CN202094528U - Wire picking device for power transmission line construction - Google Patents

Wire picking device for power transmission line construction Download PDF

Info

Publication number
CN202094528U
CN202094528U CN2010206430373U CN201020643037U CN202094528U CN 202094528 U CN202094528 U CN 202094528U CN 2010206430373 U CN2010206430373 U CN 2010206430373U CN 201020643037 U CN201020643037 U CN 201020643037U CN 202094528 U CN202094528 U CN 202094528U
Authority
CN
China
Prior art keywords
suspension
utility
line
transmission line
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206430373U
Other languages
Chinese (zh)
Inventor
吴旺东
杨亚军
时朝辉
吉喆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHEYANG COUNTY POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
State Grid Jiangsu Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
SHEYANG COUNTY POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHEYANG COUNTY POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co filed Critical SHEYANG COUNTY POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
Priority to CN2010206430373U priority Critical patent/CN202094528U/en
Application granted granted Critical
Publication of CN202094528U publication Critical patent/CN202094528U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Insulators (AREA)

Abstract

本实用新型涉及一种输电线路施工工具。输电线路附件安装过程中,由于直线杆塔悬垂线夹及绝缘子串的安装目前没有专用提线工具,通常将等待安装固定的导线放置在滑车上,夹线时悬垂线夹的固定位置不能准确判断,导致安装后悬垂线夹及绝缘子串倾斜,安装质量不高。本实用新型公开一种提线器其本体由横梁1、吊环2、绳索3、吊钩4等组成,其特征在于:吊环2固定在横梁1的中央位置,横梁1两端相对称位置悬有两根长度相同的绳索3,在绳索3另一端设有吊钩4。本实用新型所需成本很小,能解决线路杆塔上附件安装时,悬垂线夹的固定位置不能准确判断的问题,提高施工质量而且还提高施工效率。

Figure 201020643037

The utility model relates to a power transmission line construction tool. During the installation of transmission line accessories, since there is no special wire lifting tool for the installation of the suspension line clamp and insulator string of the straight pole tower, the wire waiting to be fixed is usually placed on the pulley, and the fixed position of the suspension line clamp cannot be accurately judged when clamping the line. As a result, the suspension clamps and insulator strings are tilted after installation, and the installation quality is not high. The utility model discloses a thread lifter whose body is composed of a beam 1, a suspension ring 2, a rope 3, a hook 4, etc., and is characterized in that: the suspension ring 2 is fixed at the central position of the beam 1, and the two ends of the beam 1 are suspended at symmetrical positions. Two ropes 3 having the same length are provided with suspension hooks 4 at the other ends of the ropes 3 . The utility model requires very little cost, can solve the problem that the fixed position of the suspension line clamp cannot be accurately judged when the accessories on the line pole tower are installed, improves the construction quality and also improves the construction efficiency.

Figure 201020643037

Description

A kind of power transmission sequence construction line lifter
Technical field
The utility model relates to a kind of transmission line construction instrument, belongs to electric power installation field.
Background technology
In the transmission line annex installation process, because the installation of straight line pole suspension clamp and insulator string does not have special use to carry the Line tool at present, usually the lead that wait is installed and fixed is placed on the coaster, the fixed position of suspension clamp can not accurately be judged during clamp, cause installing reverse hang wire clamp and insulator string, installation quality is not high.
Summary of the invention
The purpose of this utility model is exactly the present situation that the fixed position of suspension clamp can not accurately be judged during at clamp, and a kind of power transmission sequence construction line lifter is provided.
The technical solution of the utility model is that its body of a kind of line lifter is made up of crossbeam 1, suspension ring 2, rope 3, suspension hook 4 etc., it is characterized in that: suspension ring 2 are fixed on the middle position of crossbeam 1, symmetrical position, crossbeam 1 two ends is outstanding two ropes 3 that length is identical, is provided with suspension hook 4 at rope 3 other ends; Link up with 6 one end hooks and live suspension ring 2, the other end hooks rope sling 5.
The beneficial effects of the utility model are: the required cost of the technical solution of the utility model is very little; Solve when annex is installed on the overhead line structures, the fixed position of suspension clamp can not accurately be judged, causes installing reverse hang wire clamp and insulator string, and the problem that installation quality is not high not only improves construction quality but also the raising efficiency of construction.
Description of drawings
Fig. 1 is when two suspension insulator, enforcement schematic diagram of the present utility model.
Fig. 2 is when single suspension insulator, and the utility model is being implemented schematic diagram.
In the accompanying drawing, 1. crossbeam, 2. suspension ring, 3. rope, 4. suspension hook, 5. rope sling, 6. hook, 7. electrical lead.
Embodiment
[0008] be described in further detail below in conjunction with 1 couple of embodiment of the present utility model of accompanying drawing, following examples are descriptive, are not determinate, can not limit protection range of the present utility model with this.
A kind of crossbeam 1 of its body of line lifter, suspension ring 2, suspension hook 4 and link up with 6 and can be made by metal or alloy, the also available seizing wire of rope 3 and rope sling 5 is made.When the utility model uses, at first rope sling 5 temporarily is fixed on the shaft tower cross-arm, rope sling 5 is lived with hook 6 one end hooks then in the centre of two suspension insulator hitch points in its fixing position; The electrical lead 7 that will promote is placed on the suspension hook 4 of this line lifter, earlier with instruments such as stay cord or pulleys this line lifter is risen to certain position, and the other end with hook 6 hooks suspension ring 2 again, at last just fixedly installment work such as suspension clamp.Because the electrical lead of being fixed by suspension clamp so just guarantees that electrical lead is horizontal between two suspension hooks 4 of this line lifter, situations such as inclination just can not appear in construction.After construction is finished, take off the rope sling 5 that temporarily is fixed on the shaft tower cross-arm, just can remove this line lifter.
2 couples of another embodiment of the present utility model are described in further detail below in conjunction with accompanying drawing, and following examples are descriptive, are not determinate, can not limit protection range of the present utility model with this.
When the utility model uses, at first rope sling 5 temporarily is fixed on the shaft tower cross-arm with suspension insulator hitch point same position, other step is identical with a last embodiment.
In addition to the implementation, the utility model can also have other execution mode.All employings are equal to the technical scheme of replacement or equivalent transformation form, all drop on the protection range of the utility model requirement.

Claims (3)

1.一种送电线路施工提线器,其本体由横梁(1)、吊环(2)、绳索(3)、吊钩(4)等组成,其特征在于:吊环(2)固定在横梁(1)的中央位置,横梁(1)两端相对称位置悬有两根长度相同的绳索(3),在绳索(3)另一端设有吊钩(4);挂钩(6)一端钩住吊环(2),另一端钩住绳套(5)。 1. A wire lifter for power transmission line construction, its body is made up of crossbeam (1), suspension ring (2), rope (3), suspension hook (4) etc., it is characterized in that: suspension ring (2) is fixed on crossbeam ( 1), two ropes (3) of the same length are suspended at the symmetrical positions at both ends of the beam (1), and a hook (4) is provided at the other end of the rope (3); one end of the hook (6) hooks the suspension ring (2), the other end hooks the noose (5). 2.如权利要求1所述的送电线路施工提线器,其特征在于:其本体的横梁(1)、吊环(2)、吊钩(4),或挂钩(6)由金属或合金制成。 2. The wire lifter for power transmission line construction as claimed in claim 1, characterized in that: the beam (1), ring (2), hook (4), or hook (6) of the main body is made of metal or alloy become. 3.如权利要求1所述的送电线路施工提线器,其特征在于:绳索(3)或绳套(5)由细钢丝绳制成。  3. The wire lifter for power transmission line construction according to claim 1, characterized in that: the rope (3) or the rope sleeve (5) is made of thin steel wire rope. the
CN2010206430373U 2010-12-06 2010-12-06 Wire picking device for power transmission line construction Expired - Fee Related CN202094528U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206430373U CN202094528U (en) 2010-12-06 2010-12-06 Wire picking device for power transmission line construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206430373U CN202094528U (en) 2010-12-06 2010-12-06 Wire picking device for power transmission line construction

Publications (1)

Publication Number Publication Date
CN202094528U true CN202094528U (en) 2011-12-28

Family

ID=45369571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206430373U Expired - Fee Related CN202094528U (en) 2010-12-06 2010-12-06 Wire picking device for power transmission line construction

Country Status (1)

Country Link
CN (1) CN202094528U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103151729A (en) * 2013-03-20 2013-06-12 国家电网公司 Position converter for overhead line
CN104283151A (en) * 2014-09-26 2015-01-14 国家电网公司 Tangent tower electrified double-fission wire lifting device
GB2518345A (en) * 2013-07-03 2015-03-25 Northern Ireland Electricity Ltd Cable Support Apparatus
CN105305314A (en) * 2015-12-09 2016-02-03 国网四川省电力公司达州供电公司 Distribution network straightway line lifting device
CN108258617A (en) * 2018-01-16 2018-07-06 国网新疆电力公司塔城供电公司 A kind of more changing device that formula overhanging golden tool is twisted for transmission line of electricity aerial condutor
CN114188881A (en) * 2021-12-07 2022-03-15 广西电网有限责任公司玉林供电局 Combined device applied to wire for replacing suspension clamp

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103151729A (en) * 2013-03-20 2013-06-12 国家电网公司 Position converter for overhead line
GB2518345A (en) * 2013-07-03 2015-03-25 Northern Ireland Electricity Ltd Cable Support Apparatus
GB2518345B (en) * 2013-07-03 2017-05-31 Northern Ireland Electricity Ltd Cable Support Apparatus
CN104283151A (en) * 2014-09-26 2015-01-14 国家电网公司 Tangent tower electrified double-fission wire lifting device
CN105305314A (en) * 2015-12-09 2016-02-03 国网四川省电力公司达州供电公司 Distribution network straightway line lifting device
CN108258617A (en) * 2018-01-16 2018-07-06 国网新疆电力公司塔城供电公司 A kind of more changing device that formula overhanging golden tool is twisted for transmission line of electricity aerial condutor
CN114188881A (en) * 2021-12-07 2022-03-15 广西电网有限责任公司玉林供电局 Combined device applied to wire for replacing suspension clamp

Similar Documents

Publication Publication Date Title
CN202094528U (en) Wire picking device for power transmission line construction
CN104505766B (en) The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings
CN104022459A (en) 10 KV distribution line pole-mounted wire suspension device
CN106684756A (en) Power transmission angle iron tower conductor and ground wire lifting tool and application method of the same
CN204046062U (en) The unsettled fixed support instrument of a kind of power transmission line overhead ground wire
CN205114816U (en) Compound rigging that promotes of sewage pump
CN203806962U (en) Cable terminal head lifting fixture
CN204407790U (en) A kind of insulation gin pole for getting out wire jumper
CN105133916A (en) Auxiliary hanging bracket for mounting of upper frame on telegraph pole
CN203596547U (en) High voltage insulator suspension device
CN202197048U (en) Double angle steel hanging point lifting and connecting tool for tower use
CN202712745U (en) Universal straight-line clamp for steel pipe pole tower head
CN102354929B (en) V-shaped insulator string suspension device
CN104283156B (en) Wire lifting device for power distribution line
CN202924581U (en) CT (Current Transformer) coil hoisting device
CN103606849B (en) Transmission tower multiple fission conductor live line working lifting device and special mould clamp thereof
CN205159936U (en) Wire clamping device
CN202817600U (en) Hoisting clamping apparatus for jumpers of multi-bundled conductors in overhead line construction
CN202190023U (en) Overhead conductor puller
CN205595731U (en) Strain wire clamp used for 10kV overhead power distribution line
CN106115504B (en) A kind of suspender
CN105305316B (en) A kind of mountain region effort-saving circuit line lifter
CN204983880U (en) Supplementary gallows of wire pole roof -rack installation
CN202586164U (en) Head clamp of concrete-pole cross arm
CN103487910A (en) Optical cable tightener

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: SHEYANG POWER SUPPLY COMPANY OF JIANGSU ELECTRIC POWER COMPANY

Effective date: 20131021

Owner name: JIANGSU ELECTRIC POWER COMPANY SHEYANG POWER SUPPL

Effective date: 20131021

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 224300 YANCHENG, JIANGSU PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20131021

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Jiangsu Electric Power Company

Patentee after: Sheyang county Power Supply Company of Jiangsu Electric Power Company

Address before: 224300 No. 18 East Renmin Road, Sheyang County, Yancheng City, Jiangsu

Patentee before: Sheyang county Power Supply Company of Jiangsu Electric Power Company

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111228

Termination date: 20171206