CN209093012U - A kind of hot-water boiler flue gas processing device - Google Patents

A kind of hot-water boiler flue gas processing device Download PDF

Info

Publication number
CN209093012U
CN209093012U CN201821897644.5U CN201821897644U CN209093012U CN 209093012 U CN209093012 U CN 209093012U CN 201821897644 U CN201821897644 U CN 201821897644U CN 209093012 U CN209093012 U CN 209093012U
Authority
CN
China
Prior art keywords
water tank
water
flue gas
filtration
partition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821897644.5U
Other languages
Chinese (zh)
Inventor
史春岩
万全
赵春成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou Zhongrui Boiler Co Ltd
Original Assignee
Yangzhou Zhongrui Boiler Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou Zhongrui Boiler Co Ltd filed Critical Yangzhou Zhongrui Boiler Co Ltd
Priority to CN201821897644.5U priority Critical patent/CN209093012U/en
Application granted granted Critical
Publication of CN209093012U publication Critical patent/CN209093012U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of hot-water boiler flue gas processing devices, including water tank, sleeve and filtration, purification mechanism, the middle-end of the water tank cavity is fixedly connected with partition, and the inner surface of partition is connected with the first heat-conducting plate by inorganic nano combined binder, the outer surface of partition is connected with the second heat-conducting plate by inorganic nano combined binder, the right end of the sleeve is communicated with pipeline, and pipeline sequentially passes through the top on the left of water tank and partition and extends to the lower end of water tank cavity, and filtration, purification mechanism is fixedly connected on the right side of the water tank.The utility model has been fixedly connected with partition in the middle-end of water tank cavity, and pass through the effect of the first heat-conducting plate, the second heat-conducting plate, sleeve, pipeline and filtration, purification mechanism, a large amount of flue gas can be generated in combustion by solving boiler, if do not handled flue gas, the problem of ambient enviroment can then be polluted, do not meet national energy conservation and emission reduction demand.

Description

A kind of hot-water boiler flue gas processing device
Technical field
The utility model relates to flue gas processing device technical field, specially a kind of hot-water boiler flue gas processing device.
Background technique
Boiler is a kind of energy conversion, and the energy inputted to boiler has chemical energy and electric energy in fuel, and boiler is defeated The steam, high-temperature water or organic heat carrier of certain thermal energy are provided, the hot water or steam generated in boiler can be directly raw for industry It produces and people's lives provides required thermal energy, mechanical energy can also be converted to by Steam Power Equipment, or pass through generator again for machine Tool can be converted to electric energy, and boiler can generate a large amount of flue gas in combustion, can be dirty if do not handled flue gas Ambient enviroment is contaminated, the demand of national energy conservation and emission reduction is not met, for this purpose, it is proposed that a kind of hot-water boiler flue gas processing device.
Utility model content
The purpose of this utility model is to provide a kind of hot-water boiler flue gas processing devices, and flue gas can be handled by having The advantages of, a large amount of flue gas can be generated in combustion by solving boiler, if do not handled flue gas, can be polluted week Collarette border, the problem of not meeting national energy conservation and emission reduction demand.
To achieve the above object, the utility model provides the following technical solutions: a kind of hot-water boiler flue gas processing device, packet Water tank, sleeve and filtration, purification mechanism are included, the middle-end of the water tank cavity is fixedly connected with partition, and the inner surface of partition passes through Inorganic nano combined binder is connected with the first heat-conducting plate, and the outer surface of partition is connected with by inorganic nano combined binder Two heat-conducting plates, the right end of the sleeve is communicated with pipeline, and pipeline sequentially passes through the top on the left of water tank and partition and extends to The lower end of water tank cavity is fixedly connected with filtration, purification mechanism on the right side of the water tank, and the right end of tank top passes through pipeline It is connected to the bottom on the right side of filtration, purification mechanism.
Preferably, the left end of the tank top offers the first water filling port, the top of water tank and is located at the first water filling port Right side opening be equipped with the second water filling port, and the top of the second water filling port and the first water filling port is threaded with cover board.
Preferably, the bottom on the left of the water tank offers the first water outlet, and the middle-end of water tank bottom offers second and goes out The mouth of a river, and the inner surface of the second water outlet and the first water outlet is movably installed with valve.
Preferably, the surrounding of the water tank bottom passes through bearing and is connected with supporting leg, and the bottom of supporting leg is living It is dynamic that traveling wheel is installed.
Preferably, the middle-end of the water tank front surface and the right end of water tank front surface are provided with observation window, and observe Window includes transparent toughened glass plate.
Preferably, the partition is ring structure, and the first heat-conducting plate and the second heat-conducting plate include thermal conductive silicon offset plate.
Preferably, the filtration, purification mechanism includes filtration, purification case, and the left and right sides of filtration, purification box cavity is symmetrical It is provided with deck, the quantity of deck is four, and the distance between adjacent deck of every two is all the same, while four decks is interior Surface is connected with polyvinyl chloride strainer, active carbon filter screen, HEPA strainer and glassfibre filters respectively, and polyvinyl chloride strainer, The position of active carbon filter screen, HEPA strainer and glassfibre filters is sets gradually from top to bottom, while filtration, purification box top Middle-end offer gas outlet, the left and right ends of filtration, purification case front surface have been connected through hinge activity dodge gate, and living The front surface of dynamic door is fixedly installed with handle.
Compared with prior art, the beneficial effects of the utility model are as follows:
The utility model has been fixedly connected with partition in the middle-end of water tank cavity, and by the first heat-conducting plate, the second heat-conducting plate, The effect of sleeve, pipeline and filtration, purification mechanism, people are first by water out of the first water filling port and the second water filling port injection water tank, so Sleeve is connected to the exhanst gas outlet of hot-water boiler again afterwards, the water body on the inside of partition can be filtered processing to flue gas, together When can also transfer heat to the water body on the outside of partition by the first heat-conducting plate and the second heat-conducting plate, thus realize to water The demand for heat of body, then flue gas sheds from the water body being located on the inside of partition, and is entered in filtration, purification mechanism by pipeline, Filtration, purification mechanism can carry out the processing of level Four physical cleaning to flue gas, and cooperation through the above structure solves boiler and burning A large amount of flue gas can be generated in the process, if do not handled flue gas, can be polluted ambient enviroment, not met national energy-saving and subtract The problem of row's demand.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model schematic view of the front view;
Fig. 3 is the utility model filtration, purification mechanism structural schematic diagram.
In figure: 1 water tank, 2 sleeves, 3 first water filling ports, 4 second water filling ports, 5 filtration, purification mechanisms, the filter of 51 polyvinyl chloride Net, 52 HEPA strainers, 53 filtration, purification casees, 54 glassfibre filters, 55 decks, 56 active carbon filter screens, 57 gas outlets, 6 walkings Wheel, 7 second water outlets, 8 first heat-conducting plates, 9 supporting legs, 10 first water outlets, 11 partitions, 12 second heat-conducting plates, 13 observation windows.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3, a kind of hot-water boiler flue gas processing device, including water tank 1, sleeve 2 and filtration, purification mechanism 5 are please referred to, The left end at the top of water tank 1 offers the first water filling port 3, the top of the water tank 1 and right side opening for being located at the first water filling port 3 is equipped with second Water filling port 4, and the top of the second water filling port 4 and the first water filling port 3 is threaded with cover board, the bottom in 1 left side of water tank opens up There is the first water outlet 10, the middle-end of 1 bottom of water tank offers the second water outlet 7, and the second water outlet 7 and the first water outlet 10 Inner surface is movably installed with valve, and the surrounding of 1 bottom of water tank passes through bearing and is connected with supporting leg 9, and supporting leg 9 Bottom is movably installed with traveling wheel 6, facilitates movement of the people to the present apparatus, 1 front surface of middle-end and water tank of 1 front surface of water tank Right end be provided with observation window 13, facilitate observation of the people to water level, and observation window 13 includes transparent toughened glass plate, water tank The middle-end of 1 inner cavity is fixedly connected with partition 11, and the inner surface of partition 11 is connected with first by inorganic nano combined binder The outer surface of heat-conducting plate 8, partition 11 is connected with the second heat-conducting plate 12 by inorganic nano combined binder, and partition 11 is ring junction Structure, and the first heat-conducting plate 8 and the second heat-conducting plate 12 include thermal conductive silicon offset plate, the right end of sleeve 2 is communicated with pipeline, and pipeline according to The secondary top across water tank 1 and the left side of partition 11 and the lower end for extending to 1 inner cavity of water tank, people are first by water from the first water filling port 3 In the second water filling port 4 injection water tank 1, then sleeve 2 is connected to again with the exhanst gas outlet of hot-water boiler, is located at 11 inside of partition Water body can be filtered processing to flue gas, while can also be by the first heat-conducting plate 8 and the second heat-conducting plate 12 by heat transfer To the water body in 11 outside of partition is located at, to realize that the right side of water tank 1 is fixedly connected with filtration, purification to the demand for heat of water body Mechanism 5, when flue gas sheds from the water body for being located at 11 inside of partition, and enters the inner cavity of filtration, purification case 53 by pipeline, Glassfibre filters 54, HEPA strainer 52, active carbon filter screen 56 and polyvinyl chloride strainer 51 inside filtration, purification case 53 are to cigarette Gas carries out the processing of level Four physical cleaning, and the flue gas for then purifying completion sheds out of gas outlet 57, and the right end at 1 top of water tank is logical Piping is connected to the bottom on 5 right side of filtration, purification mechanism, and filtration, purification mechanism 5 includes filtration, purification case 53, and filtration, purification Case is symmetrically arranged with deck 55 at left and right sides of 53 inner cavity, can facilitate replacement of the people to strainer, and the quantity of deck 55 is four, And the distance between adjacent deck 55 of every two is all the same, while the inner surface of four decks 55 is connected with polyvinyl chloride filter respectively Net 51, active carbon filter screen 56, HEPA strainer 52 and glassfibre filters 54, and polyvinyl chloride strainer 51, active carbon filter screen 56, The position of HEPA strainer 52 and glassfibre filters 54 is sets gradually from top to bottom, while the middle-end at 53 top of filtration, purification case Gas outlet 57 is offered, the left and right ends of 53 front surface of filtration, purification case have been connected through hinge activity dodge gate, and activity The front surface of door is fixedly installed with handle.
In use, the middle-end in 1 inner cavity of water tank has been fixedly connected with partition 11, and pass through the first heat-conducting plate 8, the second heat-conducting plate 12, water is first injected water from the first water filling port 3 and the second water filling port 4 by the effect of sleeve 2, pipeline and filtration, purification mechanism 5, people In case 1, then sleeve 2 is connected to the exhanst gas outlet of hot-water boiler again, the water body positioned at 11 inside of partition can carry out flue gas Filtration treatment, while can also be transferred heat to by the first heat-conducting plate 8 and the second heat-conducting plate 12 positioned at 11 outside of partition Water body, to realize to the demand for heat of water body, when flue gas sheds from the water body for being located at 11 inside of partition, and by pipeline into Glassfibre filters 54, HEPA strainer 52, active carbon filter screen when entering the inner cavity of filtration, purification case 53, inside filtration, purification case 53 56 and polyvinyl chloride strainer 51 processing of level Four physical cleaning is carried out to flue gas, then purify the flue gas of completion and dissipated out of gas outlet 57 Out, cooperation through the above structure, a large amount of flue gas can be generated in combustion by solving boiler, if do not carried out to flue gas Processing, then the problem of polluting ambient enviroment, not meet national energy conservation and emission reduction demand.
In summary: the hot-water boiler flue gas processing device, the middle-end in 1 inner cavity of water tank have been fixedly connected with partition 11, and By the effect of the first heat-conducting plate 8, the second heat-conducting plate 12, sleeve 2, pipeline and filtration, purification mechanism 5, solves boiler and burning A large amount of flue gas can be generated in the process, if do not handled flue gas, can be polluted ambient enviroment, not met national energy-saving and subtract The problem of row's demand.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (7)

1. a kind of hot-water boiler flue gas processing device, including water tank (1), sleeve (2) and filtration, purification mechanism (5), feature exists In: the middle-end of water tank (1) inner cavity is fixedly connected with partition (11), and the inner surface of partition (11) is by inorganic nano combined Binder is connected with the first heat-conducting plate (8), and the outer surface of partition (11) is connected with second by inorganic nano combined binder and leads Hot plate (12), the right end of the sleeve (2) is communicated with pipeline, and pipeline sequentially passes through the top on the left of water tank (1) and partition (11) The lower end of water tank (1) inner cavity is held and extended to, is fixedly connected with filtration, purification mechanism (5) on the right side of the water tank (1), and water tank (1) right end at the top of is connected to by pipeline with the bottom on the right side of filtration, purification mechanism (5).
2. a kind of hot-water boiler flue gas processing device according to claim 1, it is characterised in that: at the top of the water tank (1) Left end offer the first water filling port (3), the top of water tank (1) and be located at the first water filling port (3) right side opening be equipped with the second note The mouth of a river (4), and the top of the second water filling port (4) and the first water filling port (3) is threaded with cover board.
3. a kind of hot-water boiler flue gas processing device according to claim 1, it is characterised in that: on the left of the water tank (1) Bottom offer the first water outlet (10), the middle-end of water tank (1) bottom offers the second water outlet (7), and the second water outlet (7) and the inner surface of the first water outlet (10) is movably installed with valve.
4. a kind of hot-water boiler flue gas processing device according to claim 1, it is characterised in that: water tank (1) bottom Surrounding pass through bearing and be connected with supporting leg (9), and the bottom of supporting leg (9) is movably installed with traveling wheel (6).
5. a kind of hot-water boiler flue gas processing device according to claim 1, it is characterised in that: the positive table of the water tank (1) The right end of middle-end and water tank (1) front surface in face is provided with observation window (13), and observation window (13) includes transparent tempering glass Glass plate.
6. a kind of hot-water boiler flue gas processing device according to claim 1, it is characterised in that: the partition (11) is ring Shape structure, and the first heat-conducting plate (8) and the second heat-conducting plate (12) they include thermal conductive silicon offset plate.
7. a kind of hot-water boiler flue gas processing device according to claim 1, it is characterised in that: the filtration, purification mechanism It (5) include filtration, purification case (53), and be symmetrically arranged with deck (55), deck at left and right sides of filtration, purification case (53) inner cavity (55) quantity is four, and the distance between adjacent deck of every two (55) is all the same, while the interior table of four decks (55) Face is connected with polyvinyl chloride strainer (51), active carbon filter screen (56), HEPA strainer (52) and glassfibre filters (54) respectively, and Polyvinyl chloride strainer (51), active carbon filter screen (56), HEPA strainer (52) and glassfibre filters (54) position be on to Under set gradually, while the middle-end at the top of filtration, purification case (53) offers gas outlet (57), filtration, purification case (53) front surface Left and right ends be connected through hinge activity dodge gate, and the front surface of dodge gate is fixedly installed with handle.
CN201821897644.5U 2018-11-16 2018-11-16 A kind of hot-water boiler flue gas processing device Expired - Fee Related CN209093012U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821897644.5U CN209093012U (en) 2018-11-16 2018-11-16 A kind of hot-water boiler flue gas processing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821897644.5U CN209093012U (en) 2018-11-16 2018-11-16 A kind of hot-water boiler flue gas processing device

Publications (1)

Publication Number Publication Date
CN209093012U true CN209093012U (en) 2019-07-12

Family

ID=67160352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821897644.5U Expired - Fee Related CN209093012U (en) 2018-11-16 2018-11-16 A kind of hot-water boiler flue gas processing device

Country Status (1)

Country Link
CN (1) CN209093012U (en)

Similar Documents

Publication Publication Date Title
CN105254097A (en) Portable and multifunctional water purifying device
CN105964097A (en) Treatment system for waste gas generated by waste combustion
CN209558372U (en) Activated carbon adsorption desorption catalyzing burner
CN107854951A (en) A kind of emission-control equipment of coal-burning boiler
CN204535440U (en) A kind of kiln gas secondary utilization device
CN209093012U (en) A kind of hot-water boiler flue gas processing device
CN205360764U (en) Scrubbing device for environment design
CN206915900U (en) A kind of swimming pool quality purifying device for water
CN104117257B (en) A kind of boiler afterheat dust removing purifier
CN206355770U (en) A kind of electrostatic oil and smoke cleaner
CN203498169U (en) Microorganism-purification sewage treatment device
CN211822485U (en) Biomass boiler burning oxygen supply device
CN205360881U (en) Dust removal and desulfuration device
CN209221794U (en) A kind of processing unit of waste water and exhaust gas
CN207378842U (en) A kind of waste heat recovery device of waste incinerator
CN111672273A (en) Waste gas recovery and discharge device for combustion waste gas detection
CN205461618U (en) Printing and dyeing forming machine waste gas treatment equipment
CN206018965U (en) A kind of industrial hot water boiler
CN205045940U (en) Multiple -layer filtering case with quick detachable function of sterilization
CN104958975A (en) Industrial exhaust gas purifier
CN205977321U (en) Crankcase filter
CN205874146U (en) Bury formula water treatment facilities
CN204247378U (en) A kind of wet electrical dust precipitator
CN210398966U (en) Boiler with waste gas energy reuse function
CN108815992A (en) The air pollutants processor of heat-recoverable

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190712

Termination date: 20211116