CN209052962U - Assembled floor tile - Google Patents
Assembled floor tile Download PDFInfo
- Publication number
- CN209052962U CN209052962U CN201821844244.8U CN201821844244U CN209052962U CN 209052962 U CN209052962 U CN 209052962U CN 201821844244 U CN201821844244 U CN 201821844244U CN 209052962 U CN209052962 U CN 209052962U
- Authority
- CN
- China
- Prior art keywords
- high density
- density composite
- drain bar
- body unit
- brick body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model relates to a kind of pavings to consolidate the assembled floor tile on drain bar in high density composite PE.Drain bar is consolidated including brick body unit, high density composite PE, the bottom surface periphery of brick body unit is equipped with convex block, high density composite PE consolidates drain bar and is equipped with male and fomale(M&F) structure, brick body unit is inserted by the male and fomale(M&F) structure that the convex block and high density composite PE of its bottom surface periphery consolidate drain bar to be cooperated, and paving consolidates on drain bar in high density composite PE.The utility model is mated formation simple, conveniently, can reduce operating expenses;The stiff grey structure of cement is not used, it can monolithic replacement;For floor tile in conjunction with the firm drain bar male and fomale(M&F) of high density composite PE, tile location is firm;Resettlement, dismounting, movement are hardly damaged, reusable;With structural permeable, Li Shui, drain function, suitable for rainwater is more and the laying of the relatively low Regional City road of winter temperature, pedestrian passage, square uses, prevent winter rain and snow weather road surface slippery situation from freezing.
Description
Technical field
The utility model relates to the floor tile of the layings such as Urban Parks, pavement, square, specifically a kind of paving is in high density
Compound PE consolidates the assembled floor tile on drain bar.
Background technique
Present clay floor tile and cement floor tile paving largely uses cement to paste, and use of disposably mating formation needs to remove
Moving, remove, moving all is destructive dismounting, and the effect for not having permeable Li Shui is all shut in floor tile gap with cement mortar, though
Right floor tile also has water penetration, and when brick body is filled moisture just to underground venting, but drainage speed is very slow, and it is wet to encounter rain and snow weather road surface
Sliding, heavy rain weather surface gathered water causes many inconvenience to pedestrian's trip.
Utility model content
The technical problem to be solved by the present invention is to provide a kind of pavings to consolidate on drain bar in high density composite PE
Assembled floor tile is pasted without cement, is moved, is removed, movement will not damage and reusable.
The utility model solve its technical problem the technical solution adopted is that:
A kind of assembled floor tile, including brick body unit, high density composite PE consolidate drain bar, the bottom surface periphery of brick body unit
Equipped with convex block, high density composite PE consolidates drain bar and is equipped with male and fomale(M&F) structure, brick body unit by the convex block of its bottom surface periphery with
The male and fomale(M&F) structure that high density composite PE consolidates drain bar inserts cooperation, and paving consolidates on drain bar in high density composite PE.
The utility model by adopting the above technical scheme, compared with prior art, the beneficial effect is that:
Paving structure is assembled, is mated formation simple and convenient, than common clay floor tile and cement floor tile must by mat formation skilled worker Lai
Mat formation, greatly reduces operating expenses and construction cost;The stiff grey structure of cement is not used, has single floor tile damage only to need to clear up
Fall between gap sand particles can monolithic replacement, bring great convenience to road, square maintenance;Floor tile and high density composite PE
Firm drain bar male and fomale(M&F), which combines, plays stabilization, and tile location is firm;Resettlement, dismounting, movement are hardly damaged, repeatable to make
With;With structural permeable, Li Shui, drain function, it is suitable for that rainwater is more and the relatively low Regional City road of winter temperature, people's row
The laying in channel, square uses, and prevents winter rain and snow weather road surface slippery situation from freezing.
Further, the preferred embodiment of the utility model is:
The main body of brick body unit is in cuboid, is respectively equipped with control phase in a long side surface of cuboid and a short sides
The small protrusion in gap between adjacent brick body unit.By small protrusion, the reasonable clearance between brick body unit can be effectively controlled.Work as brick body
When unit is without small protrusion, then brick body unit may be implemented and closely mat formation.
The bottom surface of brick body unit is equipped with expansion slot.By expansion slot, winter brick body bottom water freezing and expansion can be alleviated
Effect.
High density composite PE consolidates drain bar bottom and is equipped with permeable hole.By permeable hole, fast permeable speed, Li Shui can be played
Effect.
The male and fomale(M&F) structure that high density composite PE consolidates drain bar is equipped with reserved tongue and groove, and brick body unit passes through described pre-
The tongue and groove stayed can convert angle direction and mat formation.It is to form a complete production network since floor tile and high density composite PE consolidate drain bar, warp
It crosses the accurate convex block position for calculating floor tile and high density composite PE consolidates the male and fomale(M&F) structure of drain bar, it can be by reserved
Tongue and groove and drainage hole, so that ground transform is changed angle direction and is mated formation, herringbone, box-shaped can be mated formation into, can also be added
Various colors assembly pattern.
Detailed description of the invention
Fig. 1 is the schematic perspective view of the utility model embodiment;
Fig. 2 is the floor map of the utility model embodiment;
Fig. 3 is the structural schematic diagram of brick body unit;
Fig. 4 is the top view of Fig. 3;
Fig. 5 is the bottom view of Fig. 3;
In figure: brick body unit 1;High density composite PE consolidates drain bar 2;Convex block 11;It is small by raised 12;Expansion slot 13;It is concave-convex
Face structure 21;Permeable hole 22.
Specific embodiment
The following is a further explanation of the present invention with reference to the accompanying drawings and embodiments.
Referring to Fig. 3, Fig. 4, Fig. 5, assembled floor tile is ceramic floor tile or concrete floor tile, and 1 main body of brick body unit is in rectangular
Body is respectively equipped with convex block 11, a long side of brick body unit 1 in the middle part of the bottom surface periphery quadrangle of brick body unit 1 and two long sides
Be respectively equipped on face and a short sides control adjacent bricks body unit 1 between gap it is small by raised 12, between the bottom surface of brick body unit 1
Every equipped with expansion slot 13.
Referring to Fig. 1, Fig. 2, high density composite PE, which consolidates drain bar 2, to be formed a complete production network with brick body unit 1, high density composite
It is planar structure that PE, which consolidates 2 bottom surface of drain bar, and upper surface is male and fomale(M&F) structure 21, and male and fomale(M&F) structure 21 is equipped with reserved bumps
Slot, bottom surface are equipped with permeable hole 22.Brick body unit 1 consolidates drain bar 2 by the convex block 11 and high density composite PE of its bottom surface periphery
Male and fomale(M&F) structure 21 insert cooperation, paving high density composite PE consolidate drain bar 2 on.
The convex block 11 of 1 bottom surface quadrangle of brick body unit is plugged in high density composite PE as draining stable column and consolidates drain bar 2
Male and fomale(M&F) structure 21 in, high density composite PE firm row is mutually close to when playing the positioning action of brick body unit 1, and mating formation
The tongue and groove of water plate 2, and it is natural there are draining gap by small raised 12, and draining gap can be used 3mm~5mm sand particles and fill out
Seam consolidates the permeable hole 22 of 2 bottom of drain bar in conjunction with high density composite PE, and assembled floor tile structure is made to realize fast permeable speed, benefit
Water effect;The expansion slot 13 of 1 bottom surface of brick body unit can play relaxation effect to winter floor tile lower part water freezing and expansion.
The reserved tongue and groove of the male and fomale(M&F) structure 21 that drain bar 2 is consolidated by high density composite PE, when brick body 1 paving of unit
Angle direction can be converted, it is any assembled, herringbone, box-shaped can be mated formation into as needed, various colors spelling can also be added
Fill pattern.
Assembled ceramic floor tile or concrete floor tile described in the present embodiment, all technical meet professional standard, inhale
Water rate 4%~7%, compression strength 40MPa~50MPa, -15 DEG C of multigelations of frost resistance 30 times without damage, wearability mill hole length
Reach I class, 35 years no artificial destruction service lives or more;Firm 2 resistance to acid and alkali of drain bar of matched high density composite PE is strong, energy
The high resistance to compression load of 40MPa or more is born, there is excellent resistance to low temperature, minimum reachable using temperature -- 60 DEG C, highest uses
Temperature is up to 60 DEG C, service life 35 years or more.If being laid with passageway for fire apparatus and heavy vehicle passage, it is steady that high density composite PE can be increased
Gu the thickness of drain bar 2, reaches compression strength.
Assembled ceramic floor tile or concrete floor tile described in the present embodiment are modern city, park, square residential quarter
The indispensable novel product in construction sponge city anxious to be resolved, and it is Ke Xunhuanliyong, resettlement, dismounting, movement are hardly damaged.Tool
Have structural permeable, Li Shui, drain function, be suitable for that rainwater is more and the relatively low Regional City road of winter temperature, pedestrian passage,
The laying on square uses, and prevents winter rain and snow weather road surface slippery situation from freezing.
Above embodiments are only to illustrate the technical solution of the utility model, rather than to the limit of scope of protection of the utility model
System, although being explained in detail referring to the present embodiment to the utility model, it will be understood by those of skill in the art that can be to this
The technical solution of utility model is modified or replaced equivalently, without departing from the essence and model of technical solutions of the utility model
It encloses.
Claims (5)
1. a kind of assembled floor tile, including brick body unit, high density composite PE consolidate drain bar, it is characterised in that: brick body unit
Bottom surface periphery be equipped with convex block, high density composite PE consolidate drain bar be equipped with male and fomale(M&F) structure, brick body unit by its bottom surface week
The male and fomale(M&F) structure that the convex block and high density composite PE of edge consolidate drain bar, which inserts, to be cooperated, and paving is in the firm row of high density composite PE
On water plate.
2. assembled floor tile according to claim 1, it is characterised in that: the main body of brick body unit is in cuboid, cuboid
A long side surface and a short sides on be respectively equipped with control adjacent bricks body unit between gap small protrusion.
3. assembled floor tile according to claim 1 or 2, it is characterised in that: the bottom surface of brick body unit is equipped with expansion slot.
4. assembled floor tile according to claim 1, it is characterised in that: high density composite PE consolidates drain bar bottom and is equipped with
Permeable hole.
5. assembled floor tile according to claim 1, it is characterised in that: high density composite PE consolidates the male and fomale(M&F) of drain bar
Structure is equipped with reserved tongue and groove, and brick body unit can convert angle direction by the reserved tongue and groove and mat formation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821844244.8U CN209052962U (en) | 2018-11-09 | 2018-11-09 | Assembled floor tile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821844244.8U CN209052962U (en) | 2018-11-09 | 2018-11-09 | Assembled floor tile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209052962U true CN209052962U (en) | 2019-07-02 |
Family
ID=67052943
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821844244.8U Active CN209052962U (en) | 2018-11-09 | 2018-11-09 | Assembled floor tile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209052962U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109208423A (en) * | 2018-11-09 | 2019-01-15 | 张川 | Assembled floor tile |
CN113529524A (en) * | 2021-06-28 | 2021-10-22 | 胡玉凤 | High-strength porous water permeable brick |
-
2018
- 2018-11-09 CN CN201821844244.8U patent/CN209052962U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109208423A (en) * | 2018-11-09 | 2019-01-15 | 张川 | Assembled floor tile |
CN113529524A (en) * | 2021-06-28 | 2021-10-22 | 胡玉凤 | High-strength porous water permeable brick |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103669145B (en) | A kind of paving method of permeable pavement structure | |
CN106758638A (en) | A kind of city sponge brick and its construction technology | |
CN203295913U (en) | Novel ecological permeable road structure | |
CN209052962U (en) | Assembled floor tile | |
CN105887609A (en) | Method for constructing ecological infiltration pavement in sponge city | |
CN107059525A (en) | A kind of municipal permeable road structure and its construction technology | |
CN103669167B (en) | A kind of permeable pavement structure | |
CN109208423A (en) | Assembled floor tile | |
CN205501754U (en) | Ecological ceramic tile | |
CN206721596U (en) | A kind of pavement structure of permeable road | |
CN202055136U (en) | Permeable road kerb applied in asphalt pavement | |
CN107724201A (en) | A kind of novel water permeable brick structure and method for paving | |
CN100417767C (en) | Permeable environmental protection ground tile used for outdoor service | |
CN106996063A (en) | A kind of pavement structure of permeable road | |
CN203346758U (en) | Pervious sidewalk structure | |
CN209602919U (en) | The porous pavement of Double-layer water-filtering under a kind of sponge city | |
CN205347921U (en) | Concrete road surface brick permeates water + permeates water certainly in gap | |
CN205741824U (en) | A kind of Pavement surface drainage system | |
CN2673925Y (en) | Environmental protection and water permeable brick for outdoor use | |
CN208701457U (en) | Pavement bricks, the pavement using pavement bricks and engineering road | |
CN210657848U (en) | Permeable brick laying structure | |
CN203360974U (en) | Buckled lock type floor tiles and built-in lock type floor tiles comprising same | |
CN208250846U (en) | Surface drainage | |
CN102182131B (en) | Water permeable paving plate and construction method thereof | |
CN206768507U (en) | Spacing slot type water-permeable brick on four sides |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |