CN209082675U - Underground sewage pipe dredging system - Google Patents

Underground sewage pipe dredging system Download PDF

Info

Publication number
CN209082675U
CN209082675U CN201821371649.4U CN201821371649U CN209082675U CN 209082675 U CN209082675 U CN 209082675U CN 201821371649 U CN201821371649 U CN 201821371649U CN 209082675 U CN209082675 U CN 209082675U
Authority
CN
China
Prior art keywords
pipeline
water
water pipe
cylinder
dredging system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821371649.4U
Other languages
Chinese (zh)
Inventor
Wenhui Zhong
钟文辉
Yin Liang
梁茵
Jianmin Jiang
江俭民
Zhenyu Liang
梁振宇
Zhiliang Yan
严志亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sheng Industry Construction Co Ltd
Original Assignee
Sheng Industry Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sheng Industry Construction Co Ltd filed Critical Sheng Industry Construction Co Ltd
Priority to CN201821371649.4U priority Critical patent/CN209082675U/en
Application granted granted Critical
Publication of CN209082675U publication Critical patent/CN209082675U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of underground sewage pipe dredging systems, it is related to pipe-dredging, the main points of its technical scheme are that: including water tank and connection water tank two sides two water pipes, wherein dredge pump is connected between a water pipe and water tank, two water pipes are connected to pipeline to be unclogged, further include the pressing device for water pipe to be pressed into pipeline.The utility model solves the problems, such as that water pipe connect inconvenience in bilge well with pipeline, the pipeline having and the more convenient advantage of water pipe connection procedure.

Description

Underground sewage pipe dredging system
Technical field
The utility model relates to pipe-dredging, in particular to a kind of underground sewage pipe dredging system.
Background technique
Currently, sewerage system is often blocked because of the siltation of dirt or sandstone, it will if dredging not in time Great inconvenience is caused to the life of citizen.The cleaning of lower street water channel is generally used and draws spoon or suction-type sewer scavenger, existing soil pick-up Vehicle is suitable for sucks sewage and mud, can not clear up husky, Shi Dengchong hypostasis and anhydrous negative well.Furthermore existing soil pick-up Vehicle need to transport outward blowdown after being filled a vehicle sewage, so that cleaning a bite yin well need to repeatedly transport outward blowdown, so that existing suction-type sewer scavenger Working efficiency is low.
In order to solve the above technical problems, application No. is 201410365146.6 Chinese patents to disclose a kind of ground down blow Water pipe dredging system.Including the water tank for holding sewage and connection in two water pipes of water tank two sides, two water pipes are inserted into respectively In two adjacent bilge wells, and be connected with the pipeline for being connected between two bilge wells, one of water pipe and water tank it Between be connected with dredge pump, by the sewage in dredge pump draw line, flow back into another by water tank and another water pipe In bilge well, the number of sewage outward transport is reduced, improves working efficiency.
It is inconvenient for operation since water pipe needs to connect in bilge well with pipeline but in the program.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is that: a kind of underground sewage pipe dredging is provided System, it is more convenient in pipeline and water pipe connection procedure.
Above-mentioned technical purpose is achieved through the following technical solutions, a kind of underground sewage pipe dredging system, including water Case and connection are in two water pipes of water tank two sides, wherein being connected with dredge pump between a water pipe and water tank, two water pipes are equal It is connected to pipeline to be unclogged, further includes the pressing device for water pipe to be pressed into pipeline.
Through the above technical solutions, the dirt in pipeline is pumped into water tank from water pipe by dredge pump, and from another water Pipe flows back into pipeline, and the sewage activity in pipeline is got up, can be dredged to pipeline, is supported water pipe by pressing device Enter in pipeline, can allow between pipeline and water pipe connecting even closer by way of being pressed into, facilitate between water pipe and pipeline Connection.
Further, the pressing device includes cylinder for water pipe to be pressed into pipeline and is used to cylinder hanging in dirt Suspension in well, the cylinder are located at water pipe far from pipeline side.
Through the above technical solutions, water pipe is pressed by pipeline by cylinder, and it is easy to operate, cylinder is hung by suspension It is simple to operate to enter bilge well.
Further, the suspension includes the lifting rope being fixed on cylinder, and is fixed on lifting rope far from cylinder one The detent bar at end.
Through the above technical solutions, cylinder is hung in bilge well, regulates and detent bar is stuck in bilge well after cylinder location Well head at, by detent bar by limit cylinder fall.
Further, cylinder is connected with the support plate being connected on bilge well side wall far from water pipe one end.
Through the above technical solutions, being supported on side wall by support plate, the stress of cylinder can be facilitated, be convenient for water pipe It is pressed into pipeline.
Further, the water pipe is provided with the connector for connecting water pipe and pipeline with pipeline junction.
Through the above technical solutions, since pipeline and water pipe junction are in bilge well, so between pipeline and water pipe not Convenient directly docking, is linked together pipeline and water pipe by connector, can allow between pipeline and water pipe connect it is more convenient, It is easy connector align with tube.
Further, the connector is set as taper, and is inserted into pipeline one end section and is less than section for being connected to water pipe one end Face.
Through the above technical solutions, the connector of taper can be easier insertion pipeline, in water pipe and pipeline connection procedure It is more easier.
Further, the output end of the cylinder is connected with quasi- fishplate bar perpendicular to cylinder.
Through the above technical solutions, the diameter due to cylinder output is smaller, the diameter of water pipe is also smaller, it is not easy to Water pipe abuts, and expanding the contact area between cylinder and water pipe by quasi- fishplate bar can be easier to be docked at cylinder above water pipe Just water pipe is pressed into pipeline by cylinder.
Further, the lifting rope is equipped with two, and one be fixed on quasi- fishplate bar another it is affixed on the supporting plate.
Through the above technical solutions, cylinder balancing is avoided as caused by the centre-of gravity shift of cylinder by two lifting ropes Cylinder output is not easy to arrive to water pipe, influences the operation that water pipe is pressed into pipeline, is easier for cylinder to be aligned by two lifting ropes The side wall of water pipe and bilge well.
Further, the connector outer wall coats elasticity layer.
Through the above technical solutions, the closure between connector and pipeline can be increased by elastic layer.
Further, two water storage spaces being connected to of setting in the water tank, and filtering is provided between two water storage spaces Net, two water storage spaces are connected to two water pipes respectively.
Through the above technical solutions, sewage, which passes through filter screen after being pumped into a water storage space from water pipe, enters another Water storage space is flowed back into from another water pipe in pipeline to be unclogged, and the cleaning lasting to pipeline achievees the purpose that unclog the pipe Meanwhile filter screen can prevent blocking pipeline dirt be sucked out after flowed back into pipeline again cause cleaning be not thorough.
The utility model has following technical effect that in summary
1, the dirt in pipeline is pumped into water tank from water pipe by dredge pump by the utility model, and from another water pipe It flows back into pipeline, the sewage activity in pipeline is got up, pipeline can be dredged, be pressed into water pipe by pressing device In pipeline;
2, the utility model can allow between pipeline and water pipe in such a way that water pipe is pressed by pressing device and connect more Closely, facilitate the connection between water pipe and pipeline;
3, the utility model is allowed clearly by the way that water tank is divided into two water storage spaces and strainer is added between two water storage spaces Dirty effect is more preferable.
Detailed description of the invention
Fig. 1 is the overall structure diagram of embodiment;
Fig. 2 is the water tank schematic internal view in embodiment;
Fig. 3 is the schematic diagram that prominent detent bar blocks lifting rope in embodiment;
Fig. 4 is the structural schematic diagram of embodiment center tap;
Appended drawing reference: 1, blowdown vehicle;2, water tank;20, water storage space;21, filter screen;3, water pipe;4, dredge pump;5, it compresses Device;50, cylinder;51, lifting rope;52, quasi- fishplate bar;53, support plate;54, detent bar;6, connector;60, elastic layer.
Specific embodiment
Embodiment, a kind of underground sewage pipe dredging system, referring to Fig.1, including blowdown vehicle 1 and setting are in blowdown vehicle 1 On water tank 2, setting is provided with filter screen 21 between two water storage spaces 20 there are two the water storage space 20 being connected in water tank 2. 2 two sides of water tank are communicated with water pipe 3, and two water pipes 3 are inserted into two adjacent bilge wells, and two water pipes 3 are inserted into two The both ends of pipeline to be unclogged between a bilge well.It is connected with dredge pump 4 between one of water pipe 3 and water tank 2, passes through dredge pump 4 by a water storage space 20 in the sewage sucking water tank 2 in pipeline, by the filtering of filter screen 21 from another water pipe 3 It flows back into pipeline, by repeated flushing by pipe-dredging, this process does not need sewage improving work effect to outside transport Rate reduces job costs.
In order to facilitate the connection of water pipe 3 and pipeline, it is additionally provided with the pressing device 5 for water pipe 3 to be pressed into pipeline, is compressed Device 5 includes cylinder 50, and ties up to the lifting rope 51 on cylinder 50, and the output end of cylinder 50 is connected with quasi- fishplate bar 52, convenient for pair Quasi- water pipe 3, is pressed into pipeline for water pipe 3 and connect with pipeline, and cylinder 50 is connected with far from 3 one end of water pipe and is connected to bilge well side wall Support plate 53, be to have lifting rope 51 between support plate 53 and quasi- fishplate bar 52, there is detent bar 54 in 51 other end system of lifting rope, adjusts Detent bar 54, which is stuck at the well head of bilge well, after 50 height of cylinder can start cylinder 50, and water pipe 3 is pressed into pipeline.
It is more accurate in order to allow pipeline to connect with water pipe 3, it is connected with taper joint 6 in 3 end of water pipe, connector 6 is inserted into One end section of pipeline is less than connector 6 and connects 3 one end of water pipe.Elastic layer 60 made of rubber are coated on the outer wall of connector 6.It will Connector 6 is inserted into pipeline and realizes the connection and sealing between water pipe 3 and pipeline by the pressure of elastic layer 60 and cylinder 50.
The connector 6 of water pipe 3 is placed on the end of pipeline by specific implementation process, and cylinder 50 is hung in bilge well, works as standard When fishplate bar 52 is directed at water pipe 3 far from pipeline side, when support plate 53 is directed at bilge well side wall, detent bar 54 is stuck in bilge well Well head starts cylinder 50, and connector 6 is pressed into pipeline, realizes the connection of pipeline and water pipe 3, starting dredge pump 4, by dirt from pipe Water tank 2 is pumped into road, sewage can flow back into pipeline again after filtering, carry out repeated flushing to pipeline, both reduced The outward transport number of sewage, improves work efficiency and the utilization rate at water source.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (9)

1. a kind of underground sewage pipe dredging system, two water pipes (3) including water tank (2) and connection in water tank (2) two sides, Wherein it is connected with dredge pump (4) between a water pipe (3) and water tank (2), two water pipes (3) are connected to pipeline to be unclogged, It is characterized in that: further including the pressing device (5) for water pipe (3) to be pressed into pipeline, the pressing device (5) includes for by water Pipe (3) is pressed into the cylinder (50) of pipeline and for cylinder (50) to be hung in the suspension in bilge well, the cylinder (50) Positioned at water pipe (3) far from pipeline side.
2. sewage pipe dredging system in underground according to claim 1, it is characterised in that: the suspension includes fixing Lifting rope (51) on cylinder (50), and it is fixed on the detent bar (54) of lifting rope (51) far from cylinder (50) one end.
3. sewage pipe dredging system in underground according to claim 2, it is characterised in that: cylinder (50) is far from water pipe (3) One end is connected with the support plate (53) being connected on bilge well side wall.
4. sewage pipe dredging system in underground according to claim 1, it is characterised in that: the water pipe (3) and pipeline connect The place of connecing is provided with the connector (6) for connecting water pipe (3) Yu pipeline.
5. sewage pipe dredging system in underground according to claim 4, it is characterised in that: the connector (6) is set as boring Shape, and be inserted into pipeline one end section and be less than the section for being connected to water pipe (3) one end.
6. sewage pipe dredging system in underground according to claim 1, it is characterised in that: the output end of the cylinder (50) Quasi- fishplate bar (52) are connected with perpendicular to cylinder (50).
7. sewage pipe dredging system in underground according to claim 3, it is characterised in that: the lifting rope (51) is equipped with two Root, and one is fixed in quasi- fishplate bar (52) upper another and is fixed on support plate (53).
8. sewage pipe dredging system in underground according to claim 4, it is characterised in that: connector (6) the outer wall cladding Elasticity layer (60).
9. sewage pipe dredging system in underground according to claim 1, it is characterised in that: setting two in the water tank (2) The water storage space (20) of a connection, and filter screen (21) are provided between two water storage spaces (20), two water storage spaces (20) point It is not connected to two water pipes (3).
CN201821371649.4U 2018-08-23 2018-08-23 Underground sewage pipe dredging system Expired - Fee Related CN209082675U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821371649.4U CN209082675U (en) 2018-08-23 2018-08-23 Underground sewage pipe dredging system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821371649.4U CN209082675U (en) 2018-08-23 2018-08-23 Underground sewage pipe dredging system

Publications (1)

Publication Number Publication Date
CN209082675U true CN209082675U (en) 2019-07-09

Family

ID=67115107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821371649.4U Expired - Fee Related CN209082675U (en) 2018-08-23 2018-08-23 Underground sewage pipe dredging system

Country Status (1)

Country Link
CN (1) CN209082675U (en)

Similar Documents

Publication Publication Date Title
CN1316140C (en) Combined working platform for oil/water well
CN107869160A (en) A kind of Accrete clearing device for being used to clear up riverway sludge
CN209082675U (en) Underground sewage pipe dredging system
CN209179005U (en) The mud of direct circulation holing with slurry wall protection bored concrete pile falls arranging device
CN214832823U (en) Pressure-bearing dewatering well
CN211228566U (en) Recoverable vacuum light well point dewatering system
CN208251127U (en) A kind of construction drainage of foundation pit device
CN205136158U (en) From inhaling vacuum dredge pump
CN212327645U (en) Flushing type soft filtering device in front of pump
CN207672649U (en) A kind of Accrete clearing device for clearing up riverway sludge
CN203977571U (en) underground sewage pipe dredging system
CN212757402U (en) Underground water sample collecting and filtering device
CN204897388U (en) Water storage bag and water purification unit
CN208040449U (en) A kind of mine gas extraction system suction side automatic draining structure
CN211143181U (en) Sludge discharge device for long-distance pressure pipeline
CN108316971A (en) A kind of mine gas extraction system suction side automatic draining structure and method
CN113445970A (en) Ground production increase auxiliary device of coal bed gas single well tolerance
CN207934147U (en) Water purification filter case drainage pipeline component
CN202450564U (en) Sludge absorbing and discharging pipe for mine sump
CN220117324U (en) Integral underground continuous wall bottom cleaning and sand filtering device
CN210013690U (en) Multi-wellhead drainage device
CN214530730U (en) Drainage device for building foundation
CN202482943U (en) Non-acute-angled V-shaped trap
CN210134830U (en) Operation well head waste liquid does not fall to ground device
CN214464379U (en) Positive and negative pressure automatic water drainage device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190709