CN209065181U - A kind of manpower unfolding dedicated herringbone pedestal of strength cord - Google Patents

A kind of manpower unfolding dedicated herringbone pedestal of strength cord Download PDF

Info

Publication number
CN209065181U
CN209065181U CN201821698267.2U CN201821698267U CN209065181U CN 209065181 U CN209065181 U CN 209065181U CN 201821698267 U CN201821698267 U CN 201821698267U CN 209065181 U CN209065181 U CN 209065181U
Authority
CN
China
Prior art keywords
sides
short
dedicated
bracket
long stent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821698267.2U
Other languages
Chinese (zh)
Inventor
方学军
常子威
刘兴亚
孙仲明
郭世广
崔文睿
康杰
王萌
王琪
沙燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN TRANSMISSION AND TRANSFORMATION ENGINEERING Co Ltd
State Grid Corp of China SGCC
Original Assignee
TIANJIN TRANSMISSION AND TRANSFORMATION ENGINEERING Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN TRANSMISSION AND TRANSFORMATION ENGINEERING Co Ltd, State Grid Corp of China SGCC filed Critical TIANJIN TRANSMISSION AND TRANSFORMATION ENGINEERING Co Ltd
Priority to CN201821698267.2U priority Critical patent/CN209065181U/en
Application granted granted Critical
Publication of CN209065181U publication Critical patent/CN209065181U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of manpowers to unfold the dedicated herringbone pedestal of strength cord, the left and right sides is respectively arranged with a root long bracket and a short bracket, the short frame upper of arranged on left and right sides is cut with scissors respectively in the middle part of corresponding long stent, it is connected with sealing cross bar between the upper/lower terminal of the long stent of two sides, is connected with sealing cross bar between the short bracket upper/lower terminal of two sides;It is supported by a crowbar jointly above the crosspoint of the short bracket in two sides and long stent, the crowbar coaxial-symmetrical on the inside of the supporting structure of two sides is coated with a centre bearing, and cross steel plate is coaxially installed with outside centre bearing.The utility model production is simple, easy to process, light-weight, easy to disassemble, facilitates construction, and do not limited by landform, geographical location, whenever and wherever possible all may assembling use.Land occupation is reduced, construction damages is reduced, it is with good economic efficiency, it can be to be widely used in transmission line construction.

Description

A kind of manpower unfolding dedicated herringbone pedestal of strength cord
Technical field
The utility model belongs to field of electricity construction, is related to 110kV and the above transmission line construction stringing, across applying Work, specifically a kind of manpower unfold the dedicated herringbone pedestal of strength cord.
Background technique
Currently, strength cord is because its tension intensity is high, tensile elasticity is low, makes in transmission line of electricity group pylon line, crossing construction The more and more low advantage of valence is widely used, and has gradually replaced Di Nima rope, nylon rope, coir rope.And in artificial unfolding, one Directly lack that a kind of light pedestal is matched, use is still using wirerope pedestal, and such axis is very coarse, stupid Weight, and crane cooperation is needed, increase spending, operates very inconvenient.
Utility model content
The purpose of the utility model is to overcome in place of the deficiencies in the prior art, provide it is a kind of it is easy to operate, it is succinct it is light, The manpower unfolding dedicated herringbone pedestal of strength cord that is time saving and energy saving, cutting down expenses.
The utility model solves its technical problem and adopts the following technical solutions to achieve:
A kind of manpower unfolding dedicated herringbone pedestal of strength cord, it is characterised in that: horizontal including long stent, short bracket, sealing Bar, crowbar, centre bearing and cross steel plate, the left and right sides is respectively arranged with a root long bracket and a short bracket, left and right The short frame upper of two sides is cut with scissors respectively in the middle part of corresponding long stent, affixed between the upper/lower terminal of the long stent of two sides There is sealing cross bar, is connected with sealing cross bar between the short bracket upper/lower terminal of two sides;The short bracket in two sides intersects with long stent Point top is supported by a crowbar jointly, and the crowbar coaxial-symmetrical on the inside of the supporting structure of two sides is coated with a centre bearing, in Mandrel, which is held, outer is coaxially installed with cross steel plate.
Moreover, the short mid-stent of two sides is mounted on a lead screw.
Moreover, short frame upper passes through punching bolt hinge in the middle part of corresponding long stent respectively.
Moreover, being connected with Anchoring chain between the long stent of the same side and short bracket lower part.
Moreover, long stent, short bracket and sealing cross bar are all made of square steel and are made.
The advantages and positive effects of the utility model are as follows:
1, the utility model can substitute wirerope pedestal using this dedicated pedestal, reduce mechanical use, and safety Reliably.
2, the utility model relies on manpower that can operate completely, only needs 2 people in a few minutes can using this dedicated pedestal It is convenient and efficient pedestal is propped up.
3, the utility model production it is simple, easy to process, light-weight, easy to disassemble, facilitate construction, and not by landform, Position limitation is managed, it whenever and wherever possible all may assembling use.
4, the utility model reduces land occupation, reduces construction damages, with good economic efficiency, can be with power transmission line It is widely used in the construction of road.
Detailed description of the invention
Fig. 1 is the utility model structural front view;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is four-bladed vane schematic diagram in the present embodiment.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing and by specific embodiment, and following embodiment is only retouched The property stated, it is not restrictive, protection scope of this utility model cannot be limited by this.
A kind of manpower unfolding dedicated herringbone pedestal of strength cord, including long stent 5, short bracket 6, Anchoring chain 8, sealing cross Bar 9, crowbar 3, ball bearing 2, cross steel plate 1 and lead screw 7, the left and right sides is respectively arranged with a root long bracket and one short Bracket, the short frame upper of arranged on left and right sides pass through the hinge of punching bolt 4 in the middle part of corresponding long stent respectively, form one long one Short " chevron shaped " supporting structure, whole height is in 1.5m or so;It is connected between the long stent of the same side and short bracket lower part limited Position chain, prevents bracket from sliping off;
Sealing cross bar is connected between the upper/lower terminal of the long stent of two sides, between the short bracket upper/lower terminal of two sides It is connected with sealing cross bar, the long stent of the present embodiment, short bracket and sealing cross bar are all made of square steel and are made;
It is supported by a crowbar jointly above the crosspoint of the short bracket in two sides and long stent, on the inside of the supporting structure of two sides Crowbar coaxial-symmetrical is coated with a centre bearing, is coaxially installed with cross steel plate outside centre bearing, and the cross steel plate is for connecting Wiring axis.
The short mid-stent of two sides is mounted on a lead screw 7, and rotational lead screw can adjust the length of short bracket, to adjust The height of integral support, adjusting screw is advisable with liftoff 150mm of spool or so when construction.
Although disclosing the embodiments of the present invention and attached drawing for the purpose of illustration, those skilled in the art can be with Understand: departing from the utility model and spirit and scope of the appended claims, various substitutions, changes and modifications are all can Can, therefore, the scope of the utility model is not limited to the embodiment and attached drawing disclosure of that.

Claims (5)

1. a kind of manpower unfolds the dedicated herringbone pedestal of strength cord, it is characterised in that: including long stent, short bracket, sealing cross bar, Crowbar, centre bearing and cross steel plate, the left and right sides are respectively arranged with a root long bracket and a short bracket, and left and right two The short frame upper of side is cut with scissors respectively in the middle part of corresponding long stent, is connected between the upper/lower terminal of the long stent of two sides Cross bar is sealed, is connected with sealing cross bar between the short bracket upper/lower terminal of two sides;The crosspoint of two sides short bracket and long stent Top is supported by a crowbar jointly, and the crowbar coaxial-symmetrical on the inside of the supporting structure of two sides is coated with a centre bearing, center Cross steel plate is coaxially installed with outside bearing.
2. manpower according to claim 1 unfolds the dedicated herringbone pedestal of strength cord, it is characterised in that: the short bracket of two sides Middle part is mounted on a lead screw.
3. manpower according to claim 1 unfolds the dedicated herringbone pedestal of strength cord, it is characterised in that: short frame upper point Not Tong Guo punching bolt hinge in the middle part of corresponding long stent.
4. manpower according to claim 1 unfolds the dedicated herringbone pedestal of strength cord, it is characterised in that: draw money on credit the same side Anchoring chain is connected between frame and short bracket lower part.
5. manpower according to claim 1 unfolds the dedicated herringbone pedestal of strength cord, it is characterised in that: long stent, short branch Frame and sealing cross bar are all made of square steel and are made.
CN201821698267.2U 2018-10-19 2018-10-19 A kind of manpower unfolding dedicated herringbone pedestal of strength cord Active CN209065181U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821698267.2U CN209065181U (en) 2018-10-19 2018-10-19 A kind of manpower unfolding dedicated herringbone pedestal of strength cord

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821698267.2U CN209065181U (en) 2018-10-19 2018-10-19 A kind of manpower unfolding dedicated herringbone pedestal of strength cord

Publications (1)

Publication Number Publication Date
CN209065181U true CN209065181U (en) 2019-07-05

Family

ID=67095345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821698267.2U Active CN209065181U (en) 2018-10-19 2018-10-19 A kind of manpower unfolding dedicated herringbone pedestal of strength cord

Country Status (1)

Country Link
CN (1) CN209065181U (en)

Similar Documents

Publication Publication Date Title
CN202023404U (en) Multifunctional pole erecting device
CN203128000U (en) Hoisting device for direct-driven wind power generator set
US20100230975A1 (en) Vertical-Axis Wind Power Turbine System
CN105625795B (en) A kind of adjustable messenger unfolding arm support
CN209065181U (en) A kind of manpower unfolding dedicated herringbone pedestal of strength cord
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN205840468U (en) The three pipe towers that a kind of stability is high
CN205188795U (en) Keep natural large -span belt conveyor landing stage that overflows form of coombe
CN205555914U (en) Transformer overhauls uses hoisting apparatus
CN205678578U (en) Street lamp photovoltaic power generation plate fixed structure
CN204759212U (en) A reflex reflector for solar cell panel roofing
CN205312977U (en) Portable elevating gear
CN205713401U (en) A kind of adjustable messenger unfolding jib
CN204751934U (en) Metallurgy crane girder web crackle reinforcing apparatus
CN207228750U (en) Become length section triple strain combination emergent repairing tower
CN107654106B (en) Electric power pylon column foot replacing options
CN203050218U (en) Standard knot hoisting support for jacking
CN108756421A (en) A kind of communication steel tower convenient for safeguarding
CN102277999B (en) Large-section portal steel structure holding pole
CN209293536U (en) A kind of electric force pole tower using I-shaped tower grounding device
CN208445198U (en) A kind of quick close-up device for ultra-high-tension power transmission line
CN210041128U (en) Insulating rolling bar that electrified was strideed across
CN208502386U (en) A kind of communications tower easy to repair
CN208445246U (en) A kind of pulley rope device for ultra-high-tension power transmission line quick close-up device
CN201723387U (en) Column type small-sized wind driven generator tower capable of automatically standing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant