CN209082510U - Mansion foundation pit pillar construction - Google Patents

Mansion foundation pit pillar construction Download PDF

Info

Publication number
CN209082510U
CN209082510U CN201821288036.4U CN201821288036U CN209082510U CN 209082510 U CN209082510 U CN 209082510U CN 201821288036 U CN201821288036 U CN 201821288036U CN 209082510 U CN209082510 U CN 209082510U
Authority
CN
China
Prior art keywords
steel pipe
pipe post
foundation pit
bottom plate
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821288036.4U
Other languages
Chinese (zh)
Inventor
Yiguo Cheng
程意国
Jianjun Hu
胡建军
Zhilong Xu
徐志龙
Yanyan Xuan
玄雁燕
Rui Chen
陈锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yuxiang Construction And Development Group Co Ltd
Original Assignee
Jiangsu Yuxiang Construction And Development Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yuxiang Construction And Development Group Co Ltd filed Critical Jiangsu Yuxiang Construction And Development Group Co Ltd
Priority to CN201821288036.4U priority Critical patent/CN209082510U/en
Application granted granted Critical
Publication of CN209082510U publication Critical patent/CN209082510U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a kind of mansion foundation pit pillar constructions, it applies in building foundation pit field, it solves construction to be more troublesome, and later period dismounting is also pretty troublesome, the rate of recovery of material also very low technical problem, its key points of the technical solution are that a kind of mansion foundation pit pillar construction, including stake is poured, it is described to pour stake and be embedded in soil layer;Described pour is equipped with mounting hole in stake, sliding is equipped with steel pipe post in the mounting hole, and described pour is additionally provided with bottom plate in stake;The bottom plate is equipped with the adjusting component for adjusting steel pipe post height, and the adjusting component includes the fixing seat being arranged on the bottom plate, and sliding is connected with lifting pin in the fixing seat, and the lifting pin is connect with the steel pipe post;Having the technical effect that for having facilitates construction, and is convenient for the dismounting in later period, and material yield rate is higher.

Description

Mansion foundation pit pillar construction
Technical field
The utility model relates to building foundation pit fields, in particular to mansion foundation pit pillar construction.
Background technique
As skyscraper is more and more, deep-foundation pit engineering inevitably occurs;Traditional pattern foundation pit supporting structure column is all It is welded using cast in situs or using fashioned iron lattice column, long construction period, and also the later period removes and is more troublesome, after dismounting Stock utilization it is lower.
Currently, to disclose a kind of armored concrete vertical for the Chinese patent that notification number in the prior art is CN207499248U Rod structure, it includes column, the cylindrical link block that the column is embedded with, and the link block is rubber structure or wooden knot Structure, the exposed surface in the column in the end face of the link block.
This reinforced concrete upright column structure, although can be used as pit prop, reinforcing bar disclosed in the prior art Concrete upright column structure needs to carry out cast in situs, and construction is more troublesome, and the later period removes also pretty troublesome, the recycling of material Rate is also very low.
Utility model content
The purpose of the utility model is to provide a kind of mansion foundation pit pillar constructions, its advantage is that more conveniently construct, and Convenient for the dismounting in later period, material yield rate is higher.
The above-mentioned technical purpose of the utility model has the technical scheme that a kind of mansion foundation pit column Structure, including pour stake, it is described to pour stake and be embedded in soil layer;Described pour is equipped with mounting hole in stake, sliding in the mounting hole It moves and is equipped with steel pipe post, described pour is additionally provided with bottom plate in stake;The bottom plate is equipped with the tune for adjusting steel pipe post height Component is saved, the adjusting component includes the fixing seat being arranged on the bottom plate, and sliding is connected with lifting pin in the fixing seat, The lifting pin is connect with the steel pipe post.
Mounting hole is equipped in stake through the above technical solutions, pouring, sliding is equipped with steel pipe post in mounting hole;It pours in stake It is additionally provided with bottom plate, bottom plate is equipped with the adjusting component for adjusting steel pipe post height, and adjusting component includes being arranged on bottom plate Fixing seat, sliding is connected with lifting pin in fixing seat, and lifting pin is connect with steel pipe post;It pours stake to be embedded in soil layer, make It is relatively stable stake must to be poured;Steel pipe post sliding is arranged in the mounting hole for pouring stake, has been convenient for the installation of steel pipe post and has torn open It unloads, and entire steel pipe post can be recycled completely, so that the rate of recovery of material greatly increases;Adjusting component can be to steel pipe Column carries out the fine tuning in short transverse, so that steel pipe post be allow preferably to be used for the foundation pit of different depth.
The utility model is further arranged to: described to pour stake include several masters along the steel pipe post circle distribution Muscle, several main ribs are arranged with spiral helicine fastening rib.
Through the above technical solutions, pouring stake includes several main reinforcements along steel pipe post circumference respectively, several main reinforcement windings There is spiral helicine fastening rib, increase the structural strength for pouring stake, so that it is more stable to pour stake.
The utility model is further arranged to: the fastening rib is gradually increased close to bottom plate direction density, and main ribs are leaned on The position of nearly bottom plate, which is also bound round, is equipped with several Reinforced Hoops.
Through the above technical solutions, fastening rib is gradually increased close to bottom plate direction density, main reinforcement close to the position of bottom plate also Hoop is equipped with several Reinforced Hoops, so that closer to bottom plate direction, the intensity for pouring stake is higher, to be made with relatively reasonable material Pour the structural strength highest of stake;The setting of Reinforced Hoop further enhances the structural strength for pouring a upper end, steel pipe post master It slides in the upper part for pouring stake, and then ensures that steel pipe post sliding is more stable when pouring in stake.
The utility model is further arranged to: Extendible flake, the Extendible flake are along the circumferential direction equipped on the steel pipe post Reinforcing rib is equipped between the steel pipe post, the lifting pin is connect with the Extendible flake.
Through the above technical solutions, Extendible flake is along the circumferential direction equipped on steel pipe post, between Extendible flake and steel pipe post Equipped with reinforcing rib, reinforcing rib makes the connection between Extendible flake and steel pipe post stronger;Lifting pin is connect with Extendible flake, from And height adjustment is preferably carried out to steel pipe post by lifting pin.
The utility model is further arranged to: the steel pipe post is equipped with extension tube, is fixed on the steel pipe post Guiding tube is fixed with casing in the extension tube, and described sleeve pipe and the guiding tube are bolted.
Through the above technical solutions, steel pipe post is equipped with extension tube, it is fixed with guiding tube on steel pipe post, in extension tube It is fixed with casing, extension tube is set on guiding tube, and casing is set on steel pipe post, the lower end of extension tube and steel pipe post Upper end abuts, and is then fixed casing and extension tube by bolt, to preferably be connected steel pipe post and extension tube It connects, mounting means is more efficient and convenient, and stable structure.
The utility model is further arranged to: the extension tube is equipped with loading plate, the loading plate far from one end of bottom plate Supporting steel plate is equipped between the steel pipe post.
Through the above technical solutions, extension tube is equipped with loading plate far from one end of bottom plate, loading plate is used to support on foundation pit The crossbeam etc. in portion, loading plate increase the contact area of crossbeam and column, so that support is more stable;Loading plate and steel pipe are vertical Supporting steel plate is equipped between column, supporting steel plate strengthens the bonding strength between loading plate and steel pipe post, so that loading plate Bearing capacity is stronger.
The utility model is further arranged to: the steel pipe post is equipped with sealing component, the sealing close to bottom plate one end Component includes the steel plate for sealing water for being symmetricly set on the steel pipe post two sides, and the steel plate for sealing water and the steel pipe post are detachable Connection.
Through the above technical solutions, steel pipe post is equipped with sealing component close to bottom plate one end, sealing component is for preventing ground It is lauched and penetrates on bottom plate, prevented also from rain penetration to pouring in stake, avoiding soft soil influences to pour the stability of stake The case where;Sealing component includes the steel plate for sealing water for being symmetricly set on steel pipe post two sides, and steel plate for sealing water is detachable with steel pipe post Connection, and then facilitate the installation and removal to steel plate for sealing water.
The utility model is further arranged to: being equipped with anchor ear on the symmetrical steel plate for sealing water, the symmetrical anchor ear It is bolted.
Through the above technical solutions, being equipped with anchor ear on symmetrical steel plate for sealing water, symmetrical anchor ear is bolted, and is embraced Hoop can more stable hoop be located on steel pipe post, further facilitate the installation of steel plate for sealing water.
The utility model is further arranged to: the steel plate for sealing water is equipped with rubber washer close to the side of bottom plate.
Through the above technical solutions, steel plate for sealing water is equipped with rubber washer close to the side of bottom plate, rubber washer is supported with bottom plate Touching, the sealing performance of rubber washer is more preferable, to further improve water-stagnating effect.
In conclusion the utility model has the following beneficial effects:
1, it pours and is equipped with mounting hole in stake, sliding is equipped with steel pipe post in mounting hole, is equipped between steel pipe post and bottom plate Component is adjusted, the height of steel pipe post can be preferably adjusted, so that steel pipe post is preferably applied to different depth Foundation pit;
2, guiding tube is fixed on steel pipe post, extension tube is equipped with and is fixed with casing, and extension tube is set on guiding tube, set Pipe sleeve is located on steel pipe post, and the lower surface of extension tube and the upper surface of steel pipe post contradict, and casing and guiding tube pass through bolt Connection;To preferably connect steel pipe post with extension tube, so that installation and removal are all more convenient, and stable structure.
Detailed description of the invention
Fig. 1 is the whole structural schematic diagram of the present embodiment;
Fig. 2 is the structural schematic diagram for pouring stake of the present embodiment;
Fig. 3 is the structural schematic diagram of the adjusting component and sealing component of the present embodiment;
Fig. 4 is the part A enlarged diagram of Fig. 1;
Fig. 5 is the part B enlarged diagram of Fig. 3.
Appended drawing reference: 1, stake is poured;2, mounting hole;3, steel pipe post;4, bottom plate;5, component is adjusted;6, fixing seat;7, it pushes up Rising stem;8, main reinforcement;9, fastening rib;10, Reinforced Hoop;11, Extendible flake;12, reinforcing rib;13, extension tube;14, guiding tube;15, it covers Pipe;16, loading plate;17, supporting steel plate;18, sealing component;19, steel plate for sealing water;20, anchor ear;21, rubber washer;22, it adjusts Knob.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment:
With reference to Fig. 1 and Fig. 2, a kind of mansion foundation pit pillar construction, including stake 1 is poured, it pours stake 1 and is embedded in soil layer, pour It builds stake 1 to form using reinforcing bar and concreting, pours several main reinforcements 8 for being equipped with circle distribution in stake 1, wound in main reinforcement 8 There is fastening rib 9, fastening rib 9 is in the shape of a spiral;Fastening rib 9 is gradually increased towards the direction of bottom plate 4, the density of fastening rib 9;Pour stake 1 has several Reinforced Hoops 10 close to one end uniform array of bottom plate 4.
Referring to figs. 2 and 5, it pours and is prefabricated with mounting hole 2 in stake 1, sliding is connected with steel pipe post 3, steel pipe in mounting hole 2 Extendible flake 11 is fixedly connected on column 3, Extendible flake 11 and 3 side wall of steel pipe post are equipped with reinforcing rib 12;Steel pipe post 3 and bottom plate It is equipped between 4 and adjusts component 5, adjusting component 5 includes the fixing seat 6 being fixedly connected with bottom plate 4, slides and is connected in fixing seat 6 Lifting pin 7, is rotatably connected to the adjusting knob 22 being threadedly engaged with lifting pin 7 in fixing seat 6, lifting pin 7 far from bottom plate 4 one End is abutted with Extendible flake 11;It, can be preferably to steel pipe by rotating adjusting knob 22 when needing to adjust height steel pipe post 3 The height of column 3 is adjusted;Adjust component 5 along steel pipe post 3 circumferencial direction uniform array there are four so that adjust more Steadily.
With reference to Fig. 3 and Fig. 4, it is fixed with guiding tube 14 on steel pipe post 3, extension tube 13 is arranged on guiding tube 14, extends Casing 15 is fixed on pipe 13, casing 15 coats steel pipe post 3, locks between casing 15 and extension tube 13 by bolt;? When extension tube 13 is installed, guiding tube 14 and extension tube 13 are agreed with, then locked by bolt, it can be more stable by extension tube 13 are securely attached to together with guiding tube 14;Prolonging for production different length preferably can be carried out according to the depth of practical foundation pit Long tube 13 can also carry out segmental machining and transport to pillar, preferably reduce the difficulty of processing and transport.
With reference to Fig. 3, extension tube 13 is fixed with loading plate 16 far from one end of bottom plate 4, and loading plate 16 is for carrying foundation pit The side wall of the crossbeam of side, loading plate 16 and extension tube 13 is fixedly connected with supporting steel plate 17, preferably increases loading plate 16 Bearing capacity.
Referring to figs. 2 and 5, steel pipe post 3 is equipped with sealing component 18 close to the position of bottom plate 4, and sealing component 18 includes pair Claim the steel plate for sealing water 19 that 3 two sides of steel pipe post are set, is fixedly connected with anchor ear 20, symmetrical two sealings on steel plate for sealing water 19 Steel plate 19 is bound round and is located on steel pipe post 3 by anchor ear 20, and rubber washer 21, rubber are equipped between steel plate for sealing water 19 and bottom plate 4 21 sealing performance of rubber gasket is preferable, can preferably keep out the infiltration of water.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (9)

1. a kind of mansion foundation pit pillar construction, including stake (1) is poured, it is described to pour stake (1) and be embedded in soil layer;
It is characterized in that, described pour in stake (1) is equipped with mounting hole (2), described pour is additionally provided with bottom plate (4) on stake (1);It is described Sliding is equipped with steel pipe post (3) in mounting hole (2), and the bottom plate (4) is equipped with the adjusting for adjusting steel pipe post (3) height Component (5), described adjust component (5) include the fixing seat (6) being arranged on the bottom plate (4), are slid on the fixing seat (6) It is connected with lifting pin (7), the lifting pin (7) connect with the steel pipe post (3).
2. foundation pit pillar construction in mansion according to claim 1, which is characterized in that described to pour stake (1) include along described Several main reinforcements (8) of steel pipe post (3) circle distribution, several main ribs (8) are arranged with spiral helicine fastening rib (9).
3. foundation pit pillar construction in mansion according to claim 2, which is characterized in that the fastening rib (9) is close to bottom plate (4) Direction density is gradually increased, and main ribs (8) also bind round close to the position of bottom plate (4) and are equipped with several Reinforced Hoops (10).
4. foundation pit pillar construction in mansion according to claim 1, which is characterized in that on the steel pipe post (3) circumferentially Direction is equipped with Extendible flake (11), is equipped with reinforcing rib (12) between the Extendible flake (11) and the steel pipe post (3), the jacking Bar (7) is connect with the Extendible flake (11).
5. foundation pit pillar construction in mansion according to claim 4, which is characterized in that the steel pipe post (3), which is equipped with, prolongs Long tube (13) is fixed with guiding tube (14) on the steel pipe post (3), is fixed with casing (15), institute on the extension tube (13) It states casing (15) and the guiding tube (14) is bolted.
6. foundation pit pillar construction in mansion according to claim 5, which is characterized in that the extension tube (13) is far from bottom plate (4) one end is equipped with loading plate (16), is equipped with supporting steel plate (17) between the loading plate (16) and the steel pipe post (3).
7. foundation pit pillar construction in mansion according to claim 1, which is characterized in that the steel pipe post (3) is close to bottom plate (4) one end is equipped with sealing component (18), and the sealing component (18) includes being symmetricly set on stopping for the steel pipe post (3) two sides Water steel plate (19), the steel plate for sealing water (19) are detachably connected with the steel pipe post (3).
8. foundation pit pillar construction in mansion according to claim 7, which is characterized in that on the symmetrical steel plate for sealing water (19) Anchor ear (20) are equipped with, the symmetrical anchor ear (20) is bolted.
9. foundation pit pillar construction in mansion according to claim 8, which is characterized in that the steel plate for sealing water (19) is close to bottom plate (4) side is equipped with rubber washer (21).
CN201821288036.4U 2018-08-09 2018-08-09 Mansion foundation pit pillar construction Expired - Fee Related CN209082510U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821288036.4U CN209082510U (en) 2018-08-09 2018-08-09 Mansion foundation pit pillar construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821288036.4U CN209082510U (en) 2018-08-09 2018-08-09 Mansion foundation pit pillar construction

Publications (1)

Publication Number Publication Date
CN209082510U true CN209082510U (en) 2019-07-09

Family

ID=67114566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821288036.4U Expired - Fee Related CN209082510U (en) 2018-08-09 2018-08-09 Mansion foundation pit pillar construction

Country Status (1)

Country Link
CN (1) CN209082510U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112962471A (en) * 2021-03-30 2021-06-15 中建三局基础设施建设投资有限公司 Assembled horizontal limiting sand box supporting device and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112962471A (en) * 2021-03-30 2021-06-15 中建三局基础设施建设投资有限公司 Assembled horizontal limiting sand box supporting device and construction method thereof

Similar Documents

Publication Publication Date Title
CN204919588U (en) A board -like assembly of cavity round platform basis for frozen soil area transmission line iron tower
CN106836463A (en) The constructing device and construction method of cushion cap and ground girder construction
CN108560542A (en) A kind of waste tire cladding builds the two-directed reinforcement and its construction method of slag
CN108930224A (en) Punching stick method bent cap supports regulating system construction method
CN106677533A (en) Basement exterior wall single-side formwork supporting system and method
CN110682433A (en) Prefabricated stand column construction scheme
CN106245642A (en) A kind of pre-stressed concrete pipe pile foundation and construction method thereof
CN208844417U (en) A kind of outer precast construction for pier column and its outer prefabricated interior cast-in-place pier column
CN209082510U (en) Mansion foundation pit pillar construction
CN206468008U (en) Outer wall of basement one side formwork support system
CN109594581B (en) River-crossing pipeline structure and installation method thereof
CN203160254U (en) Pit support structure
CN204875558U (en) Shaped steel runs through inside and outside compound support formula bracket system of encorbelmenting
CN208038954U (en) A kind of road structure preventing settlement of highway
CN207582482U (en) Civil engineering built pile
CN216615873U (en) Soft soil deep foundation pit supporting structure of side slope
CN110004938A (en) A kind of foundation pit side-wall structural strengthening suspension device
CN206529881U (en) The constructing device of cushion cap and ground girder construction
CN209619853U (en) Box girder supporting system utilizing existing structural columns
CN204676591U (en) Trough rim construction elevator basis
CN212001139U (en) Deep foundation pit supporting structure capable of preventing deformation
CN108005089A (en) A kind of foundation pit supporting construction
CN110700106B (en) Bridge construction pier pouring steel template reinforcing structure
CN209799529U (en) communication tower prefabricated base convenient for wiring
CN206396764U (en) A kind of supporting pile column of deep basal pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190709

Termination date: 20210809