CN209094525U - One kind using pouring device for tin bar processing - Google Patents
One kind using pouring device for tin bar processing Download PDFInfo
- Publication number
- CN209094525U CN209094525U CN201821657170.7U CN201821657170U CN209094525U CN 209094525 U CN209094525 U CN 209094525U CN 201821657170 U CN201821657170 U CN 201821657170U CN 209094525 U CN209094525 U CN 209094525U
- Authority
- CN
- China
- Prior art keywords
- formwork
- placing
- metal
- slot
- tin bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses one kind to be used for tin bar processing pouring device, including casting platform, metal carrying handle and the second metal jacking block, the outside installation settings of the casting platform has cooling trough, and the inside installation settings of cooling trough has the first formwork for placing, the inside installation of first formwork for placing offers first and pours slot, and first the inside installation settings for pouring slot have the first metal jacking block, the metal carrying handle is fixed on the outside of the second formwork for placing, and second the inside installation of formwork for placing offer second and pour slot, the second metal jacking block is mounted on the second inside for pouring slot, the lower section installation settings of the casting platform has alloy limited block.This is used for tin bar processing pouring device and uses cooling trough and metal carrying handle, take by metal carrying handle the first formwork for placing and the second formwork for placing, time needed for shortening the first formwork for placing and the second formwork for placing bottom coohng.
Description
Technical field
The utility model relates to tin bar technical field of processing equipment, specially a kind of to use pouring device for tin bar processing.
Background technique
Tin bar is one of scolding tin product, and tin bar, which is divided into, slicker solder item and two kinds of lead-free tin bar, is for wiring board
Welding, currently, needing to pour Xi Shui in mold into, tin bar is cooled and shaped in mold during the manufacturing of tin bar
Afterwards, it fits like a glove with mold.
Therefore tin bar is removed from the molds just relatively difficult, using turning mold around, hammer taps some, makes tin
Item is damaged in production process falling ground, however this way is time-consuming and laborious, and tin bar manufacturing cost is high, and is producing
A large amount of heat is generated in the process, causes to cool down the required time longer.
Utility model content
The purpose of this utility model is to provide one kind to be used for tin bar processing pouring device, to solve above-mentioned background technique
The tin bar manufacturing cost of middle proposition is high, and generates a large amount of heat in process of production, causes to cool down the required time longer
The problem of.
To achieve the above object, the utility model provides the following technical solutions: one kind processes for tin bar and uses pouring device,
Including casting platform, metal carrying handle and the second metal jacking block, the outside installation settings of the casting platform has cooling trough, and cold
But the inside installation settings of sink has the first formwork for placing, and the inside installation of first formwork for placing offers first and pours
Slot, and the first inside installation settings for pouring slot has the first metal jacking block, the metal carrying handle is fixed on second and pours mould
The outside of plate, and the inside installation of the second formwork for placing offers second and pours slot, the second metal jacking block is mounted on
Second pours the inside of slot, and the lower section installation settings of the casting platform has alloy limited block, and the inside peace of alloy limited block
Installing is equipped with the first metallic carrier rod, is mounted with plastic support plate below first metallic carrier rod, and under plastic support plate
Side is mounted with alloy band iron, and the lower section installation settings of the alloy band iron has hydraulic stem, and the lower section installation of hydraulic stem is solid
Surely there is hydraulic cylinder, the described second lower section installation settings for pouring slot has the second metallic carrier rod, the casting platform installation settings
It is pouring above desk body, and is pouring and be mounted with sealed container door on the outside of desk body.
Preferably, the cooling trough is symmetrical about casting platform center line, and the outside surrounding of casting platform is adopted
With chamfering formula structure, and the width of cooling trough is the half of casting platform width.
Preferably, it described first pours slot and equidistantly distributes on the first formwork for placing, and the setting of the first formwork for placing
Quantity is two groups, and is respectively mounted on the outside of the first formwork for placing and the second formwork for placing and is provided with metal carrying handle.
Preferably, the second metal jacking block is connect with the second formwork for placing by alloy limited block, and the second metal roof
Block and alloy limited block constitute detaching structure, and the second metal jacking block is to be welded and fixed with the second metallic carrier rod.
Preferably, first metallic carrier rod is to be mutually perpendicular to, and plastic support plate and hydraulic stem are hinged with plastic support plate
It is fixed, and hydraulic stem and hydraulic cylinder are stretching structure.
Preferably, the longitudinal section of second metallic carrier rod is to be inverted " C " character form structure, and the second metallic carrier rod is straight
Diameter is consistent with the diameter of the first metallic carrier rod.
Compared with prior art, the utility model has the beneficial effects that this is used for tin bar processing pouring device,
1. using cooling trough and metal carrying handle, the first formwork for placing and second of being taken by metal carrying handle pours mould
Plate, the time needed for shortening the first formwork for placing and the second formwork for placing bottom coohng, and using cooling trough to casting platform
It is rapidly cooled, avoids tin bar is cooling in process of production from consuming the excessive time;
2. using plastic support plate and hydraulic stem, a degree of dynamics is applied to plastic support plate by hydraulic stem, thus
Reduce tin bar in process of production, the difficulty that tin bar is removed from the molds reduces tin bar and manufactures consumed cost and labour people
The labor intensity of member;
3. the first metallic carrier rod and the second metallic carrier rod are used, by the first metallic carrier rod and the second metallic carrier rod come to not
The formwork for placing of same type exerts a force, and tin bar is avoided to fall during being removed from the molds, and promotes different type tin bar
Produce the convenience taken out.
Detailed description of the invention
Fig. 1 is the utility model positive structure diagram;
Fig. 2 is that the utility model first pours slot positive structure diagram;
Fig. 3 is that the utility model second pours slot positive structure diagram;
Fig. 4 is the utility model side structure schematic view.
In figure: 1, casting platform;2, cooling trough;3, the first formwork for placing;4, first slot is poured;5, the first metal roof
Block;6, metal carrying handle;7, the second formwork for placing;8, second slot is poured;9, the second metal jacking block;10, alloy limited block;11,
One metallic carrier rod;12, plastic support plate;13, alloy band iron;14, hydraulic stem;15, hydraulic cylinder;16, the second metallic carrier rod;17,
Pour desk body;18, sealed container door.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1-4, the utility model provides a kind of technical solution: one kind is for tin bar processing pouring device, packet
It includes casting platform 1, cooling trough 2, the first formwork for placing 3, first pour slot 4, the first metal jacking block 5, metal carrying handle 6, second
Formwork for placing 7, second pour slot 8, the second metal jacking block 9, alloy limited block 10, the first metallic carrier rod 11, plastic support plate 12, close
Golden band iron 13, hydraulic cylinder 15, the second metallic carrier rod 16, pours desk body 17 and sealed container door 18, casting platform 1 at hydraulic stem 14
Outside installation settings have cooling trough 2, and the inside installation settings of cooling trough 2 has the first formwork for placing 3, and first pours mould
The inside installation of plate 3 offers first and pours slot 4, and the first inside installation settings for pouring slot 4 has the first metal jacking block 5, gold
Belong to the outside that carrying handle 6 is fixed on the second formwork for placing 7, and the inside installation of the second formwork for placing 7 offers second and pours
Slot 8, the second metal jacking block 9 are mounted on the second inside for pouring slot 8, and the lower section installation settings of casting platform 1 has alloy limit
Position block 10, and the inside installation settings of alloy limited block 10 has the first metallic carrier rod 11, the lower section installation of the first metallic carrier rod 11
It is fixed with plastic support plate 12, and the lower section of plastic support plate 12 is mounted with alloy band iron 13, the lower section installation of alloy band iron 13
It is provided with hydraulic stem 14, and the lower section of hydraulic stem 14 is mounted with hydraulic cylinder 15, second pours the lower section installation settings of slot 8
There is the second metallic carrier rod 16, casting platform 1, which is mounted on, pours 17 top of desk body, and the outside installation for pouring desk body 17 is fixed
There is sealed container door 18.
Cooling trough 2 is symmetrical about 1 center line of casting platform, and the outside surrounding of casting platform 1 uses chamfering formula
Structure, and the width of cooling trough 2 is the half of 1 width of casting platform, by cooling trough 2 to 1 outside four of casting platform
Zhou Jinhang is cooling, promotes efficiency cooling in tin bar casting process.
First, which pours slot 4, equidistantly distributes on the first formwork for placing 3, and the quantity of the first formwork for placing 3 setting is two
Group, and be respectively mounted on the outside of the first formwork for placing 3 and the second formwork for placing 7 and be provided with metal carrying handle 6, pass through metal carrying handle of taking
6 come the first formwork for placing 3 and the second formwork for placing 7 progress installing and dismounting, and to the first formwork for placing 3 and the second formwork for placing 7
Bottom is cooled down.
Second metal jacking block 9 is connect with the second formwork for placing 7 by alloy limited block 10, and the second metal jacking block 9 and conjunction
Golden limited block 10 constitutes detaching structure, and the second metal jacking block 9 is to be welded and fixed with the second metallic carrier rod 16, passes through second
Metal jacking block 9 ejects the tin bar inside the second formwork for placing 7, reduces the difficulty that tin bar ejects inside the second formwork for placing 7.
First metallic carrier rod 11 is to be mutually perpendicular to, and plastic support plate 12 and hydraulic stem 14 are hinged solid with plastic support plate 12
It is fixed, and hydraulic stem 14 and hydraulic cylinder 15 are stretching structure, and hydraulic stem 14 applies plastic support plate 12 with hydraulic cylinder 15
Plus-pressure promotes tin bar convenience derived from the first formwork for placing 3.
The longitudinal section of second metallic carrier rod 16 is to be inverted " C " character form structure, and the diameter of the second metallic carrier rod 16 and the
The diameter of one metallic carrier rod 11 is consistent, by the second metallic carrier rod 16 and the first metallic carrier rod 11 to the first formwork for placing 3 and
Two pour the tin bar ejection inside slot 8, reduce consumed cost and labor intensity in production process.
Working principle: when being used for tin bar processing pouring device using this, according to Fig. 1, operator will be cooled down
Liquid be poured into inside cooling trough 2, then Xi Shui is poured into and first pours slot 4 and second inside the first formwork for placing 3
Second inside formwork for placing 7 pours slot 8, then pours slot 4 for first and second pours slot 8 and transfer out extra heat,
And absorbed extra heat by cooling trough 2, according to fig. 2 and shown in Fig. 3, by alloy band iron 13 to plastic support plate
12 and hydraulic stem 14 be fixed, then plastic support plate 12 and the first metallic carrier rod 11 and the second metallic carrier rod 16 are fixed,
Hydraulic cylinder 15 adjusts the length of the first metallic carrier rod 11 and the second metallic carrier rod 16 by control pump oil amount, passes through first
Metallic carrier rod 11 and the second metallic carrier rod 16 are lifted up plastic support plate 12, plastic support plate 12 drive the first metallic carrier rod 11 and
Second metallic carrier rod 16 moves upwards, and is run up using the first metal jacking block 5 and the second metal jacking block 9, passes through the first gold medal
Belong to that jacking block 5 and the second metal jacking block 9 pour slot 4 to first and the second tin bar for pouring inside slot 8 ejects, according to Fig. 4 institute
Show, operator pours the sealed container door 18 in 17 outside of desk body by opening, and then directly dismantles alloy limited block 10, operates
Personnel are directly taken out the first formwork for placing 3 or the second formwork for placing 7 by metal carrying handle 6 of taking on the outside of casting platform 1,
So as to shorten the time needed for 7 bottom coohng of the first formwork for placing 3 or the second formwork for placing.
Although the utility model is described in detail with reference to the foregoing embodiments, come for those skilled in the art
Say, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic into
Row equivalent replacement, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should all
It is included within the scope of protection of this utility model.
Claims (6)
1. one kind is for tin bar processing pouring device, including casting platform (1), metal carrying handle (6) and the second metal jacking block
(9), it is characterised in that: the outside installation settings of the casting platform (1) has cooling trough (2), and the inside of cooling trough (2)
Installation settings has the first formwork for placing (3), and the inside installation of first formwork for placing (3) offers first and pours slot (4), and
The first inside installation settings for pouring slot (4) has the first metal jacking block (5), and the metal carrying handle (6) is fixed on second and pours
The outside of building mould (7), and the inside installation of the second formwork for placing (7) offers second and pours slot (8), second metal roof
Block (9) is mounted on the second inside for pouring slot (8), and the lower section installation settings of the casting platform (1) has alloy limited block
(10), and the inside installation settings of alloy limited block (10) has the first metallic carrier rod (11), first metallic carrier rod (11)
Lower section is mounted with plastic support plate (12), and alloy band iron (13), the conjunction are mounted with below plastic support plate (12)
The lower section installation settings of golden band iron (13) has hydraulic stem (14), and is mounted with hydraulic cylinder below hydraulic stem (14)
(15), the described second lower section installation settings for pouring slot (8) has the second metallic carrier rod (16), and casting platform (1) installation is set
It sets and is pouring above desk body (17), and pour and be mounted with sealed container door (18) on the outside of desk body (17).
2. according to claim 1 a kind of for tin bar processing pouring device, it is characterised in that: the cooling trough
(2) symmetrical about casting platform (1) center line, and the outside surrounding of casting platform (1) uses chamfering formula structure, and cold
But the width of sink (2) is the half of casting platform (1) width.
3. according to claim 1 a kind of for tin bar processing pouring device, it is characterised in that: described first pours slot
(4) it equidistantly distributes on the first formwork for placing (3), and the quantity of the first formwork for placing (3) setting is two groups, and first pours
It is respectively mounted on the outside of building mould (3) and the second formwork for placing (7) and is provided with metal carrying handle (6).
4. according to claim 1 a kind of for tin bar processing pouring device, it is characterised in that: second metal roof
Block (9) is connect with the second formwork for placing (7) by alloy limited block (10), and the second metal jacking block (9) and alloy limited block
(10) detaching structure is constituted, and the second metal jacking block (9) is to be welded and fixed with the second metallic carrier rod (16).
5. according to claim 1 a kind of for tin bar processing pouring device, it is characterised in that: first metal roof
Bar (11) is to be mutually perpendicular to, and plastic support plate (12) and hydraulic stem (14) are hinged fixed and hydraulic with plastic support plate (12)
Bar (14) and hydraulic cylinder (15) are stretching structure.
6. according to claim 1 a kind of for tin bar processing pouring device, it is characterised in that: second metal roof
The longitudinal section of bar (16) is to be inverted " C " character form structure, and the diameter of the second metallic carrier rod (16) and the first metallic carrier rod (11)
Diameter it is consistent.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821657170.7U CN209094525U (en) | 2018-10-12 | 2018-10-12 | One kind using pouring device for tin bar processing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821657170.7U CN209094525U (en) | 2018-10-12 | 2018-10-12 | One kind using pouring device for tin bar processing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209094525U true CN209094525U (en) | 2019-07-12 |
Family
ID=67154963
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821657170.7U Expired - Fee Related CN209094525U (en) | 2018-10-12 | 2018-10-12 | One kind using pouring device for tin bar processing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209094525U (en) |
-
2018
- 2018-10-12 CN CN201821657170.7U patent/CN209094525U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201922002U (en) | Lead-antimony alloy ingot casting unit | |
CN105522141A (en) | Piston gravity casting machine | |
CN209094525U (en) | One kind using pouring device for tin bar processing | |
CN103691963A (en) | Device and method for manufacturing electroplating anode copper ball | |
CN209223158U (en) | A kind of anode copper sheet production and processing system | |
CN208390948U (en) | A kind of casting die with replaceable transition chute | |
CN208357774U (en) | A kind of automation low pressure casting wheel hub process units | |
CN206256105U (en) | A kind of vertical quenching frock of big gauge modules | |
CN201320594Y (en) | Cast iron mold used for casting cast iron ingot | |
CN205887992U (en) | Easy demoulding's chain transmission type alloy pig mould | |
CN205043101U (en) | Quick cooling device of aluminium ingot | |
CN205008546U (en) | Prepare casting device of high -quality aluminum alloy ingot casting in succession | |
CN101987355A (en) | Aluminium liquid casting device | |
CN206839144U (en) | Casting machine | |
CN208825826U (en) | A kind of aluminium ingot mark laser print apparatus | |
CN210418163U (en) | Transmission device on aluminum ingot production line | |
CN205684662U (en) | A kind of hydraulic part liquid foundry work dress | |
CN109513887B (en) | Treatment method suitable for conventional ingot type steel ingot for ultrahigh-temperature soft core forging | |
CN201493465U (en) | Metallurgy solution continuous pouring molding device | |
CN112743051A (en) | Continuous casting machine for casting and molding ferroalloy production | |
CN206936321U (en) | A kind of combining structure of metal liquid die forging | |
CN206405424U (en) | A kind of casting ladle for being capable of current limliting | |
CN105108165B (en) | The process of splitting type iron alloy grain casting machine and ferroalloy production casting grain | |
CN204939581U (en) | A kind of opposite opened esr wide plate billet crystallizer | |
CN110170624A (en) | A kind of steel pawl crystallizer and its manufacturing method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190712 Termination date: 20191012 |
|
CF01 | Termination of patent right due to non-payment of annual fee |