CN209082793U - Connection structure of the prefabricated superimposed sheet of assembling type steel structure with girder steel - Google Patents

Connection structure of the prefabricated superimposed sheet of assembling type steel structure with girder steel Download PDF

Info

Publication number
CN209082793U
CN209082793U CN201821778167.0U CN201821778167U CN209082793U CN 209082793 U CN209082793 U CN 209082793U CN 201821778167 U CN201821778167 U CN 201821778167U CN 209082793 U CN209082793 U CN 209082793U
Authority
CN
China
Prior art keywords
superimposed sheet
steel
girder steel
plate
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821778167.0U
Other languages
Chinese (zh)
Inventor
于晓利
李社增
艾冀飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201821778167.0U priority Critical patent/CN209082793U/en
Application granted granted Critical
Publication of CN209082793U publication Critical patent/CN209082793U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model provides a kind of connection structure of the prefabricated superimposed sheet of assembling type steel structure with girder steel, it includes overlapping superimposed sheet on girder steel girder steel top flange plate, the superimposed sheet four corners are equipped with built-in fitting, the built-in fitting is made of two dowels and a plain plate, dowel is poured when superimposed sheet is prefabricated in plate, and plain plate is on superimposed sheet and girder steel overlap joint side end face;It is equipped with angle steel corresponding with built-in fitting position at the top of girder steel top flange plate both ends, angle steel plane is bonded and welded with plain plate;It is equipped with reinforcing bar between the superimposed sheet of two sides and has poured concrete, this programme saves a large amount of steel, and peg replaces site welding by prefabricated, can accelerate the duration, meet national requirements for environmental protection.

Description

Connection structure of the prefabricated superimposed sheet of assembling type steel structure with girder steel
Technical field
The utility model belongs to construction engineering technical field, the prefabricated superimposed sheet of specifically a kind of steel construction assembled-type house With the connection method of girder steel.
Background technique
Assembling type steel structure building meets industry development, as national industry structural adjustment and building trade are to green energy conservation Facade lighting is advocated, and assembled architecture receives more and more attention, and the development of assembling type steel structure building being capable of power-assisted Steel goes production capacity, meets the policy goals of government.Typical Representative of the steel construction as green building, greatly reduces sand, stone, ash Dosage, in demolishing buildings, most of material can effectively reduce building waste with regeneration or degradation.
In assembled-type house, together by different combinations of materials, traditional method is to be laid with building in girder steel upper surface Board (profiled sheet) is linked together floor support plate with girder steel with penetrability peg in erecting bed, above floor support plate into Row concrete pours.Such method has also needed special messenger after being laid with floor support plate, makes peg above, virtually increases people Power, the investment of material resources, increase construction cost.
Utility model content
The utility model combines the existing structure of existing superimposed sheet and girder steel, consumes steel to solve existing connection construction The disadvantages of doses is big, and investment manpower and material resources are larger proposes that one kind is simple for structure, easy to operate, can reduce the girder steel of construction cost With overlapping board connecting structure.
In order to achieve the above objectives, the technical solution adopted in the utility model is:
With the connection structure of girder steel, it includes taking on girder steel girder steel top flange plate for a kind of prefabricated superimposed sheet of assembling type steel structure Superimposed sheet is connect, the superimposed sheet four corners are equipped with built-in fitting, which is made of two dowels and a plain plate, dowel It is poured when superimposed sheet is prefabricated in plate, plain plate is on superimposed sheet and girder steel overlap joint side end face;Girder steel top flange plate both ends Top is equipped with angle steel corresponding with built-in fitting position, and angle steel plane is bonded and welded with plain plate;It is set between the superimposed sheet of two sides There is reinforcing bar and has poured concrete.
The angle steel specification is L100*63*8.
Built-in fitting is located at four diagonally opposing corners of superimposed sheet.
Connection method provided by the utility model compared with prior art, eliminates the use of floor support plate (profiled sheet), A large amount of steel can be saved, the work of erecting bed welding penetrability peg is avoided, work is shifted to an earlier date into factory and is completed, that is, is accelerated Duration, also comply with national requirements for environmental protection.
Detailed description of the invention
Fig. 1: weld stud at top flange;
Fig. 2: angle steel is welded in top flange;
Fig. 3: superimposed sheet adds built-in fitting;
Fig. 4: superimposed sheet installation is in place;
Fig. 5: overlapping analysis is in place, reinforcing bar binding figure;
Fig. 6: for the assembling reinforcement figure of 1-1 line position section view in Fig. 5;
In figure: 1- girder steel 2- peg 3- angle steel 4- superimposed sheet 5- built-in fitting 6- reinforcing bar.
Specific embodiment
The technical solution of the utility model is described in detail in 1-6 with reference to the accompanying drawing:
The utility model is to simplify superimposed sheet in existing construction and girder steel overlaps work, propose new connection structure and Its construction method is not related to floor support plate application in new departure, and the work for penetrating peg does not carry out at the construction field (site), i.e. saving material Material, and can obviously accelerate the duration.
The prefabricated superimposed sheet of steel construction assembled-type house of the utility model design is with the connection structure of girder steel: superimposed sheet 4 Four corners are equipped with built-in fitting 5, which is made of two dowels and a plain plate, and dowel is poured when superimposed sheet 4 is prefabricated It builds in plate, plain plate is on superimposed sheet and girder steel overlap joint side end face;1 top flange plate both ends of girder steel top is equipped with and built-in fitting The corresponding angle steel 3 in position, 3 plane of angle steel are bonded and welded with plain plate;Reinforcing bar 6 is equipped with simultaneously between the superimposed sheet of girder steel two sides Concrete is poured.
The construction method of connection structure of the above-mentioned prefabricated superimposed sheet of assembling type steel structure with girder steel:
(1) add built-in fitting 5 in 4 production process of superimposed sheet in advance at four angles, built-in fitting 5 include two dowels and One plain plate, plain plate are embedded on the end face of superimposed sheet and girder steel connecting side;
(2) a pair of of angle steel 3 is respectively welded on 1 top flange both ends of girder steel, angle steel 3 is opposite with 5 position of built-in fitting of superimposed sheet It answers;
(3) in the evenly spaced weld stud 2 in 1 top flange of girder steel;
(4) superimposed sheet 4 is ridden upon on girder steel 1, adjustment finishes angle steel 3 and built-in fitting 5 is welded;
(5) superimposed sheet installation is completed in Civil Specialities assembling reinforcement 6, casting concrete.
This programme is illustrated below by a construction embodiment:
(1) M16 peg 2 is welded in 1 top flange interval 200mm of girder steel.Peg 2 used herein can be with overlapping plate thickness not Peg that is same and selecting different size.When scene overlaps plate thickness 120mm, using M16*100;And when overlapping plate thickness 140mm, it fits With using M16*120.
(2) be prepared in advance built-in fitting, and built-in fitting is by two reinforcing bars and one block of plain plate is affixed forms.
(3) when factory makes superimposed sheet 4, four built-in fittings 5 is separately positioned on four diagonal angles of superimposed sheet, allow flat steel Plate after installing in next step in place, is welded and fixed in overlapping plate end face with girder steel 1.The position of built-in fitting is equipped with overlapping At the diagonally opposing corner of plate.
(4) angle steel 3 is welded on 1 top flange of girder steel, angle iron position is corresponding with built-in fitting, and each position of angle steel 3 is a pair, Angle steel plane is outside, welded with the built-in fitting on the superimposed sheet of two sides respectively, and the size of angle steel is L100*63*8.
(5) superimposed sheet 4 is installed in place, if any inclination, is adjusted with crowbar, after adjustment, welds angle steel 3 and built-in fitting 5, Superimposed sheet 4 is connected and fixed with girder steel 1.
(6) conventional method assembling reinforcement 6, casting concrete are used, superimposed sheet is connected as one with girder steel.
The above is only the utility model preferred embodiments, and any limit in structure is not done to the utility model System, the simple modification that all essence according to the utility model makes above example, category the technical solution of the utility model In range.

Claims (3)

1. a kind of prefabricated superimposed sheet of assembling type steel structure is with the connection structure of girder steel, it includes that overlapping is overlapped on girder steel top flange plate Plate, it is characterised in that: the superimposed sheet four corners are equipped with built-in fitting, which is made of two dowels and a plain plate, Dowel is poured when superimposed sheet is prefabricated in plate, and plain plate is on superimposed sheet and girder steel overlap joint side end face;Girder steel top flange It is equipped with angle steel corresponding with built-in fitting position at the top of board ends, angle steel plane is bonded and welded with plain plate;Two sides overlapping It is equipped with reinforcing bar between plate and has poured concrete.
2. connection structure of the prefabricated superimposed sheet of assembling type steel structure with girder steel according to claim 1, it is characterised in that: described Angle steel specification is L100*63*8.
3. connection structure of the prefabricated superimposed sheet of assembling type steel structure with girder steel according to claim 1, it is characterised in that: pre-buried Part is located at four diagonally opposing corners of superimposed sheet.
CN201821778167.0U 2018-10-31 2018-10-31 Connection structure of the prefabricated superimposed sheet of assembling type steel structure with girder steel Active CN209082793U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821778167.0U CN209082793U (en) 2018-10-31 2018-10-31 Connection structure of the prefabricated superimposed sheet of assembling type steel structure with girder steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821778167.0U CN209082793U (en) 2018-10-31 2018-10-31 Connection structure of the prefabricated superimposed sheet of assembling type steel structure with girder steel

Publications (1)

Publication Number Publication Date
CN209082793U true CN209082793U (en) 2019-07-09

Family

ID=67121682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821778167.0U Active CN209082793U (en) 2018-10-31 2018-10-31 Connection structure of the prefabricated superimposed sheet of assembling type steel structure with girder steel

Country Status (1)

Country Link
CN (1) CN209082793U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138246A (en) * 2018-10-31 2019-01-04 中国二十二冶集团有限公司 Connection structure and construction method of the prefabricated superimposed sheet of assembling type steel structure with girder steel
CN111441520A (en) * 2020-04-10 2020-07-24 中国五冶集团有限公司 Steel structure support-free full-precast concrete floor connecting joint and connecting method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138246A (en) * 2018-10-31 2019-01-04 中国二十二冶集团有限公司 Connection structure and construction method of the prefabricated superimposed sheet of assembling type steel structure with girder steel
CN111441520A (en) * 2020-04-10 2020-07-24 中国五冶集团有限公司 Steel structure support-free full-precast concrete floor connecting joint and connecting method

Similar Documents

Publication Publication Date Title
CN100416010C (en) Joint construction method of prefabricated composite bearing wall structure
WO2019206194A1 (en) Prefabricated floor slab, connection structure thereof and construction method therefor
CN106065669A (en) Steel bar connection mode in prefabricated shear wall connection component
WO2007134517A1 (en) Composite concrete shear wall for heat insulation
CN103982041A (en) Method for constructing reinforced-concrete prefabricated element fabricated building with frame structure system
CN110725455A (en) Transverse connection method for assembled composite floor slabs
CN109138246A (en) Connection structure and construction method of the prefabricated superimposed sheet of assembling type steel structure with girder steel
CN106759900A (en) Assembled architecture agent structure
CN108301545A (en) A kind of big module overlapping contignation of the assembled with space truss temporary support
CN108222347A (en) A kind of big module welding overlapping beam slab of the assembled with plane girder temporary support
CN112982142B (en) Cold-formed thin-walled steel web plate combined PC box girder
CN209082793U (en) Connection structure of the prefabricated superimposed sheet of assembling type steel structure with girder steel
CN202125104U (en) Residential building system formed by cast-in-place beam columns and prefabricated sandwich concrete wall slabs
CN108385884A (en) A kind of bolted and welded connection steel reinforced concrete special-shape column-stealth beam floor assembly system
CN105201079A (en) Floorslab and wallboard welding technique
CN202430876U (en) Floor system with structure of steel and concrete precast slabs
CN103397700A (en) Connection structure of building composite floor slab and steel tube shear wall
CN215106121U (en) One-way superimposed sheet piece department joint construction
CN206752828U (en) A kind of steel bar girder sandwich precast floor slab
CN209837426U (en) Assembled timber structure combination superstructure
CN211396202U (en) Prefabricated floor of assembled
CN115961719B (en) Prefabricated shear wall system and construction method thereof
CN105275145A (en) Assembly type multifunctional composite wallboard
CN112252560A (en) Novel composite floor slab for building and construction method thereof
CN203475609U (en) Connecting structure of composite floor slab and steel tube shear wall of building