CN209166249U - A kind of depositing dust formula blast hole stemming structure - Google Patents

A kind of depositing dust formula blast hole stemming structure Download PDF

Info

Publication number
CN209166249U
CN209166249U CN201821588723.8U CN201821588723U CN209166249U CN 209166249 U CN209166249 U CN 209166249U CN 201821588723 U CN201821588723 U CN 201821588723U CN 209166249 U CN209166249 U CN 209166249U
Authority
CN
China
Prior art keywords
area
water bag
interior location
detonator
explosive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821588723.8U
Other languages
Chinese (zh)
Inventor
贺广龙
好燕飞
牛智
史柏林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Shengli Zhongwei Blasting Co Ltd
Original Assignee
Inner Mongolia Shengli Zhongwei Blasting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Shengli Zhongwei Blasting Co Ltd filed Critical Inner Mongolia Shengli Zhongwei Blasting Co Ltd
Priority to CN201821588723.8U priority Critical patent/CN209166249U/en
Application granted granted Critical
Publication of CN209166249U publication Critical patent/CN209166249U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of depositing dust formula blast hole stemming structures, including blasthole, from top to bottom successively fixation offers the first water bag rest area at the interior location of the blasthole, first river sand clogs area, second explosive clogs area, second water bag rest area, second river sand clogs area, first explosive clogs area, water bag rack is fixedly installed at the interior location of first water bag rest area and the second water bag rest area, the second cap sensitive packet is from top to bottom successively fixedly installed at the interior location in the first explosive filling area, second blasting charge, the first cap sensitive packet is from top to bottom successively fixedly installed at the interior location in the second explosive filling area, first blasting charge, the utility model was provided with sieve, cross sieve screen apertures, cross sieve screen apertures by the river sand that is sieved prevent biggish stone slide into blasthole cause plug-hole or The phenomenon that smashing the first detonator, the second detonator.

Description

A kind of depositing dust formula blast hole stemming structure
Technical field
The utility model relates to blast working auxiliary tool technology field, specifically a kind of depositing dust formula blast hole stemming structure.
Background technique
Explosion is to be compressed, loosened caused by explosion in empty gas and water, native stone medium or object using explosive, destroyed, thrown It throws and lethal effect, a special kind of skill to achieve the desired purpose.Pack or the powder charge explosion time in native stone medium or works, make soil Stone medium or works generate the phenomenon that compression, deformation, destruction, loose and throwing, are mainly used for earth and rock works, and building The dismounting etc. of object.Outdoor and underground mining, underground excavation generally use medium-length hole blasting, and blasting method is blast with linear charges, multiple medicine Packet, delaying blasting need that drilling device is used to bore in advance according to the actual conditions of blasting site in practical digging process certain The blasthole of the certain arrangement mode of quantity is also needed after having loaded explosive for loading explosive using the blast hole stemmings material such as sandy soil Material carries out plug-hole to blasthole, to realize explosion.
In surface blasting construction, often there is biggish stone to slide into blasthole during filling, may result in stifled Leader spool is smashed in hole, will cause loss, and a large amount of dust can be generated in blasting process, since dust can not be timely The working environment for being degrading operation field is dispersed, therefore, those skilled in the art provide a kind of depositing dust formula blast hole stemming structure, To solve the problems mentioned in the above background technology.
Utility model content
The purpose of this utility model is to provide a kind of depositing dust formula blast hole stemming structures, to solve to mention in above-mentioned background technique Dust can not disperse in time out is degrading the working environment of operation field, often has biggish stone to slide into blasthole may to lead The problem of causing plug-hole or smashing Leader spool.
To achieve the above object, the utility model provides the following technical solutions:
A kind of depositing dust formula blast hole stemming structure, including blasthole are from top to bottom successively fixed at the interior location of the blasthole Offer the first water bag rest area, the first river sand filling area, the second explosive filling area, the second water bag rest area, the second river sand are filled out It is fixedly installed at the interior location of plug area, the first explosive filling area, first water bag rest area and the second water bag rest area There is water bag rack, is from top to bottom successively fixedly installed the second cap sensitive at the interior location in the first explosive filling area It wraps, second blasting charge, is from top to bottom successively fixedly installed the first detonator at the interior location in the second explosive filling area and draws Quick-fried packet, first blasting charge, offer bottom resistance area, the interior location in bottom resistance area at the bottom position of the blasthole Place is packed with cement plug, and there are four fixed disk, the upper end faces of the fixed disk for fixed setting at the lateral location of the blasthole It is fixedly connected with support frame at position, fixed outer ring, the fixation are fixedly connected at the upper end face position of support frame as described above The middle position of outer ring was fixedly installed sieve, was fixedly installed second at the apical position in the second explosive filling area Partition is fixedly installed first partition, and the inside in the first explosive filling area at the apical position in first explosive filling area It is provided with the first detonator at position, is provided with the second detonator at the interior location in the second explosive filling area.
As a further solution of the present invention: the interior position in the first river sand filling area, the second river sand filling area The place of setting is packed with river sand.
As a further solution of the present invention, at the interior location of the water bag rack there are four fixed placements Water bag.
It is opened up at the upper and lower ends surface location of the water bag rack as a further solution of the present invention, There is third detonator port.
Symmetrically open up that there are two the at the surface location of the second partition as a further solution of the present invention, One detonator port offers the second detonator port at the surface location of the first partition.
Sieve screen apertures were offered at the surface location for crossing sieve as a further solution of the present invention, and Positioning pipe there are two being symmetrical arranged is crossed at the surface location of sieve, is fixedly connected with flexible skin at an end position of the positioning pipe Matter hose.
As a further solution of the present invention, the water bag be fill clear water polyethylene be raw material form Component.
Compared with prior art, the utility model has the beneficial effects that
1, the utility model was provided with sieve, excessively sieve screen apertures, and sieve screen apertures excessively are prevented biggish by the river sand that is sieved Stone slides into blasthole the phenomenon that leading to plug-hole or smashing the first detonator, the second detonator.
2, the utility model is provided with positioning pipe, elastic cortex hose, and the first detonator, the second detonator are played positioning and protected Shield effect, prevents the first detonator, the second detonator from shaking the phenomenon that fractureing.
3, the utility model is provided with two water bag racks, eight water bags, enhances dust-laying effect, reduces the production of dust It is raw, optimize the working environment of operation field.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of depositing dust formula blast hole stemming inside configuration;
Fig. 2 is a kind of structural schematic diagram of depositing dust formula blast hole stemming structure;
Fig. 3 is the structural schematic diagram that sieve is crossed in a kind of depositing dust formula blast hole stemming structure;
Fig. 4 is a kind of structural schematic diagram of water bag rack in depositing dust formula blast hole stemming structure;
Fig. 5 is the structural schematic diagram of first partition and second partition in a kind of depositing dust formula blast hole stemming structure.
In figure: 1, the first detonator;2, support frame;3, water bag rack;4, the first cap sensitive packet;5, the first explosive Packet;6, first partition;7, second blasting charge;8, cement plug;9, the second cap sensitive packet;10, second partition;11, river sand;12, Water bag;13, the second detonator;14, the first water bag rest area;15, the first river sand clogs area;16, the second water bag rest area;17, First explosive clogs area;18, bottom resistance area;19, the second river sand clogs area;20, the second explosive clogs area;21, elastic cortex Hose;22, sieve is crossed;23, fixed disk;24, fixed outer ring;25, sieve screen apertures are crossed;26, positioning pipe;27, the first detonator port; 28, the second detonator port;29, third detonator port;30, blasthole.
Specific embodiment
Please refer to Fig. 1~5, in the utility model embodiment, a kind of depositing dust formula blast hole stemming structure, including blasthole 30, big gun It is from top to bottom successively fixed at the interior location in hole 30 to offer the first water bag rest area 14, the first river sand filling area 15, second Explosive clogs area 20, the second water bag rest area 16, the second river sand filling area 19, the first explosive filling area 17, and the first water bag is placed Water bag rack 3 is fixedly installed at the interior location of area 14 and the second water bag rest area 16, the first explosive clogs area 17 The second cap sensitive packet 9, second blasting charge 7 are from top to bottom successively fixedly installed at interior location, the second explosive clogs area 20 Interior location at be from top to bottom successively fixedly installed the first cap sensitive packet 4, first blasting charge 5, the bottom end position of blasthole 30 The place of setting offers bottom resistance area 18, and cement plug 8, the lateral location of blasthole 30 are packed at the interior location in bottom resistance area 18 Place's fixed setting is fixedly connected with support frame 2 at the upper end face position of fixed disk 23 there are four fixed disk 23, support frame 2 Fixed outer ring 24 is fixedly connected at upper end face position, the middle position of fixed outer ring 24 was fixedly installed sieve 22, It is fixedly installed second partition 10 at the apical position in the second explosive filling area 20, the first explosive is clogged at the apical position in area 17 It is fixedly installed first partition 6, and is provided with the first detonator 1, the second explosive at the interior location in the first explosive filling area 17 It clogs and is provided with the second detonator 13 at the interior location in area 20.
In Fig. 1: the first river sand filling area 15, the second river sand filling area 19 interior location at be packed with river sand 11, energy It utilizes the energy of explosive charge well, improves the effect of explosion and crushing.
In Fig. 4: there are four water bags 12 for fixed placement at the interior location of water bag rack 3, pass through 12 explosion of water bag Broken water occurs in journey will disperse spillage absorption dust, reduces the generation of dust, optimizes the working environment of operation field.
In Fig. 4: offering third detonator port 29 at the upper and lower ends surface location of water bag rack 3, reach First detonator 1, the second detonator 13 can extend to the purpose of 30 outside of blasthole through water bag rack 3.
In Fig. 5: the first detonator port 27 there are two symmetrically being opened up at the surface location of second partition 10, first partition The second detonator port 28 is offered at 6 surface location, reaching the first detonator 1, the second detonator 13 can be through first Partition 6, second partition 10 extend to the purpose of 30 outside of blasthole.
In figure 2 and figure 3: crossing at the surface location of sieve 22 and offered sieve screen apertures 25, and cross the surface position of sieve 22 Positioning pipe 26 there are two locating to be symmetrical arranged is set, flexible cortex hose 21 is fixedly connected at an end position of positioning pipe 26, is sieved Mesh 25 prevents to lead to plug-hole in biggish stone slide-in blasthole 30 or smashes the first detonator by the river sand 11 that is sieved 1, the phenomenon that the second detonator 13, positioning pipe 26 and elastic cortex hose 21 play positioning to the first detonator 1, the second detonator 13 Protective effect places the first detonator 1, the second detonator 13 and shakes the phenomenon that fractureing.
In Fig. 1: water bag 12 is the component filling the polyethylene of clear water and forming for raw material, and water bag 12 is in the shape that suffers oppression State, water bag 12 are not susceptible to rupture.
The working principle of the utility model is: passing through sieve 22 first before carrying out blast operations and carrying out filling river sand 11 to the first river sands clog area 15, the second river sand is clogged in area 19, water bag 12 are placed on water bag rack 3, in the first water bag The water bag rack 3 for having water bag 12 is placed in rest area 14 and the second water bag rest area 16, then passes through the first detonator 1, the second detonator 13 ignites second blasting charge 7, first blasting charge 5, the first water bag rest area 14 and the second water bag rest area 16 Broken water occurs in interior 12 blasting process of water bag will disperse spillage absorption dust, reduces the generation of dust, optimizes operation field Working environment, positioning pipe 26 and elastic cortex hose 21 play positioning protective effect to the first detonator 1, the second detonator 13, Place the first detonator 1, the second detonator 13 shakes the phenomenon that fractureing.
It is above-described, the only preferable specific embodiment of the utility model, but the protection scope of the utility model is simultaneously It is not limited to this, anyone skilled in the art within the technical scope disclosed by the utility model, according to this reality It is subject to equivalent substitution or change with novel technical solution and its utility model design, should all covers the protection in the utility model Within the scope of.

Claims (7)

1. a kind of depositing dust formula blast hole stemming structure, including blasthole (30), which is characterized in that at the interior location of the blasthole (30) It is from top to bottom successively fixed to offer the first water bag rest area (14), the first river sand filling area (15), the second explosive filling area (20), the second water bag rest area (16), the second river sand filling area (19), the first explosive filling area (17), first water bag are put It sets and is fixedly installed water bag rack (3) at the interior location of area (14) and the second water bag rest area (16), described first is fried The second cap sensitive packet (9), second blasting charge are from top to bottom successively fixedly installed at the interior location of medicine filling area (17) (7), the first cap sensitive packet is from top to bottom successively fixedly installed at the interior location of the second explosive filling area (20) (4), first blasting charge (5) offer bottom resistance area (18), bottom resistance area at the bottom position of the blasthole (30) (18) it is packed at interior location cement plug (8), there are four fixed disks for fixed setting at the lateral location of the blasthole (30) (23), it is fixedly connected with support frame (2) at the upper end face position of the fixed disk (23), the upper end table of support frame as described above (2) It is fixedly connected at the position of face fixed outer ring (24), the middle position of the fixed outer ring (24) was fixedly installed sieve (22), it is fixedly installed second partition (10) at the apical position of the second explosive filling area (20), first explosive is filled out It fills in and is fixedly installed first partition (6) at the apical position of area (17), and set at the interior location of the first explosive filling area (17) It is equipped with the first detonator (1), is provided with the second detonator (13) at the interior location of the second explosive filling area (20).
2. a kind of depositing dust formula blast hole stemming structure according to claim 1, which is characterized in that first river sand clogs area (15), river sand (11) are packed at the interior location of the second river sand filling area (19).
3. a kind of depositing dust formula blast hole stemming structure according to claim 1, which is characterized in that the water bag rack (3) Interior location at fixed placement there are four water bag (12).
4. a kind of depositing dust formula blast hole stemming structure according to claim 1, which is characterized in that the water bag rack (3) Upper and lower ends surface location at offer third detonator port (29).
5. a kind of depositing dust formula blast hole stemming structure according to claim 1, which is characterized in that the second partition (10) It is symmetrically opened up at surface location there are two the first detonator port (27), is offered at the surface location of the first partition (6) Second detonator port (28).
6. a kind of depositing dust formula blast hole stemming structure according to claim 1, which is characterized in that the table for crossing sieve (22) It offered sieve screen apertures (25), and was symmetrical arranged at the surface location of sieve (22) excessively there are two positioning pipe (26) at the position of face, Flexible cortex hose (21) is fixedly connected at one end position of the positioning pipe (26).
7. a kind of depositing dust formula blast hole stemming structure according to claim 3, which is characterized in that the water bag (12) is to fill The polyethylene of clear water is the component of raw material composition.
CN201821588723.8U 2018-09-27 2018-09-27 A kind of depositing dust formula blast hole stemming structure Active CN209166249U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821588723.8U CN209166249U (en) 2018-09-27 2018-09-27 A kind of depositing dust formula blast hole stemming structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821588723.8U CN209166249U (en) 2018-09-27 2018-09-27 A kind of depositing dust formula blast hole stemming structure

Publications (1)

Publication Number Publication Date
CN209166249U true CN209166249U (en) 2019-07-26

Family

ID=67332423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821588723.8U Active CN209166249U (en) 2018-09-27 2018-09-27 A kind of depositing dust formula blast hole stemming structure

Country Status (1)

Country Link
CN (1) CN209166249U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110332870A (en) * 2019-08-03 2019-10-15 贵州久远爆破工程有限责任公司 A kind of Tunnel Blasting depositing dust water stemming bag
CN111457809A (en) * 2020-05-21 2020-07-28 广州轨道交通建设监理有限公司 Guiding control recovery device and method for underwater blasting slurry of shield tunnel
CN115127412A (en) * 2022-07-19 2022-09-30 中国人民解放军陆军工程大学 Small-distance explosive-charging explosion-proof device in hard rock hole

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110332870A (en) * 2019-08-03 2019-10-15 贵州久远爆破工程有限责任公司 A kind of Tunnel Blasting depositing dust water stemming bag
CN110332870B (en) * 2019-08-03 2024-05-10 贵州久远爆破工程有限责任公司 Water stemming bag for tunnel blasting dust fall
CN111457809A (en) * 2020-05-21 2020-07-28 广州轨道交通建设监理有限公司 Guiding control recovery device and method for underwater blasting slurry of shield tunnel
CN115127412A (en) * 2022-07-19 2022-09-30 中国人民解放军陆军工程大学 Small-distance explosive-charging explosion-proof device in hard rock hole

Similar Documents

Publication Publication Date Title
CN209166249U (en) A kind of depositing dust formula blast hole stemming structure
CN107063014B (en) Cutting shallow hole step controlled blasting slope cutting method in complex environment
CN110332860A (en) A kind of the periphery hole charge constitution and its construction method of cumulative smooth Hydraulic Blasting
CN103629980A (en) Adjacent existing railway steep mountain loosen control blast construction method
CN101397900A (en) Perforator charge with a case containing a reactive material
CN112857156B (en) Environment-friendly dust suppression blasting method for surface mine and water hole charging blasting method
CN106560671A (en) Explosion method for tundra of high-and-cold surface mine
CN102914227B (en) A kind of construction method for the novel charge constitution of explosives mix-load truck
CN203837604U (en) Full-face hole bottom air-spaced loading mechanism for underground roadway tunneling
CN102967191A (en) Blasting method for treatment of gob
CN105971580B (en) A kind of screen casing explosion fracturing experimental provision and method
CN109163630A (en) A kind of loading method of Caving Method with Large Space mining deep hole water pressure blasting explosion
CN105865283A (en) Blasting dedusting method
CN114279286A (en) Multistage filling blasting dust-settling method for open-air iron ore
CN107288606A (en) A kind of method of artificial construction hot dry rock heat reservori
CN109186390A (en) Hole Blasting In Open-pit Mines water spacer-coupling charging blasting method and dedicated water column bag
CN112747644A (en) Blasting method for reducing rock chunks of strip mine
CN208936891U (en) Close on high-voltage line mining blasting safeguard structure
CN107560504A (en) A kind of mining blasting cartridge for increasing safety in utilization
CN217585518U (en) Blasting loaded constitution
CN107228608B (en) The blasting method of rock directional splitting
CN213021276U (en) Explosive loading funnel for blasting
RU2235971C1 (en) Method of dispersion of a charge in a borehole
KR100559936B1 (en) Blasting method for constructing base of power transmission tower
CN107356166A (en) A kind of blasting method for firing medium and medium being fired using this for restricted clearance explosion

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant