CN209114328U - A kind of bridge construction curing means - Google Patents
A kind of bridge construction curing means Download PDFInfo
- Publication number
- CN209114328U CN209114328U CN201821137172.3U CN201821137172U CN209114328U CN 209114328 U CN209114328 U CN 209114328U CN 201821137172 U CN201821137172 U CN 201821137172U CN 209114328 U CN209114328 U CN 209114328U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- gear
- bull stick
- inner cavity
- cabinet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of bridge construction curing means, including pedestal and connecting band, water tank is fixedly connected on the left of the base top, water inlet pipe is communicated on the left of the tank top, the inner cavity of the water tank is provided with water pump, and the water outlet of the water pump through water tank and is communicated with hose, and the hose is communicated with siphunculus far from one end of water pump, the right end of the siphunculus is communicated with spray head, is fixedly connected with cabinet on the right side of the base top.The utility model is used cooperatively by setting motor, the first belt pulley, the first bull stick, the second belt pulley, first gear, second gear, the second bull stick, third gear, tooth plate and box body, solves the problems, such as existing bridge construction curing means low efficiency, the bridge construction curing means, has efficient advantage, the working efficiency for improving worker reduces the working strength of worker, easy to operate, it accelerates construction progress, is conducive to the use of people.
Description
Technical field
The utility model relates to bridge construction technology field, specially a kind of bridge construction curing means.
Background technique
Bridge refers to as road the building built across natural or cultural obstacle, it is erected at rivers,lakes and seas
On, make traffic etc. that can smoothly pass through, bridge is generally made of superstructure, substructure and attached structure, top knot
Structure refers mainly to bridge span structure and support system;Substructure includes abutment, bridge pier and basis;Attached structure then refers to that end of the bridge is taken
Plate, truncated cone banking, shore protection, training works etc., bridge is divided according to structural system, has beam bridge, arch bridge, rigid frame bridge, suspension cable to hold
Weight (suspension bridge, cable-stayed bridge) four kinds of primary structures, can use curing means in bridge construction, and bridge can carry out it in construction
Sprinkling maintenance, existing maintenance watering device are that fixation sprinkles water to a direction, reduce the working efficiency of worker, increase
The working strength of worker is added, operating difficulties is unfavorable for the use of people.
Utility model content
The purpose of this utility model is to provide a kind of bridge construction curing means, have efficient advantage, solve
The problem of existing bridge construction curing means low efficiency.
To achieve the above object, the utility model provides the following technical solutions: a kind of bridge construction curing means, including
Pedestal and connecting band are fixedly connected with water tank on the left of the base top, are communicated with water inlet pipe on the left of the tank top,
The inner cavity of the water tank is provided with water pump, and the water outlet of the water pump through water tank and is communicated with hose, and the hose is far from water
One end of pump is communicated with siphunculus, and the right end of the siphunculus is communicated with spray head, is fixedly connected with cabinet on the right side of the base top,
The bottom of the cabinets cavity is fixedly connected with motor, and the surface of the machine shaft is arranged with the first belt pulley, the cabinet
Inner cavity be provided with the first bull stick, and the top and bottom of the first bull stick pass through bearing and are flexibly connected with the inner wall of cabinet, institute
The surface for stating the first bull stick is arranged with the second belt pulley, and the second belt pulley and the first belt pulley are sequentially connected by connecting band,
The surface of first bull stick is arranged with first gear, and second gear, second tooth are engaged on the right side of the first gear
It takes turns and is fixedly connected with the second bull stick at the center at top, and company is fixed through cabinet and with the bottom of siphunculus in the top of the second bull stick
It connects, the surface that second bull stick is located in the box body chamber one end is arranged with third gear, and the back side of the third gear is engaged with
Tooth plate, box body is fixedly connected on the right side of the cabinets cavity, and the right end of the tooth plate through box body and is fixedly connected with support
Plate is fixedly connected with spring on the right side of the support plate, and the top and bottom of the box cavity offer sliding slot, the branch
Slide bar is fixedly connected at the top and bottom of fagging, and slide bar extends to the inner cavity of sliding slot far from one end of support plate.
Preferably, it is provided with pipe lid at the top of the water inlet pipe, is provided with handle at the top of the pipe lid.
Preferably, the two sides of the base bottom are fixedly connected to supporting leg, and the bottom of the supporting leg passes through shaft activity
It is connected with runner.
Preferably, the two sides of the motor are fixedly connected to fixed block, and the bottom of the bottom of fixed block and cabinets cavity
Portion is fixedly connected.
Compared with prior art, the beneficial effects of the utility model are as follows:
1, the utility model passes through setting motor, the first belt pulley, the first bull stick, the second belt pulley, first gear, second
Gear, the second bull stick, third gear, tooth plate and box body are used cooperatively, and are solved existing bridge construction and are imitated with curing means
The low problem of rate, the bridge construction curing means, has efficient advantage, improves the working efficiency of worker, reduces
The working strength of worker, it is easy to operate, it accelerates construction progress, is conducive to the use of people.
2, the utility model can prevent foreign matter from entering water tank by setting pipe lid, damage water pump, ensure that construction
It is normally carried out, by setting supporting leg and runner, can effectively reduce the frictional force on pedestal and ground, improve the work of worker
Make efficiency, be convenient for people to use, by the way that fixed block is arranged, motor more steady operation at work can be made, ensure that and apply
Work is normally carried out.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the partial structural diagram in the utility model Fig. 1;
Fig. 3 is the partial structural diagram in the utility model Fig. 1;
Fig. 4 is the local structure top view in the utility model Fig. 2;
Fig. 5 is the local structure top view in the utility model Fig. 2.
In figure: 1 pedestal, 2 connecting bands, 3 water tanks, 4 water inlet pipes, 5 water pumps, 6 hoses, 7 siphunculus, 8 spray heads, 9 cabinets, 10 electricity
Machine, 11 first belt pulleys, 12 first bull sticks, 13 second belt pulleys, 14 first gears, 15 second gears, 16 second bull sticks, 17
Three gears, 18 tooth plates, 19 box bodys, 20 support plates, 21 springs, 22 sliding slots, 23 slide bars, 24 pipe lids, 25 supporting legs, 26 runners, 27 are consolidated
Determine block.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
It is equal to please refer to Fig. 1-5, a kind of beam construction curing means, including pedestal 1 and connecting band 2, the two sides of 1 bottom of pedestal
It is fixedly connected with supporting leg 25, the bottom of supporting leg 25 is connected with runner 26 by shaft, by the way that supporting leg 25 and runner 26 is arranged,
The frictional force that pedestal 1 and ground can effectively be reduced, improves the working efficiency of worker, is convenient for people to use, and pedestal 1 pushes up
Water tank 3 is fixedly connected on the left of portion, the left side at 3 top of water tank is communicated with water inlet pipe 4, and the top of water inlet pipe 4 is provided with pipe lid
24, the top of pipe lid 24 is provided with handle, by the way that pipe lid 24 is arranged, can prevent foreign matter from entering water tank 3, damage water pump 5, protect
Being normally carried out for construction is demonstrate,proved, the inner cavity of water tank 3 is provided with water pump 5, and the water outlet of water pump 5 through water tank 3 and is communicated with hose
6, hose 6 is communicated with siphunculus 7 far from one end of water pump 5, and the right end of siphunculus 7 is communicated with spray head 8, and the right side at 1 top of pedestal is fixed
It is connected with cabinet 9, the bottom of 9 inner cavity of cabinet is fixedly connected with motor 10, and the two sides of motor 10 are fixedly connected to fixed block 27,
And the bottom of fixed block 27 is fixedly connected with the bottom of 9 inner cavity of cabinet, by the way that fixed block 27 is arranged, motor 10 can be made to work
In more steady operation, ensure that being normally carried out for construction, the surface of 10 shaft of motor is arranged with the first belt pulley 11, cabinet
9 inner cavity is provided with the first bull stick 12, and the top and bottom of the first bull stick 12 pass through bearing and the inner wall activity of cabinet 9 connects
It connects, the surface of the first bull stick 12 is arranged with the second belt pulley 13, and the second belt pulley 13 and the first belt pulley 11 pass through connecting band 2
Transmission connection, the surface of the first bull stick 12 are arranged with first gear 14, and the right side of first gear 14 is engaged with second gear 15, the
Be fixedly connected with the second bull stick 16 at the center at the top of two gear 15, and the top of the second bull stick 16 through cabinet 9 and with siphunculus 7
Bottom be fixedly connected, the surface that the second bull stick 16 is located at 9 inner cavity one end of cabinet is arranged with third gear 17, third gear 17
The back side is engaged with tooth plate 18, and box body 19 is fixedly connected on the right side of 9 inner cavity of cabinet, and the right end of tooth plate 18 through box body 19 and is fixed
It is connected with support plate 20, the right side of support plate 20 is fixedly connected with spring 21, and the top and bottom of 19 inner cavity of box body offer
Sliding slot 22, the top and bottom of support plate 20 are fixedly connected to slide bar 23, and slide bar 23 extends far from one end of support plate 20
To the inner cavity of sliding slot 22, by the way that motor 10, the first belt pulley 11, the first bull stick 12, the second belt pulley 13, first gear is arranged
14, second gear 15, the second bull stick 16, third gear 17, tooth plate 18 and box body 19 are used cooperatively, and solve existing bridge
The problem of construction curing means low efficiency, which has efficient advantage, improves worker's
Working efficiency reduces the working strength of worker, easy to operate, accelerates construction progress, is conducive to the use of people.
In use, the water in water tank 3 is transferred to hose 6 by water pump 5, by being used cooperatively for siphunculus 7, by spray head 8 to
Outer sprinkling, starts motor 10, and motor 10 drives the rotation of the first belt pulley 11, passes through being used cooperatively for connecting band 2, the first belt pulley
11 drive the rotation of the second belt pulley 13, and the second belt pulley 13 drives the rotation of the first bull stick 12, and the first bull stick 12 drives first gear
14 rotations, first gear 14 drive second gear 15 to rotate, and second gear 15 drives the rotation of the second bull stick 16,16 band of the second bull stick
Dynamic siphunculus 7 rotates, and siphunculus 7 drives spray head 8 to rotate, while the second bull stick 16 drives third gear 17 to rotate, 17 band of third gear
Moving tooth plate 18 is moved to the left, and by being used cooperatively for sliding slot 22 and slide bar 23, tooth plate 18 drives support plate 20 to be moved to the left, and is supported
20 extension spring 21 of plate, by the reaction force of spring 21, passes through sliding slot when first gear 14 gets along well the engagement of second gear 15
22 and slide bar 23 be used cooperatively, spring 21 drives support plate 20 to move right, and support plate 20 moves right with moving tooth plate 18, tooth
Plate 18 drives third gear 17 to rotate backward, and third gear 17 drives the second bull stick 16 to rotate backward, and the second bull stick 16 drives logical
Pipe 7 moves backward, and siphunculus 7 drives spray head 8 to rotate backward, so as to reach efficient purpose.
In summary: beam construction curing means passes through setting motor 10, the first belt pulley 11, the first bull stick 12, the
The cooperation of two belt pulleys 13, first gear 14, second gear 15, the second bull stick 16, third gear 17, tooth plate 18 and box body 19 makes
With solving the problems, such as existing bridge construction curing means low efficiency.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (4)
1. a kind of bridge construction curing means, including pedestal (1) and connecting band (2), it is characterised in that: pedestal (1) top
It is fixedly connected on the left of portion water tank (3), the left side at the top of the water tank (3) is communicated with water inlet pipe (4), the water tank (3)
Inner cavity is provided with water pump (5), and the water outlet of the water pump (5) through water tank (3) and is communicated with hose (6), and the hose (6) is remote
One end from water pump (5) is communicated with siphunculus (7), and the right end of the siphunculus (7) is communicated with spray head (8), at the top of the pedestal (1)
Right side is fixedly connected with cabinet (9), and the bottom of cabinet (9) inner cavity is fixedly connected with motor (10), and the motor (10) turns
The surface of axis is arranged with the first belt pulley (11), and the inner cavity of the cabinet (9) is provided with the first bull stick (12), and the first bull stick
(12) top and bottom pass through bearing and are flexibly connected with the inner wall of cabinet (9), and the surface of first bull stick (12) is arranged
Have the second belt pulley (13), and the second belt pulley (13) and the first belt pulley (11) are by connecting band (2) transmission connection, described the
The surface of one bull stick (12) is arranged with first gear (14), is engaged with second gear (15) on the right side of the first gear (14),
It is fixedly connected with the second bull stick (16) at center at the top of the second gear (15), and case is run through at the top of the second bull stick (16)
Body (9) is simultaneously fixedly connected with the bottom of siphunculus (7), and the surface that second bull stick (16) is located at cabinet (9) inner cavity one end is arranged
Have third gear (17), the back side of the third gear (17) is engaged with tooth plate (18), and the right side of cabinet (9) inner cavity is fixed
It is connected with box body (19), the right end of the tooth plate (18) through box body (19) and is fixedly connected with support plate (20), the support
It being fixedly connected on the right side of plate (20) spring (21), the top and bottom of box body (19) inner cavity offer sliding slot (22),
It is fixedly connected to slide bar (23) at the top and bottom of the support plate (20), and the one end of slide bar (23) far from support plate (20)
Extend to the inner cavity of sliding slot (22).
2. a kind of bridge construction curing means according to claim 1, it is characterised in that: the top of the water inlet pipe (4)
Portion is provided with pipe lid (24), is provided with handle at the top of the pipe lid (24).
3. a kind of bridge construction curing means according to claim 1, it is characterised in that: pedestal (1) bottom
Two sides are fixedly connected to supporting leg (25), and the bottom of the supporting leg (25) is connected with runner (26) by shaft.
4. a kind of bridge construction curing means according to claim 1, it is characterised in that: the two sides of the motor (10)
It is fixedly connected to fixed block (27), and the bottom of fixed block (27) is fixedly connected with the bottom of cabinet (9) inner cavity.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821137172.3U CN209114328U (en) | 2018-07-18 | 2018-07-18 | A kind of bridge construction curing means |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821137172.3U CN209114328U (en) | 2018-07-18 | 2018-07-18 | A kind of bridge construction curing means |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209114328U true CN209114328U (en) | 2019-07-16 |
Family
ID=67196111
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821137172.3U Active CN209114328U (en) | 2018-07-18 | 2018-07-18 | A kind of bridge construction curing means |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209114328U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112538827A (en) * | 2020-12-11 | 2021-03-23 | 中冶东北建设(沈阳)工程技术有限公司 | A curing means for road and bridge |
CN113463568A (en) * | 2021-04-19 | 2021-10-01 | 孙作壮 | Ecological bank protection curing means of hydraulic engineering |
-
2018
- 2018-07-18 CN CN201821137172.3U patent/CN209114328U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112538827A (en) * | 2020-12-11 | 2021-03-23 | 中冶东北建设(沈阳)工程技术有限公司 | A curing means for road and bridge |
CN113463568A (en) * | 2021-04-19 | 2021-10-01 | 孙作壮 | Ecological bank protection curing means of hydraulic engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206526982U (en) | A kind of efficient glue spreader | |
CN206024742U (en) | Novel irrigator is used to agricultural | |
CN209114328U (en) | A kind of bridge construction curing means | |
CN107127171A (en) | A kind of traffic bridge roadblock device for high-efficiency cleaning | |
CN206815334U (en) | A kind of long timber pile driving machine of Portable flood-prevention rescue | |
CN106824632A (en) | A kind of gardens trunk surface sprays white equipment | |
CN209717320U (en) | A kind of hydraulic engineering pipeline external surface derusting device | |
CN106438172A (en) | Environment-friendly water surface hydroelectric power plant | |
CN207159972U (en) | Power drive and high-pressure spraying mounting structure at the top of mechanical alga removal device | |
CN109025340A (en) | A kind of interior decoration wall skin remover device | |
CN205008205U (en) | A rotatory rubber coating platform of 6 -degree of freedom for production of cavity glass | |
CN210959753U (en) | Curing means is used in gardens | |
CN105970870B (en) | A kind of municipal works handle car with road ponding | |
CN108547638A (en) | A kind of lining concrete adjustable type watering device of constructing tunnel | |
CN202298703U (en) | Multifunctional river way sand dredger | |
CN207071557U (en) | A kind of traffic bridge roadblock device for high-efficiency cleaning | |
CN107460843B (en) | A kind of efficient asphalt concrete road surface area water processing equipment | |
CN202809683U (en) | Mobile type grab bucket trash remover | |
CN202125396U (en) | Water wheel capable of generating electricity and irrigating | |
CN214883450U (en) | Flood control dam with constant flow flood discharge function | |
CN210906632U (en) | Sluice gate pier spraying device for hydraulic engineering | |
CN111962596B (en) | Quick foundation filling device for construction site | |
CN207348829U (en) | Hydraulic double-arm balance oil extractor | |
CN208159647U (en) | A kind of agricultural hand sprinkling irrigation pump | |
CN206925100U (en) | A kind of pipeline cleaning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |