CN209160731U - Completely quickly accumulate carrier chain device - Google Patents

Completely quickly accumulate carrier chain device Download PDF

Info

Publication number
CN209160731U
CN209160731U CN201822059254.7U CN201822059254U CN209160731U CN 209160731 U CN209160731 U CN 209160731U CN 201822059254 U CN201822059254 U CN 201822059254U CN 209160731 U CN209160731 U CN 209160731U
Authority
CN
China
Prior art keywords
pair
rail
load bearing
bearing beam
traction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822059254.7U
Other languages
Chinese (zh)
Inventor
丁海峰
陈志敏
丁庆军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou Olster Machinery Co Ltd
Original Assignee
Yangzhou Olster Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou Olster Machinery Co Ltd filed Critical Yangzhou Olster Machinery Co Ltd
Priority to CN201822059254.7U priority Critical patent/CN209160731U/en
Application granted granted Critical
Publication of CN209160731U publication Critical patent/CN209160731U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Chain Conveyers (AREA)

Abstract

Completely quickly accumulate carrier chain device.It is related to coating system of processing, more particularly to completely quickly accumulates carrier chain device.It is simple to provide a kind of structure, runs smoothly, all fronts for improving working efficiency quickly accumulate carrier chain device.Including by including the connected traction rail of frame and bearing rail, the traction rail is located at the top of bearing rail, and traction chain is equipped in the traction rail, and the traction chain is used to drive transport establishment, and the transport establishment is slidably connected in bearing rail;The preceding load bearing beam is arranged in parallel with rear load bearing beam and connects main load bearing beam by pin shaft, and the main load bearing beam connects workpiece by tooling.The utility model facilitates processing, high degree of automation.

Description

Completely quickly accumulate carrier chain device
Technical field
The utility model relates to coating systems of processing, more particularly to completely quickly accumulate carrier chain device.
Background technique
Coating is an important link in modern product manufacture, and antirust, anticorrosive coating quality are that product is comprehensive One of importance of quality.Coating is a system engineering, it includes processing before coating to coated article surface, coating process With dry three basic working procedures and the reasonable coat system of design, suitable coating is selected, determines good operating environment item Part carries out the important links such as quality, process management and Technological Economy.
Since coating is related to multiple processes, usually directly conveyed by trolley;However, trolley is in transit, stablize Property is poor, reduces coating reliability.
Utility model content
The utility model is run smoothly, improves all fronts of working efficiency in view of the above problems, to provide a kind of structure simple Quickly accumulate carrier chain device.
The technical solution of the utility model is: including by including the connected traction rail of frame and bearing rail, the traction rail position In the top of bearing rail, traction chain is equipped in the traction rail, the traction chain is for driving transport establishment, the transport Mechanism slips are connected in bearing rail;
The traction rail includes a pair of symmetrically arranged a few font rails, and the oral area of a pair of a few font rails is oppositely arranged;
The traction chain includes spaced horizontal Slide Group and vertical sliding motion group, and the horizontal Slide Group includes one To transverse slat disposed in parallel, a pair of of transverse slat is connected by a pair of parallel connecting rod one, and the connecting rod one is located at the both ends of transverse slat, institute The both ends for stating connecting rod one stretch out a pair of of transverse slat respectively and are equipped with pulley one;
The vertical sliding motion group includes a pair of riser disposed in parallel, and a pair of of riser is connected by a pair of parallel connecting rod two It connects, the connecting rod two is located at the both ends of riser, and the both ends of the connecting rod two stretch out a pair of of riser respectively and are equipped with pulley two;
The central axis of the pulley one is connected in the center line of pulley two, adjacent connecting rod one with connecting rod two;
A pair of of pulley two is located at the oral area of a pair of a few font rails, and a pair of of pulley one is located at the two of a few font rail oral areas End;
The bearing rail includes a pair of symmetrically arranged c-type rail, and the C-shaped mouth of a pair of of c-type rail is oppositely arranged.
The transport establishment includes preceding transport group, rear transport group and main load bearing beam, and the preceding transport group is including small before a pair Vehicle and preceding load bearing beam, it is a pair of before trolley be slidably connected in bearing rail, it is a pair of before trolley by the preceding load bearing beam of pin shaft connection,
Transport group includes trolley and rear load bearing beam after a pair after described, and trolley is slidably connected in bearing rail after a pair, and one Load bearing beam after being connected to rear trolley by pin shaft,
The preceding load bearing beam is arranged in parallel with rear load bearing beam and connects main load bearing beam by pin shaft, and the main load bearing beam is logical Cross tooling connection workpiece.
The riser of any vertical sliding motion group is equipped with positioning plate, before the positioning plate is connected on trolley.
The tooling includes crossbeam, and the top side detachable of the crossbeam is equipped with a pair of symmetrically arranged L shape support, bottom is set There is a pair of of lifting rope, a pair of of support is connected on main load bearing beam, and a pair of of lifting rope is for connecting workpiece.
The utility model includes that traction rail and bearing rail by the two combinative movement facilitate drive workpiece;Wherein, it is leading Traction chain is set in approach rail, transport establishment is driven by traction chain, transport establishment is slidably connected in bearing rail;
Traction rail includes symmetrically arranged a few font rails, and traction chain includes spaced horizontal Slide Group and vertically slides Dynamic group, wherein adjacent connecting rod one is connected with connecting rod two, realizes that horizontal Slide Group is connected with vertical sliding motion group;It is sliding by level Pulley one in dynamic group is located at the both ends of a few font rail oral areas, and the pulley two in vertical sliding motion group is located at the oral area of a few font rails, Realize that traction chain is reliably slidably connected in traction rail, reliable in action.
Traction chain can be run at high speed, and saved the time transported between station, improved productivity, while also subtracting significantly Lack suspender quantity, reduces cost.
The utility model facilitates processing, high degree of automation.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model,
Fig. 2 is the right view of Fig. 1,
Fig. 3 is the attachment structure schematic diagram of traction rail and bearing rail,
Fig. 4 is the structural schematic diagram of traction chain,
Fig. 5 is the structural schematic diagram of traction chain and traction rail;
11 be traction rail in figure, and 110 be a few font rails, and 12 be bearing rail, and 120 be c-type rail,
2 be to include frame
3 be tooling,
31 be crossbeam, and 32 be support, and 33 be lifting rope,
4 be workpiece,
5 be traction chain,
51 be horizontal Slide Group, and 511 be transverse slat, and 512 be connecting rod one, and 513 be pulley one,
52 be vertical sliding motion group, and 521 be riser, and 522 be connecting rod two, and 523 be pulley two,
53 be positioning plate,
6 be transport establishment,
61 be preceding transport group, and 611 be preceding trolley, and 612 be preceding load bearing beam,
62 be after transport group, 621 be rear trolley, and 622 be rear load bearing beam,
63 be main load bearing beam.
Specific embodiment
The utility model is as shown in Figs. 1-5, including by including the connected traction rail 11 of frame 2 and bearing rail 12, the traction Rail is located at the top of bearing rail, traction chain 5 is equipped in the traction rail, the traction chain is for driving transport establishment 6, institute Transport establishment is stated to be slidably connected in bearing rail;
The traction rail includes a pair of symmetrically arranged a few font rails 110, and the oral area of a pair of a few font rails is oppositely arranged;
The traction chain 5 includes spaced horizontal Slide Group 51 and vertical sliding motion group 52, the horizontal Slide Group Including a pair of transverse slat 511 disposed in parallel, a pair of of transverse slat is connected by a pair of parallel connecting rod 1, and the connecting rod one is located at The both ends of transverse slat, the both ends of the connecting rod one stretch out a pair of of transverse slat respectively and are equipped with pulley 1;
The vertical sliding motion group includes a pair of riser 521 disposed in parallel, and a pair of of riser passes through a pair of parallel connecting rod two 522 connections, the connecting rod two are located at the both ends of riser, and the both ends of the connecting rod two stretch out a pair of of riser respectively and are equipped with pulley 2 523;
The central axis of the pulley one is connected in the center line of pulley two, adjacent connecting rod one with connecting rod two;
A pair of of pulley 2 523 is located at the oral area of a pair of a few font rails, and a pair of of pulley 1 is located at a few font rail oral areas Both ends;
The bearing rail includes a pair of symmetrically arranged c-type rail 120, and the C-shaped mouth of a pair of of c-type rail is oppositely arranged.
The utility model includes that traction rail and bearing rail by the two combinative movement facilitate drive workpiece;Wherein, it is leading Traction chain is set in approach rail, transport establishment is driven by traction chain, transport establishment is slidably connected in bearing rail;
Traction rail includes symmetrically arranged a few font rails, and traction chain includes spaced horizontal Slide Group and vertically slides Dynamic group, wherein adjacent connecting rod one is connected with connecting rod two, realizes that horizontal Slide Group is connected with vertical sliding motion group;It is sliding by level Pulley one in dynamic group is located at the both ends of a few font rail oral areas, and the pulley two in vertical sliding motion group is located at the oral area of a few font rails, Realize that traction chain is reliably slidably connected in traction rail, reliable in action.
Traction chain can be run at high speed, and saved the time transported between station, improved productivity, while also subtracting significantly Lack suspender quantity, reduces cost.
The utility model facilitates processing, high degree of automation.
The transport establishment includes preceding transport group 61, rear transport group 62 and main load bearing beam, and the 63 preceding transport groups include one To preceding trolley 611 and preceding load bearing beam 612, trolley is slidably connected in bearing rail before a pair, and trolley passes through pin shaft and connects before a pair Preceding load bearing beam,
Transport group 62 includes trolley 621 and rear load bearing beam 622 after a pair after described, and trolley is slidably connected at carrying after a pair On rail, load bearing beam after trolley is connected by pin shaft after a pair,
The preceding load bearing beam is arranged in parallel with rear load bearing beam and connects main load bearing beam 63, the main load bearing beam by pin shaft Workpiece is connected by tooling 3.
Transport establishment includes preceding transport group, rear transport group and main load bearing beam, preceding load bearing beam and rear transport in preceding transport group Rear load bearing beam in group connects main load bearing beam jointly, improves the reliability of lifting.Main load bearing beam connects workpiece, side by tooling again Just it connects.
The riser of any vertical sliding motion group is equipped with positioning plate 53, before the positioning plate is connected on trolley.
Trolley facilitates operation so that transport establishment be driven to act before being connected by positioning plate.
The tooling includes crossbeam 31, and the top side detachable of the crossbeam is equipped with a pair of symmetrically arranged L shape support 32, bottom Portion is equipped with a pair of of lifting rope 33, and a pair of of support is connected on main load bearing beam, and a pair of of lifting rope is for connecting workpiece.
By the way that a pair of of support to be connected to the both ends of main load bearing beam, then it is bolted on crossbeam;Pass through a pair again Lifting rope connects workpiece, convenient to work piece hoisting.

Claims (4)

1. completely quickly accumulating carrier chain device, which is characterized in that described including by including the connected traction rail of frame and bearing rail Traction rail is located at the top of bearing rail, and traction chain is equipped in the traction rail, and the traction chain is used to drive transport establishment, The transport establishment is slidably connected in bearing rail;
The traction rail includes a pair of symmetrically arranged a few font rails, and the oral area of a pair of a few font rails is oppositely arranged;
The traction chain includes spaced horizontal Slide Group and vertical sliding motion group, and the horizontal Slide Group includes a pair of flat The transverse slat of row setting, a pair of of transverse slat are connected by a pair of parallel connecting rod one, and the connecting rod one is located at the both ends of transverse slat, the company The both ends of bar one stretch out a pair of of transverse slat respectively and are equipped with pulley one;
The vertical sliding motion group includes a pair of riser disposed in parallel, and a pair of of riser is connected by a pair of parallel connecting rod two, institute The both ends that connecting rod two is located at riser are stated, the both ends of the connecting rod two stretch out a pair of of riser respectively and are equipped with pulley two;
The central axis of the pulley one is connected in the center line of pulley two, adjacent connecting rod one with connecting rod two;
A pair of of pulley two is located at the oral area of a pair of a few font rails, and a pair of of pulley one is located at the both ends of a few font rail oral areas;
The bearing rail includes a pair of symmetrically arranged c-type rail, and the C-shaped mouth of a pair of of c-type rail is oppositely arranged.
2. all fronts according to claim 1 quickly accumulate carrier chain device, which is characterized in that before the transport establishment includes Transport group, rear transport group and main load bearing beam, the preceding transport group include trolley and preceding load bearing beam before a pair, and trolley slides before a pair It is connected in bearing rail, load bearing beam before trolley is connected by pin shaft before a pair,
Transport group includes trolley and rear load bearing beam after a pair after described, and trolley is slidably connected in bearing rail after a pair, Yi Duihou Load bearing beam after trolley is connected by pin shaft,
The preceding load bearing beam is arranged in parallel with rear load bearing beam and connects main load bearing beam by pin shaft, and the main load bearing beam passes through work Load connects workpiece.
3. all fronts according to claim 2 quickly accumulate carrier chain device, which is characterized in that any vertical sliding motion group is erected Plate is equipped with positioning plate, before the positioning plate is connected on trolley.
4. all fronts according to claim 2 quickly accumulate carrier chain device, which is characterized in that the tooling includes crossbeam, The top side detachable of the crossbeam is equipped with a pair of symmetrically arranged L shape support, bottom is equipped with a pair of of lifting rope, and a pair of of support is connected to On main load bearing beam, a pair of of lifting rope is for connecting workpiece.
CN201822059254.7U 2018-12-07 2018-12-07 Completely quickly accumulate carrier chain device Active CN209160731U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822059254.7U CN209160731U (en) 2018-12-07 2018-12-07 Completely quickly accumulate carrier chain device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822059254.7U CN209160731U (en) 2018-12-07 2018-12-07 Completely quickly accumulate carrier chain device

Publications (1)

Publication Number Publication Date
CN209160731U true CN209160731U (en) 2019-07-26

Family

ID=67342814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822059254.7U Active CN209160731U (en) 2018-12-07 2018-12-07 Completely quickly accumulate carrier chain device

Country Status (1)

Country Link
CN (1) CN209160731U (en)

Similar Documents

Publication Publication Date Title
CN209160730U (en) Suspension conveying system
CN103086134A (en) Automatic double-layer conveying device on logistics transport line
CN209871633U (en) Full-automatic intelligent transfer machine
CN103449118B (en) A kind of weld car side wall line conveying mechanism
CN202296236U (en) Double-layered automatic conveying device for logistics forwarding lines
CN106429432A (en) Feeding machine and method of wood board
CN206046867U (en) A kind of solar energy frame automatization processing line
CN205906608U (en) Automatic transporting structure of multipurpose
CN107010405B (en) Product grabbing structure
CN101633439A (en) Three-rail heavy accumulation type conveying equipment
CN209160731U (en) Completely quickly accumulate carrier chain device
CN109436709A (en) A kind of all fronts quickly accumulate carrier chain device
CN207524549U (en) A kind of import switching chain bed
CN208544840U (en) A kind of door of elevator production line feeding and conveying device
CN203064650U (en) Multi-position transport system
CN103287790B (en) Wide type chain rotation device
CN207276747U (en) A kind of minus plate transport carriage
CN201670639U (en) Full-automatic reciprocating type vertical conveyor
CN109625813A (en) A kind of suspension conveying system
CN107826653A (en) Flexible conveying device for corner conveying
CN207844230U (en) Flexible conveying device for corner conveying
CN208790989U (en) Narrow line elevator cars component
CN204250798U (en) The automatic metalworking travel line of cage guide step wise
CN209567698U (en) A kind of carriage and the Cargo Lift with the carriage
CN105293016A (en) Formed coke blank arrangement and arraying device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant