Prior art keywords
hollow pipe
periphery
prefabricated hollow
cement slurry
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821815697.8U
Other languages
Chinese (zh)
Inventor
刘寅平
王海鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821815697.8U priority Critical patent/CN209066422U/en
Application granted granted Critical
Publication of CN209066422U publication Critical patent/CN209066422U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A kind of Prefabricated hollow pipe structure forming root pile and stake bottom susceptor, belong to building field, first Prefabricated hollow pipe foundation pile bottom is provided with the downward inverted cone-shaped structure of cone, inverted cone-shaped structure centrum circumferential distribution has multiple pressure rupture disks, multiple communicating pipes are provided between the intermediate cement slurry gate spool that multiple pressure rupture disks are arranged with inner cavity among Prefabricated hollow pipe foundation pile respectively, multiple communicating pipe outer ends are tightly connected with multiple pressure rupture disks respectively, led on the pressure rupture disk on pile body periphery on the Prefabricated hollow pipe foundation pile shape body by the cement slurry gate spool of vertical direction and communicating pipe, stake bottom susceptor and root pile can be formed at stake bottom and shape body periphery, the structure, construction technology can be simplified, improve bearing capacity, reduce sedimentation degree, guarantee construction quality.

Description

A kind of Prefabricated hollow pipe structure forming root pile and stake bottom susceptor
Technical field
The utility model relates to a kind of Prefabricated hollow pipe structure, in particular to a kind of formation root pile is pre- with stake bottom susceptor Tubular structure processed, belongs to building field.
Background technique
With the development of real estate, the height of building constantly extends to high-altitude, the following building construction technology Also it is constantly innovating, increasingly developed real estate requirement is met with this, in building foundation construction, has applied for Shen before It please number be 201810185389.X patent name are as follows: a kind of grouting behind shaft or drift lining Prefabricated hollow pipe tree root pilework and construction method, it is this Technology is that cement slurry gate spool, electric wire are provided in Prefabricated hollow pipe, and Prefabricated hollow pipe docking section is provided with connector, connection Part is cylindrical body, cylindrical body internal water slurry casting pipe periphery be equably provided with it is multiple radially slide part, radially slide part and lean on Cement slurry gate spool Slideslip, which is provided with, radially slides axis, inside sets conduit and electric wire, and line end is provided with miniature welding gun, miniature welding gun Be connected to and radially slide the multiple positions of part, radially slide axis and be connected to cement slurry gate spool, in Prefabricated hollow pipe electric wire top with Electric welding machine connection will radially slide part using high current and melt to be formed to cement slurry pouring mouth, in Prefabricated hollow pipe connecting portion Hollow pipe tree root pilework is formed, the sedimentation of foundation pile is reduced with this, improves the bearing capacity of foundation pile, in actual operation, hair The construction method more easier than this construction method is showed, then having declared application again is 201810794212.X application title Are as follows: the construction technology of modified Prefabricated hollow pipe tree root pilework, forming method and cement slurry, this technology include prefabricated sky Heart pipe and connector, the axial cement slurry gate spool periphery being arranged among the connector be connected with it is multiple radially slide axis, It radially slides the sliding of axis periphery to be provided with and radially slide part, radially slides part and be slidably connected in the radial chamber of connector, diameter It is interconnected to sliding axle with part is radially slided, radially slides part outer end and be provided with pressure rupture disk, connector outer end Cement slurry protective bag is provided in radial chamber space, radial chamber is provided with brittleness protective layer in connector periphery, utilizes This hollow pipe stub structure, simplified operation shorten the construction time, prevent the loss of mud, reduce the sedimentation degree of pile foundation, improve The bearing capacity of pile foundation periphery soil layer intensity and precast hollow tubular pole.
Modified Prefabricated hollow pipe tree root pilework and a kind of grouting behind shaft or drift lining Prefabricated hollow pipe tree root pilework applied before And construction method is compared, and pressure rupture disk is utilized, and simplifies the structure to form root pile, utilizes this in cement slurry casting process The plug hole to be formed and be starched to the casting cement on Prefabricated hollow pipe periphery can be realized in body pressure, is greatly reduced after being formed and infuses Starch the cost of Prefabricated hollow pipe tree root pilework.
In long-term construction, discovery is namely infused after first precast hollow bottom of the tube is implemented in precast hollow bottom of the tube Slurry forms hollow pipe tree root pilework on slurry Prefabricated hollow pipe periphery simultaneously, can further decrease the sedimentation degree of pile foundation, improves stake The bearing capacity of primitive period side soil layer intensity and precast hollow tubular pole forms which type of structure can play drop with which type of method Low heavy, raising bearing capacity, and difficulty of construction can be reduced, reduce cost, inventor is studied.
Summary of the invention
Which type of method to form which type of structure can play reduction sinking, raising bearing capacity and reduction for Difficulty of construction reduces cost, and the utility model provides a kind of Prefabricated hollow pipe structure for forming root pile and stake bottom susceptor, mesh Be that lower cost, which is realized, to be reduced, improves building foundation bearing capacity using relatively simple structure, improve construction speed Degree, increases economic efficiency.
The technical solution of the utility model is: a kind of Prefabricated hollow pipe structure forming root pile and stake bottom susceptor, including Based on stake Prefabricated hollow pipe interconnected, the intermediate cement slurry gate spool of inner cavity setting, described among Prefabricated hollow pipe The first root bottom part of Prefabricated hollow pipe is provided with the downward inverted cone-shaped structure of cone, and inverted cone-shaped structure cone circumferential distribution has multiple pressures Power rupture disk is connected separately with multiple communicating pipes, multiple communicating pipes between multiple pressure rupture disks and intermediate cement slurry gate spool Outer end is tightly connected with multiple pressure rupture disks respectively, at the same time, setting is distributed in the identical height in Prefabricated hollow pipe outer periphery There are multiple pressure rupture disks, is provided with multiple communicating pipes, Duo Gelian between intermediate cement slurry gate spool and multiple pressure rupture disks Siphunculus outer end is tightly connected between multiple pressure rupture disks respectively, passes through casting cement slurry after intermediate cement slurry gate spool When, make the multiple pressures being arranged in multiple pressure rupture disks height identical with Prefabricated hollow pipe periphery of inverted cone-shaped structure circumferential distribution Power rupture disk explosion, on the outside of inverted cone-shaped structure periphery and stake bottom susceptor is formed on bottom, is formed on the outside of Prefabricated hollow pipe periphery Root pile;
It is a kind of formed root pile and stake bottom susceptor Prefabricated hollow pipe structure, including based on stake it is interconnected prefabricated Hollow pipe, the intermediate cement slurry gate spool of Prefabricated hollow pipe centre inner cavity setting, the first pile foundation stake bottom of the Prefabricated hollow pipe Portion is provided with the downward inverted cone-shaped structure of cone, and inverted cone-shaped structure circumferential distribution has multiple pressure rupture disks, multiple pressure explosions Be connected separately with multiple communicating pipes between piece and intermediate cement slurry gate spool, multiple communicating pipe outer ends respectively with multiple pressure explosions Piece is tightly connected, and at the same time, the periphery cement slurry that one or more vertical direction is provided in precast hollow inside pipe wall pours Note is managed, and multiple pressure rupture disks are provided in the identical height in Prefabricated hollow pipe outer periphery, and periphery cement slurry gate spool passes through multiple Communicating pipe or ring pipe and communicating pipe are sealingly connected to multiple pressure rupture disks respectively, pass through intermediate cement slurry gate spool and week After side cement slurry gate spool carries out respectively when casting cement slurry, make inverted cone-shaped structure circumferential distribution multiple pressure rupture disks and The multiple pressure rupture disk explosions being arranged in the identical height in Prefabricated hollow pipe periphery, on the outside of inverted cone-shaped structure periphery and the shape of bottom Pile bottom susceptor forms root pile on the outside of Prefabricated hollow pipe periphery;
Further, the inverted cone-shaped structure is the metal product of high-strength corrosion-resisting;
Further, inverted cone-shaped structure and Prefabricated hollow pipe is arranged according to identical indexing in the multiple pressure rupture disk Periphery;
Further, the multiple pressure rupture disks being arranged in the identical height in the periphery of the Prefabricated hollow pipe are an identical height Degree or multiple identical height;
Further, the multiple pressure rupture disks being arranged in the identical height in the periphery of the Prefabricated hollow pipe are distributed in one in advance In the identical height in hollow pipe periphery processed or in the identical height in more Prefabricated hollow pipe peripheries;
Further, the periphery cement slurry gate spool is one or two, the periphery cement slurry gate spool vertical direction On be connected with the ring pipe of horizontal direction, be connected between ring pipe and periphery cement slurry gate spool, ring pipe periphery utilizes connection The seal of tube is connected to the pressure rupture disk on Prefabricated hollow pipe periphery;
Further, the periphery cement slurry gate spool is two roots or more, and two with upper periphery cement slurry gate spool difference Utilize the pressure rupture disk for the setting for being sealingly connected to periphery communicating pipe.
The good effect that the utility model has is: by the way that first prefabricated blank pipe bottom is designed to back draught structure, Be conducive to prefabricated pipe hollow pipe to squeeze to the ground;By the way that in back draught structural perimeter, identical height periphery is divided with prefabricated pipe hollow pipe Multiple pressure rupture disks are not set, under extruding slurry pressure, makes pressure rupture disk explosion, cement slurry can be made from explosion mouth To external penetration, cement slurry is expressed in the base foundation at bottom, basis can be made to squeeze more solid, meanwhile, at first Prefabricated hollow pipe bottom periphery forms the stake bottom cement base of a chondritic, increases the stress surface of precast hollow bottom of the tube Product, improves the support force of foundation pile, meanwhile, in one or more mutually level setting pressure of Prefabricated hollow pipe pile body periphery Rupture disk can be further formed one or more tree root pileworks on the periphery of Prefabricated hollow pipe, be conducive to further increase The support force of foundation pile reduces the sinking amplitude of building, the reliability of building, safety can be improved;By in prefabricated sky Inner cavity is arranged intermediate cement slurry gate spool, one is arranged in the pile lining on Prefabricated hollow pipe intermediate inner wall and periphery among heart pipe Or the periphery cement slurry gate spool of more vertical direction, it can guarantee accelerate to be in the milk by multiple pipeline cement injection slurries Speed, accelerate construction progress;By using the structure of the utility model, setting of the Prefabricated hollow pipe in construction can be simplified Root pile technique, improving speed of application in conjunction with the formation of stake bottom susceptor can further improve the bearing capacity of Prefabricated hollow pipe, drop The sinking amplitude of low building can be improved reliability, the safety of building, is conducive to building and continues to short transverse Extend, improves construction area in unit area.
Detailed description of the invention
Fig. 1 is provided with the Prefabricated hollow pipe longitudinal profile structure schematic of intermediate cement slurry gate spool.
The horizontal profile structure schematic diagram in the direction A-A along Fig. 1 Fig. 2.
Fig. 3 is provided with intermediate and periphery cement slurry gate spool longitudinal profile structure schematic.
The horizontal profile structure schematic diagram in the direction B-B along Fig. 3 Fig. 4.
The stake bottom susceptor and root pile longitudinal profile schematic diagram that Fig. 5 utilizes the utility model to be formed.
Label declaration: first Prefabricated hollow pipe of 10- inverted cone-shaped structure, 11-, 12- intermediate prefabricated hollow pipe, 13- pile lining, Inner cavity among 14-, cement slurry gate spool among 15-, the bottom 16a- communicating pipe, 16b- intermediate connection pipe, 17- pressure rupture disk, 18- ring pipe, the periphery 19- cement slurry gate spool, 20- interconnecting piece, 21- bottom susceptors, 22- root pile.
Specific embodiment
Below in conjunction with attached drawing, the technical solution of the utility model is further described in detail.
The technical solution of the utility model is a kind of Prefabricated hollow pipe structure that can form root pile Yu stake bottom susceptor, Fig. 1 It is the Prefabricated hollow pipe longitudinal profile structure schematic for being provided with intermediate cement slurry gate spool.Fig. 2 is the direction A-A along Fig. 1 Horizontal profile structure schematic diagram.The Prefabricated hollow pipe of stake includes first Prefabricated hollow pipe 11 and in addition to this including based on Intermediate prefabricated hollow pipe 12,20 is precast hollow pipe jointing part, and interconnecting piece 20 can be the direct docking of Prefabricated hollow pipe, can also In, using connector connection is mentioned in background technique, being arranged in the inner cavity 14 of Prefabricated hollow pipe centre between Prefabricated hollow pipe Between cement slurry gate spool 15,11 bottom of the first Prefabricated hollow pipe is provided with the downward inverted cone-shaped structure 10 of cone, back taper Multiple pressure rupture disks 17 are distributed in the cone outer periphery of structure 10, the multiple pressure rupture disks 17 being distributed on inverted cone-shaped structure 10 Multiple communicating pipes are connected separately between the intermediate cement slurry gate spool 15 being arranged respectively with inner cavity 14 among Prefabricated hollow pipe, That is: bottom communicating pipe 16a, multiple bottom communicating pipe 16a outer ends are tightly connected with pressure rupture disks 17 multiple in cone respectively, with This is provided with multiple pressure rupture disks 17, precast hollow inside pipe wall and multiple pressures simultaneously in the identical height in Prefabricated hollow pipe periphery Multiple communicating pipes are provided in pile lining 13 between power rupture disk 17, it may be assumed that outside intermediate connection pipe 16b, multiple intermediate connection pipe 16b End is tightly connected between multiple pressure rupture disks 17 respectively, by when casting cement slurry, making back taper after cement slurry gate spool The multiple pressure bursts being arranged in multiple pressure rupture disks 17 height identical with Prefabricated hollow pipe periphery of 10 circumferential distribution of shape structure 17 explosion of fragmentation, on the outside of 10 periphery of inverted cone-shaped structure and stake bottom susceptor 21, the shape on the outside of Prefabricated hollow pipe periphery are formed on bottom At root pile 22.
A kind of Prefabricated hollow pipe structure that can form root pile 22 Yu stake bottom susceptor 21, Fig. 3 are to be provided with intermediate and periphery The longitudinal profile structure schematic of cement slurry gate spool 19.Fig. 4 is the horizontal profile structure schematic diagram in the direction B-B along Fig. 3.
The Prefabricated hollow pipe of stake includes that first Prefabricated hollow pipe 11 and intermediate prefabricated in addition to this are empty including based on The interconnecting piece between Prefabricated hollow pipe of heart pipe 12,20, interconnecting piece 20 can be the direct docking of Prefabricated hollow pipe, can also be pre- It is connected between hollow pipe processed using mentioning connector in background technique, the intermediate cement being arranged among Prefabricated hollow pipe in inner cavity 14 Gate spool 15 is starched, 11 bottom of the first Prefabricated hollow pipe is provided with the downward inverted cone-shaped structure 10 of cone, inverted cone-shaped structure 10 Cone circumferential distribution has multiple pressure rupture disks 17, the centre that multiple pressure rupture disks 17 are arranged with Prefabricated hollow pipe centre respectively Multiple communicating pipes are connected separately between cement slurry gate spool 15, it may be assumed that bottom communicating pipe 16a, multiple bottom communicating pipe 16a outer ends With respectively with multiple pressure rupture disks 17 be tightly connected, at the same time, in the wall 13 between precast hollow inside pipe wall and periphery It is provided with the periphery cement slurry gate spool 19 of one or more vertical direction, is provided in the identical height in Prefabricated hollow pipe periphery more A pressure rupture disk 17, periphery cement slurry gate spool 19 pass through multiple communicating pipe 16b or ring pipe and the communicating pipe company of sealing respectively It is connected on the pressure rupture disk 17 on Prefabricated hollow pipe periphery, passes through intermediate cement slurry gate spool 15 and periphery cement slurry gate spool 19 Respectively carry out after casting cement slurry when, make 10 circumferential pressure rupture disk 17 of inverted cone-shaped structure with Prefabricated hollow pipe periphery identical height Multiple 17 explosions of pressure rupture disk being arranged on degree form stake bottom susceptor 21 on 10 periphery of inverted cone-shaped structure and bottom, prefabricated Hollow pipe foundation pile periphery forms root pile 22.
The inverted cone-shaped structure 10 is the metal product of high-strength corrosion-resisting, has used stainless steel in the present invention 304 materials.
The multiple pressure rupture disk 17 is on the periphery of inverted cone-shaped structure 10 and Prefabricated hollow pipe foundation pile, by identical point Degree setting.It is provided in the present embodiment on the periphery of inverted cone-shaped structure 10 and Prefabricated hollow pipe foundation pile by 60 ° of indexing Six bottom communicating pipes 16a and intermediate connection pipe 17a, bottom communicating pipe 16a and the outer end intermediate connection pipe 17a are directly and pressure Rupture disk 17 is tightly connected.
The multiple pressure rupture disks 17 being arranged in the identical height in the periphery of the Prefabricated hollow pipe be an identical height or Multiple identical height, the multiple pressure rupture disks 17 being arranged in the identical height in the periphery of the Prefabricated hollow pipe include a height It is upper to form the pressure plate on a root pile 22 or form the pressure plate on the root pile 22 in multiple height, in the present embodiment In, it is respectively provided with a root pile 22 on first Prefabricated hollow pipe 11 and intermediate prefabricated hollow pipe 12 respectively, it, can when construction The quantity of corresponding root pile 22 is set according to the height of floor, local ground soil property.
The multiple pressure rupture disks 17 being arranged in the identical height in the periphery of the Prefabricated hollow pipe are distributed in a prefabricated sky In the identical height in heart pipe periphery or more Prefabricated hollow pipe peripheries, that is to say, that root pile 22 can not only be provided at first in advance On hollow pipe 11 processed, also it can be set in one or more height of other intermediate prefabricated hollow pipes 12.
The periphery cement slurry gate spool 19 is one or two, is connected in 19 vertical direction of periphery cement slurry gate spool It is connected to the ring pipe 18 of horizontal direction, is connected between ring pipe 18 and periphery cement slurry gate spool 19,18 periphery lateral dominance of ring pipe The pressure rupture disk 17 on Prefabricated hollow pipe periphery is sealingly connected to intermediate connection pipe 16b, if floor is not high, construction period not Tight project, the good place of foundation soil are constructed using one or two periphery cement slurry gate spools 19.
If when construction task is more, time requirement is tightly project, can use two roots with upper periphery cement slurry gate spool 19, two are utilized respectively the setting that intermediate connection pipe 16b is directly sealingly connected to periphery with upper periphery cement slurry gate spool 19 Pressure rupture disk 17.It can further improve speed of application using more periphery cement slurry gate spools 19.
It, can be either using the structure in above-mentioned Fig. 1 and Fig. 2, or using the structure in Fig. 3 and Fig. 4 Root pile 22 and stake bottom susceptor 21 are formed using the method for rear casting cement slurry after piling, the stake bottom susceptor 21 can be set On first Prefabricated hollow pipe 11, it may also be arranged on the outside of any one 12 periphery of intermediate prefabricated hollow pipe, both can be set one A root pile 22 can also form multiple root piles 22 on the outside of more intermediate prefabricated hollow pipes 12, so as to improve holding for basis The subsiding extent for carrying power, reducing building, improves the safety of building, guarantees the construction quality of building.
The utility model is conducive to squeeze prefabricated pipe sky by the way that first prefabricated blank pipe bottom is designed to back draught structure Heart pipe is to the ground;By the way that in back draught structural perimeter, multiple pressure explosions are respectively set in identical height periphery with prefabricated pipe hollow pipe Piece 17 makes 17 explosion of pressure rupture disk under extruding slurry pressure, and cement slurry can be made from explosion mouth to external penetration, water Material-mud is expressed in the base foundation at bottom, basis can be made to squeeze more solid, meanwhile, at first 11 bottom of Prefabricated hollow pipe Portion periphery forms the stake bottom cement base of a chondritic, increases the forced area of Prefabricated hollow pipe foundation pile bottom, mentions The high support force of foundation pile, meanwhile, Prefabricated hollow pipe pile body periphery it is mutually level one or more pressure explosions are set Piece 17 can be further formed one or more 22 structures of root pile on the periphery of Prefabricated hollow pipe, be conducive to further increase The support force of foundation pile reduces the sinking amplitude of building, the reliability of building, safety can be improved;By in prefabricated sky Intermediate cement slurry gate spool 15 is arranged, in the pile lining 13 on precast hollow inside pipe wall and periphery in inner cavity 14 among heart pipe foundation pile The periphery cement slurry gate spool 19 of one or more vertical direction is set, can be guaranteed through multiple pipeline cement injection slurries, The speed that can accelerate grouting, accelerates construction progress;By using the structure of the utility model, Prefabricated hollow pipe basis can be simplified Setting root pile 22 technique of the stake in construction, improve speed of application can further improve pre- in conjunction with the formation of stake bottom susceptor 21 The bearing capacity of hollow pipe processed reduces the sinking amplitude of building, can be improved reliability, the safety of building, is conducive to build It builds object and continues extension to short transverse, improve construction area in unit area.

Claims (8)

1. it is a kind of formed root pile and stake bottom susceptor Prefabricated hollow pipe structure, including based on stake prefabricated sky interconnected Heart pipe, the intermediate cement slurry gate spool of Prefabricated hollow pipe centre inner cavity setting, it is characterised in that: first of the Prefabricated hollow pipe Bottom is provided with the downward inverted cone-shaped structure of cone, and inverted cone-shaped structure cone circumferential distribution has multiple pressure rupture disks, multiple pressures Be connected separately with multiple communicating pipes between power rupture disk and intermediate cement slurry gate spool, multiple communicating pipe outer ends respectively with multiple pressures Power rupture disk is tightly connected, and at the same time, distribution is provided with multiple pressure rupture disks in the identical height in Prefabricated hollow pipe outer periphery, Be provided with multiple communicating pipes between intermediate cement slurry gate spool and multiple pressure rupture disks, multiple communicating pipe outer ends respectively with it is multiple It is tightly connected between pressure rupture disk, by when casting cement slurry, making inverted cone-shaped structure periphery after intermediate cement slurry gate spool The multiple pressure rupture disk explosions being arranged in multiple pressure rupture disks height identical with Prefabricated hollow pipe periphery of distribution, in back taper Stake bottom susceptor is formed on the outside of shape structural perimeter and bottom, forms root pile on the outside of Prefabricated hollow pipe periphery.
2. it is a kind of formed root pile and stake bottom susceptor Prefabricated hollow pipe structure, including based on stake prefabricated sky interconnected Heart pipe, the intermediate cement slurry gate spool of Prefabricated hollow pipe centre inner cavity setting, it is characterised in that: first of the Prefabricated hollow pipe Foundation pile bottom is provided with the downward inverted cone-shaped structure of cone, and inverted cone-shaped structure circumferential distribution has multiple pressure rupture disks, multiple Be connected separately with multiple communicating pipes between pressure rupture disk and intermediate cement slurry gate spool, multiple communicating pipe outer ends respectively with it is multiple Pressure rupture disk is tightly connected, and at the same time, the periphery of one or more vertical direction is provided in precast hollow inside pipe wall Cement slurry gate spool is provided with multiple pressure rupture disks, periphery cement slurry gate spool in the identical height in Prefabricated hollow pipe outer periphery By being sealingly connected to multiple communicating pipes or ring pipe and communicating pipe multiple pressure rupture disks respectively, poured by intermediate cement slurry After note pipe and periphery cement slurry gate spool carry out respectively when casting cement slurry, make multiple pressure of inverted cone-shaped structure circumferential distribution The multiple pressure rupture disk explosions being arranged in rupture disk height identical with Prefabricated hollow pipe periphery, on the outside of inverted cone-shaped structure periphery Stake bottom susceptor is formed with bottom, forms root pile on the outside of Prefabricated hollow pipe periphery.
3. a kind of Prefabricated hollow pipe structure for forming root pile and stake bottom susceptor according to claim 1 or 2, feature exist In: the inverted cone-shaped structure is the metal product of high-strength corrosion-resisting.
4. a kind of Prefabricated hollow pipe structure for forming root pile and stake bottom susceptor according to claim 1 or 2, feature exist The periphery of inverted cone-shaped structure and Prefabricated hollow pipe foundation pile is set in: the multiple pressure rupture disk according to identical indexing.
5. a kind of Prefabricated hollow pipe structure for forming root pile and stake bottom susceptor according to claim 1 or 2, feature exist In: multiple pressure rupture disks being arranged in the identical height in the periphery of the Prefabricated hollow pipe be an identical height or multiple identical Highly.
6. a kind of Prefabricated hollow pipe structure for forming root pile and stake bottom susceptor according to claim 1 or 2, feature exist In: the multiple pressure rupture disks being arranged in the identical height in the periphery of the Prefabricated hollow pipe are distributed in a Prefabricated hollow pipe periphery In the identical height in identical height or more Prefabricated hollow pipe peripheries.
7. a kind of Prefabricated hollow pipe structure for forming root pile and stake bottom susceptor according to claim 2, it is characterised in that: The periphery cement slurry gate spool is one or two, is connected with horizontal direction in the periphery cement slurry gate spool vertical direction Ring pipe, be connected between ring pipe and periphery cement slurry gate spool, ring pipe periphery is sealingly connected to prefabricated using communicating pipe The pressure rupture disk on hollow pipe periphery.
8. a kind of Prefabricated hollow pipe structure for forming root pile and stake bottom susceptor according to claim 2, it is characterised in that: The periphery cement slurry gate spool is two roots or more, and two roots are utilized respectively the connection seal of tube with upper periphery cement slurry gate spool It is connected to the pressure rupture disk of the setting on periphery.
CN201821815697.8U 2018-11-06 2018-11-06 A kind of Prefabricated hollow pipe structure forming root pile and stake bottom susceptor Active CN209066422U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821815697.8U CN209066422U (en) 2018-11-06 2018-11-06 A kind of Prefabricated hollow pipe structure forming root pile and stake bottom susceptor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821815697.8U CN209066422U (en) 2018-11-06 2018-11-06 A kind of Prefabricated hollow pipe structure forming root pile and stake bottom susceptor

Publications (1)

Publication Number Publication Date
CN209066422U true CN209066422U (en) 2019-07-05

Family

ID=67097763

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821815697.8U Active CN209066422U (en) 2018-11-06 2018-11-06 A kind of Prefabricated hollow pipe structure forming root pile and stake bottom susceptor

Country Status (1)

Country Link
CN (1) CN209066422U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265710A (en) * 2018-03-07 2018-07-10 刘寅平 A kind of grouting behind shaft or drift lining Prefabricated hollow pipe tree root pilework and construction method
CN114293949A (en) * 2021-11-22 2022-04-08 中国石油天然气股份有限公司 Cement slurry recharge pipe
CN114319331A (en) * 2022-03-08 2022-04-12 中国长江三峡集团有限公司 Construction method of underwater pipe pile type foundation and underwater pipe pile type foundation
CN115198729A (en) * 2022-08-30 2022-10-18 济南城建集团有限公司 Blasting umbrella-type steel pipe pile device and construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265710A (en) * 2018-03-07 2018-07-10 刘寅平 A kind of grouting behind shaft or drift lining Prefabricated hollow pipe tree root pilework and construction method
CN114293949A (en) * 2021-11-22 2022-04-08 中国石油天然气股份有限公司 Cement slurry recharge pipe
CN114319331A (en) * 2022-03-08 2022-04-12 中国长江三峡集团有限公司 Construction method of underwater pipe pile type foundation and underwater pipe pile type foundation
CN115198729A (en) * 2022-08-30 2022-10-18 济南城建集团有限公司 Blasting umbrella-type steel pipe pile device and construction method
CN115198729B (en) * 2022-08-30 2024-01-30 济南城建集团有限公司 Explosion type umbrella type steel pipe pile device and construction method

Similar Documents

Publication Publication Date Title
CN209066422U (en) A kind of Prefabricated hollow pipe structure forming root pile and stake bottom susceptor
CN103437372B (en) A kind of connecting structure for jacket foundation and underwater pile foundation of offshore wind turbine and grouting method
CN202578782U (en) Downcast pipe used for rich water powder fine sand layer
CN110172973A (en) A kind of grouting method of combined steel tube pile structure
CN207685822U (en) A kind of Novel watertight concrete precast pipe pile
CN104060606B (en) A kind of combined and spliced pile tube and pile extension method thereof
CN206220112U (en) Length pulls together to control heavy stiff composite pile system
CN104674839A (en) Foundation structure for wind-driven generator
CN209483286U (en) A kind of fracture grouting hole sealing device suitable for Site of Collapsible Loess
CN203890978U (en) Contact grouting structure for buried pressure pipe
CN110306525A (en) Treatment method of collapsible loess foundation
CN214033778U (en) Novel pile foundation jacket foundation grouting connecting section structure
CN108661053A (en) The full protecting pipe pipe drawing device of bored concrete pile
CN109519151A (en) A kind of fracture grouting hole sealing device and method suitable for Site of Collapsible Loess
CN206337556U (en) A kind of grouting behind shaft or drift lining Prefabricated hollow pile
CN202023185U (en) Concrete tubular pile
CN206545205U (en) A kind of closed type plug-in type slip casting foundation pile
CN202273229U (en) Pile end slurry injecting and pressing device
CN208563321U (en) Compaction grouting spike anchor tube
CN209722952U (en) Pile foundation provisions for grouting
CN207553084U (en) A kind of variable diameters PHC piles
CN211113612U (en) Steel pipe grouting pile
CN204370484U (en) Cone expansion formula anchor pole
CN208586604U (en) A kind of modified grouting behind shaft or drift lining Prefabricated hollow pipe tree root pilework
CN206245301U (en) A kind of inclinometer pipe with Grouting Pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant