CN209145293U - A kind of construction concrete casting device - Google Patents
A kind of construction concrete casting device Download PDFInfo
- Publication number
- CN209145293U CN209145293U CN201821802366.0U CN201821802366U CN209145293U CN 209145293 U CN209145293 U CN 209145293U CN 201821802366 U CN201821802366 U CN 201821802366U CN 209145293 U CN209145293 U CN 209145293U
- Authority
- CN
- China
- Prior art keywords
- mounting rack
- pipe
- bottom end
- concrete casting
- casting device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a kind of construction concrete casting devices, including the first mounting rack and the second mounting rack, the bottom end of first mounting rack is equipped with and pours pipe, the side for pouring pipe is equipped with conveying pipeline, the top of the conveying pipeline is equipped with feed pipe, the inside for pouring pipe, conveying pipeline and feed pipe is connected to setting, and the bottom end of second mounting rack is equipped with motor.This construction concrete casting device, by the way that the pipeline and feed pipe of conveying are attached, then again motor is worked, so that concrete can pour operation from pouring pipe and falling, while is controlled by the work to electric telescopic rod, to which the height of vibrating head be adjusted, operation of vibrating can be effectively carried out in concreting process, without repeatedly pour, ensure that the effect poured, the efficiency of work is improved, convenient for the use of people.
Description
Technical field
The utility model relates to pour engineering device technique field, specially a kind of construction concrete casting device.
Background technique
Concrete is configured according to a certain percentage by cementitious material, water and coarse aggregate, fine aggregate, by uniform mix,
It pours, vibration compacting, and the artificial stone material made of maintenance hardening under the conditions of certain temperature and appropriateness, concreting are
Refer to by concreting enter mould until plasticizing process need first to pour at present when construction site pours concrete,
Then it reuses vibrating head to vibrate, also to pour after the completion of vibrating and vibrate again again, thus be worked repeatedly, the speed poured
Degree is slower, to influence the efficiency of work.
Utility model content
The technical problems to be solved in the utility model is to overcome existing defect, provides a kind of construction and is poured with concrete
Device is built, concrete vibrating can be carried out while pouring, operation is poured without carrying out again, accelerates and pour
Speed, improve the efficiency of work, can effectively solve the problems in background technique.
To achieve the above object, the utility model provides the following technical solutions: a kind of construction is filled with concreting
It sets, including the first mounting rack and the second mounting rack, the bottom end of first mounting rack, which is equipped with, pours pipe, the side for pouring pipe
Equipped with conveying pipeline, the top of the conveying pipeline is equipped with feed pipe, and the inside for pouring pipe, conveying pipeline and feed pipe, which is connected to, to be set
It sets, the bottom end of second mounting rack is equipped with motor, and the output shaft of the motor runs through and extends to inside and the company of conveying pipeline
It is connected to carriage, the top of first mounting rack is equipped with mounting plate, the bottom end of the mounting plate at the corresponding position for pouring pipe
It is connect by electric telescopic rod with the surface of the first mounting rack, the bottom end of the mounting plate is connected at the corresponding position for pouring pipe
Vibrating head, the surface of first mounting rack are equipped with control switch group, and the output end electrical connection electricity of the control switch group is mechanical, electrical
The input terminal of dynamic telescopic rod and vibrating head.
As a kind of optimal technical scheme of the utility model, the two sides of first mounting rack are connected by bearing block
It is connected to idler wheel, the corresponding first mounting rack structure on two sides setting in the two sides of second mounting rack.
As a kind of optimal technical scheme of the utility model, the bottom end of the mounting plate is equipped with terminal pad, the connection
The bottom end of disk is equipped with screw rod, and the top of the vibrating head, which corresponds to, is equipped with through-hole at the position of screw rod, screw rod runs through and extends to vibration
Below the top of dynamic stick and it is connected with nut.
As a kind of optimal technical scheme of the utility model, the top of the feed pipe is equipped with ring flange, the flange
Disk is equipped with fixation hole, is rotatably connected to fixed column in the fixation hole.
As a kind of optimal technical scheme of the utility model, second mounting rack is equipped with connecting hole, the connection
Connecting column is rotatably connected in hole.
Compared with prior art, the utility model has the beneficial effects that this construction concrete casting device, passes through
The pipeline and feed pipe of conveying are attached, then again motor is worked, so that concrete can be fallen from pipe is poured
Under carry out pouring operation, while being controlled, the height of vibrating head adjusted, energy by the work to electric telescopic rod
It is enough that operation of continuously vibrating effectively is carried out in casting process, ensure that the effect poured, without repeatedly pour, improve
The efficiency of work, convenient for the use of people.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model section structural schematic diagram.
In figure: 1 first mounting rack, 2 second mounting racks, 3 pour pipe, 4 conveying pipelines, 5 feed pipes, 6 motors, 7 carriages, 8
Electric telescopic rod, 9 mounting plates, 10 vibrating heads, 11 control switch groups, 12 idler wheels, 13 terminal pads, 14 screw rods, 15 nuts, 16 flanges
Disk, 17 fixation holes, 18 fixed columns, 19 connecting holes, 20 connecting columns.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model provides a kind of technical solution referring to FIG. 1-2: a kind of construction concrete casting device,
Including the first mounting rack 1 and the second mounting rack 2, the bottom end of the first mounting rack 1, which is equipped with, pours pipe 3, pours the side of pipe 3 equipped with defeated
Expects pipe 4, the top of conveying pipeline 4 are equipped with feed pipe 5, and the top of feed pipe 5 is equipped with ring flange 16, and ring flange 16 is equipped with fixation hole
17, fixed column 18 is rotatably connected in fixation hole 17, convenient for the conveyance conduit of feed pipe 5 and the external world is attached, pours pipe
3, conveying pipeline 4 is connected to setting with the inside of feed pipe 5, and the bottom end of the second mounting rack 2 is equipped with motor 6, and the output shaft of motor 6 passes through
It wears and extends to the inside of conveying pipeline 4 and be connected with carriage 7, the top of the first mounting rack 1 is set at the corresponding position for pouring pipe 3
There is mounting plate 9, the bottom end of mounting plate 9 is connect by electric telescopic rod 8 with the surface of the first mounting rack 1, the bottom end pair of mounting plate 9
It should pour and be connected with vibrating head 10 at the position of pipe 3, the bottom end of mounting plate 9 is equipped with terminal pad 13, and the bottom end of terminal pad 13 is equipped with
Screw rod 14, the top of vibrating head 10, which corresponds to, is equipped with through-hole at the position of screw rod 14, screw rod 14 runs through and extends to vibrating head 10
Below top and it is connected with nut 15, is selected convenient for user according to specification of the depth poured to vibrating head 10, thus
It is convenient for operation of vibrating, the two sides of the first mounting rack 1 are that idler wheel 12 is connected with by bearing block, the two of the second mounting rack 2
Corresponding first mounting rack, the 1 structure on two sides setting in side, convenient for being moved to whole, consequently facilitating user carries out pouring operation,
Second mounting rack 2 is equipped with connecting hole 19, is rotatably connected to connecting column 20 in connecting hole 19, convenient for drawing whole with other
Device is attached, consequently facilitating user moves to whole, the surface of the first mounting rack 1 is equipped with control switch group 11,
The input terminal of the output end electrical connection motor 6 of control switch group 11, electric telescopic rod 8 and vibrating head 10, in control switch group 11
It is corresponded with motor 6, electric telescopic rod 8 and vibrating head 10 and is equipped with regulation button, control switch group 11 controls motor 6, electronic
Telescopic rod 8 and the work of vibrating head 10 are all made of method commonly used in the prior art.
When in use: being attached by 20 pulling equipment of connecting column and the second mounting rack 2, then pass through 16, ring flange
Extraneous delivery pipe is attached with feed pipe 5, is moved integrally by traction device at corresponding position, is then made motor
6 work, enable concrete to fall from pouring in pipe 3, then control by the work to electric telescopic rod 8, thus make
It obtains vibrating head 10 to be able to enter in the concrete after pouring, then makes vibrating head 10 work again, to carry out operation of vibrating.
The utility model is controlled by the work to motor 6, thus, it is possible to convey to concrete, is easy to use
Person carries out pouring operation.Simultaneously when being poured, controlled by the work to vibrating head 10, thus, it is possible to vibrate
Operation carries out simultaneously so that pouring and vibrating, and the later period is not necessarily to manually carry out operation of vibrating again, improves the efficiency of work,
Reduce the labor intensity of worker.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of construction concrete casting device, including the first mounting rack (1) and the second mounting rack (2), feature exists
In: the bottom end of first mounting rack (1) is equipped with and pours pipe (3), and the side for pouring pipe (3) is equipped with conveying pipeline (4), described
The top of conveying pipeline (4) be equipped with feed pipe (5), it is described pour pipe (3), conveying pipeline (4) is connected to the inside of feed pipe (5) and sets
It sets, the bottom end of second mounting rack (2) is equipped with motor (6), and the output shaft of the motor (6) runs through and extends to conveying pipeline
(4) inside is simultaneously connected with carriage (7), and the top of first mounting rack (1) is equipped with peace at the corresponding position for pouring pipe (3)
The bottom end of loading board (9), the mounting plate (9) is connect by electric telescopic rod (8) with the surface of the first mounting rack (1), the peace
The bottom end of loading board (9) is connected with vibrating head (10) at the corresponding position for pouring pipe (3), and the surface of first mounting rack (1) is set
Have control switch group (11), output end electrical connection motor (6), electric telescopic rod (8) and the vibration of the control switch group (11)
The input terminal of stick (10).
2. a kind of construction concrete casting device according to claim 1, it is characterised in that: first installation
The two sides of frame (1) are to be connected with by bearing block idler wheel (12), corresponding first mounting rack in the two sides of second mounting rack (2)
(1) structure on two sides is arranged.
3. a kind of construction concrete casting device according to claim 1, it is characterised in that: the mounting plate
(9) bottom end is equipped with terminal pad (13), and the bottom end of the terminal pad (13) is equipped with screw rod (14), the top of the vibrating head (10)
Through-hole is equipped at the position of corresponding screw rod (14), screw rod (14) runs through and extends to below the top of vibrating head (10) and be connected with
Nut (15).
4. a kind of construction concrete casting device according to claim 1, it is characterised in that: the feed pipe
(5) top is equipped with ring flange (16), and the ring flange (16) is equipped with fixation hole (17), and rotation connects in the fixation hole (17)
It is connected to fixed column (18).
5. a kind of construction concrete casting device according to claim 1, it is characterised in that: second installation
Frame (2) is equipped with connecting hole (19), is rotatably connected to connecting column (20) in the connecting hole (19).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821802366.0U CN209145293U (en) | 2018-11-02 | 2018-11-02 | A kind of construction concrete casting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821802366.0U CN209145293U (en) | 2018-11-02 | 2018-11-02 | A kind of construction concrete casting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209145293U true CN209145293U (en) | 2019-07-23 |
Family
ID=67272252
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821802366.0U Active CN209145293U (en) | 2018-11-02 | 2018-11-02 | A kind of construction concrete casting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209145293U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113106855A (en) * | 2021-04-20 | 2021-07-13 | 樊涛 | Bridge support building and pouring forming equipment and method |
CN118128304A (en) * | 2024-05-08 | 2024-06-04 | 星原建设集团有限公司 | Feeding device for assembled concrete building construction |
-
2018
- 2018-11-02 CN CN201821802366.0U patent/CN209145293U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113106855A (en) * | 2021-04-20 | 2021-07-13 | 樊涛 | Bridge support building and pouring forming equipment and method |
CN113106855B (en) * | 2021-04-20 | 2022-12-30 | 唐山市华运铁路交通器材有限公司 | Bridge support building and pouring forming equipment and method |
CN118128304A (en) * | 2024-05-08 | 2024-06-04 | 星原建设集团有限公司 | Feeding device for assembled concrete building construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209145293U (en) | A kind of construction concrete casting device | |
CN211037850U (en) | Concrete pouring equipment for building | |
CN101992500B (en) | Concrete pipe platform vibration moulding process and device thereof | |
CN110744702B (en) | Multifunctional pouring equipment and application method thereof | |
CN105863266B (en) | Building template surface removal of impurities purging system | |
CN204844405U (en) | Fixed mould platform is used in synchronous vibration device and production of PC component | |
CN207700642U (en) | A kind of even husky equipment before construction floor tile | |
CN112976229A (en) | Prefab processingequipment for building engineering | |
CN211415673U (en) | Multifunctional pouring equipment | |
CN104002374A (en) | Plaster concrete building block forming machine | |
CN208645648U (en) | A kind of precast concrete filling production lines | |
CN208105089U (en) | A kind of culvert building wall device | |
CN105921267A (en) | Iron removing device | |
CN206186075U (en) | Prefab production line | |
CN202744907U (en) | Concrete leveling, paste lifting and elevation control integrated device for bed plates | |
CN105171896B (en) | A kind of cement cable quadrant flow line production device | |
CN204769117U (en) | Deironing device of building rubbish | |
CN108385550A (en) | A kind of culvert building wall device | |
CN220954684U (en) | Concrete construction pouring equipment | |
CN113478611B (en) | Building prefabricated plate manufacturing equipment | |
CN105965681A (en) | Vertical pouring and fast homogenizing device and method for pipe cores of PCCPs | |
CN105107622A (en) | Iron removing device | |
CN201841583U (en) | High-frequency vibrator | |
CN105569070B (en) | The method for pouring large-size concrete beam column | |
CN215094567U (en) | Feed divider of cement concrete prefabricated component processing usefulness |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |