Prior art keywords
platform
leg
bearing platform
wind farm
offshore wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821609394.0U
Other languages
Chinese (zh)
Inventor
薛志武
李海方
薛帆
苏艳
王磊
李清华
纪岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Original Assignee
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd filed Critical CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Priority to CN201821609394.0U priority Critical patent/CN209114452U/en
Application granted granted Critical
Publication of CN209114452U publication Critical patent/CN209114452U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to piling Technology fields, in particular to a kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform.Including bearing platform and several platform legs for being used to support bearing platform, it is characterised in that: the platform leg upper end is provided with the lifting apparatus for adjusting bearing platform vertical height;The bearing platform is the truss structure being fixed on lifting apparatus, is equipped with that multiple groups are corresponding with platform leg, pile holding device for adjusting bearing platform horizontal position on bearing platform;The pile holding device includes the thrustor that several are looped around platform leg surrounding;Described thrustor one end is fixed on bearing platform, and the other end is pushed against on platform leg in the horizontal direction.The platform structure of the utility model is simple, easy for installation, and positioning accuracy is high, and small by Lidar Equation, can be realized the steel-pipe pile under marine environment harsh conditions and efficiently constructs, and has great promotional value.

Description

A kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform
Technical field
The utility model relates to piling Technology field, in particular to a kind of steady stake of offshore wind farm pile foundation automatic positoning and Drilling platform.
Background technique
Offshore pile construction routine carries out based on using jack-up unit or the steady stake platform of fixed operation set up The injection of engineering pile.Jack-up unit is as special equipment, the piling work being adapted under different water depth and wave environment, but It being influenced when being that cost is high, professional is needed to operate, and shifting by wave period, time-consuming for mobile and positioning, by Sea situation environment influences greatly, and positioning accuracy is not high when each position is converted, and effect is relatively low;When being constructed using fixed platform, bore Hole precision depends on platform positioning accuracy, and platform bore position after fixed can not adjust.
Utility model content
The purpose of this utility model seeks to solve the Pile Installation Platform for the prior art mentioned in above-mentioned background technique There is a problem of that positioning accuracy is low, a kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform are provided.
The technical solution of the utility model are as follows: a kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform, including hold Galassing platform and several platform legs for being used to support bearing platform, it is characterised in that: the platform leg upper end is provided with Adjust the lifting apparatus of bearing platform vertical height;The bearing platform is the truss structure being fixed on lifting apparatus, is held It is equipped with that multiple groups are corresponding with platform leg, pile holding device for adjusting bearing platform horizontal position on galassing platform;Described Pile holding device includes the thrustor that several are looped around platform leg surrounding;It is flat that described thrustor one end is fixed on load-bearing On platform, the other end is pushed against on platform leg in the horizontal direction.
Further every group of pile holding device includes at least three groups of thrustors, circumferencial direction of the thrustor along platform leg Equidistant interval arrangement.
The further thrustor is concatenated two-stage pushing tow structure.
First order pushing tow structure in the further thrustor includes pedestal, push cylinder and sliding oil cylinder Seat;The pedestal is fixed on bearing platform, and the horizontal guide rail extended along platform leg radial direction is provided on pedestal;Institute The push cylinder cylinder body stated is fixed on the base, and pushing end is fixedly connected on sliding oil cylinder seat;The sliding oil cylinder seat sliding It is connected to guide rail, one end of object platform spud leg is provided with the rolling wheel support with idler wheel.
Second level pushing tow structure in the further thrustor includes pipe bending cylinder;The pipe bending cylinder cylinder Body is fixed on sliding oil cylinder seat, and pushing end is fixed on rolling wheel support;It is disposed on the sliding oil cylinder seat along platform stake The horizontal slide rail that leg radial direction extends;The rolling wheel support is slidably connected on sliding rail.
The further lifting apparatus includes the lifting pedestal and lifting oil cylinder for being fixed on platform leg stake top;It is described Lifting oil cylinder it is vertically arranged, cylinder body be arranged in lifting pedestal upper surface, upper end is provided with to be connect with bearing platform lower end surface The support base of touching.
The further lifting pedestal surrounding is disposed with multiple groups limitation lifting pedestal and platform leg generates horizontal position The position limiting structure of shifting.
The further position limiting structure includes vertical bar and limit plate;The vertical bar upper end is fixed on lifting pedestal edge At edge, lower end is vertically extending at platform leg pile body;The limit plate is fixed on vertical bar lower end, and is tightly attached to platform stake Leg outer side.
On the bearing platform along its it is circumferentially-spaced be disposed with it is multiple for being oriented to inserting piling stake Guiding device;The guiding device includes leading truck;Described leading truck one end is fixed on bearing platform edge, the other end Horizontally extending to form cantilevered structure outside to bearing platform, leading truck overhanging end is provided with the anchor ear playing the guiding role.
The further anchor ear includes two mechanical arms;The mechanical arm rotationally can hingedly connect around vertical axis It is connected to leading truck end, the rotary oil cylinder of driving mechanical arm opening and closing is provided between mechanical arm and leading truck.
A kind of method of piling construction, it is characterised in that: in stake position to be onstructed sea area inserting piling platform leg, in platform leg Stake top installs lifting apparatus, lifts on bearing platform to lifting apparatus, is looped around the pile holding device on bearing platform right therewith On the platform leg answered, the vertical position of bearing platform is adjusted by lifting apparatus, passes through pile holding device top pushing platform spud leg tune The horizontal position for saving bearing platform carries out steel pipe pile sinking construction based on the bearing platform regulated, and to the sea area, steel-pipe pile is applied After the completion of work, handling bearing platform is detached from it with platform leg, removes lifting apparatus, extracts platform leg and is moved to next apply Work stake position sea area, successively carries out according to the above process, until all steel pipe pile driving constructions are completed.
The advantages of the utility model, has: 1, can adjust bearing platform respectively by setting lifting apparatus and pile holding device Vertical and horizontal position, improves bearing platform positioning accuracy, not only reduces Lidar Equation, but also improves steel-pipe pile pile sinking essence Degree;
2, it can be improved the connection of bearing platform and platform leg by pile holding device of the setting ring set on platform leg Stability improves the safety of entire platform piling construction;
3, by can disposably realize the piling construction of multiple steel-pipe piles in bearing platform surrounding setting guiding device, The efficiency of construction is improved, the number that platform is carried is reduced.
The platform structure of the utility model is simple, easy for installation, and positioning accuracy is high, and small by Lidar Equation, can be realized Steel-pipe pile under marine environment harsh conditions is efficiently constructed, and has great promotional value.
Detailed description of the invention
Fig. 1: the plane arrangement structure schematic diagram of the pile holding device of the utility model;
Fig. 2: the drilling platform main view of the utility model;
Fig. 3: the thrustor structural schematic diagram of the utility model;
Fig. 4: the lifting apparatus structural schematic diagram of the utility model;
Fig. 5: the guiding device structural schematic diagram of the utility model;
Wherein: 1- bearing platform;2- platform leg;3- pedestal;4- push cylinder;5- sliding oil cylinder seat;6- guide rail;7- rolling Wheel;8- rolling wheel support;9- pipe bending cylinder;10- sliding rail;11- is lifted pedestal;12- is lifted oil cylinder;13- support base;14- vertical bar; 15- limit plate;16- leading truck;17- mechanical arm;18- rotary oil cylinder.
Specific embodiment
The utility model is described in further detail in the following with reference to the drawings and specific embodiments.
Such as Fig. 1~5, a kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform, the platform of the present embodiment are to fix Fixed platform structure on sea bed, smaller by Lidar Equation, positioning accuracy is high.Bearing platform 1 and it is used to support bearing platform 1 Several platform legs 2, as shown in Fig. 1~2, platform leg 2 first passes through pile driving barge or other device inserting pilings to heavy in advance Pile driving construction sea area, the platform of the present embodiment include four platform legs 2.
As shown in Fig. 1~2, the bearing platform 1 of the present embodiment is the truss structure of surfacing, by lifting handling to On platform leg 2 through inserting piling on sea bed.Be equipped on bearing platform 1 multiple groups it is corresponding with platform leg 2, for adjust hold The pile holding device of 1 horizontal position of galassing platform, pile holding device include the thrustor that several are looped around 3 surrounding of platform leg, are led to 2 acting in opposition of thrustor top pushing platform spud leg is crossed in bearing platform 1, is both adjustable the horizontal position of bearing platform 1, moreover it is possible to protect Card bearing platform 1 is stably fixed on platform leg 2.
As shown in figure 3, the thrustor of the present embodiment is second level pushing tow structure, wherein first order pushing tow structure includes pedestal 3, push cylinder 4 and sliding oil cylinder seat 5, pedestal 3 are fixed on bearing platform 1, are provided on pedestal 3 radial along platform leg 2 The horizontal guide rail 6 that direction extends, 4 cylinder body of push cylinder is fixed, and pushing end is fixedly connected on sliding oil cylinder seat 5 on the base 3, sliding Dynamic oil cylinder seat 5 is slidably connected to guide rail 6, and one end of object platform spud leg 2 is provided with the rolling wheel support 8 with idler wheel 7.
Second level pushing tow structure includes pipe bending cylinder 9, and 9 cylinder body of pipe bending cylinder is fixed on sliding oil cylinder seat 5, and pushing end is solid It is scheduled on rolling wheel support 8, the horizontal slide rail 10 extended along 2 radial direction of platform leg, idler wheel branch is disposed on sliding oil cylinder seat 5 Frame 8 is slidably connected on sliding rail 10.
The distance of pushing tow can be provided in the limited situation in space by second level pushing tow, increase the adjusting of bearing platform 1 Range.Wherein, every group of pile holding device includes that at least three groups of thrustors, thrustor is equidistant along the circumferencial direction of platform leg 2 Arranged for interval.As shown in Figure 1, every group of pile holding device of the present embodiment includes three groups of thrustors, three groups of thrustors are mutual Every 120 °.
In order to realize the vertical position adjustment to bearing platform 1, the present embodiment is between platform leg 2 and bearing platform 1 It is provided with lifting apparatus.As shown in figure 4, lifting apparatus includes the lifting pedestal 11 and lifting oil for being fixed on 2 stake top of platform leg Cylinder 12, lifting oil cylinder 12 is vertically arranged, and cylinder body is arranged in lifting 11 upper surface of pedestal, and upper end is provided with and bearing platform 1 The support base 13 of lower end face contact.Support base 13 is vertically jacked by driving lifting oil cylinder 12, it will be able to realize The adjustment of 1 vertical position of bearing platform.
The lifting apparatus of the present embodiment is the stake top for being fixed on platform leg 2, positioned at the surface of pile holding device.In order to protect Lifting apparatus and 2 stable connection of platform leg are demonstrate,proved, lifting 11 surrounding of pedestal is disposed with multiple groups limitation lifting pedestal 11 and platform stake The position limiting structure of the generation horizontal displacement of leg 2.As shown in figure 4, position limiting structure includes vertical bar 14 and limit plate 15,14 upper end of vertical bar is solid It is scheduled on lifting 11 edge of pedestal, lower end is vertically extending at 2 pile body of platform leg, and limit plate 15 is fixed under vertical bar 14 End, and it is tightly attached to 2 outside of platform leg.
The bearing platform 1 of the present embodiment is used as steel-pipe pile pile sinking platform, can be in piling construction region inserting piling steel-pipe pile, this Embodiment on bearing platform 1 along its it is circumferentially-spaced be disposed with multiple guiding devices for being oriented to inserting piling stake, guiding Device includes leading truck 16, and 16 one end of leading truck is fixed on 1 edge of bearing platform, and the other end is horizontally extending to load-bearing Cantilevered structure is formed outside platform 1, leading truck 16 overhangs end and is provided with the anchor ear playing the guiding role.As shown in figure 4, anchor ear includes Two mechanical arms 17, mechanical arm 17 can be rotationally articulated and connected in 16 end of leading truck, mechanical arm 17 and guiding around vertical axis The rotary oil cylinder 18 of driving 17 opening and closing of mechanical arm is provided between frame 16.
When practice of construction, comprising the following steps: 1, at sea the sea area near wind-powered electricity generation pile foundation by pile driving barge or other Sinking apparatus inserting piling platform leg 2;
2, lifting pedestal 11 is shelved on stake top from top to bottom, makes to be lifted by lifting lifting apparatus to the stake top of platform leg 2 The limit plate 15 of 11 surrounding of pedestal is fitted in the horizontal transverse movement of 2 surrounding of platform leg limitation lifting apparatus;
3, on handling bearing platform 1 to support base 13, make every group of pile holding device ring set on corresponding platform leg 2;
4, the vertical position that bearing platform 1 is adjusted by jacking lifting oil cylinder 12, passes through jacking push cylinder 4 and pushing tow oil Cylinder 9 adjusts the horizontal position of bearing platform 1, until bearing platform 1 reaches design position;
5, driving rotary oil cylinder 18 opens mechanical arm 17, and handling waits on the steel-pipe pile to leading truck 16 of inserting piling, mechanical arm 17 It holds steel-pipe pile tightly, piling construction is carried out by the pile driving equipment on bearing platform 1;
6, after the completion of the steel-pipe pile inserting piling in the sea area, handling bearing platform 1 disengages it from lifting apparatus and platform leg 2, lifting apparatus is then removed, platform leg 2 is extracted and is moved to next pile sinking sea area, sequentially carry out according to the above process, directly It is completed to all steel-pipe pile inserting pilings.
Basic principles, main features, and advantages of the present invention has been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only illustrate the principles of the present invention, the utility model can also on the premise of not departing from the spirit and scope of the utility model There are various changes and modifications, these various changes and improvements fall within the scope of the claimed invention.The utility model is wanted Protection scope is asked to be defined by appended claims and its equivalent.

Claims (10)

1. a kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform, including bearing platform (1) and to be used to support load-bearing flat Several platform legs (2) of platform (1), it is characterised in that: described platform leg (2) upper end is provided with adjusting bearing platform (1) lifting apparatus of vertical height;The bearing platform (1) is the truss structure being fixed on lifting apparatus, bearing platform (1) it is equipped with that multiple groups are corresponding with platform leg (2), pile holding device for adjusting bearing platform (1) horizontal position on;It is described Pile holding device include thrustor that several are looped around platform leg (2) surrounding;Described thrustor one end is fixed on On bearing platform (1), the other end is pushed against in the horizontal direction on platform leg (2).
2. a kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform as described in claim 1, it is characterised in that: every group Pile holding device includes at least three groups of thrustors, and thrustor is arranged along the circumferencial direction equidistant interval of platform leg (2).
3. a kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform as claimed in claim 1 or 2, it is characterised in that: The thrustor is concatenated two-stage pushing tow structure.
4. a kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform as claimed in claim 3, it is characterised in that: described Thrustor in first order pushing tow structure include pedestal (3), push cylinder (4) and sliding oil cylinder seat (5);The pedestal (3) it is fixed on bearing platform (1), the horizontal guide rail (6) extended along platform leg (2) radial direction is provided on pedestal (3); Described push cylinder (4) cylinder body is fixed on pedestal (3), and pushing end is fixedly connected on sliding oil cylinder seat (5);The sliding Oil cylinder seat (5) is slidably connected to guide rail (6), and one end of object platform spud leg (2) is provided with the rolling wheel support (8) with idler wheel (7).
5. a kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform as claimed in claim 4, it is characterised in that: described Thrustor in second level pushing tow structure include pipe bending cylinder (9);Described pipe bending cylinder (9) cylinder body is fixed on sliding oil In cylinder seat (5), pushing end is fixed on rolling wheel support (8);It is disposed on the sliding oil cylinder seat (5) along platform leg (2) The horizontal slide rail (10) that radial direction extends;The rolling wheel support (8) is slidably connected on sliding rail (10).
6. a kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform as described in claim 1, it is characterised in that: described Lifting apparatus include be fixed on platform leg (2) stake top lifting pedestal (11) and be lifted oil cylinder (12);The lifting oil Cylinder (12) is vertically arranged, and cylinder body is arranged in lifting pedestal (11) upper surface, and upper end is provided with and bearing platform (1) lower end surface The support base (13) of contact.
7. a kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform as claimed in claim 6, it is characterised in that: described Lifting pedestal (11) surrounding be disposed with multiple groups limitation lifting pedestal (11) and platform leg (2) generate horizontal displacement limit knot Structure;The position limiting structure includes vertical bar (14) and limit plate (15);Described vertical bar (14) upper end is fixed on lifting pedestal (11) edge, lower end are vertically extending at platform leg (2) pile body;The limit plate (15) is fixed under vertical bar (14) End, and be tightly attached on the outside of platform leg (2).
8. a kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform as described in claim 1, it is characterised in that: described Bearing platform (1) on along its circumferentially-spaced be disposed with multiple guiding devices for being oriented to inserting piling stake.
9. a kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform as claimed in claim 8, it is characterised in that: described Guiding device include leading truck (16);Described leading truck (16) one end is fixed on bearing platform (1) edge, other end edge Horizontal direction extends to bearing platform (1) and forms cantilevered structure outside, and leading truck (16) overhanging end, which is provided with, to play the guiding role Anchor ear.
10. a kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform as claimed in claim 9, it is characterised in that: institute The anchor ear stated includes two mechanical arms (17);The mechanical arm (17) can rotationally be articulated and connected around vertical axis in leading truck (16) end is provided with the rotary oil cylinder (18) of driving mechanical arm (17) opening and closing between mechanical arm (17) and leading truck (16).
CN201821609394.0U 2018-09-30 2018-09-30 A kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform Active CN209114452U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821609394.0U CN209114452U (en) 2018-09-30 2018-09-30 A kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821609394.0U CN209114452U (en) 2018-09-30 2018-09-30 A kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform

Publications (1)

Publication Number Publication Date
CN209114452U true CN209114452U (en) 2019-07-16

Family

ID=67200061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821609394.0U Active CN209114452U (en) 2018-09-30 2018-09-30 A kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform

Country Status (1)

Country Link
CN (1) CN209114452U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208564A (en) * 2018-09-30 2019-01-15 中交武汉港湾工程设计研究院有限公司 A kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208564A (en) * 2018-09-30 2019-01-15 中交武汉港湾工程设计研究院有限公司 A kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform

Similar Documents

Publication Publication Date Title
WO2018045772A1 (en) Construction method and construction system for overwater bored piles based on incremental launching movement platform
CN107152027A (en) Offshore wind farm multi-column pier foundation pile sinking construction method and special leading truck
US20200157833A1 (en) Method and apparatus for erecting tower with hydraulic cylinders
CN109208564A (en) A kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform
WO2018000409A1 (en) Pile top-supported walking type moving pile-driving platform
CN102079477A (en) Fan holding and lifting device and mobile overwater operation platform
KR20110100570A (en) Deck ascent and descent type worktable ship and construction method of shore wind power generation facility using the same
CN111913233B (en) Penetration method of self-adjusting hydrostatic penetration device suitable for land and slope areas
CN207277337U (en) The special leading truck of offshore wind farm multi-column pier foundation piling construction
CN102328732A (en) Offshore pile driving, pile pressing and installing united engineering ship
US20150316021A1 (en) A stabilised hydroelectric turbine system
CN209114452U (en) A kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform
CN204455856U (en) A kind of pressure mechanism in place of prefabricated pier
CN115897575B (en) Underwater pile sinking process based on suction barrel type pile stabilizing platform
CN208792357U (en) A kind of control platform for the construction of marine jacket-type blower foundation
CN216948415U (en) Movable stable pile platform suitable for offshore steel pile driving
CN216615834U (en) Marine wind-power single-pile foundation construction special-purpose ship
CN207261176U (en) A kind of offshore wind power platform pitching pile fixing device
CN206562605U (en) Offshore wind farm job platform
CN214940110U (en) Negative pressure barrel type guide frame platform for pile sinking construction
CN210315548U (en) Large-diameter floating type combined pile embracing system
US11131073B2 (en) Method for foundation of a transformer platform and transformer platform with at least three piles
CN105804111A (en) Unequal-length-leg offshore wind power jacket foundation and construction method thereof
CN110130348B (en) Large-diameter floating combined pile embracing system and construction method thereof
CN208415285U (en) A kind of steel cushion cap support leveling system of offshore wind turbine foundation