CN209066873U - A kind of pipeline hangs hole mold - Google Patents

A kind of pipeline hangs hole mold Download PDF

Info

Publication number
CN209066873U
CN209066873U CN201821818715.8U CN201821818715U CN209066873U CN 209066873 U CN209066873 U CN 209066873U CN 201821818715 U CN201821818715 U CN 201821818715U CN 209066873 U CN209066873 U CN 209066873U
Authority
CN
China
Prior art keywords
ring
snap ring
half module
hole mold
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821818715.8U
Other languages
Chinese (zh)
Inventor
王学军
黄乙峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau Third Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau Third Construction Engineering Co Ltd
Priority to CN201821818715.8U priority Critical patent/CN209066873U/en
Application granted granted Critical
Publication of CN209066873U publication Critical patent/CN209066873U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model discloses a kind of pipelines to hang hole mold, belong to construction fixture technology field, including left half module, right half module and the C-shaped snap ring for being provided with opening, one end of the C-shaped snap ring is provided with hook, and the other end of the C-shaped snap ring is provided with the buckle with hook clamping;The C-shaped snap ring is elastic metallic material preparation.A kind of pipeline disclosed by the utility model is hung hole mold and is integrated Zuo Banmo, the clamping of right half module using C-shaped snap ring, the dismounting that pipeline hangs hole mold can be realized without other tools, structure is simple, easy for installation, easily operated.

Description

A kind of pipeline hangs hole mold
Technical field
The utility model construction engineering technical field, and in particular to a kind of pipeline hangs hole mold.
Background technique
As the national density of population is gradually increased, Living consumption steadily improves, city, the newly-built multilayer in rural area are on the middle and senior level And high residential building is increasing, the requirement to construction quality is also gradually stringent.Antiseep at the most concerned problem of small proprietor it One, and hang the main reason for floor seepage is often caused in hole.
Hole construction quality is hung itself is a generally but easily ignoring, and the waterproof requirement of architectural engineering it is high, The scale of construction is big.If quality control can be reinforced, construction quality not only can be improved, more can increase owner's satisfaction, brings potential warp Ji benefit.
At present in building roof, kitchen, toilet, the construction of piping shaft preserved pipeline sealing hole, there is also with tradition Mode plank, iron wire, the production such as reinforcing bar simply hang mould, which needs to be divided to two to casting concrete three times, is applying It also needs especially to clear up hole periphery before work and scalpriform, be supported to mould plank is hung, time-consuming long, efficiency of constructing It is low.Also provide in the market simultaneously it is some hang hole mold, but it mostly uses greatly bolt to be attached fastening, during the installation process, It installs connection inconvenience, and the tool and accessory for needing to carry are more, and bolt is easy to fall in disassembly process, for dismounting speed Degree brings certain influence.
Utility model content
The utility model is directed to the prior art, provides a kind of pipeline and hangs hole mold, using C-shaped snap ring by Zuo Banmo, the right side Half module clamping is integrated, and the dismounting that pipeline hangs hole mold can be realized without other tools, structure is simple, easy for installation, easily In operation.
The utility model is achieved through the following technical solutions: a kind of pipeline hangs hole mold, including left half module, right half module and sets It is equipped with the C-shaped snap ring of opening, one end of the C-shaped snap ring is provided with hook, and the other end of the C-shaped snap ring is provided with and links up with The buckle of clamping;The C-shaped snap ring is elastic metallic material preparation.
The left half module and right half module have been oppositely arranged semicircle arc groove, the semi-circular arc of the left half module and right half module Shape slot is combined into and the consistent circle of through-flooring outer diameter tube.The C-shaped snap ring is that radian is greater than 180 ° of arc ring, not by In the case where external force, the internal diameter of C-shaped snap ring is not more than the outer diameter of left half module and right half module, allows to be stuck in left half module and the right side The outer surface of half module fits closely left half module and right half module.
Further, the bullet that the snap ring buckled including being fixed on C-shaped collar surface and one end are fixedly connected with snap ring Property band, the elastic webbing far from snap ring one end setting with hook clamping grab.
The elastic webbing side is provided with multiple grabs along the arrangement of elastic webbing length direction, can according to need selection card Hook adjusts the degree of the clamping of C-shaped snap ring left half module and right half module, extends the service life of C-shaped snap ring, avoids since elastic webbing is more After secondary use, elasticity is deteriorated, and cannot reach the left half module of C-shaped snap ring clamping and right half module, and pipeline is made to hang the effect of hole mold not spillage Fruit.
The left half module includes integrally formed left panel and left anchor ear, and it is recessed that the side of the left panel offers left circular arc Slot, the radian of the opening direction of left anchor ear anchor ear consistent and left with left arc groove opening direction and the arc of left arc groove Degree is consistent;The right half module includes integrally formed right panel and right anchor ear, and the side of the right panel offers and left circular arc The corresponding right arc groove of groove, the opening direction of right anchor ear anchor ear consistent and right with right arc groove opening direction Radian is consistent with the radian of right arc groove, and the C-shaped snap ring is buckled in the outer surface of left anchor ear and right anchor ear.
The C-shaped snap ring is arc panel made of the bending of elastic metallic thin plate, when the left half module of clamping and right half module, C-shaped The inner surface of snap ring and the outer surface of left anchor ear and right anchor ear fit closely, and make the close fitting of left half module and right half module.
Preferably, the hook of C-shaped snap ring one end setting is no less than two, and the C-shaped snap ring is set far from hook one end The grab set is identical as the quantity of hook, and multiple grabs and snap ring are clamped, and keeps C-shaped snap ring clamping effect more preferable.
It is provided with semicircle step on the top surface of the left panel and right panel, is arranged in the left panel and right panel The semicircle step having is oppositely arranged;Sealing ring is equipped in the semicircle step, the internal diameter and Zuo Banmo of the sealing ring, The annular that right half module surrounds is consistent.
The sealing ring includes the left semi-ring and right semi-ring for being spliced into annular, and the left semi-ring and right semi-ring are wooden material Material preparation, increases the frictional force between through-flooring pipeline.
Annular edge edge is provided on the upper surface of the sealing ring, the annular edge edge extends outwardly;The annular edge The lower surface on edge is bonded with the top surface of left panel, left panel, is bonded the upper surface of sealing ring with floor, reduces the polishing of floor Level requirements reduce construction work.
The both ends of the left semi-ring are provided with dovetail key, and the both ends of the right semi-ring are provided with dovetail corresponding with dovetail key Slot, left semi-ring and right semi-ring pass through dovetail key and dovetail groove splicing cyclization.
Preferably, in use, the connection of the connecting line, left half module and right half module of the left semi-ring and right semi-ring Line, C-shaped snap ring opening not on the same face, make its seal fastening effect it is more preferable.
The utility model compared with prior art, have the following advantages that and the utility model has the advantages that
(1) a kind of pipeline provided by the utility model hang hole mold use C-shaped snap ring by Zuo Banmo, right half module clamping for One, can be realized the dismounting that pipeline hangs hole mold without other tools, structure is simple, easy for installation, easily operated.
(2) the utility model, which provides a kind of pipeline and hangs the C-shaped snap ring of hole mold, carries out elastic connection using elastic webbing, makes Its is convenient for disassembly and assembly, while applicability is more preferable, is convenient for the left half module of clamping and right half module.
(3) the utility model provides a kind of pipeline and hangs the sealing ring that hole mold is additionally provided with wood materials preparation, increases Sealing effect avoids the leakage that concrete slurry occurs.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the left half module, right half module structural schematic diagram of the utility model;
Fig. 3 is 3 cross-sectional view of the utility model embodiment;
In figure: 1-Zuo Banmo, 11-left panels, 111-left arc grooves, 112-semicircle steps, 12-left anchor ears, 2-right half modules, 21-right panels, 211-right arc grooves, 22-right anchor ears, 3-C-shaped snap rings, 31-buckles, 32-hooks, 33-elastic webbings, 34-grabs, 4-sealing rings, 41-Zuo Banhuan, 42-right semi-rings.
Specific embodiment
Embodiment 1
As shown in Figure 1, 2, a kind of pipeline hangs hole mold, and a kind of pipeline hangs hole mold, including left half module 1, right half module 2 and sets It is equipped with the C-shaped snap ring 3 of opening, one end of the C-shaped snap ring 3 is provided with hook 32, and the other end of the C-shaped snap ring 3 is provided with The buckle 31 being clamped with hook 32;The C-shaped snap ring 3 is elastic metallic material preparation.
The left half module 1 includes integrally formed left panel 11 and left anchor ear 12, and the side of the left panel 11 offers Left arc groove 111, the arc of the opening direction of the left anchor ear 12 anchor ear 12 consistent and left with left 111 opening direction of arc groove It spends consistent with the radian of left arc groove 111;The right half module 2 includes integrally formed right panel 21 and right anchor ear 22, described The side of right panel 21 offers right arc groove 211 corresponding with left arc groove 111, the opening side of the right anchor ear 22 Radian to anchor ear 22 consistent and right with right 211 opening direction of arc groove is consistent with the radian of right arc groove 211, the C The buckle 31 of shape snap ring 3 is in the outer surface of left anchor ear 12 and right anchor ear 22.
The left half module 1 and right half module 2 have been oppositely arranged semicircle arc groove, the semicircle of the left half module 1 and right half module 2 Shape arc groove is combined into and the consistent circle of through-flooring outer diameter tube.The C-shaped snap ring 3 is the arc ring that radian is greater than 180 °, In the case where not by external force, the internal diameter of C-shaped snap ring 3 is not more than the outer diameter of left half module 1 and right half module 2, allows to be stuck in The outer surface of left half module 1 and right half module 2 fits closely left half module 1 and right half module 2.
The C-shaped snap ring 3 is arc panel made of the bending of elastic metallic thin plate, when the left half module 1 of clamping and right half module 2, C The inner surface of shape snap ring 3 and the outer surface of left anchor ear 12 and right anchor ear 22 fit closely, and make the close of left half module 1 and right half module 2 Fitting.
Embodiment 2
The present embodiment is to improve on the basis of embodiment 1, is theed improvement is that: the buckle 31 includes fixing In the elastic webbing 33 that the snap ring on 3 surface of C-shaped snap ring and one end are fixedly connected with snap ring, the described one end of elastic webbing 33 far from snap ring Grab 34 with 32 clamping of hook is set.
In use, C-shaped snap ring 3 to be first connected to the outer surface of right half module 2 and left half module 1, make left half module 1 and right half module 2 The semicircle arc slot of opposite fitting, Zuo Banmo 1 and right half module 2 forms the cylinder being bonded with through-flooring pipeline external surface;Then Tensile elasticity band 33 allows the grab 34 of 33 one end of elastic webbing and hook 32 to buckle 31 together, makes C-shaped snap ring 3 tightly The left half module 1 of clamping and right half module 2 avoid seeping slurry in work progress.Disassembly makes, it is only necessary to by tensile elasticity band 33, make grab 34 It is unbuttoned with hook 32, removes C-shaped snap ring 3, removing for left half module 1 and right half module 2 can be realized, installation process is simple and convenient, It can be realized without other tools.
33 side of elastic webbing is provided with multiple grabs 34 along the arrangement of 33 length direction of elastic webbing, can according to need choosing Card grab 34 is selected, the degree of 3 clamping of C-shaped snap ring left half module 1 and right half module 2 is adjusted, extends the service life of C-shaped snap ring 3, avoids After being used for multiple times due to elastic webbing 33, elasticity is deteriorated, and cannot reach the left half module 1 of 3 clamping of C-shaped snap ring and right half module 2, hang pipeline The effect of hole mold not spillage.
Preferably, the hook 32 of 3 one end of C-shaped snap ring setting is no less than two, and the C-shaped snap ring 3 is far from hook 32 The buckle 31 of one end setting is identical as the quantity of hook 32, and multiple buckles 31 and hook 32 are clamped, and makes 3 clamping of C-shaped snap ring Effect is more preferable.
Other parts and 1 embodiment are essentially identical in the present embodiment, therefore no longer repeat one by one.
Embodiment 3
The present embodiment is improved on the basis of embodiment 1 or 2, is theed improvement is that: as shown in figure 3, described It is provided with semicircle step 112 on the top surface of left panel 11 and right panel 21, is arranged in the left panel 11 and right panel 21 The semicircle step 112 having is oppositely arranged;Sealing ring 4, the internal diameter of the sealing ring 4 are equipped in the semicircle step 112 The annular surrounded with left half module 1, right half module 2 is consistent.
The sealing ring 4 includes the left semi-ring 41 and right semi-ring 42 for being spliced into annular, the left semi-ring 41 and right semi-ring 42 It is wood materials preparation, increases the frictional force between through-flooring pipeline.
Annular edge edge is provided on the upper surface of the sealing ring 4, the annular edge edge extends outwardly;The annular edge The lower surface on edge is bonded with the top surface of left panel 11, left panel 11, is bonded the upper surface of sealing ring 4 with floor, reduces floor The requirement that polishes flat, reduce construction work.
The both ends of the left semi-ring 41 are provided with dovetail key, and the both ends of the right semi-ring 42 are provided with corresponding with dovetail key Dovetail groove, Zuo Banhuan 41 and right semi-ring 42 pass through dovetail key and dovetail groove splicing cyclization.
Preferably, in use, the connecting line of the left semi-ring 41 and right semi-ring 42, Zuo Banmo 1 and right half module 2 Connecting line, C-shaped snap ring 3 opening not on the same face, make its seal fastening effect it is more preferable.
The above is only the preferred embodiment of the utility model, not does limit in any form to the utility model System, any simple modification made by the above technical examples according to the technical essence of the present invention, equivalent variations, each falls within Within the protection scope of the utility model.

Claims (8)

1. a kind of pipeline hangs hole mold, it is characterised in that: including left half module (1), right half module (2) and the C-shaped card for being provided with opening One end of ring (3), the C-shaped snap ring (3) is provided with hook (32), and the other end of the C-shaped snap ring (3) is provided with and links up with (32) buckle (31) being clamped;The C-shaped snap ring (3) is elastic metallic material preparation.
2. a kind of pipeline according to claim 1 hangs hole mold, it is characterised in that: the buckle (31) includes being fixed on C The elastic webbing (33) that the snap ring on shape snap ring (3) surface and one end are fixedly connected with snap ring, the elastic webbing (33) is far from snap ring The grab (34) of one end setting and hook (32) clamping.
3. a kind of pipeline according to claim 2 hangs hole mold, it is characterised in that: elastic webbing (33) side is provided with Multiple grabs (34) along the arrangement of elastic webbing (33) length direction.
4. a kind of pipeline according to claim 1 hangs hole mold, it is characterised in that: the left half module (1) include one at The left panel (11) and left anchor ear (12) of type, the side of the left panel (11) offer left arc groove (111), and described left armful Bind round the radian and left arc groove of the opening direction anchor ear (12) consistent and left with left arc groove (111) opening direction of (12) (111) radian is consistent;The right half module (2) includes integrally formed right panel (21) and right anchor ear (22), the right panel (21) side offers right arc groove (211) corresponding with left arc groove (111), the opening of the right anchor ear (22) The radian of direction anchor ear (22) consistent and right with right arc groove (211) opening direction and the radian one of right arc groove (211) It causes, the C-shaped snap ring (3) is buckled in the outer surface of left anchor ear (12) and right anchor ear (22).
5. a kind of pipeline according to claim 4 hangs hole mold, it is characterised in that: the left panel (11) and right panel (21) it is provided on top surface semicircle step (112), the semicircle being provided on the left panel (11) and right panel (21) Shape step (112) is oppositely arranged;It is equipped with sealing ring (4) in the semicircle step (112), the internal diameter of the sealing ring (4) The annular surrounded with Zuo Banmo (1), right half module (2) is consistent.
6. a kind of pipeline according to claim 5 hangs hole mold, it is characterised in that: on the upper surface of the sealing ring (4) It is provided with annular edge edge, the annular edge edge extends outwardly;The lower surface and left panel (11), left panel on the annular edge edge (11) top surface fitting.
7. a kind of pipeline according to claim 5 hangs hole mold, it is characterised in that: the sealing ring (4) includes being spliced into The left semi-ring (41) and right semi-ring (42) of annular, the left semi-ring (41) and right semi-ring (42) are wood materials preparation.
8. a kind of pipeline according to claim 7 hangs hole mold, it is characterised in that: the both ends of the left semi-ring (41) are arranged There is dovetail key, the both ends of the right semi-ring (42) are provided with dovetail groove corresponding with dovetail key.
CN201821818715.8U 2018-11-06 2018-11-06 A kind of pipeline hangs hole mold Expired - Fee Related CN209066873U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821818715.8U CN209066873U (en) 2018-11-06 2018-11-06 A kind of pipeline hangs hole mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821818715.8U CN209066873U (en) 2018-11-06 2018-11-06 A kind of pipeline hangs hole mold

Publications (1)

Publication Number Publication Date
CN209066873U true CN209066873U (en) 2019-07-05

Family

ID=67097835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821818715.8U Expired - Fee Related CN209066873U (en) 2018-11-06 2018-11-06 A kind of pipeline hangs hole mold

Country Status (1)

Country Link
CN (1) CN209066873U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111633805A (en) * 2020-05-27 2020-09-08 山西鑫联智慧科技股份有限公司 Method for manufacturing steel bellmouth A-shaped pipe by core mould vibration process
CN112031413A (en) * 2020-09-27 2020-12-04 中冶天工集团有限公司 Water collecting wellhead part mold and using method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111633805A (en) * 2020-05-27 2020-09-08 山西鑫联智慧科技股份有限公司 Method for manufacturing steel bellmouth A-shaped pipe by core mould vibration process
CN112031413A (en) * 2020-09-27 2020-12-04 中冶天工集团有限公司 Water collecting wellhead part mold and using method thereof

Similar Documents

Publication Publication Date Title
CN209066873U (en) A kind of pipeline hangs hole mold
CN203716326U (en) Rope connector
CN211398817U (en) Protective device for engineering pipeline construction
CN201813110U (en) Special clamp for drawing cable machine
CN202132612U (en) Multi-pipeline water-proof sleeve
CN202899301U (en) Hold hoop device for jacking steel pipe concrete
CN211113222U (en) Bridge bent cap top construction safety faces device of limit protection
CN202055458U (en) Mounting structure for locally thickening slabstone for architectural decoration
CN204300528U (en) Glass fiber reinforced plastic sand-inclusion pipeline
CN211203148U (en) Wall bushing's mounting structure
CN211228362U (en) A mechanism for laying hydraulic engineering slope net
CN209854888U (en) Novel bathroom floor drain waterproof construction
CN212154109U (en) Outer frame wall connecting piece convenient to install
CN209339614U (en) A kind of panel plug-hole structure
CN204662937U (en) A kind of fixture being fixed on steel structure girder
CN204437536U (en) A kind of flexible bell and spigot joint iron drain-pipe anticreep clip
CN202012079U (en) Pile anchor for cable crane
CN215669674U (en) Joint structure for suspension tunnel
CN201843338U (en) Bottom die for jointing penetrable hole of pipeline of cement floors
CN211370707U (en) Novel seal cover of sealant delivery pump
CN214999984U (en) Pipeline quick connecting device for building site
CN214574448U (en) Large-diameter assembly type non-pressure rainwater sewage pipe ring
CN220223211U (en) Concrete pipeline hoist and mount auxiliary device
CN219952546U (en) Assembled wall brick mounting structure
CN213712109U (en) Cast iron drain pipe fixing member convenient to dismouting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Beijing road 563000 in Guizhou province Zunyi city Honghuagang District No. 57

Patentee after: The Third Construction Co.,Ltd. of China Construction Fourth Engineering Bureau

Address before: Beijing road 563000 in Guizhou province Zunyi city Honghuagang District No. 57

Patentee before: THE THIRD CONSTRUCTION & ENGINEERING CO. OF CCFED

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190705