CN209144142U - Biogas comprehensive utilization system - Google Patents

Biogas comprehensive utilization system Download PDF

Info

Publication number
CN209144142U
CN209144142U CN201821912653.7U CN201821912653U CN209144142U CN 209144142 U CN209144142 U CN 209144142U CN 201821912653 U CN201821912653 U CN 201821912653U CN 209144142 U CN209144142 U CN 209144142U
Authority
CN
China
Prior art keywords
water
biogas
methane
gas
generating pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821912653.7U
Other languages
Chinese (zh)
Inventor
王锐刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi University
Original Assignee
Shanxi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi University filed Critical Shanxi University
Priority to CN201821912653.7U priority Critical patent/CN209144142U/en
Application granted granted Critical
Publication of CN209144142U publication Critical patent/CN209144142U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The biogas comprehensive utilization system of the utility model belongs to household biogas application field, it solves due to north of china in winter very cold, methane tank gas production rate is very low, it is unable to satisfy use demand, be in the presence of methane-generating pit half a year with half a year spare time the problem of, the technical solution of use: heating and thermal insulation is carried out to methane-generating pit using biogas heating furnace, the hot water burnt in biogas heating furnace first passes through radiator and realizes indoor heating, it is passed through the heat exchange coil being laid in methane-generating pit again, improve methane-generating pit temperature, to make gas production be increased to original 5~6 times, newly-designed simple constant-pressure gas storage bag is introduced into family's user type bionethanation system simultaneously, both the volume of methane-generating pit sweathouse had been increased, increase gas production, it rationally and effectively has adjusted again and produces gas and with the contradiction between gas, gas production can be made to improve 1.2~1. on the original basis after designing using this 3 times.

Description

Biogas comprehensive utilization system
Technical field:
The utility model belongs to household biogas application field, more particularly to a kind of biogas comprehensive utilization system.
Background technique:
As the growth and the development of society, energy shortage of population are increasingly becoming global significant problem, biogas conduct A kind of new energy is increasingly subject to the attention of national governments.Currently, northern China rural household house type methane-generating pit in winter due to by Temperature influences, and is unable to normal use, and many seriously affects the enthusiasm that peasant household uses biogas in idle or half idle state, The waste of vast resources is caused, so the northern area of China methane-generating pit heat preservation technology becomes key technology urgently to be resolved at present and asks Topic.
For this problem, there are two types of technologies at present to solve, and are respectively: with Electric radiant Heating Film plus insulating layer and utilizing solar heat Hydrophone is methane-generating pit heat preservation, heats.
Electric radiant Heating Film adds the technical method of insulating layer to be to lay one layer of Electric radiant Heating Film in methane-generating pit outer surface, then lays again certain The insulating layer of thickness keeps the temperature and heats to achieve the purpose that, is generally kept the temperature using benzene plate and polyurethane foam.Electric radiant Heating Film adds guarantor Though the technical method of warm layer solves the problems, such as the heat preservation of winter methane-generating pit, it to consume high-grade electric energy as cost, economy, Energy saving and it is social be not very ideal.
Solar water heater be methane-generating pit keep the temperature and the technology that heats be solar water heater is mounted on farm house (stock barn, Brooder) roof on, absorb sunlight and be simultaneously converted to thermal energy, using heat-transfer working medium (water) by thermal energy storage in water tank, and By circulation line by the heat exchange coil of delivery to methane-generating pit, heat exchange coil improves and keeps biogas to methane-generating pit heat supply The temperature in pond, to improve the gas production of biogas.However, the technology is affected by weather, therefore feasibility is poor.
In view of the deficiency of both the above technical method, a kind of biogas system of suitable northern China use in winter is designed System --- biogas heating wall-hung boiler and novel constant-pressure gas-storing bag are introduced into northern China man user type bionethanation system.It not only can be with It solves the problems, such as that northern China methane-generating pit is idle, sufficient gas for domestic use is provided for peasant household, can also be heated wall-hung boiler by biogas Solve the problems, such as peasant household's winter heating of house.
Utility model content:
The utility model overcomes the shortcomings of the prior art, solves due to north of china in winter very cold, methane-generating pit produces Gas rate is very low, is unable to satisfy use demand, be in the presence of methane-generating pit half a year with half a year spare time the problem of, it is desirable to provide Yi Zhongzhao Gas utilization system, this system are the bionethanation system for being suitble to northern China rural area to use, and are able to solve the heating in rural area winter Problem.
In order to solve the above technical problems, the technical solution adopted by the utility model is: biogas comprehensive utilization system, including natural pond Gas pond is provided with heat exchange coil, the water outlet of heat exchange coil and the water inlet of biogas heating furnace in the fermenting cellar of the methane-generating pit The water outlet of connection, biogas heating is connect with threeway, other two interface of threeway ends with the first shut-off valve and second respectively Valve connection, the other end of the first shut-off valve are connected with the water inlet of indoor radiating piece, the water outlet and third of indoor radiating piece Shut-off valve is connected, and third shut-off valve and the second shut-off valve pass through water pipe and is connected after connecing with force (forcing) pump water inlet, force (forcing) pump Water outlet be connected with the water inlet of heat exchange coil;
The gas-guide tube of the methane-generating pit is connected by appendix with desulfurizer, and the desulfurizer includes tower body, tower Body lower part is equipped with the biogas entrance being connected with appendix, and biogas entrance top tower body is equipped at least one layer of spraying layer, biogas It is provided with arc substrate below entrance, is communicated with L shape drainpipe below the middle part of arc substrate, is set above the spraying layer There is demister, the top of tower body is methane outlet, and methane outlet is connected with the import of gas-storing bag;
The gas-storing bag includes the plastic feet being obliquely installed, and installs terylene cloth bag additional above plastic feet, terylene cloth bag Outside is provided with wooden protective shell, and air inlet is arranged in the high point of plastic feet, and low spot is provided with gas outlet and drain valve, gas outlet Positioned at the top of drain valve, gas outlet is connected with the air inlet of biogas distributor, and gas outlet and the biogas of biogas distributor add The air inlet of hot stove is connected.
Specifically, the methane-generating pit includes pond body, is fermenting cellar inside pond body, heat exchange coil is located in fermenting cellar, pond body Side be provided with feed pipe, the other side is discharge room, and feed inlet is connected on the upside of feed pipe, is provided with work at the top of pond body Dynamic cover board, gas-guide tube are arranged on removable cover.
Specifically, heat preservation benzene plate is provided on the outer wall of the pond body.
Specifically, the spraying layer includes the auxiliary water-feeding tube of main-supply and Duo Gen parallel arrangement, and auxiliary water-feeding tube is set It is closed in the intracorporal end of tower, main-supply is connected to more auxiliary water-feeding tubes respectively, and the two sides end of auxiliary water-feeding tube is sealed It closes, multiple hollow cone nozzles is communicated on main-supply, multiple hollow cone nozzles, Mei Gekong are communicated on every auxiliary water-feeding tube The water spray end that the heart bores nozzle is upwardly disposed.
Specifically, the main-supply is ladder pipe, and the main-supply includes a sequentially connected water supplying pipe, secondary Water supplying pipe and three times water supplying pipe, the outer diameter of a water supplying pipe are greater than the outer diameter of secondary water-supply pipe, and the outer diameter of secondary water-supply pipe is greater than The water supply port of the outer diameter of water supplying pipe three times, a water supplying pipe is placed in the outside of tower body, and water supplying pipe is fixed in tower body three times.
Specifically, clump weight is provided at the top of the wooden protective shell.Clump weight prevents wooden protective shell from toppling over.
Specifically, the volume of the gas-storing bag is the 1/2-2/3 of the methane-generating pit daily output.
The utility model has the following advantages that compared with prior art.This system carries out methane-generating pit using biogas heating furnace Heating and thermal insulation, indoors by the installation of biogas heating furnace, the hot water burnt in biogas heating furnace first pass through radiator and realize that interior is adopted It is warm, then it is passed through the heat exchange coil being laid in methane-generating pit, methane-generating pit temperature is improved, so that gas production be made to be increased to original 5~6 Times.Secondly, newly-designed simple gas-storing bag is introduced into bionethanation system, both increase the volume of methane-generating pit sweathouse, increases production Tolerance, and rationally and effectively have adjusted and produce gas and (generation of biogas is continuous and to utilize be that interval is capable with the contradiction between gas ), gas production can be made to improve 1.2~1.3 times on the original basis after designing using this.
Detailed description of the invention:
The utility model is described in more detail with reference to the accompanying drawing.
Fig. 1 is the general structure schematic diagram of the utility model.
Fig. 2 is the structural schematic diagram of methane-generating pit.
Fig. 3 is the structural schematic diagram of desulfurizer.
Fig. 4 is the structural schematic diagram of spraying layer.
Fig. 5 is the structural schematic diagram of gas-storing bag.
In figure: 1 is radiator, and 2 be methane-generating pit, and 21 be pond body, and 22 be fermenting cellar, and 23 be feed pipe, and 24 be discharge room, 25 It is removable cover for feed inlet, 26,27 be gas-guide tube, and 3 be heat exchange coil, and 4 be desulfurizer, and 41 be tower body, and 42 enter for biogas Mouthful, 43 be arc substrate, and 44 be L shape drainpipe, and 45 be spraying layer, and 451 be main-supply, and 4511 be a water supplying pipe, 4522 It is water supplying pipe three times for secondary water-supply pipe, 4533,452 be auxiliary water-feeding tube, and 453 be hollow cone nozzle, and 46 be demister, and 47 are Methane outlet, 5 be gas-storing bag, and 51 be plastic feet, and 52 be terylene cloth bag, and 53 be wooden protective shell, and 54 be air inlet, and 55 is out Port, 56 be drain valve, and 57 be clump weight, and 6 be biogas distributor, and 7 be biogas heating furnace, and 8 be the first shut-off valve, and 9 be second Shut-off valve, 10 be third shut-off valve, and 11 be force (forcing) pump.
Specific embodiment:
It is understandable to enable the purpose of this utility model, feature and advantage to become apparent, it is practical to this with reference to the accompanying drawing Novel specific embodiment is described in detail.
As shown in Figure 1, biogas comprehensive utilization system, including methane-generating pit 2, methane-generating pit 2 include pond body 21, are inside pond body 21 Fermenting cellar 22, heat exchange coil 3 are located in fermenting cellar 22, and the side of pond body 21 is provided with feed pipe 23, and the other side is discharge room 24, The upside of feed pipe 23 is connected with feed inlet 25, and the top of pond body 21 is provided with removable cover 26, and gas-guide tube 27 is arranged in activity On cover board 26.
The main structure of methane-generating pit 2 the uses or common hydraulic type biomass pool 2 of northern country, in the hair of methane-generating pit 2 Heat exchange coil 3 is provided in ferment room 22, the water outlet of heat exchange coil 3 is connect with the water inlet of biogas heating furnace 7, biogas heating Water outlet is connect with threeway, other two interface of threeway is connected to the first shut-off valve 8 and the second shut-off valve 9 respectively, and first section Only the other end of valve 8 is connected with the water inlet of indoor radiating piece, and the water outlet of indoor radiating piece is connected with third shut-off valve 10 Logical, third shut-off valve 10 and the second shut-off valve 9 pass through water pipe and are connected after connecing with force (forcing) pump water inlet, the water outlet of force (forcing) pump It is connected with the water inlet of heat exchange coil 3.
By the way that heat exchange coil 3 is arranged in fermenting cellar 22, heating and thermal insulation is carried out to methane-generating pit 2 using biogas heating furnace 7, is made Temperature in methane-generating pit 2 remains at 25 DEG C or so, may insure that methane-generating pit 2 generates sufficient biogas in this way.When it is indoor not When needing heating, the first shut-off valve 8 and third shut-off valve 10 are closed, the second shut-off valve 9 is opened, is thus passed directly into hot water In heat exchange coil 3.
The gas-guide tube 27 of methane-generating pit 2 is connected by appendix with desulfurizer 4, and the desulfurizer 4 includes tower body 41, 41 lower part of tower body is equipped with the biogas entrance 42 being connected with appendix, and 42 top tower body 41 of biogas entrance is equipped at least one layer of spray Drenching layer 45, the lower section of biogas entrance 42 are provided with arc substrate 43, are communicated with L shape drainpipe below the middle part of arc substrate 43 44, the top of the spraying layer 45 is equipped with demister 46, and the top of tower body 41 is methane outlet 47, methane outlet 47 and gas-storing bag 5 import is connected.Spraying layer 45 includes the auxiliary water-feeding tube 452 that main-supply 451 and Duo Gen are arranged in parallel, auxiliary water-feeding tube 452 are placed in the closing of the end in tower body 41, and main-supply 451 is connected to more auxiliary water-feeding tubes 452 respectively, auxiliary water-feeding tube 452 two sides end is all closed, and is communicated with multiple hollow cone nozzles 453 on main-supply 451, on every auxiliary water-feeding tube 452 Multiple hollow cone nozzles 453 are communicated with, the water spray end of each hollow cone nozzle 453 is upwardly disposed.
Main-supply 451 is ladder pipe, and the main-supply 451 includes a sequentially connected water supplying pipe 4511, secondary Water supplying pipe 4512 and three times water supplying pipe 4513, the outer diameter of a water supplying pipe 4511 is greater than the outer diameter of secondary water-supply pipe 4512, secondary The outer diameter of water supplying pipe 4512 is greater than the outer diameter of water supplying pipe 4513 three times, and the water supply port of a water supplying pipe 4511 is placed in tower body 41 Outside, water supplying pipe 4513 is fixed in tower body 41 three times.
Water flow is sent in each auxiliary water-feeding tube 452 from main-supply 451, and water flow is sprayed from each hollow cone nozzle 453 Out, multiple 453 arrangements of hollow cone nozzle are uniform, guarantee that sprinkling drop is uniform.Washing water after clarified separation can be with It is pumped into Multi-layer sprinkling layer 45 and continues cycling through use, it is at low cost, it reuses high-efficient.
Gas-storing bag 5 includes the plastic feet 51 being obliquely installed, and installs terylene cloth bag 52, terylene cloth bag additional above plastic feet 51 52 outside is provided with wooden protective shell 53, and air inlet 54 is arranged in the high point of plastic feet 51, and low spot is provided with 55 He of gas outlet Drain valve 56, gas outlet 55 are located at the top of drain valve 56, and gas outlet 55 is connected with the import of biogas distributor 6, biogas point The outlet of orchestration 6 is connected with the air inlet 54 of biogas heating furnace 7.
2 pond body of methane-generating pit, 21 lower part is that sweathouse, top are between gas storage, and the two is an entirety, and increasing amount of filler can be with Gas production is improved, but volume between gas storage can be made accordingly to reduce, affects biogas storage.Therefore the utility model devises simple storage Airbag 5, material used are the extraordinary PVC woven dacron of anticorrosive and gas capacitive, and production wooden shell, which rises, outside gas-storing bag 5 protects The volume of shield effect, gas-storing bag 5 is related with the volume of methane-generating pit 2 and daily output tolerance, and the volume of usual gas-storing bag 5 is daily gas The 1/2 of amount is advisable.
In order to more preferably promote the temperature in methane-generating pit 2, heat preservation benzene plate is provided on the outer wall of the pond body 21.
The utility model combines gas wall-hung boiler heating system with production and use of marsh gas system, solves north of china in winter Methane-generating pit 2 leaves unused problem, and biogas is used for heating.Constant-pressure gas storage bag 5 is introduced into family's user type bionethanation system simultaneously, improves and produces Tolerance adjusts and produces gas and with the contradiction between gas.Curve guide impeller goes out funnel-form blow-off pipe, it is ensured that methane-generating pit 2 is conveniently, safely Ground operation.
China rural area is completed 235,000,000, family's user type methane-generating pit at present, but at most of 2 winters of methane-generating pit of the north In idle and half idle state.The design only need to be easily transformed on the basis of built biogas project, disposably Additional investment 3000-5000 member can solve the problems, such as that winter methane-generating pit 2 leaves unused, after transformation can normal use 15-20, and It realizes and carries out indoor heating with biogas, there is obviously economic benefit, social benefit and environmental benefit, be suitble in China Northern country is promoted.
The embodiments of the utility model have been described in detail above with reference to the accompanying drawings, but the utility model is not limited to Embodiment is stated, within the knowledge of a person skilled in the art, the utility model aims can also not departed from Under the premise of various changes can be made.

Claims (7)

1. biogas comprehensive utilization system, including methane-generating pit (2), which is characterized in that set in the fermenting cellar (22) of the methane-generating pit (2) It is equipped with heat exchange coil (3), the water outlet of heat exchange coil (3) is connect with the water inlet of biogas heating furnace (7), the water outlet of biogas heating Mouth is connect with threeway, other two interface of threeway is connected to the first shut-off valve (8) and the second shut-off valve (9) respectively, and first section Only the other end of valve (8) is connected with the water inlet of indoor radiating piece, the water outlet of indoor radiating piece and third shut-off valve (10) It is connected, third shut-off valve (10) and the second shut-off valve (9) pass through water pipe and is connected after connecing with force (forcing) pump (11) water inlet, add The water outlet of press pump (11) is connected with the water inlet of heat exchange coil (3);
The gas-guide tube (27) of the methane-generating pit (2) is connected by appendix with desulfurizer (4), desulfurizer (4) packet It includes tower body (41), tower body (41) lower part is equipped with the biogas entrance (42) being connected with appendix, tower body above biogas entrance (42) (41) it is equipped at least one layer of spraying layer (45), is provided with arc substrate (43), arc substrate below biogas entrance (42) (43) L shape drainpipe (44) is communicated with below middle part, the top of the spraying layer (45) is equipped with demister (46), tower body (41) Top be methane outlet (47), methane outlet (47) is connected with the import of gas-storing bag (5);
The gas-storing bag (5) includes the plastic feet (51) being obliquely installed, and installs terylene cloth bag (52) additional above plastic feet (51), It is provided on the outside of terylene cloth bag (52) wooden protective shell (53), air inlet (54) are arranged in the high point of plastic feet (51), low spot It is provided with gas outlet (55) and drain valve (56), gas outlet (55) are located at the top of drain valve (56), gas outlet (55) and biogas The import of distributor (6) is connected, and the outlet of biogas distributor (6) is connected with the air inlet (54) of biogas heating furnace (7).
2. biogas comprehensive utilization system according to claim 1, it is characterised in that: the methane-generating pit (2) includes pond body It (21), is fermenting cellar (22) that heat exchange coil (3) is located in fermenting cellar (22) inside pond body (21), the side setting of pond body (21) Have feed pipe (23), the other side is discharge room (24), is connected with feed inlet (25) on the upside of feed pipe (23), the top of pond body (21) Portion is provided with removable cover (26), and gas-guide tube (27) is arranged on removable cover (26).
3. biogas comprehensive utilization system according to claim 2, it is characterised in that: be arranged on the outer wall of the pond body (21) There is heat preservation benzene plate.
4. biogas comprehensive utilization system according to claim 1, it is characterised in that: the spraying layer (45) includes main water supply The auxiliary water-feeding tube (452) of (451) and more parallel arrangements is managed, auxiliary water-feeding tube (452) is placed in the envelope of the end in tower body (41) It closes, main-supply (451) is connected to more auxiliary water-feeding tubes (452) respectively, and the two sides end of auxiliary water-feeding tube (452) is sealed It closes, multiple hollow cone nozzles (453) is communicated on main-supply (451), are communicated with multiple skies on every auxiliary water-feeding tube (452) The heart bores nozzle (453), and the water spray end of each hollow cone nozzle (453) is upwardly disposed.
5. biogas comprehensive utilization system according to claim 4, it is characterised in that: the main-supply (451) is ladder Pipe, the main-supply (451) include a sequentially connected water supplying pipe (4511), secondary water-supply pipe (4512) and supply water three times It manages (4513), the outer diameter of a water supplying pipe (4511) is greater than the outer diameter of secondary water-supply pipe (4512), secondary water-supply pipe (4512) Outer diameter is greater than the outer diameter of water supplying pipe (4513) three times, and the water supply port of a water supplying pipe (4511) is placed in the outside of tower body (41), Water supplying pipe (4513) is fixed in tower body (41) three times.
6. biogas comprehensive utilization system according to claim 1, it is characterised in that: the top of the wooden protective shell (53) It is provided with clump weight (57).
7. biogas comprehensive utilization system according to claim 1, it is characterised in that: the volume of the gas-storing bag (5) is natural pond The 1/2-2/3 of gas pond (2) daily output.
CN201821912653.7U 2018-11-20 2018-11-20 Biogas comprehensive utilization system Expired - Fee Related CN209144142U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821912653.7U CN209144142U (en) 2018-11-20 2018-11-20 Biogas comprehensive utilization system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821912653.7U CN209144142U (en) 2018-11-20 2018-11-20 Biogas comprehensive utilization system

Publications (1)

Publication Number Publication Date
CN209144142U true CN209144142U (en) 2019-07-23

Family

ID=67286709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821912653.7U Expired - Fee Related CN209144142U (en) 2018-11-20 2018-11-20 Biogas comprehensive utilization system

Country Status (1)

Country Link
CN (1) CN209144142U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113444618A (en) * 2021-07-26 2021-09-28 华北理工大学 Heat preservation and methane heating furnace fuel supply system for steel waste heat methane tank and treatment method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113444618A (en) * 2021-07-26 2021-09-28 华北理工大学 Heat preservation and methane heating furnace fuel supply system for steel waste heat methane tank and treatment method

Similar Documents

Publication Publication Date Title
CN201362716Y (en) Solar energy temperature raising and heat insulation biogas generating pit
CN206669861U (en) A kind of solar energy kang heating system of active-passive composite
CN110940102A (en) Phase-change heat accumulating type solar heatable brick bed mechanism system
CN201731548U (en) Solar and electrical energy combined heating facility
CN209144142U (en) Biogas comprehensive utilization system
CN101182462A (en) Methane packaged technical equipment for cold area
CN106885293A (en) A kind of solar energy kang heating system of active-passive composite
CN204325359U (en) A kind of energy-conservation water cycle high temperature methane tank
CN208639266U (en) Convenient for the pig house of regulating and controlling temperature
CN203240739U (en) Mixed type multipurpose energy-saving water heater
CN209877097U (en) Composite heat source domestic hot water supply system composed of solar energy and heat pump
CN207143064U (en) A kind of solar energy auxiliary heating type pigsty biogas fermentation device
CN211458407U (en) Heat preservation pig house with ground heating system
CN207527699U (en) Central drainage waste heat comprehensive utilization system for waste water
CN206222449U (en) A kind of full room heating system of solar energy
CN207880923U (en) A multistage high position takes heat and efficient waste heat evaporation endothermic combined type heating hot water integrated machine
CN206755589U (en) A kind of low-power multiple water heater
CN207075389U (en) One kind takes off warm hen house
CN201803412U (en) Solar hot water centralization conveying system
CN202022834U (en) Multiple heating system for methane tank in winter
CN205939739U (en) Surplus water pipe way of solar photovoltaic electricity generation hot water
CN110651649A (en) Roof hydrologic cycle temperature regulating system before sunlight greenhouse
CN111059604A (en) Integrated heat supply device, integrated heat supply control system and method
CN201795620U (en) Water-saving device for water tank pressurization and pipe evacuation of solar water heater
CN205641609U (en) Solar water heater's water tank structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190723

Termination date: 20191120