end There are the structure of flat mouth hook (802), and the upper flat mouth hook (802) for hooking arm (201) and lower hook arm (202) The flat mouth hook (802) is opposite and sets.
3. the general live working tools of multi-thread folder as claimed in claim 2, it is characterised in that: the lead raker (5) It there are two if, is made of second spring (9) and C-shaped hook (10), the installation side is fixed in one end of the second spring (9) The plate face of plate (1), the other end connect C-shaped hook (10).
4. the general live working tools of multi-thread folder as claimed in claim 3, it is characterised in that: described two lead rakers (5) the same plate face of the installation side plate (1), another plate face of the installation side plate (1) opposite with the plate face are mounted on Connecting elements (11) for attended operation insulating bar is installed;
Upper first rod piece (6) for hooking arm (201) and lower first rod piece (6) for hooking arm (202) tilt be fixed in respectively In the two side walls opposing upper and lower of the installation side plate (1), and first rod piece (6) and the installation side plate (1) installation Have and is equipped with gusset (12) between the plate face of the lead raker (5).
5. the general live working tools of multi-thread folder as claimed in claim 4, it is characterised in that: the connecting elements (11) The plate structure of column is equipped with for upper and lower surfaces.
6. the general live working tools of multi-thread folder as claimed in claim 3, it is characterised in that: the flat mouth hook (802) outer wall of outer wall and the C-shaped hook (10) is respectively connected with pull ring (13).
7. the general live working tools of multi-thread folder as claimed in claim 3, it is characterised in that: the flat mouth hook (802) and on the C-shaped hook (10) it is packaged with insulating sheath respectively.
8. the general live working tools of multi-thread folder as claimed in claim 7, it is characterised in that: further include protection shell (3), it is described protection shell (3) respectively with the outer wall of the installation side plate (1), it is described it is upper hook arm (201) outer wall and it is described under Hook the outer wall fitting of arm (202).
9. the general live working tools of multi-thread folder as claimed in claim 8, it is characterised in that: the protection shell (3) Bottom surface offer arc-shaped opening (14), through the visible lower hook arm (202) of the arc-shaped opening (14).
CN201920024132.6U 2019-01-07 2019-01-07 A kind of live working tools that multi-thread folder is general Active CN209169825U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920024132.6U CN209169825U (en) 2019-01-07 2019-01-07 A kind of live working tools that multi-thread folder is general

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920024132.6U CN209169825U (en) 2019-01-07 2019-01-07 A kind of live working tools that multi-thread folder is general

Publications (1)

Publication Number Publication Date
CN209169825U true CN209169825U (en) 2019-07-26

Family

ID=67328174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920024132.6U Active CN209169825U (en) 2019-01-07 2019-01-07 A kind of live working tools that multi-thread folder is general

Country Status (1)

Country Link
CN (1) CN209169825U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109616946A (en) * 2019-01-07 2019-04-12 国网浙江省电力有限公司杭州供电公司 A kind of live working tools and its application method that multi-thread folder is general
CN114520490A (en) * 2021-11-30 2022-05-20 国网浙江省电力有限公司宁海县供电公司 Universal low-voltage puncture wire clamp installation auxiliary device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109616946A (en) * 2019-01-07 2019-04-12 国网浙江省电力有限公司杭州供电公司 A kind of live working tools and its application method that multi-thread folder is general
CN114520490A (en) * 2021-11-30 2022-05-20 国网浙江省电力有限公司宁海县供电公司 Universal low-voltage puncture wire clamp installation auxiliary device

Similar Documents

Publication Publication Date Title
WO2012088987A1 (en) Maintenance tool for insulator of direct current transmission line
CN209169825U (en) A kind of live working tools that multi-thread folder is general
CN205123185U (en) Non -maintaining insulator wire fixation clamp
CN203350292U (en) Wiring apparatus used for breaker characteristic test
CN203967713U (en) For the terminal clamping device of crane cable
CN102832567B (en) Arc suppressing device for leads disconnected in live manner and method for disconnecting leads in live manner
CN109616946A (en) A kind of live working tools and its application method that multi-thread folder is general
CN202094528U (en) Wire picking device for power transmission line construction
CN207868409U (en) Power construction electrical bonding drainage thread device
CN207117054U (en) Conductor load transfer tool and replacing insulator string device
CN105699713A (en) Multifunctional telescopic high-altitude electric testing clamp and application method thereof
CN106299764B (en) A kind of wired earth wire clamp with double hanging wire modes
CN104538890A (en) Method for electrified lead connection
CN107436401A (en) It is a kind of quickly to test the pressure-resistant device of suspension insulator and method of testing
CN203895633U (en) Short circuit grounding wire suitable for box transformer substation and electricity distribution room
CN205846267U (en) Temporary ground wire three-phase unification patch panel
CN207163820U (en) A kind of cable production stretching-machine
CN206432414U (en) The quick electricity getting device of low pressure overhead bare conductor
CN205544052U (en) Frame is climbed to cable
CN206148640U (en) Wire earth clamp with two hanging wire modes
CN205319355U (en) Pole line integral type earthing device
CN205335799U (en) Strain clamp
CN104143781B (en) The electrification installation method of electricity testing grounding ring and the installation tool of electricity testing grounding ring
CN107558793A (en) Multilayer cross-arm lifting installation method and its specific purpose tool on a kind of overhead transmission line electric pole
CN208272150U (en) A kind of portable rapid wiring device of maintenance power supply

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant