CN207277337U - The special leading truck of offshore wind farm multi-column pier foundation piling construction - Google Patents

The special leading truck of offshore wind farm multi-column pier foundation piling construction Download PDF

Info

Publication number
CN207277337U
CN207277337U CN201720738366.8U CN201720738366U CN207277337U CN 207277337 U CN207277337 U CN 207277337U CN 201720738366 U CN201720738366 U CN 201720738366U CN 207277337 U CN207277337 U CN 207277337U
Authority
CN
China
Prior art keywords
leading truck
grouser
conduit
downcomer
piling bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720738366.8U
Other languages
Chinese (zh)
Inventor
黄锡柱
陈龙剑
张青海
朱代炼
王书稳
朱晓超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG HUAERCHEN OFFSHORE WIND POWER ENGINEERING Co Ltd
Original Assignee
GUANGDONG HUAERCHEN OFFSHORE WIND POWER ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG HUAERCHEN OFFSHORE WIND POWER ENGINEERING Co Ltd filed Critical GUANGDONG HUAERCHEN OFFSHORE WIND POWER ENGINEERING Co Ltd
Priority to CN201720738366.8U priority Critical patent/CN207277337U/en
Application granted granted Critical
Publication of CN207277337U publication Critical patent/CN207277337U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a kind of special leading truck of offshore wind farm multi-column pier foundation piling construction, including upper leading truck and lower leading truck, the upper leading truck includes four conduits on the piling bar of symmetry arrangement two-by-two, and conduit on grouser is equipped with each two piling bar between conduit, connected on conduit and grouser between conduit by upper girder steel on the piling bar;The lower leading truck includes the piling bar downcomer of four symmetry arrangements two-by-two, and grouser downcomer is equipped between each two piling bar downcomer, connected between the piling bar downcomer and grouser downcomer by lower girder steel, the suspension arrangement of leading truck can be lifted by being equipped with the top of the grouser, the upper leading truck before lower leading truck with being bolted as an entirety, the leading truck, which can sit bottom, becomes interim fixed platform, and can also be suspended on grouser becomes interim floating platform.Special leading truck provided by the utility model has the features such as positioning is fast, and precision is high, while the requirement to ship machine equipment is relatively low, reduces construction cost.

Description

The special leading truck of offshore wind farm multi-column pier foundation piling construction
Technical field
It the utility model is related to a kind of special leading truck of offshore wind farm multi-column pier foundation piling construction.
Background technology
With the fast development of domestic Oversea wind power generation, especially high-power wind-driven generator and deep water offshore wind field, The geological conditions difference of different waters is huge, and offshore wind turbine foundation allows for adapting to Various Complex geology, multi-column pier foundation conduct A kind of main offshore wind power foundation pattern, has a wide range of applications meaning, especially opens promoting southeastern coast marine wind electric field Hair has the function that important.
Single-pile foundation guide body structure stress is obvious, can locate on the quarter by transforming placement leading truck, but clump of piles base temporarily Plinth structure is more scattered, can not be realized by directly locating to place leading truck on the quarter.
Thus, need us to design for above-mentioned requirements a kind of easy for construction, and can ensure piling bar position, vertical Degree, elevation and height difference are accurate, the construction method of steel pile structure uniform force and science, and make in a kind of this method of design Special leading truck.
Utility model content
For overcome the deficiencies in the prior art, it is special that the utility model provides a kind of offshore wind farm multi-column pier foundation piling construction Leading truck.
Technical solution is used by the utility model solves its technical problem:
The special leading truck of offshore wind farm multi-column pier foundation piling construction, it is characterised in that:Including upper leading truck and lower leading truck, The upper leading truck includes four conduits on the piling bar of symmetry arrangement two-by-two, and is equipped with each two piling bar between conduit on grouser Conduit, is connected on conduit and grouser between conduit by upper girder steel on the piling bar;The lower leading truck is right two-by-two including four Claim the piling bar downcomer of arrangement, and be equipped with grouser downcomer between each two piling bar downcomer, the piling bar downcomer with temporarily Connected, be bolted between the upper leading truck and lower leading truck as an entirety by lower girder steel between stake downcomer, and Conduit and corresponding grouser downcomer are coaxial on grouser, on each piling bar the top ends of conduit be equipped with it is some being capable of school The guide wheel group of positive piling bar verticality, the piling bar downcomer low side are welded with mud mat, and being equipped with the top of the grouser to carry Rise the suspension arrangement of leading truck.
The guide wheel group includes the oil hydraulic cylinder being fixed on leading truck, and the piston rod end of the oil hydraulic cylinder is connected with cunning Block, the sliding block are equipped with shaft, which is equipped with roller.
Limited block is equipped with the conduit.
The top ends annular of conduit is evenly equipped with four groups of guide wheel groups on the piling bar.
It is additionally provided with the upper oblique girder steel for strengthening connection on the piling bar on conduit and grouser between conduit;Under the piling bar The oblique girder steel for strengthening connection is additionally provided between conduit and grouser downcomer.
The mud mat is equipped with some through holes.
The suspension arrangement of leading truck can be lifted by being equipped with the top of the grouser.
Conduit is bolted as the casing of an entirety with corresponding piling bar downcomer on the piling bar.
Horizontal scale line is provided with described sleeve pipe.
The beneficial effects of the utility model are:The leading truck back welding of the utility model has mud mat, and leading truck passes through anti-settling Plate is put on sea bed, if sea bed is slightly concavo-convex, because anti-settling plate suqare is big, thus entirety can also keep smooth, avoid to ship machine Transformation for installing special leading truck.But since mud mat is absorbed in the mud of sea bed, the difficulty of lifting is added, because And this leading truck uses removable upper and lower double-layer structure, can be selected leading truck in connection and lower guiding after the completion of piling The Bolt dismantling of frame falls, and the layering of upper and lower two layers of leading truck is sling, and upper and lower two layers of leading truck can also be selected together to sling.It is anti-settling Plate is equipped with some through holes, can reduce mud to mud mat suction-operated.
The utility model, which can sit bottom, becomes interim fixed platform, and can also be suspended on grouser becomes interim floating Platform, has the features such as positioning is fast, and precision is high, and has the function that rapid construction, greatly improves China's offshore wind farm construction Technical merit
Construction cost is greatly reduced, promotes the development in China offshore wind farm market.
Brief description of the drawings
The utility model is further illustrated with reference to the accompanying drawings and examples.
Fig. 1 is the positive structure diagram of the utility model;
Fig. 2 is the overlooking the structure diagram of the utility model;
Fig. 3 is partial enlarged view at the A of Fig. 1.
Embodiment
Referring to figs. 1 to Fig. 3, the utility model discloses a kind of special leading truck of offshore wind farm multi-column pier foundation piling construction, Including upper leading truck 1 and lower leading truck 2, the upper leading truck 1 includes four conduits 11 on the piling bar of symmetry arrangement, and often two-by-two Conduit 12 on grouser is equipped with two piling bars between conduit 11, on the piling bar on conduit 11 and grouser between conduit 12 by upper Girder steel 13 connects;The lower leading truck 2 includes the piling bar downcomer 21 of four symmetry arrangements two-by-two, and each two piling bar downcomer Grouser downcomer 22 is equipped between 21, is connected between the piling bar downcomer 21 and grouser downcomer 22 by lower girder steel 23, institute Conduit 11 and corresponding piling bar downcomer 21 on piling bar is stated to be bolted as a casing, thus also make leading truck 1 with Lower leading truck 2 is connected as an entirety, and conduit 12 and corresponding grouser downcomer 22 are coaxial on grouser, connects to increase Connect the upper tiltedly girder steel 14 being additionally provided with intensity piling bar on conduit 11 and grouser between conduit 12 for strengthening connection;Under the piling bar The oblique girder steel 24 for strengthening connection is additionally provided between conduit 21 and grouser downcomer 22.In said structure, grouser passes through Conduit 12 and corresponding grouser downcomer 22 import on grouser, again hang up leading truck after grouser is squeezed into, by outstanding Hang device hangs over leading truck on grouser, which is a hangoff receptacle 15 for being positioned over grouser top, the hangoff receptacle 15 edge is equipped with hanger bar 16, which is locked by bolt and upper leading truck 1, so that leading truck be hung on On grouser, by leading truck leveling while suspension, form interim floating piling platform, thus by piling bar from piling bar conduit 11 And corresponding piling bar downcomer 21 imports and hammers predetermined absolute altitude into shape, and horizontal scale line is provided with the leading truck casing.
Certainly it is above-mentioned simply we leading truck 1 is used according to construction requirement and environment it is a kind of specifically chosen;In difference Construction requirement and environment under, leading truck can be also integrally placed on sea bed by we, and insertion grouser fixed position, measurement is led To frame levelness, design level is reached by the fine setting of local ballast, forms interim fixed piling platform.
As shown in the figure, in order to ensure the verticality of piling bar during piling bar is squeezed into, conduit 11 on each piling bar Top ends be equipped with four groups of guide wheel groups 3 that can correct piling bar verticality, the guide wheel group 3 includes being fixed on leading truck Oil hydraulic cylinder 31 on 1, the piston rod end of the oil hydraulic cylinder 31 are connected with sliding block 32, which is equipped with shaft 33, the shaft 33 are equipped with roller 34, and upper leading truck 1 is equipped with the conduit 35 that guide shoe 32 is slided, thus by controlling each oil hydraulic cylinder 31 The position of respective roller 34 can be just controlled, piling bar is pushed with regard to piling bar can be made to keep vertical by roller 34, and in conduit 35 Equipped with limited block 36, the shift position for control slide block 32.
A kind of special leading truck of offshore wind farm multi-column pier foundation piling construction provided above the utility model embodiment, It is described in detail, specific case used herein is set forth the principle and embodiment of the utility model, with The explanation of upper embodiment is only intended to help the method and its core concept for understanding the utility model;Meanwhile for this area Those skilled in the art, according to the thought of the utility model, there will be changes, comprehensive in specific embodiments and applications Upper described, this specification content should not be construed as the limitation to the utility model.

Claims (9)

1. the special leading truck of offshore wind farm multi-column pier foundation piling construction, it is characterised in that:Including upper leading truck and lower leading truck, institute Stating leading truck includes four conduits on the piling bar of symmetry arrangement two-by-two, and is equipped with grouser and leads between conduit on each two piling bar Pipe, is connected on conduit and grouser between conduit by upper girder steel on the piling bar;The lower leading truck is symmetrical two-by-two including four The piling bar downcomer of arrangement, and grouser downcomer is equipped between each two piling bar downcomer, the piling bar downcomer and grouser Connected, be bolted between the upper leading truck and lower leading truck as an entirety, and face by lower girder steel between downcomer When the upper conduit of stake it is coaxial with corresponding grouser downcomer, the top ends of conduit can be corrected equipped with some on each piling bar The guide wheel group of piling bar verticality, the piling bar downcomer low side are welded with mud mat, and being equipped with the top of the grouser to be lifted The suspension arrangement of leading truck.
2. the special leading truck of offshore wind farm multi-column pier foundation piling construction according to claim 1, it is characterised in that:It is described to lead The oil hydraulic cylinder for including being fixed on upper leading truck to wheel group, the piston rod end of the oil hydraulic cylinder is connected with sliding block, is set on the sliding block There is shaft, which is equipped with roller.
3. the special leading truck of offshore wind farm multi-column pier foundation piling construction according to claim 2, it is characterised in that:It is described to lead Limited block is equipped with pipe.
4. the special leading truck of offshore wind farm multi-column pier foundation piling construction according to claim 2, it is characterised in that:The steel The top ends annular of conduit is evenly equipped with four groups of guide wheel groups in stake.
5. the special leading truck of offshore wind farm multi-column pier foundation piling construction according to claim 1, it is characterised in that:The steel It is additionally provided with the upper oblique girder steel for strengthening connection in stake on conduit and grouser between conduit;Under the piling bar downcomer and grouser The oblique girder steel for strengthening connection is additionally provided between conduit.
6. the special leading truck of offshore wind farm multi-column pier foundation piling construction according to claim 1, it is characterised in that:It is described anti- Heavy plate is equipped with some through holes.
7. the special leading truck of offshore wind farm multi-column pier foundation piling construction according to claim 1, it is characterised in that:It is described to face When stake top portion be equipped with and can lift the suspension arrangement of leading truck.
8. the special leading truck of offshore wind farm multi-column pier foundation piling construction according to claim 1, it is characterised in that:The steel Conduit is bolted as the casing of an entirety with corresponding piling bar downcomer in stake.
9. the special leading truck of offshore wind farm multi-column pier foundation piling construction according to claim 8, it is characterised in that:The set Horizontal scale line is provided with pipe.
CN201720738366.8U 2017-06-22 2017-06-22 The special leading truck of offshore wind farm multi-column pier foundation piling construction Active CN207277337U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720738366.8U CN207277337U (en) 2017-06-22 2017-06-22 The special leading truck of offshore wind farm multi-column pier foundation piling construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720738366.8U CN207277337U (en) 2017-06-22 2017-06-22 The special leading truck of offshore wind farm multi-column pier foundation piling construction

Publications (1)

Publication Number Publication Date
CN207277337U true CN207277337U (en) 2018-04-27

Family

ID=61993034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720738366.8U Active CN207277337U (en) 2017-06-22 2017-06-22 The special leading truck of offshore wind farm multi-column pier foundation piling construction

Country Status (1)

Country Link
CN (1) CN207277337U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107152027A (en) * 2017-06-22 2017-09-12 广东华尔辰海上风电工程有限责任公司 Offshore wind farm multi-column pier foundation pile sinking construction method and special leading truck
CN109208624A (en) * 2018-11-06 2019-01-15 江苏龙源振华海洋工程有限公司 A kind of offshore boosting station jacket leveling construction technology
CN110185390A (en) * 2019-06-10 2019-08-30 中铁五局集团建筑工程有限责任公司 A kind of mini pile clump of piles boring positioning guiding device and application method
CN110804948A (en) * 2019-10-31 2020-02-18 安徽省路港工程有限责任公司 Construction method of steel pipe pile bailey truss foundation full-space bracket system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107152027A (en) * 2017-06-22 2017-09-12 广东华尔辰海上风电工程有限责任公司 Offshore wind farm multi-column pier foundation pile sinking construction method and special leading truck
CN109208624A (en) * 2018-11-06 2019-01-15 江苏龙源振华海洋工程有限公司 A kind of offshore boosting station jacket leveling construction technology
CN110185390A (en) * 2019-06-10 2019-08-30 中铁五局集团建筑工程有限责任公司 A kind of mini pile clump of piles boring positioning guiding device and application method
CN110804948A (en) * 2019-10-31 2020-02-18 安徽省路港工程有限责任公司 Construction method of steel pipe pile bailey truss foundation full-space bracket system
CN110804948B (en) * 2019-10-31 2021-05-11 安徽省路港工程有限责任公司 Construction method of steel pipe pile bailey truss foundation full-space bracket system

Similar Documents

Publication Publication Date Title
CN207277337U (en) The special leading truck of offshore wind farm multi-column pier foundation piling construction
CN107152027A (en) Offshore wind farm multi-column pier foundation pile sinking construction method and special leading truck
CN101538844B (en) Construction method for building large-scale offshore wind farm with depth more than 2m
CN107142918B (en) Marine half floading condition operational method of self-elevating work platform
CN109629568A (en) The process for sinking of the steady stake platform of offshore wind farm jacket foundation steel pipe pile floating
GB2502876A (en) Support structure installation, eg for offshore wind turbines
CN202323978U (en) Base components for offshore wind power set installation
CN205917719U (en) Marine anemometer tower of multi -bucket negative -pressure barrel formula
CN111913233A (en) Self-adjusting hydrostatic force injection device and method suitable for land and slope area
CN204676584U (en) A kind of high stake truss-like offshore wind turbine foundation structure
CN103161174A (en) Offshore wind turbine generator set installation fundamental assembly
CN103243732A (en) Installing method of marine anemometer tower base structure
CN202543954U (en) Multiangular frame foundation for offshore wind power generator
CN109208564A (en) A kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform
CN211006604U (en) Offshore wind turbine generator system positioning support guide frame
CN218843097U (en) Deep water area underwater pile sinking positioning guide frame
CN207261176U (en) A kind of offshore wind power platform pitching pile fixing device
CN106948367B (en) Wind power foundation assembled by quadrangular jacket column jacket and construction method thereof
CN107795438A (en) A kind of construction method of assistance platform
CN111101497A (en) Offshore booster station structure capable of being integrally transported and installed
CN114635427B (en) Underwater guide frame
CN205776423U (en) A kind of levelling device for offshore wind farm catheterostat basis
CN207376596U (en) Jacket
CN106939613B (en) A kind of four rise gantry type wind power foundation structure and its construction method certainly
CN209114452U (en) A kind of steady stake of offshore wind farm pile foundation automatic positoning and drilling platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant