CN208792357U - A kind of control platform for the construction of marine jacket-type blower foundation - Google Patents

A kind of control platform for the construction of marine jacket-type blower foundation Download PDF

Info

Publication number
CN208792357U
CN208792357U CN201821262973.2U CN201821262973U CN208792357U CN 208792357 U CN208792357 U CN 208792357U CN 201821262973 U CN201821262973 U CN 201821262973U CN 208792357 U CN208792357 U CN 208792357U
Authority
CN
China
Prior art keywords
locating rack
workbench
control platform
leading truck
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821262973.2U
Other languages
Chinese (zh)
Inventor
练学标
张跃辉
季景远
倪辉
焦守增
徐新庆
徐华锋
曹宝勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU BRANCH OF CCCC SHANGHAI PORT ENGINEERING Co Ltd
Original Assignee
JIANGSU BRANCH OF CCCC SHANGHAI PORT ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU BRANCH OF CCCC SHANGHAI PORT ENGINEERING Co Ltd filed Critical JIANGSU BRANCH OF CCCC SHANGHAI PORT ENGINEERING Co Ltd
Priority to CN201821262973.2U priority Critical patent/CN208792357U/en
Application granted granted Critical
Publication of CN208792357U publication Critical patent/CN208792357U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

A kind of control platform for the construction of marine jacket-type blower foundation, including locating rack, locating rack are the tower structure for being set in blower foundation periphery, provide base support for entire control platform, bear external load and pinpoint effect;Top workbench, top workbench are erected at the top of locating rack, the circumferential setting at the top of locating rack;Lower part workbench, lower part workbench are located at below the workbench of top, along the circumferential setting in the periphery of locating rack;Leading truck, leading truck are arranged in the frame of locating rack, and using rigidly fixing or being flexibly connected between locating rack, leading truck, which is equipped with, guarantees that foundation pile passes through pilot hole;Pile holding locator, pile holding locator and pilot hole are arranged in a one-to-one correspondence below leading truck, and pile holding locator is fixedly connected with locating rack.It is equipped in the top periphery of locating rack and leans on ship anticollision component.It can be with effective position foundation pile position, it is ensured that the relative position of foundation pile meets design requirement, and reliable in quality, it is convenient to construct.

Description

A kind of control platform for the construction of marine jacket-type blower foundation
Technical field
It is especially a kind of for marine jacket-type wind the utility model relates to a kind of marine wind electric field construction equipment The control platform of machine foundation construction.
Background technique
Currently, there are two development trends for marine wind electric field construction.Developed first is that it builds the depth of water from intertidal zone to shallow sea, example As Guangdong Province is being built or the projects awaiting construction depth of water reaches 30-50m in recent years;Second is that the single-machine capacity of blower constantly increase and unit by Step enlargement.This certainly will propose new requirement to the basis of offshore wind farm unit, and the Wind turbines used have been put at present Base form has single pile formula, high-rise pile cap formula, gravity type, negative pressure barrel type, jacket-type, and wherein jacket-type basis is due to structure Simply, securely and reliably, speed of application is fast, required construction equipment requires lower, the wind power plant project of neritic province domain was most in recent years Using quadrangle jacket-type blower foundation.
Jacket-type blower foundation is a kind of steel structure frame, which mainly consists of two parts, first is that jacket, Usually triangle, quadrangle or hexagonal are welded with conduit on each angle;Second is that steel-pipe pile (i.e. foundation pile), for jacket is fixed On sea bed, and bear the load transmitted by jacket.There are two types of the connection types of jacket and foundation pile, and one is steel-pipe piles Conduit on jacket is squeezed into subsea strata;Another connection type is steel-pipe pile first to be squeezed on sea bed, then will lead Pipe support end is inserted into foundation pile.Two kinds of connection types require to pour into the annular gap between steel-pipe pile and jacket conduit Jacket and steel-pipe pile are connected into an organic whole, form the basis of wind power generating set by special slurry material.
Using a Under Pile top mark high position 10~20m below the water surface of second of connection type, jacket installation contraposition is equal It carries out under water.Design requirement stake top the relative position error < 50mm, there are no similar engineering precedents at home for this.
The foundation pile of underwater jacket installation uses pile driving barge piling construction, and stake top position deviation is larger.The depth of water is deeper, sea situation Under conditions of poorer, the pile position deviation of pile driving barge pile sinking is bigger.During at sea driving piles, since construction area is wide, work surface Greatly, construction environment and weather conditions are poor, use GPS-RTK measuring technique according to conventional positioning method, stake position error is only capable of reaching ≤300mm.After the completion of pile sinking, about high mud extraction face 10m at the top of foundation pile is in free end state, in external forces such as wave, ocean currents Under, stake top can be continuously in upset condition.If not taking special construction technology and control measure, stake top the relative position error It is unable to satisfy the requirement (< 50mm) of design.
The utility model is constructed for high-precision jacket-type blower foundation and is researched and proposed, and has important practical significance And social benefit.
Summary of the invention
The technical problems to be solved in the utility model is in view of the deficiencies of the prior art, to propose a kind of effective position foundation pile Position, it is ensured that the relative position of foundation pile meets design requirement, and reliable in quality, construction is easily for marine jacket-type blower base The control platform of plinth construction.
The technical problems to be solved in the utility model is achieved through the following technical solutions, and one kind is for marine conduit The control platform of posture blower foundation construction, its main feature is that:
Including locating rack, locating rack is the tower structure for being set in blower foundation periphery, is provided for entire control platform Base support bears external load and pinpoint effect;
Top workbench, top workbench are erected at the top of locating rack, the circumferential setting at the top of locating rack;
Lower part workbench, lower part workbench are located at below the workbench of top, along the circumferential setting in the periphery of locating rack;
Leading truck, leading truck are arranged in the frame of locating rack, use between locating rack and rigidly fix or be flexibly connected, Leading truck, which is equipped with, guarantees that foundation pile passes through pilot hole;
Pile holding locator, pile holding locator and pilot hole are arranged in a one-to-one correspondence below leading truck, pile holding locator and fixed Position frame is fixedly connected.
The technical problems to be solved in the utility model can also further realize by the following technical programs, in locating rack Top periphery be equipped with lean on ship anticollision component.
The technical problems to be solved in the utility model can also further realize by the following technical programs, in locating rack Top is equipped with lifting lug.
The technical problems to be solved in the utility model can also further realize by the following technical programs, and locating rack is It is formed by locating rack head tree, locating rack horizontal brace, locating rack auxiliary strut and locating rack diagonal brace Combination Welding.
The technical problems to be solved in the utility model can also further realize by the following technical programs, and leading truck is It is formed by pilot hole, leading truck diagonal brace and leading truck stull Combination Welding.
The technical problems to be solved in the utility model can also further realize by the following technical programs, lean on ship anticollision Component by ship anticollision steel pipe frame and ladder Combination Welding by forming.
The technical problems to be solved in the utility model can also further realize by the following technical programs, upper and lower part Workbench is equipped with workbench panel and workbench guardrail.
The technical problems to be solved in the utility model can also further realize by the following technical programs, pile holding positioning Device is made of fixation steel plate and intermediate plate, plays the role of fixed foundation pile.
Compared with prior art, locating rack is set in blower foundation periphery to the utility model, provides for entire control platform Base support bears external load and pinpoint effect;Workbench is located at locating rack top, adjusts convenient for construction personnel Pile holding locator, location and installation blower jacket.The utility model patent can be with effective position foundation pile position, it is ensured that the phase of foundation pile Design requirement is met to position, reliable in quality, it is convenient to construct.Location control effectively can be provided for jacket installation, it is ensured that lead Pipe support is smoothly inserted into inside foundation pile in underwater supporting leg.
Detailed description of the invention
Fig. 1 is the structure combination diagram of marine jacket-type blower pile foundation and the utility model;
Fig. 2 is the structural schematic diagram of the utility model;
Fig. 3 is locating rack schematic diagram;
Fig. 4 is lifting lug schematic diagram;
Fig. 5 is by ship anticollision component schematic diagram;
Fig. 6 is workbench schematic diagram;
Fig. 7 is pile holding locator schematic diagram;
Fig. 8 is leading truck schematic diagram.
Specific embodiment
The specific technical solution of the present invention described further below, in order to which those skilled in the art is further understood that The present invention, without constituting the limitation to its right.
A kind of control platform for the construction of marine jacket-type blower foundation, including locating rack, locating rack are to be set in The tower structure of blower foundation periphery provides base support for entire control platform, bears external load and pinpoint Effect;Top workbench, top workbench are erected at the top of locating rack, the circumferential setting at the top of locating rack;Lower part work Platform, lower part workbench are located at below the workbench of top, along the circumferential setting in the periphery of locating rack;Leading truck, guiding are set up It sets in the frame of locating rack, using rigidly fixing or being flexibly connected between locating rack, leading truck, which is equipped with, guarantees that foundation pile is suitable Benefit passes through pilot hole;Pile holding locator, pile holding locator and pilot hole are arranged in a one-to-one correspondence below leading truck, pile holding locator It is fixedly connected with locating rack.
It is equipped in the top periphery of locating rack and leans on ship anticollision component.Lifting lug is equipped at the top of locating rack.
Control platform includes a locating rack main structure stress system, a leading truck auxiliary construction structure and attached sets It applies.Locating rack main structure is steel pipe framework structure, provides base support for entire control platform, bears external load and accurately determine The effect of position;Leading truck auxiliary construction structure is the steel framework structure with pilot hole, provides guiding work for the construction of foundation pile With;Affiliated facility includes lifting lug, by ship anticollision component, pile holding locator and workbench etc., for marine jacket-type blower base Plinth construction provides safe mass guarantee.
Locating rack main structure stress system is steel pipe framework structure, is formed by the steel-pipe welding of major diameter, heavy wall, main structure Top view can be triangle, quadrangle, hexagon etc., depending on foundation pile arrange shape depending on.Between suspension column by horizontal brace with Diagonal brace plays the role of transfer charge and reinforces locating rack intensity as pull rod.In Construction control Platform Structure Design, determine The principal outline size of jacket is a critically important job, and main contents are as follows:
(1) crest level of Construction control platform;
(2) the bottom elevation of Construction control platform;
(3) the interlayer elevation of Construction control platform;
(4) scantling of column, horizontal brace, diagonal brace;
When carrying out structure general layout, Ying Jinliang makes rod piece that can play larger effect, bar under various stresses Number of packages amount and specification make every effort to few, symmetrical configuration.
Leading truck is the steel framework structure with pilot hole, and leading truck is located on the inside of locating rack, can between locating rack To be to rigidly fix, it is also possible to be flexibly connected;The diameter of pilot hole is more bigger than foundation pile diameter, both can guarantee that foundation pile smoothly led to Pilot hole pile sinking is crossed, and guiding role can be played.By adjusting the connection distance between leading truck and locating rack, may be implemented Locating rack is suitable for a variety of different pipe dimensions framves bases, and leading truck may be only available between the same shape arrangement, same foundation pile Foundation pile construction away from, same diameter dimension.
Affiliated facility includes lifting lug, by ship anticollision component, pile holding locator and workbench etc., is needed according to live practical Accessory structure is rationally arranged in conditions of demand.
The structure type of the utility model patent needs, plane geometry determining according to the arrangement form of offshore wind farm foundation pile Shape need to be identical with foundation pile shape, is suitable for different shape, various sizes of blower pile foundation construction.
The size and steel pipe model of the components such as column, horizontal brace, the diagonal brace of locating rack need to be according to sea water advanced, geology feelings The combined factors such as condition, foundation pile absolute altitude are selected.
Locating rack lower part stull optimum position at the absolute altitude of mud face, the stability of control platform by column embedded depth And the buoyant state co- controlling of each component steel pipe.
The control platform that design is completed need to be hung with crane ship to designated position in land formation.
Foundation pile is constructed under the auxiliary positioning effect of control platform, and after the completion of foundation pile construction, jacket contraposition is placed to The process of foundation pile also needs the auxiliary positioning of control platform.
The steel structure frame of locating rack, leading truck can be made of steel such as I-steel, H profile steels;In addition it can position Frame lower beam welds mud mat to reach control platform and provide base support, receiving external load and pinpoint effect.
As shown in the figure, in which: 1- blower jacket, 2- control platform, 3- blower foundation pile, 4- locating rack, 5- leading truck, 6- Top workbench, the lower part 7- workbench, 8- are stood by ship anticollision component, 9- pile holding locator, 10- lifting lug, 11- locating rack master Column, 12- locating rack horizontal brace, 13- locating rack auxiliary strut, 14- locating rack diagonal brace, 15- lean on ship anticollision steel pipe frame, 16- ladder, 17- workbench panel, 18- workbench guardrail, 19- fixation steel plate, 20- intermediate plate, 21- pilot hole, 22- leading truck diagonal brace, 23- leading truck stull.
In conjunction with shown in attached drawing 1~8, jacket-type blower foundation is made of blower jacket (1) and blower foundation pile (3);Control Platform (2) processed by locating rack (4), leading truck (5) and top workbench (6), lower part workbench (7), lean on ship anticollision component (8), the affiliated facilities such as pile holding locator (9), lifting lug (10) form;Wherein locating rack (4) is by locating rack head tree (11), determines Position frame horizontal brace (12), locating rack auxiliary strut (13) and locating rack diagonal brace (14) are welded, and locating rack material therefor is big The steel pipe of diameter, heavy wall;Leading truck is welded by pilot hole (21), leading truck diagonal brace (22) and leading truck stull (23), Pilot hole need to be made according to foundation pile diameter, and leading truck diagonal brace, stull can be welded with steel pipe or fashioned iron;By ship anticollision Component (8) by ship anticollision steel pipe frame (15) and ladder (16) by being welded, and control platform is lost caused by can preventing because of ship collision Surely, while convenient for construction personnel enter workbench (6,7);Upper and lower part workbench (6,7) by workbench panel (17) and Workbench guardrail (18) is welded, and adjusts pile holding locator (9), location and installation blower jacket (1) convenient for construction personnel; Pile holding locator (9) is made of fixation steel plate (19) and intermediate plate (20), plays the role of fixed foundation pile.

Claims (8)

1. a kind of control platform for the construction of marine jacket-type blower foundation, it is characterised in that:
Including locating rack, locating rack is the tower structure for being set in blower foundation periphery, provides basis for entire control platform External load and pinpoint effect are born in support;
Top workbench, top workbench are erected at the top of locating rack, the circumferential setting at the top of locating rack;
Lower part workbench, lower part workbench are located at below the workbench of top, along the circumferential setting in the periphery of locating rack;
Leading truck, leading truck are arranged in the frame of locating rack, using rigidly fixing or being flexibly connected between locating rack, are oriented to Frame, which is equipped with, guarantees that foundation pile passes through pilot hole;
Pile holding locator, pile holding locator and pilot hole are arranged in a one-to-one correspondence below leading truck, pile holding locator and locating rack It is fixedly connected.
2. the control platform according to claim 1 for marine jacket-type blower foundation construction, it is characterised in that: The top periphery of locating rack, which is equipped with, leans on ship anticollision component.
3. the control platform according to claim 1 for marine jacket-type blower foundation construction, it is characterised in that: Lifting lug is equipped at the top of locating rack.
4. the control platform according to claim 1 for marine jacket-type blower foundation construction, it is characterised in that: fixed Position frame is formed by locating rack head tree, locating rack horizontal brace, locating rack auxiliary strut and locating rack diagonal brace Combination Welding.
5. the control platform according to claim 1 for marine jacket-type blower foundation construction, it is characterised in that: lead It to frame is formed by pilot hole, leading truck diagonal brace and leading truck stull Combination Welding.
6. the control platform according to claim 2 for marine jacket-type blower foundation construction, it is characterised in that: lean on Ship anticollision component by ship anticollision steel pipe frame and ladder Combination Welding by forming.
7. the control platform according to claim 1 for marine jacket-type blower foundation construction, it is characterised in that: Upper and lower part workbench is equipped with workbench panel and workbench guardrail.
8. the control platform according to claim 1 for marine jacket-type blower foundation construction, it is characterised in that: embrace Stake locator is made of fixation steel plate and intermediate plate, plays the role of fixed foundation pile.
CN201821262973.2U 2018-08-07 2018-08-07 A kind of control platform for the construction of marine jacket-type blower foundation Active CN208792357U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821262973.2U CN208792357U (en) 2018-08-07 2018-08-07 A kind of control platform for the construction of marine jacket-type blower foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821262973.2U CN208792357U (en) 2018-08-07 2018-08-07 A kind of control platform for the construction of marine jacket-type blower foundation

Publications (1)

Publication Number Publication Date
CN208792357U true CN208792357U (en) 2019-04-26

Family

ID=66204780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821262973.2U Active CN208792357U (en) 2018-08-07 2018-08-07 A kind of control platform for the construction of marine jacket-type blower foundation

Country Status (1)

Country Link
CN (1) CN208792357U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110980495A (en) * 2019-12-19 2020-04-10 南通泰胜蓝岛海洋工程有限公司 Jacket anti-sinking plate and hoisting and turning-over process thereof
CN111532983A (en) * 2020-05-29 2020-08-14 中交一航局第二工程有限公司 Single-point hoisting pile erecting system and pile erecting construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110980495A (en) * 2019-12-19 2020-04-10 南通泰胜蓝岛海洋工程有限公司 Jacket anti-sinking plate and hoisting and turning-over process thereof
CN111532983A (en) * 2020-05-29 2020-08-14 中交一航局第二工程有限公司 Single-point hoisting pile erecting system and pile erecting construction method

Similar Documents

Publication Publication Date Title
CN109629568A (en) The process for sinking of the steady stake platform of offshore wind farm jacket foundation steel pipe pile floating
AU2012204091B2 (en) Method for providing a foundation for a mass located at height, and a positioning frame for performing the method
CN105926628B (en) One kind is floated, fixed convertible pile foundation in water construction platform device
CN107152027A (en) Offshore wind farm multi-column pier foundation pile sinking construction method and special leading truck
CN108571425B (en) Pile foundation cap foundation of offshore wind turbine generator set and construction method thereof
CN104727336A (en) Construction method of large single-pipe pile foundation of shallow-sea wind power plant
KR20110092257A (en) Barge device for installation of tidal power structure
CN102328732A (en) Offshore pile driving, pile pressing and installing united engineering ship
CN208792357U (en) A kind of control platform for the construction of marine jacket-type blower foundation
CN203729330U (en) Positioning frame of subway station section steel column formed through cover and cut-top down method
CN105464117A (en) Rotary-type overwater piling guide frame and piling process for overwater pile group foundations
CN114319356A (en) Offshore wind power single-pile foundation construction method and special ship
CN104805814A (en) Self-elevating platform pile leg mounting method
CN202577305U (en) Steel column positioner
EP2591175A1 (en) Surface-breaking re-usable submergeable template for installing one or more submerged columns/piles
CN111456009A (en) Engineering pile guiding device in piling construction and using method thereof
CN209538210U (en) A kind of interpolation type offshore wind farm jacket basis carrying steady pipe casing
CN208415258U (en) A kind of piling positioning mould bases of offshore wind turbine foundation
CN104594317B (en) Working platform, single pile foundation, offshore working platform and installing method of offshore working platform
CN210887261U (en) Steel cofferdam with locate function
CN217231978U (en) Underwater measurement frame for offshore wind power jacket foundation pipe pile
CN217977720U (en) Construction equipment for penetrating and installing prefabricated steel sleeve pipeline in well in first-sinking and then-dragging type
CN216615834U (en) Marine wind-power single-pile foundation construction special-purpose ship
CN201495556U (en) Structure for quickly hoisting and centering base of large steel frame
CN105804111A (en) Unequal-length-leg offshore wind power jacket foundation and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant