CN209163175U - A kind of movable container office building inside corridor lighting ceiling - Google Patents

A kind of movable container office building inside corridor lighting ceiling Download PDF

Info

Publication number
CN209163175U
CN209163175U CN201821312443.4U CN201821312443U CN209163175U CN 209163175 U CN209163175 U CN 209163175U CN 201821312443 U CN201821312443 U CN 201821312443U CN 209163175 U CN209163175 U CN 209163175U
Authority
CN
China
Prior art keywords
glass
connecting plate
office building
corridor
daylighting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821312443.4U
Other languages
Chinese (zh)
Inventor
李广金
全有维
张继梅
程建军
陈小龙
李正岚
周慧洁
赵伟
黄树熔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201821312443.4U priority Critical patent/CN209163175U/en
Application granted granted Critical
Publication of CN209163175U publication Critical patent/CN209163175U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model discloses a kind of movable container office building inside corridor lighting ceilings, and including several daylighting components being installed on the ceiling of corridor, the daylighting component serves as the daylighting channel inside corridor;The daylighting component includes glass, connecting plate and fixed frame;The fixed frame includes two channel steels and several connecting rods;The channel steel parallel laying spaced apart, and notch is opposite;The connecting rod is vertically connected between two channel steels, and the two ends of connecting rod are fixedly arranged on the middle part of notch;The two sides of the glass are separately connected one piece of connecting plate, and the connecting plate is parallel with glass surface;The outer side edges of every piece of connecting plate are connected to the upper surface of channel steel, and the glass has certain drainage grade;In being filled with heat insulation layer in the space that the connecting plate and fixed frame are formed.The utility model had both met the waterproof requirement of ceiling, at the same can with natural lighting, preferably create comfortable pleasant working environment, achieve good economic benefit.

Description

A kind of movable container office building inside corridor lighting ceiling
Technical field
The utility model relates to spliced container office building inside corridor ceiling light technical fields, and in particular to Yi Zhongke Mobile container office building inside corridor lighting ceiling and its construction method.
Background technique
With the development of modern architecture industry, engineering construction speed is constantly accelerated, and movable container is widely used in work Cheng Jianshe and other fields.Large-scale container office building is more and more to use double combined combining form, and office building inside corridor is logical Frequently with lamplit mode, the daily most of the time is all lighting state, just can ensure that lighting demand.Although light Illumination meets base lighting demand, but consuming electric power is more and visual comfort is low.
Utility model content
Purpose of utility model: the purpose of this utility model is that in view of the deficiencies of the prior art, providing a kind of packaged type Container office building inside corridor lighting ceiling and its construction method, to solve to walk in spliced container office building in the prior art Corridor expends the problem that electric power is more and visual comfort is low frequently with lamplit mode.
Technical solution: a kind of movable container office building inside corridor lighting ceiling, including several corridors that are installed on are pushed up Daylighting component on canopy, the daylighting component serve as the daylighting channel inside corridor.
Further, the daylighting component includes glass, connecting plate and fixed frame;The fixed frame include two channel steels and Several connecting rods;The channel steel parallel laying spaced apart, and notch is opposite;The connecting rod is vertically connected at two channel steels Between, and the two ends of connecting rod are fixedly arranged on the middle part of notch;
The two sides of the glass are separately connected one piece of connecting plate, and the connecting plate is parallel with glass surface;Every piece of connection The outer side edges of plate are connected to the upper surface of channel steel, and the glass has certain drainage grade;In the connecting plate and fixation Heat insulation layer is filled in the space that frame is formed.
It further, further include collet, the collet is combined into L-shaped structure by cross bar and vertical bar;
Symmetrically be connected a collet on the inside of the two sides of channel steel, and the cross bar of collet is connected to the bottom on the inside of channel steel side End, the vertical bar spacing of collet are equal to the thickness of connecting rod.
Further, the connecting rod is "-" type aluminum-pinch furred ceiling.
Further, the connecting plate is zinc-plated grooving board;The inner side edge of the connecting plate passes through elastic construction glue connection In the side of glass.
Further, the glass is the double-deck doubling tempered glass.
It further, further include slope angle support rod;The slope angle support rod is fixedly arranged on the ceiling of corridor, and the glass Lower surface fits in the upper surface of slope angle support rod.
The construction method of movable container office building inside corridor lighting ceiling described in the utility model, feature exist In including the following steps:
(1) container is installed in place by layout drawing;Field measurement corridor dimensional discrepancy and check;
(2) it is produced by size daylighting component;
(3) handling of daylighting component and installation;
(4) joining place leakproof water process;It drenches with rain inspection and repairing;
(5) it clears up and checks and accepts.
Further, the production of daylighting component includes the following steps:
(1) the handling installation of channel steel;
(2) "-" type aluminum-pinch installation of ceiling;
(3) filling of heat insulation layer;
(4) installation and splicing of zinc-plated grooving board and glass;
(5) the integral waterproofing processing of daylighting component.
Further, the installation and splicing of zinc-plated grooving board and glass include the following steps:
(1) the slope angle support rod is fixedly arranged on the ceiling of corridor, and forms certain drainage grade;
(2) handling and installation of glass;Using the two-sided bonding die of PVC, the lower surface of glass is pasted on slope angle support rod Upper surface;
(3) inner side edge of the connecting plate is connected to the side of glass by elastic construction glue connection.
Compared with prior art, the utility model has the beneficial effects that
(1) the utility model had both met the waterproof requirement of ceiling, at the same can with natural lighting, preferably create it is comfortable Pleasant working environment, and the saving power consumption of high degree, achieve good economic benefit;
(2) the utility model is suitable for the construction of all double combined office building inside corridor ceilings;
(3) the utility model uses the livable theory of energy-saving and environment friendly, has reached comfortable natural lighting and green energy conservation Effect;The double-deck doubling tempered glass has good thermal and insulating performance while meeting natural lighting;Meanwhile finished product top Also there is canopy preferable peace to tear performance open, can have enough to meet the need utilization, greatly reduce the consumption of electric energy, environmentally protective, therefore this method Huge social benefit can be brought by promoting the use.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the cross section view of Fig. 1;
Fig. 3 is the corridor ceiling top view for being equipped with several daylighting components;
In figure, 1- channel steel, 2- bilayer doubling tempered glass, 3- collet, 4- environment-protective glass fibre cotton, 5- "-" type aluminum-pinch The zinc-plated grooving board of furred ceiling, 6-, 7- slope angle support rod.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe.Obviously, described embodiment is only a part of the embodiment of the utility model, rather than all Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Under every other embodiment obtained, fall within the protection scope of the utility model.
Embodiment 1: please referring to Fig. 1-Fig. 3, a kind of movable container office building inside corridor lighting ceiling, including several The daylighting component being installed on the ceiling of corridor, the daylighting component serve as the daylighting channel inside corridor;
The daylighting component includes glass, connecting plate and fixed frame;The fixed frame includes two channel steels 1 and two connections Bar;The parallel laying spaced apart of channel steel 1, and notch is opposite;The spacing of the channel steel 1 is greater than the width of glass;
The connecting rod is vertically connected between two channel steels 1, and the two ends of connecting rod are fixedly arranged on the middle part of notch;The slot Steel 1 and connecting rod are combined into frame-shaped structure;
The two sides of the glass are separately connected one piece of connecting plate, and the connecting plate is parallel with glass surface;Every piece of connection The outer side edges of plate are connected to the upper surface of channel steel 1, and the glass has certain drainage grade;In the connecting plate and fixation Heat insulation layer is filled in the space that frame is formed.
In order to realize connecting rod and the more firm connection of channel steel 1;It further include collet 3, the collet 3 is by cross bar and vertical bar It is combined into L-shaped structure;
Symmetrically be connected a collet 3 on the inside of the two sides of channel steel 1, and the cross bar of collet 3 is connected on the inside of 1 side of channel steel Bottom end, the vertical bar spacing of collet 3 is equal to the thickness of connecting rod.
The connecting rod is "-" type aluminum-pinch furred ceiling 5;The glass is the double-deck doubling tempered glass 2;
The connecting plate is zinc-plated grooving board 6;The inner side edge of the connecting plate is connected to glass by elastic construction glue connection Side;
It further include slope angle support rod 7 to give the effect of one support force of glass under side;The slope angle support rod 7 is fixed In on the ceiling of corridor, and the lower surface of the glass fits in the upper surface of slope angle support rod 7;The slope angle support rod 7 can be adopted It is made of light square steel.
Environment-protective glass fibre cotton 4 can be used in the heat insulation layer, with good insulation and anti-mold effect.
The construction method of the movable container office building inside corridor lighting ceiling of the utility model, including walk as follows It is rapid:
(1) container is installed in place (upper beam reserves ceiling skeleton link bolt hole) by layout drawing;Field measurement corridor Dimensional discrepancy and check;
(2) it is produced by size daylighting component:
A, the handling installation of channel steel 1;B, "-" type aluminum-pinch furred ceiling 5 is installed;C, the filling of heat insulation layer;
D, zinc-plated grooving board 6 (when being connected processing, is completely filled out elastic construction coupler, is avoided with the installation of glass and splicing The problems such as cracking leak of joining place);E, the integral waterproofing processing of daylighting component;
(3) handling of daylighting component and installation;
(4) joining place leakproof water process;It drenches with rain inspection and repairing;
(5) it clears up and checks and accepts;
Wherein, the installation and splicing of zinc-plated grooving board and glass, includes the following steps:
(1) ceiling unit skeleton is carried out that slope is looked for handle using square steel tube, it is ensured that glass can form single slope after being installed Drainage effect looks for the slope gradient by 1% control;
(2) handling and installation of glass;Using the two-sided bonding die of PVC, the lower surface of glass is pasted on slope angle support rod 7 Upper surface;
(3) inner side edge of the connecting plate is connected to the side of glass by elastic construction glue connection.
Further, it is also possible to using the elastic joint strip tight bond slope angle support rod 7 and glass of other forms.
Wherein, when container (upper beam reserves ceiling skeleton link bolt hole) customized is installed by layout drawing, need to meet following Condition: (1) packaging box foundation carries out structure and looks for slope, controls the uniformity of the whole gradient, avoids the gradient for influencing roof drainage; (2) container hanging connection line style is straight, linking is close reliable;(3) using hinged U-shaped fastener connection between container and container Knot;(4) each container top mark height control is smooth;(5) piece is close using the filling of cone rubber item between container and container It is real;(5) ceiling skeleton is connected by screw bolts with container framework beam, and convenient disassembly, stress is reliable and stable, repeats turnover benefit With.
After the completion of container hanging, technical staff's in-site measurement corridor dimensional discrepancy and check determine corridor ceiling ruler Very little and aperture size, position mainly include the following contents:
(1) with measuring device instrument check corridor dead size, setting aperture at ceiling support frame, tolerance and The method of inspection see the table below:
Points for attention:
1. each stitching portion of daylighting component is both needed to carry out water-proofing treatment, using elastic construction glue to piece, zinc-plated indent Plate 6 and container top surface contact gap carry out full packing envelope;Structure glue, which is completely filled out, uniformly just can ensure that waterproof effect, and carry out glue Before tying water-proofing treatment, gluing position glass should be protected using U.S. line paper, it is ensured that cementing lines are beautiful;
2. ceiling completion whole face needs after splicing, experience is drenched with rain or water pouring test examines waterproof effect, it is ensured that ne-leakage;
3. carrying out beautification to each boundary of daylighting component receives side processing;
4. carrying out safety education and training to all operating personnels, it is ensured that each worker is to live risk factor, material In the minds of being clear, key points for operation are clearly known, and in operating process supervision inspection and guide;
5. operation process, proper use of protection tool, such as mask, gloves, prevent the infringement of material clast;
6. glass on-site hoisting installation exercise, lifting will be fixed using reliable suspender, and stacking will carry out overturn-preventing danger and arrange It applies, stacking number is no more than 2 layers, never concentrates and is deposited in container roofing;
7. face side operation, it is necessary to wear safety belt and the warning tape that properly protects etc..
As described above, although the utility model has been indicated and described referring to specific preferred embodiment, it must not It is construed to the limitation to the utility model itself.In the spirit and scope for not departing from the utility model that appended claims define Under the premise of, it can various changes can be made in the form and details to it.

Claims (6)

1. a kind of movable container office building inside corridor lighting ceiling, it is characterised in that: be installed on corridor top including several Daylighting component on canopy, the daylighting component serve as the daylighting channel inside corridor;
The daylighting component includes glass, connecting plate and fixed frame;The fixed frame includes two channel steels (1) and several connections Bar;Channel steel (1) the parallel laying spaced apart, and notch is opposite;The connecting rod is vertically connected at two channel steels (1) Between, and the two ends of connecting rod are fixedly arranged on the middle part of notch;
The two sides of the glass are separately connected one piece of connecting plate, and the connecting plate is parallel with glass surface;Every piece of connecting plate Outer side edges are connected to the upper surface of channel steel (1), and the glass has certain drainage grade;In the connecting plate and fixed frame Heat insulation layer is filled in the space of formation.
2. movable container office building inside corridor lighting ceiling according to claim 1, it is characterised in that: further include Collet (3), the collet (3) are combined into L-shaped structure by cross bar and vertical bar;
Symmetrically be connected a collet (3) on the inside of the two sides of channel steel (1), and the cross bar of collet (3) is connected to channel steel (1) side The bottom end of inside, the vertical bar spacing of collet (3) are equal to the thickness of connecting rod.
3. movable container office building inside corridor lighting ceiling according to claim 2, it is characterised in that: the company Extension bar is "-" type aluminum-pinch furred ceiling (5).
4. movable container office building inside corridor lighting ceiling according to claim 3, it is characterised in that: the company Fishplate bar is zinc-plated grooving board (6);The inner side edge of the connecting plate is connected to the side of glass by elastic construction glue connection.
5. movable container office building inside corridor lighting ceiling according to claim 4, it is characterised in that: the glass Glass is the double-deck doubling tempered glass (2).
6. movable container office building inside corridor lighting ceiling according to claim 5, it is characterised in that: further include Slope angle support rod (7);The slope angle support rod (7) is fixedly arranged on the ceiling of corridor, and the lower surface of the glass fits in slope angle The upper surface of support rod (7).
CN201821312443.4U 2018-08-15 2018-08-15 A kind of movable container office building inside corridor lighting ceiling Expired - Fee Related CN209163175U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821312443.4U CN209163175U (en) 2018-08-15 2018-08-15 A kind of movable container office building inside corridor lighting ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821312443.4U CN209163175U (en) 2018-08-15 2018-08-15 A kind of movable container office building inside corridor lighting ceiling

Publications (1)

Publication Number Publication Date
CN209163175U true CN209163175U (en) 2019-07-26

Family

ID=67329739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821312443.4U Expired - Fee Related CN209163175U (en) 2018-08-15 2018-08-15 A kind of movable container office building inside corridor lighting ceiling

Country Status (1)

Country Link
CN (1) CN209163175U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025031A (en) * 2018-08-15 2018-12-18 中建八局第三建设有限公司 A kind of movable container office building inside corridor lighting ceiling and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025031A (en) * 2018-08-15 2018-12-18 中建八局第三建设有限公司 A kind of movable container office building inside corridor lighting ceiling and its construction method
CN109025031B (en) * 2018-08-15 2024-01-19 中建八局第三建设有限公司 Movable container office building corridor lighting ceiling and construction method thereof

Similar Documents

Publication Publication Date Title
CN202073197U (en) Composite board and assembly thereof, template, concrete slab and mould section bar comprising same
CN106065661A (en) Large span unsettled steel corridor construction engineering method
CN102477778A (en) Prefabricated heat-retaining composite plate and assembly, prefabricating method and mould profile thereof as well as template and concrete slab comprising composite plate
CN105275089B (en) A kind of complete prefabricated cold formed steel house modular unit and assembly connection method
CN206971542U (en) A kind of assembled wallboard with switch enclosure and penetration pipe
CN209163175U (en) A kind of movable container office building inside corridor lighting ceiling
CN107165307A (en) Light steel integrated assembled type wall
CN208472936U (en) A kind of packing box-type room
CN206607736U (en) A kind of house construction engineering construction ceiling structure
CN106013453B (en) Long-span Cantilever transfinites structure construction engineering method
CN206888321U (en) A kind of lightgage steel joist Thistle board furred ceiling
CN109025031A (en) A kind of movable container office building inside corridor lighting ceiling and its construction method
CN203867088U (en) Seamless connection fixing device for large-area laminboard color steel tile roof
CN209174272U (en) A kind of marble slabs gluing assembly line
CN203846672U (en) PVC (polyvinyl chloride) hollow partition board
CN207110024U (en) A kind of building energy conservation can cultivate green plant balcony
CN203821757U (en) Wall-mounted plate
CN207348290U (en) Double-deck plaster tablet suspended ceiling
CN206428875U (en) A kind of steel house ridge structure
CN210164125U (en) Unit type paper gypsum board ceiling
CN208830777U (en) Energy saving photovoltaic glass sunlight house
CN208251537U (en) A kind of movable composition formula decorative wall panels for indoor design
CN208152458U (en) A kind of concave-convex moulding clay plate curtain wall system with water proof thermal insulation function
CN206368464U (en) Beveled glass curtain wall corner device and beveled glass curtain wall system
CN206873752U (en) A kind of novel architecture energy-saving light-weight wallboard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190726

CF01 Termination of patent right due to non-payment of annual fee