CN209144853U - A kind of structure of pile foundation of bridge pier - Google Patents

A kind of structure of pile foundation of bridge pier Download PDF

Info

Publication number
CN209144853U
CN209144853U CN201821305147.1U CN201821305147U CN209144853U CN 209144853 U CN209144853 U CN 209144853U CN 201821305147 U CN201821305147 U CN 201821305147U CN 209144853 U CN209144853 U CN 209144853U
Authority
CN
China
Prior art keywords
duct
prefabricated
tubular pile
periphery
prefabricated tubular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821305147.1U
Other languages
Chinese (zh)
Inventor
林上顺
李军
秦志清
刘秋江
汤宇
张洁丰
查雄栋
林长庚
彭胤涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian University of Technology
Original Assignee
Fujian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian University of Technology filed Critical Fujian University of Technology
Priority to CN201821305147.1U priority Critical patent/CN209144853U/en
Application granted granted Critical
Publication of CN209144853U publication Critical patent/CN209144853U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to technical field of bridge construction, and in particular to a kind of structure of pile foundation of bridge pier, including prefabricated cushion cap and prefabricated tubular pile;The prefabricated cushion cap is set to the top of the prefabricated tubular pile;Central duct and periphery duct are offered on the prefabricated cushion cap, the periphery duct is arranged around the central duct;Spacer bar is provided in the periphery duct.The utility model has the beneficial effects that: passing through the setting of positioning fixed steel bars and fixing steel plate, prefabricated cushion cap and prefabricated tubular pile can be attached by mechanical structure during the installation process, facilitate fixation, save the time of construction, while increasing the safety in work progress;Spacer bar is capable of providing preferable horizontal plane shear behavior simultaneously, increases the relative stability between pile foundation of bridge pier and prefabricated cushion cap, avoids the two that opposite sliding occurs;The setting of fixed steel bars can effectively reinforce the connection between prefabricated tubular pile and cast-in-place plain concrete.

Description

A kind of structure of pile foundation of bridge pier
Technical field
The utility model relates to technical field of bridge construction, and in particular to a kind of structure of pile foundation of bridge pier.
Background technique
The method that highway in China bridge pile foundation, cushion cap mostly use greatly cast-in-site at present is constructed, this construction method Period is long, and construction efficiency is low, and work progress is affected to surrounding resident life.
Utility model content
In order to overcome the defects of the prior art described above, the technical problem to be solved by the utility model is to provide one kind to mention The structure of the pile foundation of bridge pier of high construction efficiency.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model are as follows:
A kind of structure of pile foundation of bridge pier, including prefabricated cushion cap and prefabricated tubular pile;The prefabricated cushion cap is set to described prefabricated The top of tubular pole;
Central duct and periphery duct are offered on the prefabricated cushion cap, the periphery duct is set around the central duct It sets, the central duct and the periphery duct are set to the top of the prefabricated tubular pile pipeline, the central duct and described It is parallel to each other between the axis in periphery duct;
It is provided with fixing steel plate at the upper opening in the periphery duct, reinforced hole, institute are provided on the fixing steel plate Reinforced hole is stated to be set to above the duct in the periphery duct;Spacer bar, the positioning steel are provided in the periphery duct Muscle protrudes into the pipeline of the prefabricated tubular pile, and the top of the spacer bar is fixed on the fixing steel plate.
Further, grout hole is additionally provided on the fixing steel plate, the grout hole is placed in the hole in the periphery duct Above road.
Further, tubular pole lengthways main steel bar is provided in the side wall of the prefabricated tubular pile.
Further, the top of the prefabricated tubular pile is arranged with hollow weather-proof steel bushing.
Further, the prefabricated tubular pile further includes fixed steel bars, and the length of the fixed steel bars is less than the prefabricated pipe Stake radius, one end of the fixed steel bars traverse into the hollow weather-proof steel bushing and the prefabricated tubular pile, and the other end stretches out The hollow weather-proof steel bushing is simultaneously fixed by anchorage.
Further, the top of the spacer bar is provided with helicitic texture, and the spacer bar is pierced by the reinforced hole And it is fixed by nut.
Further, groove, the central duct and the periphery duct are additionally provided on the top surface of the prefabricated cushion cap It is arranged in the groove.
Further, high-performance epoxy resin mortar is filled in the periphery duct and the groove;The prefabricated tubular pile Plain concrete is filled in pipeline and central duct.
A kind of construction method of above-mentioned pile foundation of bridge pier, comprising the following steps:
Step 1: the prefabricated tubular pile is squeezed into the designated position of ground;
Step 2: the prefabricated cushion cap is placed in the designated position of the top of the prefabricated tubular pile;
Step 3: being inserted into the spacer bar in the reinforced hole of the periphery duct and pass through the nut;
Step 4: the perfusion plain concrete in the central duct is until central duct is filled;Height is poured into the duct of periphery Performance epoxy resin mortar is until the groove is filled.
Further, in the step 3, the top of the spacer bar is provided with helicitic texture, and the spacer bar is worn It the reinforced hole and is fixed out by nut.
Reinforced hole spacer bar is the utility model has the beneficial effects that: pass through spacer bar, fixed steel bars and positioning steel Prefabricated cushion cap and prefabricated tubular pile can be attached by mechanical structure during the installation process, facilitate fixation by the setting of plate, section The time of construction has been saved, while having increased the safety in work progress;Hollow weathering steel is effectively strengthened by fixed steel bars Both contacting between sleeve and prefabricated tubular pile, while the connection between prefabricated tubular pile and plain concrete is effectively strengthened, make It connects stronger.
Detailed description of the invention
Fig. 1 is a kind of positive view of the structure of pile foundation of bridge pier of specific embodiment of the present invention;
Fig. 2 is a kind of top view of the prefabricated cushion cap of the structure of pile foundation of bridge pier of specific embodiment of the present invention;
Fig. 3 is partial enlarged view at the A of specific embodiment of the present invention Fig. 1;
Fig. 4 is partial enlarged view at the B of specific embodiment of the present invention Fig. 1;
Fig. 5 is partial enlarged view at the C of specific embodiment of the present invention Fig. 2;
Label declaration:
1, prefabricated cushion cap;11, central duct;12, periphery duct;13, fixing steel plate;131, reinforced hole;132, grout hole; 14, spacer bar;15, groove;
2, prefabricated tubular pile;21, tubular pole lengthways main steel bar;22, hollow weather-proof steel bushing;23, fixed steel bars;24, anchorage;
3, plain concrete;
4, high-performance epoxy resin mortar.
Specific embodiment
For technology contents, the objects and the effects that the utility model is described in detail, below in conjunction with embodiment and match Attached drawing is closed to be explained.
The design of the utility model most critical is:, can by the setting of spacer bar, fixed steel bars and fixing steel plate Prefabricated cushion cap and prefabricated tubular pile are attached by mechanical structure during the installation process, facilitate fixation, save construction when Between, while increasing the safety in work progress;Hollow weather-proof steel bushing and prefabricated pipe are effectively strengthened by fixed steel bars Connection between stake, while the connection between prefabricated tubular pile and plain concrete is effectively strengthened, keep the connection of the two stronger.
It please refers to shown in Fig. 1-Fig. 3, a kind of structure of pile foundation of bridge pier, including prefabricated cushion cap 1 and prefabricated tubular pile 2;It is described pre- Cushion cap 1 processed is set to the top of the prefabricated tubular pile 2;
Central duct 11 and periphery duct 12 are offered on the prefabricated cushion cap 1, the periphery duct 12 is surround in described The setting of heart duct 11, the central duct 11 and the periphery duct 12 are set to the top of 2 pipeline of prefabricated tubular pile, described It is parallel to each other between central duct 11 and the axis in the periphery duct 12;
It is provided with fixing steel plate 13 at the upper opening in the periphery duct 12, is provided with reinforcing bar on the fixing steel plate 13 Hole 131, the reinforced hole 131 are set to above the duct in the periphery duct 12;Positioning is provided in the periphery duct 12 Reinforcing bar 14, the spacer bar 14 protrude into the pipeline of the prefabricated tubular pile 2, and the top of the spacer bar 14 is fixed on described On fixing steel plate 13.
Seen from the above description, a kind of beneficial effect of the structure of above-mentioned pile foundation of bridge pier is: by spacer bar 14, The setting of fixed steel bars 23 and fixing steel plate 13 can pass through mechanical structure for prefabricated cushion cap 1 and prefabricated pipe during the installation process Stake 2 is attached, and is facilitated fixation, is saved the time of construction, while increasing the safety in work progress;Pass through fixed steel Muscle 23 effectively strengthens contacting between hollow weather-proof steel bushing 22 and prefabricated tubular pile 2, at the same effectively strengthen prefabricated tubular pile 2 with Connection between plain concrete 3 keeps the connection of the two stronger.
Further, grout hole 132 is additionally provided on the fixing steel plate 13, the grout hole 132 is placed in the periphery Above the duct in duct 12.
Seen from the above description, the setting of grout hole 132 facilitates pouring into for slurry, further increases the effect of construction Rate.
Further, tubular pole lengthways main steel bar 21 is provided in the side wall of the prefabricated tubular pile 2.
Seen from the above description, by the way that tubular pole lengthways main steel bar 21 is arranged in the prefabricated tubular pile 2, prefabricated tubular pile is increased 2 structural strength, the shear resistance being especially horizontally oriented, to increase the stability of structure entirety.
Further, the top of the prefabricated tubular pile 2 is arranged with hollow weather-proof steel bushing 22.
Seen from the above description, by the setting of hollow weather-proof steel bushing 22, it can transmit, disperse load, dispersion will be pre- The impact force received when ground is squeezed into tubulation stake 2, and top when squeezing into ground of prefabricated tubular pile 2 is prevented to be destroyed.
Further, the prefabricated tubular pile 2 further includes fixed steel bars 23, and the length of the fixed steel bars 23 is less than described pre- 2 radius of tubulation stake, one end of the fixed steel bars 23 traverse into the hollow weather-proof steel bushing 22 and the prefabricated tubular pile 2, The other end stretches out the hollow weather-proof steel bushing 22 and is fixed by anchorage 24.
Seen from the above description, by the setting of fixed steel bars 23, it is capable of fixing hollow weather-proof steel bushing 22, is reinforced hollow Connection between weather-proof steel bushing 22 and prefabricated tubular pile 2, to enhance the energy of the hollow transmitting of weather-proof steel bushing 22, dispersion load Power, while the connection between prefabricated tubular pile 2 and plain concrete 3 can be enhanced after pouring into plain concrete 3.
Further, the top of the spacer bar 14 is provided with helicitic texture, and the spacer bar 14 is pierced by the steel Muscle hole 131 is simultaneously fixed by nut.
Seen from the above description, spacer bar 14 conveniently can be connected to by fixing steel plate by the setting of nut On 13, the efficiency of construction is increased.
Further, groove 15, the central duct 11 and the periphery are additionally provided on the top surface of the prefabricated cushion cap 1 Duct 12 is set in the groove 15.
Further, high-performance epoxy resin mortar 4 is filled in the periphery duct 12 and the groove 15;The prefabricated pipe Plain concrete 3 is filled in the pipeline and central duct 11 of stake 2.
Seen from the above description, the setting of groove 15 can by pour 4 center seal duct 11 of high-performance epoxy resin mortar, Periphery duct 12 and 14 top of spacer bar and fixing steel plate 13, prevent spacer bar 14 and 13 rust corrosion of fixing steel plate with And central duct 11 and 12 edge of periphery duct intake;A relatively firm closing is capable of forming by high-performance epoxy resin mortar 4 Encapsulated by structures spacer bar 14 and fixing steel plate 13, avoid the spacer bar being wrapped in epoxy resin mortar 14 and fixing steel plate 13 It touches moisture and air and is corroded;The relatively firm stabilization of the structure of plain concrete 3, and cost is relatively low, is suitable as bridge pier The packing material of pile foundation main body.
Embodiment one
A kind of structure of pile foundation of bridge pier, including prefabricated cushion cap 1 and prefabricated tubular pile 2;The prefabricated cushion cap 1 is set to described pre- The top of tubulation stake 2;Central duct 11 and periphery duct 12 are offered on the prefabricated cushion cap 1, the periphery duct 12 is surround The central duct 11 is arranged, and the central duct 11 and the periphery duct 12 are set to the upper of 2 pipeline of prefabricated tubular pile Side, is parallel to each other between the central duct 11 and the axis in the periphery duct 12;The upper opening in the periphery duct 12 Place is provided with fixing steel plate 13, and reinforced hole 131 is provided on the fixing steel plate 13, and the reinforced hole 131 is set to the week Above the duct in lateral opening road 12;Spacer bar 14 is provided in the periphery duct 12, the spacer bar 14 protrudes into described pre- In the pipeline of tubulation stake 2, the top of the spacer bar 14 is fixed on the fixing steel plate 13;On the fixing steel plate 13 also It is provided with grout hole 132, the grout hole 132 is placed in above the duct in the periphery duct 12;The side wall of the prefabricated tubular pile 2 Inside it is provided with tubular pole lengthways main steel bar 21;The top of the prefabricated tubular pile 2 is arranged with hollow weather-proof steel bushing 22;The prefabricated tubular pile 2 further include fixed steel bars 23, and the length of the fixed steel bars 23 is less than 2 radius of prefabricated tubular pile, the fixed steel bars 23 One end traverses into the hollow weather-proof steel bushing 22 and the prefabricated tubular pile 2, and the other end stretches out the hollow weather-proof steel bushing 22 and fixed by anchorage 24;The top of the spacer bar 14 is provided with helicitic texture, and the spacer bar 14 is pierced by described Reinforced hole 131 is simultaneously fixed by nut;Groove 15,11 He of central duct are additionally provided on the top surface of the prefabricated cushion cap 1 The periphery duct 12 is set in the groove 15;High-performance epoxy is filled in the periphery duct 12 and the groove 15 Mortar 4;Plain concrete 3 is filled in the pipeline and central duct 11 of the prefabricated tubular pile 2.
Embodiment two
A kind of construction method of above-mentioned pile foundation of bridge pier, comprising the following steps:
Step 1: the prefabricated tubular pile 2 is squeezed into the designated position of ground;
Step 2: the prefabricated cushion cap 1 is placed in the designated position of the top of the prefabricated tubular pile 2;
Step 3: being inserted into the spacer bar 14 in 12 reinforced hole 131 of periphery duct and pass through the nut;
Step 4: the perfusion plain concrete 3 in the central duct 11 is until central duct 11 is filled;Toward periphery duct 12 High-performance epoxy resin mortar 4 is inside poured into until the groove 15 is filled.
Further, in the step 3, the top of the spacer bar 14 is provided with helicitic texture, the spacer bar 14 are pierced by the reinforced hole 131 and are fixed by nut.
In conclusion a kind of structure of pile foundation of bridge pier provided by the utility model, by spacer bar, fixed steel bars and determines Prefabricated cushion cap and prefabricated tubular pile, can be attached by mechanical structure by the setting of position steel plate during the installation process, convenient solid It is fixed, the time of construction is saved, while increasing the safety in work progress;It is effectively strengthened by fixed steel bars hollow resistance to Contacting between steel bushing and prefabricated tubular pile is waited, while effectively strengthening the connection between prefabricated tubular pile and plain concrete, makes two The connection of person is stronger;Seen from the above description, the setting of grout hole facilitates pouring into for slurry, further increases construction Efficiency;By the way that tubular pole lengthways main steel bar is arranged in the prefabricated tubular pile, the structural strength of prefabricated tubular pile, especially water are increased Square to shear resistance, to increase the stability of structure entirety;Pass through the setting of hollow weather-proof steel bushing, Neng Gouchuan It passs, disperse load, the impact force that dispersion receives when prefabricated tubular pile is squeezed into ground prevents prefabricated tubular pile when squeezing into ground Top is destroyed;By the setting of fixed steel bars, it is capable of fixing hollow weather-proof steel bushing, reinforces hollow weather-proof steel bushing and prefabricated Connection between tubular pole to enhance the ability of hollow weather-proof steel bushing transmitting, dispersion load, while can pour into plain coagulation Enhance the connection between prefabricated tubular pile and plain concrete after soil;Conveniently spacer bar can be connected by the setting of nut It is connected on fixing steel plate, increases the efficiency of construction;The setting of groove can be by pouring high-performance epoxy resin mortar center seal Duct, periphery duct and spacer bar top and fixing steel plate, prevent spacer bar and fixing steel plate rust corrosion and in Heart duct and the water inlet of periphery porthole edge edge;A relatively firm closed encapsulated by structures is capable of forming by high-performance epoxy resin mortar Spacer bar and fixing steel plate, avoid the spacer bar being wrapped in epoxy resin mortar and fixing steel plate touch moisture and air and It is corroded;The relatively firm stabilization of the structure of plain concrete, and cost is relatively low, is suitable as the packing material of pile foundation of bridge pier main body.
The above description is only the embodiments of the present invention, and therefore it does not limit the scope of the patent of the utility model, all Equivalents made based on the specification and figures of the utility model are applied directly or indirectly in relevant technology neck Domain is also included in the patent protection scope of the utility model.

Claims (8)

1. a kind of structure of pile foundation of bridge pier, which is characterized in that including prefabricated cushion cap and prefabricated tubular pile;The prefabricated cushion cap is set to The top of the prefabricated tubular pile;
Central duct and periphery duct are offered on the prefabricated cushion cap, the periphery duct is arranged around the central duct, The central duct and the periphery duct are set to the top of the prefabricated tubular pile pipeline, the central duct and the periphery It is parallel to each other between the axis in duct;
It is provided with fixing steel plate at the upper opening in the periphery duct, reinforced hole, the steel are provided on the fixing steel plate Muscle hole is set to above the duct in the periphery duct;Spacer bar is provided in the periphery duct, the spacer bar is stretched In the pipeline for entering the prefabricated tubular pile, the top of the spacer bar is fixed on the fixing steel plate.
2. the structure of pile foundation of bridge pier according to claim 1, which is characterized in that be additionally provided with grouting on the fixing steel plate Hole, the grout hole are placed in above the duct in the periphery duct.
3. the structure of pile foundation of bridge pier according to claim 1, which is characterized in that be provided in the side wall of the prefabricated tubular pile Tubular pole lengthways main steel bar.
4. the structure of pile foundation of bridge pier according to claim 1, which is characterized in that the top of the prefabricated tubular pile is arranged free The weather-proof steel bushing of the heart.
5. the structure of pile foundation of bridge pier according to claim 4, which is characterized in that the prefabricated tubular pile further includes fixed steel The length of muscle, the fixed steel bars is less than the prefabricated tubular pile radius, and one end of the fixed steel bars traverses into described hollow resistance to It waits in steel bushing and the prefabricated tubular pile, the other end stretches out the hollow weather-proof steel bushing and fixed by anchorage.
6. the structure of pile foundation of bridge pier according to claim 1, which is characterized in that the top of the spacer bar is provided with spiral shell Line structure, the spacer bar are pierced by the reinforced hole and are fixed by nut.
7. the structure of pile foundation of bridge pier according to claim 1, which is characterized in that also set up on the top surface of the prefabricated cushion cap Fluted, the central duct and the periphery duct are arranged in the groove.
8. the structure of pile foundation of bridge pier according to claim 7, which is characterized in that filled out in the periphery duct and the groove Filled with high-performance epoxy resin mortar;Plain concrete is filled in the pipeline and central duct of the prefabricated tubular pile.
CN201821305147.1U 2018-08-14 2018-08-14 A kind of structure of pile foundation of bridge pier Active CN209144853U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821305147.1U CN209144853U (en) 2018-08-14 2018-08-14 A kind of structure of pile foundation of bridge pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821305147.1U CN209144853U (en) 2018-08-14 2018-08-14 A kind of structure of pile foundation of bridge pier

Publications (1)

Publication Number Publication Date
CN209144853U true CN209144853U (en) 2019-07-23

Family

ID=67265571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821305147.1U Active CN209144853U (en) 2018-08-14 2018-08-14 A kind of structure of pile foundation of bridge pier

Country Status (1)

Country Link
CN (1) CN209144853U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952453A (en) * 2019-11-25 2020-04-03 通号建设集团有限公司 Construction method of abutment structure
CN111254815A (en) * 2020-03-04 2020-06-09 东南大学 Self-resetting prefabricated pier structure for single-pile foundation and assembling method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952453A (en) * 2019-11-25 2020-04-03 通号建设集团有限公司 Construction method of abutment structure
CN110952453B (en) * 2019-11-25 2021-11-12 通号建设集团有限公司 Construction method of abutment structure
CN111254815A (en) * 2020-03-04 2020-06-09 东南大学 Self-resetting prefabricated pier structure for single-pile foundation and assembling method thereof

Similar Documents

Publication Publication Date Title
CN109024654A (en) A kind of structure and its construction method of pile foundation of bridge pier
CN209144853U (en) A kind of structure of pile foundation of bridge pier
CN207228402U (en) The reinforced concrete shear wall of built-in prestress steel diagonal brace
CN209353325U (en) Resistance to compression cracking resistance environmental protection pile for prestressed pipe
CN205662838U (en) Prestressing force joint construction of pier is assembled to prefabricated segment
CN207904914U (en) A kind of anti-floating constructing structure of filling pile cage of reinforcement
CN207194167U (en) Prefabricated member
CN209114493U (en) A kind of bridge pile foundation pier integral structure
CN208235562U (en) A kind of static pressure pile structure for Collapsible Loess Stabilized
CN203394092U (en) Concrete hollow block masonry structure reinforced by adopting internal prestressing force
CN207998988U (en) With the attachment device of the fixed reinforcing bar of steel plate for sealing water
CN207228480U (en) A kind of assembly of shear wall structure exterior wall reinforcing bar is partly in the milk attachment device
CN107044132B (en) A kind of construction method of quake-resistant safety ground
CN206360212U (en) A kind of resistance to compression factory building concrete filled steel tube column
CN202483084U (en) Reinforced cushion block
CN204728356U (en) The hardened system of generation power foundation of wind power cyclic group plinth
CN204151822U (en) A kind of sleeve pipe Rock Bolt Foundation
CN211646355U (en) Novel combined pile foundation structure suitable for whole bridge
CN203654709U (en) Side slope scaffold connecting part
CN209723400U (en) Using a kind of prefabricated integral frame bean column node that sleeve quickly connects
CN208650097U (en) A kind of node for mixture of piles and concrete wall formula underground structure
CN207047840U (en) Corrosion-resistant prestressed concrete pipe pile
CN207761175U (en) A kind of lightning-arrest sleeve prefabricated for building structure
CN209456825U (en) A kind of flexible asphalt pavement structure for arterial highway reparation
CN205839782U (en) A kind of high bearing type pile foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant