CN206752828U - A kind of steel bar girder sandwich precast floor slab - Google Patents
A kind of steel bar girder sandwich precast floor slab Download PDFInfo
- Publication number
- CN206752828U CN206752828U CN201720616630.0U CN201720616630U CN206752828U CN 206752828 U CN206752828 U CN 206752828U CN 201720616630 U CN201720616630 U CN 201720616630U CN 206752828 U CN206752828 U CN 206752828U
- Authority
- CN
- China
- Prior art keywords
- hard material
- material layer
- steel bar
- layer
- cement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 106
- 239000010959 steel Substances 0.000 title claims abstract description 106
- 239000000463 material Substances 0.000 claims abstract description 64
- 239000004568 cement Substances 0.000 claims abstract description 37
- 229920002223 polystyrene Polymers 0.000 claims abstract description 28
- 239000004793 Polystyrene Substances 0.000 claims abstract description 27
- 239000004744 fabric Substances 0.000 claims abstract description 13
- 230000015572 biosynthetic process Effects 0.000 claims description 2
- 238000005755 formation reaction Methods 0.000 claims description 2
- 239000000203 mixture Substances 0.000 claims 1
- 238000009413 insulation Methods 0.000 abstract description 8
- 238000009434 installation Methods 0.000 abstract description 6
- 239000010410 layer Substances 0.000 abstract 1
- 238000011068 load Methods 0.000 description 10
- 238000000034 method Methods 0.000 description 7
- 229910001335 Galvanized steel Inorganic materials 0.000 description 6
- UHOVQNZJYSORNB-UHFFFAOYSA-N benzene Chemical compound C1=CC=CC=C1 UHOVQNZJYSORNB-UHFFFAOYSA-N 0.000 description 6
- 238000010276 construction Methods 0.000 description 6
- 239000008397 galvanized steel Substances 0.000 description 6
- 238000011065 in-situ storage Methods 0.000 description 6
- 239000011159 matrix material Substances 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 230000003014 reinforcing Effects 0.000 description 5
- 239000002002 slurry Substances 0.000 description 5
- 210000003205 Muscles Anatomy 0.000 description 4
- 239000000853 adhesive Substances 0.000 description 4
- 230000001070 adhesive Effects 0.000 description 4
- 239000002699 waste material Substances 0.000 description 4
- 238000005266 casting Methods 0.000 description 3
- 230000000875 corresponding Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000009415 formwork Methods 0.000 description 3
- 239000011268 mixed slurry Substances 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 238000007789 sealing Methods 0.000 description 3
- 238000007711 solidification Methods 0.000 description 3
- 210000003195 Fascia Anatomy 0.000 description 2
- 239000011248 coating agent Substances 0.000 description 2
- 238000000576 coating method Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 238000005192 partition Methods 0.000 description 2
- 210000001503 Joints Anatomy 0.000 description 1
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 210000001138 Tears Anatomy 0.000 description 1
- 230000001680 brushing Effects 0.000 description 1
- 239000000306 component Substances 0.000 description 1
- 239000008358 core component Substances 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000003247 decreasing Effects 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000005538 encapsulation Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000000116 mitigating Effects 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000009376 nuclear reprocessing Methods 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 238000009416 shuttering Methods 0.000 description 1
- 239000008261 styrofoam Substances 0.000 description 1
- 230000001629 suppression Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Abstract
The utility model discloses a kind of steel bar girder sandwich precast floor slab.It is the layer structure battenboard being made up of the lower hard material layer, cement and polystyrene laminboard layer and upper hard material layer being stacked from bottom to top;Tiling has steel fabric sheet in lower hard material layer and upper hard material layer, and triangle steel bar girder is enclosed with cement and polystyrene laminboard layer, is provided with cement and polystyrene laminboard layer arranged on left and right sides face and is mutually matched tenon, groove;Triangle steel bar girder is to be arranged in triangular apex position by a upper cage bar and two lower cage bars and be connected the truss element that upper and lower cage bar formed by two groups of diagonal bars in wave Longitudinal extending;Wherein, lower cage bar is placed with is embedded at the bonding crack between cement and polystyrene laminboard layer and upper hard material layer in lower hard material layer upper surface, upper cage bar.The utility model has the advantages that from heavy and light, cost is low, easy positioning, installation effectiveness is high, environmentally friendly, cost-effective, connection is reliable, anti-seismic performance is strong and sound insulation, insulation, overall appearance.
Description
Technical field
The utility model is related to the precast floor unit in a kind of building engineering field, be more specifically it is a kind of be applied to it is more
The steel bar girder sandwich precast floor slab of layer or high-rise steel structure engineering, internal partition, Side fascia, plate can also be used as across 3.0 meters of left sides
It is right short to be used across loading plate or long span non-bearing roofing board.
Background technology
At present, the floor in architectural engineering is broadly divided into two major classes --- precast floor slab and cast-in-situ floor.But traditional two
Kind floor all exposes respective shortcoming and defect at leisure in use.
Precast floor slab does not occur larger changes and improvements technically for many years, substantially or with hollow hole
Based on the concrete floor in hole.Major defect existing for such a concrete floor is:Plate is heavy, heavy, shock resistance is poor, not sound insulation,
It is not incubated, needs repeatedly lifting and transhipment, manually installed difficulty(Individual plates are general all more than 350 kilograms, during fine position not
Conveniently move), and easily occur plate stitch after assembling due to being completely independent, lacking reliable connection between adjacent floor deck, influence
Attractive in appearance, globality poor.
For cast-in-situ floor, live formwork erection, cast-in-site, although eliminating the trouble for repeatedly lifting and transporting,
It is to need to build substantial amounts of scaffold, the lumps of wood and plank sheathing in place limited at the scene, manual branch mold process is cumbersome, work is strong
Spend big, time-consuming, laborious, with greatly improving for labor cost, this mode is more and more uneconomical, and wastes a large amount of timber moneys
Source.
In recent years, steel structure frame formula building was more and more, i.e., is arrived first using as the steel column of main support, steel girder erection
Position, floor, lining, Side fascia and steel column, the girder steel of subsequent installation are attached and fixed again.Then there have been a kind of generation
For the corrugated steel cast-in-situ floor of traditional plank sheathing:Corrugated steel is positioned on girder steel, directly by the use of corrugated steel as
Building template, while the bottom reinforcement bars as floor again.Although corrugated steel cast-in-situ floor can save traditional plank sheathing and tear open
The trouble of mould, but the exposed corrugated steel of floor slab bottoms unsightly, difficulty coats;Structure fire poor performance, steel plate once by
Bearing capacity of floor slab just substantially reduces after heat;In addition, as the problem of reinforcing bar detraction also be present in steel plate corrosion.Therefore, this ripple
Steel plate cast-in-situ floor is limited significantly using upper, is only used at present in Small-scale redevelopment engineering and fitting-out work, is failed a large amount of
It is generalized in multilayer, high-rise steel structure engineering.
At present in multilayer, high-rise steel structure engineering, most widely used cast-in-place concrete floor formwork erection plate technique, is one
Kind be called the technology of " steel bar truss floor support plate ", and with the immediate prior art of the utility model.Steel bar truss floor support plate
Core component be triangle steel bar girder, i.e., arranged, put into along horizontal Longitudinal extending by a upper cage bar, two lower cage bars
Cross section be triangle component.In other words, as a horizontal bottom and two inclinations are formd between three cage bars
Side, it is provided with two inclined sides and is longitudinally continuous the diagonal bar for curving wave extension and is welded with upper and lower cage bar.And
Steel bar truss floor support plate is exactly that the triangle steel bar girder three that will be welded is one group, by three triangle reinforcing bars in a manner of uniform
The horizontal bottom of truss is fixed and is welded on one piece of thin galvanized steel plain sheet, that is, forming one piece 60 centimeters wide, length can arbitrarily set
Steel form, steel bar truss floor support plate is fixed on girder steel, then direct casting concrete slurry.It is cast-in-place with above-mentioned corrugated steel
Floor is compared, and the thin galvanized steel plain sheet of steel bar truss floor support plate bottom is flat board, and only plays temporary support concrete, in building
Thin galvanized steel plain sheet is with regard to ineffective after board concrete solidification, because the triangle steel bar girder in floor just constitutes floor requirement
Arrangement of reinforcement, bearing requirements can be met.Therefore, the thin galvanized steel plain sheet of bottom can be removed after floorslab concrete solidification.
In addition, triangle steel bar girder can continuously be welded by automatic welder, machining accuracy height, efficiency high, good economy performance.Meanwhile steel
Formwork erection mode of the muscle truss floor support plate as main flow in current multilayer, high-rise steel structure engineering, save substantial amounts of shuttering and
Labour cost, also save substantial amounts of timber resources.It is disadvantageous in that:The thin galvanized steel plain sheet of manual demolition needs to expend necessarily
Manpower, and the galvanized steel plain sheet majority gross distortion removed, so reprocessing can only be melted down when waste product, this also results in one newly
Waste.
Compare from construction weight merely, either floor or wallboard, be mostly on the premise of same breadth, equal thickness
The weight of Bars In Poured Concrete Slab is more than prefabricated board(Such as most general office building, spot-cast concrete floor-slab thickness are 10 centimeters, conduct oneself with dignity every square
240 kilograms, and common prefabricated board is typically in 170-180 kilograms/square meter), therefore Bars In Poured Concrete Slab has no in terms of construction weight is mitigated
Advantage, and also have no the feasible method for mitigating construction weight in the construction technology of Bars In Poured Concrete Slab at present.Pushed greatly in current country
Under the background of the assembled architecture of row energy-saving and environmental protection, in this field of building floor, have the technique for improving precast floor slab only, subtract
The deadweight of light floor, the assembly performance for improving floor are only the direction of technological innovation, and this is also reason place of the present utility model.
The content of the invention
The purpose of this utility model is exactly to provide a kind of reinforcing bar for the weak point in the presence of above-mentioned prior art
Truss sandwich precast floor slab.The utility model has from heavy and light, cost is low, easy positioning, installation effectiveness are high, it is environmentally friendly, cost-effective,
Connection is reliable, anti-seismic performance is strong and the advantages that sound insulation, insulation, overall appearance.
The purpose of this utility model can be realized by following technique measures:
Steel bar girder sandwich precast floor slab of the present utility model is gathered by lower hard material layer, the cement being stacked from bottom to top
The layer structure battenboard that benzene laminboard layer and upper hard material layer are formed;In the lower hard material layer and upper hard material layer
Tiling has steel fabric sheet(Purpose is anticracking and strengthens top layer rigidity), it is enclosed with the cement and polystyrene laminboard layer some
The triangle steel bar girder that group extends along longitudinally, be provided with cement and polystyrene laminboard layer arranged on left and right sides face Longitudinal extending and
Tenon, the groove being mutually matched(The fast positioning of adjacent two pieces of battenboards and quick splicing can be realized when assembling at the scene, and
Good sealing effect after being handled at splicing seams using cement base adhesives);The triangle steel bar girder is by a upper cage bar
Triangular apex position is arranged in two lower cage bars and by being connected upper and lower master in two groups of diagonal bars of wave Longitudinal extending
The truss element that muscle is formed;Wherein, lower cage bar is placed with is embedded in cement and polystyrene sandwich in lower hard material layer upper surface, upper cage bar
At bonding crack between layer and upper hard material layer.
The area that upper cage bar is wrapped up by upper hard material layer described in the utility model is more than by cement and polystyrene laminboard layer bag
The area wrapped up in(It is easy to combine and bears pressure).
The thickness of upper hard material layer is more than the thickness of lower hard material layer, the cement and polystyrene described in the utility model
The thickness of laminboard layer is more than the thickness of upper hard material layer.
The width of steel fabric sheet described in the utility model is equal with the width of upper and lower hard material layer.
The quantity of triangle steel bar girder described in the utility model is three groups.
The quantity of tenon described in the utility model and groove is one.
The cross sectional shape of tenon described in the utility model and groove is trapezoidal(With pattern draft, adjacent two pieces of sandwiches
Tenon and groove easily assemble when plate assembles, and are easy to fast positioning).
The cross sectional shape of tenon described in the utility model and groove is semicircle arcuation(It is convex during adjacent two pieces of battenboards assembling
Tenon and groove are easily assembled, and are easy to fast positioning, and corresponding arcuation mould is easily worked).
Design principle of the present utility model is as follows:
From the above as can be seen that the cement and polystyrene laminboard layer positioned at intermediate layer accounts for master on the structural thickness of battenboard
(thickness of lower hard material layer is 5mm~10mm to body, and the thickness of upper hard material layer is 10mm~20mm, the cement in intermediate layer
Thickness 80mm~150mm of polyphenyl sandwich layer), that is, the large percentage of battenboard plate bulk is accounted for, and intermediate layer is small by proportion
(density of mixed slurry is about every cubic metre to the mixed slurry moulding by casting that granular polystyrene is formed after being mixed with cement slurry
250 kilograms), compared with the steel bar truss floor support plate of traditional simplex concrete structure, the deadweight of floor mitigates significantly.It is meanwhile poly-
Benzene particle is derived from discarded styrofoam, waste secondary use, cost-effective, environmental protection;And granular polystyrene has well
Heat insulation effect and soundproof effect.Offered in the both sides of steel bar girder sandwich precast floor slab of the present utility model extend longitudinally,
And shape and size match tenon and groove, fast positioning can be achieved when so assembling at the scene between adjacent two pieces of battenboards
It is high with quick splicing, installation effectiveness.Simultaneously as it is equipped with and can prevents in the upper and lower layer hard material layer of sandwich precast floor slab
The steel fabric sheet of surface rigidity is split and strengthens, along with can be to using cement base at splicing seams after adjacent floor deck fast positioning
Adhesives carries out encapsulation process, and the easy brush trowelling material in outer surface of hard material layer carries out later stage decoration up and down, therefore
The utility model not only solves traditional plate stitch problem, and the overall plate face of floor is attractive in appearance.The utility model is with multigroup
Light floor of the triangle steel bar girder as arrying main body, after floor is placed on girder steel matrix, it can be easy to knock out to be placed with
Lower cage bar in underfloor hard material layer upper surface, and reinforcing bar point is welded on girder steel matrix and is positioned and is fixed, solve
The problem that conventional floors can not position on girder steel, connection is reliable, bearing capacity is strong, anti-seismic performance greatly improves.
The beneficial effects of the utility model are as follows:
The utility model has from heavy and light, cost is low, easy positioning, installation effectiveness is high, environmentally friendly, cost-effective, connection is reliable,
Anti-seismic performance is strong and the advantages that sound insulation, insulation, overall appearance.
More specifically, current cast-in-situ floor weight is generally more than 240 kilograms/square meter, and precast floor slab weight is general all big
In 170 kilograms/square meter, and the weight of steel bar girder sandwich precast floor slab of the present utility model accomplish 70 kilograms -100 kilograms/it is flat
Rice, it is contemplated that the weight of steel structure column, beam main body frame in multi-storey steel structure is typically in every square metre of 100 kilograms of construction area
Within, every square metre of floor weight, which mitigates more than 140 kilograms, means that architectural complex weight mitigates significantly, and building cost is also corresponding
It is greatly decreased.Compared to common prefabricated board, due to half of the weight less than normal concrete prefabricated board, it is well suited for construction site
Repeatedly dismantle, install and use;Simultaneously in post-disaster reconstruction, it is adapted to high-volume to transport, quick New Dwelling.
Brief description of the drawings
Fig. 1 is the sectional elevation of the utility model structure one.
Fig. 2 is longitudinal section of the present utility model.
Fig. 3 is the cross-sectional front view of the utility model intermediate cam steel bar girder.
Fig. 4 is Fig. 3 left view.
Fig. 5 is the sectional elevation of the utility model structure two.
Sequence number in figure:1st, lower hard material layer, 2, cement and polystyrene sandwich of layers, 3, upper hard material layer, 4, steel fabric sheet, 5,
Triangle steel bar girder, 6, groove, 7, tenon, 8, upper cage bar, 9, lower cage bar, 10, diagonal bar.
Embodiment
The utility model is below with reference to embodiment(Accompanying drawing)It is further described:
Embodiment one
As shown in Figure 1 to 4, steel bar girder sandwich precast floor slab of the present utility model is lower hard by what is be stacked from bottom to top
The layer structure battenboard that the material bed of material 1, cement and polystyrene laminboard layer 2 and upper hard material layer 3 are formed;In the lower hard material
Tiling has steel fabric sheet 4 in layer 1 and upper hard material layer 3(Purpose is anticracking and strengthens top layer rigidity), in the cement
Some groups of triangle steel bar girders 5 extended along longitudinally are enclosed with polyphenyl sandwich layer 2, it is left and right in cement and polystyrene laminboard layer 2
Tenon 7, the groove 6 that Longitudinal extending is provided with two sides and is mutually matched(Adjacent two pieces of sandwiches can be realized when assembling at the scene
The fast positioning of plate and quick splicing, and at splicing seams using the processing of cement base adhesives after good sealing effect);It is described
Triangle steel bar girder 5 is to be arranged in triangular apex position and by wave by a upper cage bar 8 and two lower cage bars 9
Two groups of diagonal bars 10 of Longitudinal extending connect the truss element that upper and lower cage bar 8,9 is formed;Wherein, lower cage bar 9 is placed with lower hard material
The upper surface of the bed of material 1, upper cage bar 8 are embedded at the bonding crack between cement and polystyrene laminboard layer 2 and upper hard material layer 3.
The area that upper cage bar 8 is wrapped up by upper hard material layer 3 described in the utility model is more than by cement and polystyrene laminboard layer 2
The area of parcel(It is easy to combine and bears pressure).
The thickness of upper hard material layer 3 is more than the thickness of lower hard material layer 1 described in the utility model, and the cement gathers
The thickness of benzene laminboard layer 2 is more than the thickness of upper hard material layer 3.
The width of steel fabric sheet 4 described in the utility model is equal with the width of upper and lower hard material layer 3,1.
The quantity of triangle steel bar girder described in the utility model 5 is three groups.
The quantity of tenon 7 described in the utility model and groove 6 is one.
The cross sectional shape of tenon 7 described in the utility model and groove 6 is trapezoidal(With pattern draft, adjacent two pieces of folders
Tenon 7 and groove 6 easily assemble when core plate assembles, and are easy to fast positioning).
Embodiment two
The present embodiment and the difference of embodiment one are only in that:The cross sectional shape of the tenon 7 and groove 6 is semicircle
Arcuation(Tenon 7 and groove 6 easily assemble during the assembling of adjacent two pieces of battenboards, are easy to fast positioning, and corresponding arcuation mould is easy
Processing).
Specifically used process of the present utility model is:
Steel bar girder sandwich precast floor slab of the present utility model can be used as indoor floor, can also be used as internal partition, outer
Wallboard.Operation during use is very simple, by taking floor as an example:First, some pieces of battenboards of the present utility model are transported,
And it is placed into in requisition for the position of installation, making the front and rear often tenon 7 of adjacent two pieces of battenboards, 6 mutual clamp of groove, being spelled
Connect;Then, after floor positioning, in needing the position that is connected with girder steel matrix to knock out lower hard material layer 1 steel fabric sheet 4 with
And lower cage bar 9, it is spot-welded together with girder steel matrix, then battenboard just with girder steel matrix it is unusually strong be fixed as one it is whole
Body, thus easily solve the problem that common prefabricated board can not position in girder steel matrix, and greatly strengthen battenboard and exist
Anti-seismic performance during use;After positioning is fixed, cement injection base adhesives, complete at the splicing seams of adjacent battenboard
Sealing and bonding into piece, it is easy in later stage fitment process to underfloor external coating coating, to upper surface laying floor
Deng.
Additionally by experimental verification, the utility model is also used as plate across 3.0 meters or so short across loading plate or length
Across non-bearing roofing board uses:In structural steelwork, by setting steel secondary beam to be easily met the span requirement of floor.With width
60cm, long 360cm, high 10cm steel bar girder sandwich precast floor slab exemplified by, three group three is disposed with cement and polystyrene laminboard layer 2
Angle steel bar girder 5, the height of triangle steel bar girder 5 are 8.5cm, a diameter of Ф 10mm of upper cage bar 8, lower cage bar 9 it is a diameter of
Ф 8mm, upper and lower cage bar 8,9 are III grade of reinforcing bar, and the thickness of lower hard material layer 1 is 5mm, and the thickness of upper hard material layer 3 is
15mm, actual measurement plate weigh 175 kilograms, i.e., nearly weigh 80 kilograms per square meter.700 public affairs are first added on the steel bar girder sandwich precast floor slab
Jin evenly load, actual measurement amount of deflection are less than 2cm, and now per 325 kilograms of square meter evenly load, and general floor plan payload values are
200 kilograms/square meter.From simple loading test, the bearing capacity of steel bar girder sandwich precast floor slab fully meets requirement,
And when reaching 325 kilograms of every square meter dead load, plate does not have the sign of any destruction yet, and plate has good elasticity.With it is common pre-
It is deflection that making sheet, which is compared slightly discrepant,(That is amount of deflection in the middle part of plate)It is slightly larger, in 700 kilograms of total load heads amount of deflection close to 2cm, this
Main body mainly due to steel bar girder sandwich precast floor slab is that steel bar girder adds light sandwich layer, thus during stress deflection compared with
Greatly.If same plate, span is changed to 2.4 meters, then under same evenly load, according to the elastic theory of plate, amount of deflection will become
For 3.6 meters of spans when 1/5th, i.e. amount of deflection will be kept to be less than 4mm, the i.e. deflection less than plate length 2/1000ths, and this is with regard to complete
Bearing capacity and the amount of deflection requirement of full up pedal plate.Therefore, for this brassboard, as 2.4 meters across loading plate it is enough, such as
Fruit will increase span, and side can be appropriate to increase thickness of slab to realize by increasing bar diameter.On the whole, the utility model ratio
The short long span non-bearing roofing board within loading plate or 6.0 meters being more suited to as 3.0 meters or so uses.
Steel bar girder sandwich precast floor slab of the present utility model pour building up using horizontal positioned template in factory
Type, specific manufacturing process are as follows:
(1)Spelling steel form:Steel form is spelled by counterdie, side form and end module, formation cross section is as shown in Figure 1 to be poured into
Type inner chamber.Wherein, bed die must be horizontal positioned, to ensure that layers of material thickness is uniform;It is suppressed with and is used in side form shaping panel
Concavity cambered surface, the convex cambered surface that tenon 7, the groove 6 of sandwich floor slab are molded.
(2) group weldering triangle steel bar girder:The structure of triangle steel bar girder 5 refers to Fig. 3, Fig. 4, will be oblique using automatic welder
Muscle 10 continuously welds with upper cage bar 8, lower cage bar 9 and forms triangle steel bar girder.
(3)Cloth muscle:After steel form spelling, steel fabric sheet 4 is laid in the bottom of forming cavity first, then in steel wire
Triangle steel bar girder 5 is put on piece 4, triangle steel bar girder 5 should be fixed at both ends, not shift position during ensureing to pour.Typically
The width of sandwich floor slab is 60cm, puts three groups high 8.5cm~15cm steel bar girders.
(4)Pour lower hard material layer:Lower hard material layer 1 is poured using cement-based grouting material, general bottom pours
Thickness 5mm to 10mm, play cover to reinforcement, while be easy to later stage brushing paint.
(5)Joints cement polyphenyl sandwich layer:After the lower initial set of hard material layer 1, in the top cavity of lower hard material layer 1
The mixed slurry that middle cast is formed after being mixed by the small granular polystyrene of proportion with cement slurry, pour height and flooded substantially for slurry
Triangle steel bar girder 5, the radius for the upper cage bar 8 that the upper top exposed portion of cage bar 8 is slightly larger than, forms water in triangle steel bar girder 5
Mud polyphenyl sandwich layer 2.
(6)Pour hard material layer:After the initial set of cement and polystyrene laminboard layer 2, in the upper surface of cement and polystyrene laminboard layer 2
Steel fabric sheet 4 is laid, then casting cement base grouting material, pour the upper surface of slurry and the side form of steel form, end mould top surface
Concordantly, the thickness of upper hard material layer 3 is typically set to 10mm~20mm after solidification.Wherein, upper cage bar 8 is simultaneously by upper hard material
Layer 3 and lower hard material layer 1 wrap up, and are easy to combine and bear pressure.
(7)Maintenance, stock, use:Conserved under normal temperature three days can stock stack, can come into operation within 15th.
Claims (8)
- A kind of 1. steel bar girder sandwich precast floor slab, it is characterised in that:It is the lower hard material layer by being stacked from bottom to top (1), cement and polystyrene laminboard layer(2)With upper hard material layer(3)The layer structure battenboard of composition;In the lower hard material layer (1)With upper hard material layer(3)Inside tiling has steel fabric sheet(4), in the cement and polystyrene laminboard layer(2)In be enclosed with it is some The triangle steel bar girder that group extends along longitudinally(5), in cement and polystyrene laminboard layer(2)Arranged on left and right sides is provided with longitudinal direction on face Extension and the tenon being mutually matched(7), groove(6);The triangle steel bar girder(5)It is by a upper cage bar(8)With under two Cage bar(9)It is arranged in triangular apex position and by two groups of diagonal bars in wave Longitudinal extending(10)Connect upper and lower cage bar (8、9)The truss element of formation;Wherein, lower cage bar(9)It is placed with lower hard material layer(1)Upper surface, upper cage bar(8)It is embedded in Cement and polystyrene laminboard layer(2)With upper hard material layer(3)Between bonding crack at.
- 2. steel bar girder sandwich precast floor slab according to claim 1, it is characterised in that:The upper cage bar(8)By upper hard The material bed of material(3)The area of parcel is more than by cement and polystyrene laminboard layer(2)The area of parcel.
- 3. steel bar girder sandwich precast floor slab according to claim 1, it is characterised in that:The upper hard material layer(3) Thickness be more than lower hard material layer(1)Thickness, the cement and polystyrene laminboard layer(2)Thickness be more than upper hard material layer (3)Thickness.
- 4. steel bar girder sandwich precast floor slab according to claim 1, it is characterised in that:The steel fabric sheet(4)Width Degree and upper and lower hard material layer(3、1)Width it is equal.
- 5. steel bar girder sandwich precast floor slab according to claim 1, it is characterised in that:The triangle steel bar girder(5) Quantity be three groups.
- 6. steel bar girder sandwich precast floor slab according to claim 1, it is characterised in that:The tenon(7)And groove(6) Quantity be one.
- 7. steel bar girder sandwich precast floor slab according to claim 1, it is characterised in that:The tenon(7)And groove(6) Cross sectional shape to be trapezoidal.
- 8. steel bar girder sandwich precast floor slab according to claim 1, it is characterised in that:The tenon(7)And groove(6) Cross sectional shape be semicircle arcuation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720616630.0U CN206752828U (en) | 2017-05-31 | 2017-05-31 | A kind of steel bar girder sandwich precast floor slab |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720616630.0U CN206752828U (en) | 2017-05-31 | 2017-05-31 | A kind of steel bar girder sandwich precast floor slab |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206752828U true CN206752828U (en) | 2017-12-15 |
Family
ID=60621398
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720616630.0U Expired - Fee Related CN206752828U (en) | 2017-05-31 | 2017-05-31 | A kind of steel bar girder sandwich precast floor slab |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206752828U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106996161A (en) * | 2017-05-31 | 2017-08-01 | 桑大勇 | A kind of steel bar girder sandwich precast floor slab |
CN108842944A (en) * | 2018-06-21 | 2018-11-20 | 宝业集团浙江建设产业研究院有限公司 | A kind of assembled light composite thermo-insulating wall board and preparation method thereof and installation method |
CN112064847A (en) * | 2020-07-17 | 2020-12-11 | 湖北神州建材有限责任公司 | Assembly construction method of assembled floor slab |
-
2017
- 2017-05-31 CN CN201720616630.0U patent/CN206752828U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106996161A (en) * | 2017-05-31 | 2017-08-01 | 桑大勇 | A kind of steel bar girder sandwich precast floor slab |
CN108842944A (en) * | 2018-06-21 | 2018-11-20 | 宝业集团浙江建设产业研究院有限公司 | A kind of assembled light composite thermo-insulating wall board and preparation method thereof and installation method |
CN112064847A (en) * | 2020-07-17 | 2020-12-11 | 湖北神州建材有限责任公司 | Assembly construction method of assembled floor slab |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206070835U (en) | A kind of assembled architecture bottom composite floor | |
CN106996161A (en) | A kind of steel bar girder sandwich precast floor slab | |
CN101967851A (en) | Board-mixing structure assembly type house and building method thereof | |
CN206752828U (en) | A kind of steel bar girder sandwich precast floor slab | |
CN107780576A (en) | A kind of assembled architecture bottom composite floor and its connected mode | |
CN206873730U (en) | A kind of steel bar truss floor structure | |
CN107165271A (en) | A kind of assembled Special-Shaped Column concrete frame structure | |
CN205875394U (en) | Antidetonation concrete beam column that dry process is connected | |
CN101435237A (en) | Novel hollow combined board | |
CN202430876U (en) | Floor system with structure of steel and concrete precast slabs | |
CN105696453B (en) | A kind of steel-concrete combination beam | |
CN108643429B (en) | But height-adjusting's assembled coincide floor | |
CN109518861A (en) | A kind of steel bar truss floor support plate being applied in combination with cast-in-situ wall | |
CN215106121U (en) | One-way superimposed sheet piece department joint construction | |
CN205976215U (en) | Compound box roof beam of assembled concrete | |
CN206545308U (en) | A kind of Steel Castellated Beams rib concrete folding plate | |
CN108301545A (en) | A kind of big module overlapping contignation of the assembled with space truss temporary support | |
CN212358789U (en) | Prefabricated composite bottom plate concrete superimposed sheet connection structure based on tongue-and-groove form | |
CN205444514U (en) | Bearing light insulation intergral template | |
CN210685149U (en) | Triangular steel bar truss welding type concrete prefabricated bottom plate | |
CN105971176A (en) | Hollow concrete composite slab provided with thin-wall steel tube ribs, floor, building and manufacturing method | |
CN203160489U (en) | Cold-formed thin-wall lattice-type steel-concrete composite heat-insulation floor slab | |
CN207121992U (en) | A kind of assembled Special-Shaped Column concrete frame structure | |
CN206616695U (en) | A kind of concrete panel and girt strip floor dry type connecting node | |
CN205857488U (en) | A kind of light composite heat-preserving laminated floor slab |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171215 Termination date: 20200531 |
|
CF01 | Termination of patent right due to non-payment of annual fee |