CN209040144U - A kind of integrated form combination pilework of foundation engineering - Google Patents

A kind of integrated form combination pilework of foundation engineering Download PDF

Info

Publication number
CN209040144U
CN209040144U CN201821855645.3U CN201821855645U CN209040144U CN 209040144 U CN209040144 U CN 209040144U CN 201821855645 U CN201821855645 U CN 201821855645U CN 209040144 U CN209040144 U CN 209040144U
Authority
CN
China
Prior art keywords
inserted link
arc pressuring
reinforcing bar
rectangular support
pressuring plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821855645.3U
Other languages
Chinese (zh)
Inventor
杨芳亮
徐志红
辛威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821855645.3U priority Critical patent/CN209040144U/en
Application granted granted Critical
Publication of CN209040144U publication Critical patent/CN209040144U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a kind of integrated form combination pilework of foundation engineering, including arc pressuring plate, reinforcing bar slotting ring, formed punch, rubber block tilt inserted link, positioning seat and positioning pluging rod;The main body frame of the combination pile body by circular array three rectangular support frames and be connected at three four groups of arc pressuring plates that circular array between rectangular support frame is arranged and weld to combine jointly and formed, it and include to present lower equidistant spaced arc pressuring plate everywhere in each group of arc pressuring plate, also reinforcing bar slotting ring at two is symmetrically welded on the arc inner wall of arc pressuring plate described in everywhere, this reinforcing bar slotting ring corresponding position in the space about the inclination inserted link at two, the setting of the utility model rubber block, inclination inserted link can be clamped by rubber block at left and right corresponding two, and then the outside for closing pile body can be emerged in avoid inclination inserted link gravity sliding, insertion hole under the entirety of combination pile body is caused to scrape obstacle.

Description

A kind of integrated form combination pilework of foundation engineering
Technical field
The utility model belongs to engineering construction engineering device technique field, and more specifically, in particular to a kind of foundation engineering is used Integrated form combine pilework.
Background technique
Piling, which refers to, to be thrown stake in ground into, keeps building basis firm.Because if above ground structure will be built on the ground, ground Face will bear very big pressure, it is necessary that there is enough renitent intensity on ground, this is often difficult to accomplish, so Must just the receiving mode on ground be reinforced or improved to the ground for bearing building, so just expecting beating on ground Stake, allows most of weight of building to pass to the very deep position of below ground by stake, because the ground of this position compares ground Ability to bear is much bigger.
Found in conjunction with prior art people, although existing built pile is able to carry out conventional use, but its Exist in practical application, follow closely that solid mode is more single, causes the overall support stability of built pile poor, using effect is bad The problem of.
Then, in view of this, being studied improvement for existing structure and missing, a kind of collection of foundation engineering is provided An accepted way of doing sth combines pilework, to achieve the purpose that with more more practical value.
Utility model content
In order to solve the above-mentioned technical problem, the utility model provides a kind of integrated form combination pilework of foundation engineering, It is more single to solve the solid mode of existing combination dowel pin, cause the overall support stability of built pile poor, using effect is not Good problem.
The purpose and effect of the integrated form combination pilework of the utility model foundation engineering, by technological means in detail below Reached:
A kind of integrated form combination pilework of foundation engineering, including combination pile body, rectangular support frame, connecting rod, arc Shape connecting plate, reinforcing bar slotting ring, formed punch, rubber block tilt inserted link, positioning seat and positioning pluging rod;The main body of the combination pile body Frame by circular array three rectangular support frames and be connected at three what circular array between rectangular support frame was arranged Four groups of arc pressuring plates are welded combination jointly and are formed, and include to present lower equidistant radial arrangement in each group of arc pressuring plate Arc pressuring plate everywhere, present lower equidistant arrangement between the lateral branch fagging of the rectangular support frame everywhere and be supported by six Connecting rod, and reinforcing bar slotting ring at two is symmetrically welded on the inner side end of everywhere connecting rod;The connection of arc described in everywhere Also reinforcing bar slotting ring at two is symmetrically welded on the arc inner wall of plate, this at two reinforcing bar slotting ring corresponding position in inclination inserted link or so In space at two.
Further, circular array on the interlude of the cambered vertical fagging of the rectangular support frame inner band at three Tilt inserted link for two layers totally at six through being inserted with, and this at six inclination inserted link head end insert point and correspond to the rectangular support frame at three Outside upright fagging.
Further, opposite in the outer circumferential walls of reinforcing bar slotting ring at six on intermediate two layers of arc pressuring plate inner wall As soon as rubber block at being adhesive with, and the tail end section that inserted link is tilted at three inserts be sandwiched between three groups of opposite rubber blocks of left and right respectively.
Further, the formed punch is whole is made of wedge plate circular array weldering at three, and everywhere wedge plate is outer It rolls tiltedly sliding lean on face and offers sliding slot at one, when being inserted under formed punch in the cylinder chamber at three between rectangular support frame, This at three sliding slot it is corresponding with three at tilt the end hemisphere sliding contact of inserted link.
Further, the positioning seat is supported in three positioning of center disk bottom by center disk, circular array Inserted link and circular array are supported in positioning pluging rod common combination at the three of center disk periphery and are formed, wherein periphery is fixed at three Inserted link corresponding be inserted through at combine pile body bottommost three in position connects short slab, and bottom positioning pluging rod is inserted in bottom at three Three in annular space between arc pressuring plate.
Compared with prior art, the utility model has the following beneficial effects:
Present specification can be implemented to stablize by tilting being used cooperatively for inserted link and positioning seat at six to combination pile body Nail it is solid, effectively raise the stability of strutting system of combination pile body, using effect more preferably, and can a shape by lower hammer formed punch Complete that all hammer pounds that nail is solid, and operation is put just to inserted link and positioning seat is tilted at six.
Detailed description of the invention
Fig. 1 is the utility model structure diagram.
Fig. 2 is the utility model schematic view of the front view.
Fig. 3 is the utility model overlooking structure diagram.
Fig. 4 is that the utility model inclination inserted link is slidably installed position view.
Fig. 5 is the utility model positioning seat schematic view of the mounting position.
Fig. 6 is the utility model punch structure schematic diagram.
In figure, the corresponding relationship of component names and accompanying drawing number are as follows:
Combine pile body -1, rectangular support frame -101, connecting rod -102, arc pressuring plate -2, reinforcing bar slotting ring -3, formed punch - 4, rubber block -5 tilts inserted link -6, positioning seat -7, positioning pluging rod -701.
Specific embodiment
The embodiments of the present invention is described in further detail with reference to the accompanying drawings and examples.Following embodiment For illustrating the utility model, but cannot be used to limit the scope of the utility model.
In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or more;Term The orientation of the instructions such as "upper", "lower", "left", "right", "inner", "outside", " front end ", " rear end ", " head ", " tail portion " or position are closed System is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of describing the present invention and simplifying the description, rather than The device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot It is construed as a limitation of the present invention.In addition, term " first ", " second ", " third " etc. are used for description purposes only, and cannot It is interpreted as indication or suggestion relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, it can also be indirectly connected through an intermediary.For this For the those of ordinary skill in field, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Embodiment:
As shown in attached drawing 1 to attached drawing 6:
The utility model provides a kind of integrated form combination pilework of foundation engineering, including combination pile body 1, rectangle branch Support frame 101, connecting rod 102, arc pressuring plate 2, reinforcing bar slotting ring 3, formed punch 4, rubber block 5 tilt inserted link 6, positioning seat 7 and positioning Inserted link 701;The main body frame of the combination pile body 1 by circular array three rectangular support frames 101 and be connected to three Four groups of arc pressuring plates 2 for locating circular array setting between rectangular support frame 101 are welded combination jointly and are formed, and each group of arc It include to present lower equidistant spaced arc pressuring plate 2 everywhere in shape connecting plate 2, the rectangular support frame 101 everywhere Lateral branch fagging between present lower equidistant arrangement and be supported by connecting rod 102 at six, and the inner end of everywhere connecting rod 102 Reinforcing bar slotting ring 3 at two is symmetrically welded on face;It is also symmetrically welded on the arc inner wall of arc pressuring plate 2 described in everywhere Reinforcing bar slotting ring 3 at two, this 3 corresponding position of reinforcing bar slotting ring in the space about the inclination inserted link 6 at two.
Wherein, circular array on the interlude of the cambered vertical fagging of 101 inner band of rectangular support frame at three Tilt inserted link 6 for two layers totally at six through being inserted with, and this at six inclination 6 head end of inserted link insert point and correspond to the rectangular support at three The outside upright fagging of frame 101 is swept away in the hammer of formed punch 4, and inclination inserted link 6 can be rushed to summit by hammer at six inserts in stake hole periphery In soil layer, and then circumferential registration can be carried out to combination pile body 1, its torsion shaking is avoided to effectively raise combination pile body 1 Stability of strutting system.
Wherein, relatively glutinous in the outer circumferential walls of reinforcing bar slotting ring 3 at six on intermediate two layers of 2 inner wall of arc pressuring plate As soon as rubber block 5 at posting, and the tail end section that inserted link 6 is tilted at three inserts be sandwiched between three groups of opposite rubber blocks 5 of left and right respectively, Inclination inserted link 6 can be clamped by rubber block 5 at left and right corresponding two, and then can be emerged in avoid inclination 6 gravity of inserted link sliding The outside for closing pile body 1 causes to scrape obstacle to insertion hole under the entirety of combination pile body 1.
Wherein, the formed punch 4 is whole is made of wedge plate circular array weldering at three, and the outer inclination of everywhere wedge plate It is tiltedly sliding to offer sliding slot at one on face, when being inserted under formed punch 4 in the cylinder chamber at three between rectangular support frame 101, This at three sliding slot it is corresponding with three at tilt the end hemisphere sliding contact of inserted link 6, inclination inserted link 6, which can cooperate, at three slides on three Locate in the sliding slot in the outer lateral incline of wedge plate, convenient to implement to rush to summit to slide outward to insert, formed punch 4 can not only be pushed up and be tilted at punching three Inserted link 6 can also implement hammer to positioning seat 7 and pound, and insert positioning for the whole nail of combination pile body 1 and provide convenience, in addition at three Wedge plate is corresponding rush to summit inclination inserted link 6 at three will not reinforcing bar slotting ring 3 on 2 inner wall of secondary damage arc pressuring plate.
Wherein, the positioning seat 7 is supported in three positioning pluging rods of center disk bottom by center disk, circular array 701 and circular array be supported in 701 common combination of positioning pluging rod at the three of center disk periphery and formed, wherein peripheral at three Corresponding be inserted through at combine 1 bottommost of pile body three of positioning pluging rod 701 connects short slab, and bottom positioning pluging rod 701 at three It is inserted in the annular space at the three of bottom between arc pressuring plate 2, positioning seat 7 can will combine the bottom portion of pile body 1 Divide nail to be placed on the soil layer of stake hole bottom and further increases the stability of strutting system of combination pile body 1.
The specifically used mode and effect of the present embodiment:
The utility model installs and uses process, will combine be inserted in the dress hole dug under 1 entirety of pile body first, then Formed punch 4 is inserted in the cylinder chamber at three between rectangular support frame 101, and implements hammer with tup and pounds, make to tilt inserted link 6 and is determined The punching of positioning pluging rod 701 on the seat 7 of position inserts in soil layer, is then successively inserted in reinforcing bar in all coaxial reinforcing bar slotting rings 3, most After implement concreting.
Illustrate: when implementing hammer and pounding, formed punch 4 first can rush to summit to inclination inserted link 6 at the three of upper layer, then according under need Sliding to rush to summit to inclination inserted link 6 at lower layer three, it is solid that last continuous slide implements nail to positioning seat 7.
The embodiments of the present invention are given for the purpose of illustration and description, and are not exhaustively or to incite somebody to action The utility model is limited to disclosed form.Many modifications and variations are aobvious and easy for the ordinary skill in the art See.Embodiment was chosen and described in order to better illustrate the principle and practical application of the utility model, and makes this field Those of ordinary skill it will be appreciated that the utility model to designing various embodiments suitable for specific applications with various modifications.

Claims (5)

1. a kind of integrated form of foundation engineering combines pilework, it is characterised in that: the integrated form built pile of the foundation engineering Structure includes combining pile body (1), rectangular support frame (101), connecting rod (102), arc pressuring plate (2), reinforcing bar slotting ring (3), Formed punch (4), rubber block (5) tilt inserted link (6), positioning seat (7) and positioning pluging rod (701);The master of combination pile body (1) Body frame by circular array three rectangular support frames (101) and be connected at three between rectangular support frame (101) in ring Welding combination is formed four groups of arc pressuring plates (2) of shape array setting jointly, and includes in each group of arc pressuring plate (2) Lower equidistant spaced arc pressuring plate everywhere (2) is presented, everywhere between the lateral branch fagging of the rectangular support frame (101) It presents lower equidistant arrangement to be supported by connecting rod at six (102), and equal balanced welding on the inner side end of everywhere connecting rod (102) It is connected to reinforcing bar slotting ring (3) at two;Reinforcing bar at two is also symmetrically welded on the arc inner wall of arc pressuring plate described in everywhere (2) Slotting ring (3), this reinforcing bar slotting ring (3) corresponding position in the space about inclination inserted link (6) at two.
2. the integrated form of foundation engineering as described in claim 1 combines pilework, it is characterised in that: the rectangular support at three Circular array tilts inserted link totally at six through being inserted with two layers on the interlude of the cambered vertical fagging of frame (101) inner band (6), and this at six inclination inserted link (6) head end insert the outside upright fagging that point corresponds to the rectangular support frame (101) at three.
3. the integrated form of foundation engineering as described in claim 1 combines pilework, it is characterised in that: intermediate two layers of arc On connecting plate (2) inner wall six at reinforcing bar slotting ring (3) outer circumferential walls on it is opposite be adhesive with rubber block at one (5), and at three The tail end section for tilting inserted link (6) is just inserted respectively to be sandwiched between three groups of opposite rubber blocks (5) of left and right.
4. the integrated form of foundation engineering as described in claim 1 combines pilework, it is characterised in that: the formed punch (4) is whole Be made of wedge plate circular array weldering at three, and everywhere wedge plate outside inclination it is sliding offered on face it is sliding at one Slot, when being inserted under formed punch (4) in the cylinder chamber at three between rectangular support frame (101), this at three sliding slot it is corresponding with three at Tilt the end hemisphere sliding contact of inserted link (6).
5. the integrated form of foundation engineering as described in claim 1 combines pilework, it is characterised in that: the positioning seat (7) by Center disk, circular array are supported in positioning pluging rod (701) and circular array at the three of center disk bottom and are supported in Positioning pluging rod (701) common combination is formed at the three of center disk periphery, wherein periphery positioning pluging rod (701) is corresponding interspersed at three By combining pile body (1) bottommost three at connect short slab, and bottom positioning pluging rod (701) is inserted at the three of bottom at three In annular space between arc pressuring plate (2).
CN201821855645.3U 2018-11-12 2018-11-12 A kind of integrated form combination pilework of foundation engineering Expired - Fee Related CN209040144U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821855645.3U CN209040144U (en) 2018-11-12 2018-11-12 A kind of integrated form combination pilework of foundation engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821855645.3U CN209040144U (en) 2018-11-12 2018-11-12 A kind of integrated form combination pilework of foundation engineering

Publications (1)

Publication Number Publication Date
CN209040144U true CN209040144U (en) 2019-06-28

Family

ID=67042098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821855645.3U Expired - Fee Related CN209040144U (en) 2018-11-12 2018-11-12 A kind of integrated form combination pilework of foundation engineering

Country Status (1)

Country Link
CN (1) CN209040144U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942401A (en) * 2021-02-04 2021-06-11 赵紫荣 Foundation pile for highway bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942401A (en) * 2021-02-04 2021-06-11 赵紫荣 Foundation pile for highway bridge
CN112942401B (en) * 2021-02-04 2022-04-12 赵紫荣 Foundation pile for highway bridge

Similar Documents

Publication Publication Date Title
CN209040144U (en) A kind of integrated form combination pilework of foundation engineering
CN106284654A (en) Novel fabricated beam column node connection device
KR101207092B1 (en) A joint apparatus of concrete pile for foundation work
CN102493475B (en) Lattice pile foundation and construction method thereof
CN111764376B (en) Earthquake-resistant building foundation pile
CN209323829U (en) A kind of steel tube concrete column feet node
CN209975719U (en) Oblique crossing type single-layer latticed shell welding joint
CN210288353U (en) Integrated pedestal reinforcement cage shaping jig frame
CN213296406U (en) Reinforced structure concrete building pile foundation
CN213173700U (en) Precast pile for soft foundation treatment
CN209652913U (en) A kind of mini pile for composite foundation processing
KR101135384B1 (en) Earth retaining structure having ring beam
CN202012195U (en) Divergent steel moulding plate for arc bracket of machine pier
KR20110022956A (en) Pile structure having changing section and retaining wall using the same
CN104404967B (en) Rigid frame posture internal support of foundation pit structure and construction method
CN111576925B (en) Quick building steel support frame and implementation method thereof
CN210315493U (en) Foundation structure
CN106759908A (en) Pneumatic membrane building anchor
CN210482551U (en) Assembly type building bottom connecting mechanism
CN209179253U (en) A kind of sliceable shear wall steelframe for building
CN213115213U (en) Stone pillar and wood pillar joint structure
CN212077902U (en) Civil engineering cylindricality foundation pile structure
CN213061985U (en) Combined pile for constructional engineering
CN210459220U (en) Concrete pouring device for construction of pile foundation engineering
KR102282115B1 (en) Structure of joints of the steel beams in the upper and lower ground reinforcing shear force with the combination of projection and acceptance plate in the NATM

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190628

Termination date: 20191112

CF01 Termination of patent right due to non-payment of annual fee