CN111576925B - Quick building steel support frame and implementation method thereof - Google Patents

Quick building steel support frame and implementation method thereof Download PDF

Info

Publication number
CN111576925B
CN111576925B CN202010358559.7A CN202010358559A CN111576925B CN 111576925 B CN111576925 B CN 111576925B CN 202010358559 A CN202010358559 A CN 202010358559A CN 111576925 B CN111576925 B CN 111576925B
Authority
CN
China
Prior art keywords
building
caulking groove
caulking
column
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010358559.7A
Other languages
Chinese (zh)
Other versions
CN111576925A (en
Inventor
陈小俊
陆科琪
张达芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dongxin Construction Co.,Ltd.
Original Assignee
Zhejiang Dongxin Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Dongxin Construction Co ltd filed Critical Zhejiang Dongxin Construction Co ltd
Priority to CN202010358559.7A priority Critical patent/CN111576925B/en
Publication of CN111576925A publication Critical patent/CN111576925A/en
Application granted granted Critical
Publication of CN111576925B publication Critical patent/CN111576925B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/02Shores or struts; Chocks non-telescopic
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G2025/003Supports therefor, e.g. tripods
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G2025/006Heads therefor, e.g. pivotable

Abstract

The invention belongs to the technical field of buildings, and particularly relates to a quick building steel support frame and an implementation method thereof. Has the advantages that: the invention has better combination capability, improves the convenience of storage and transportation, has higher use freedom degree, is convenient to be better matched with various projects for use, has good supporting effect, can be repeatedly used and has good economical usability.

Description

Quick building steel support frame and implementation method thereof
Technical Field
The invention belongs to the technical field of buildings, and particularly relates to a quick building steel support frame and an implementation method thereof.
Background
Construction steel materials can be generally classified into steel for steel structures and reinforcing steel for reinforced concrete structures. The steel structure steel mainly comprises common carbon structural steel and low-alloy structural steel, the varieties comprise section steel, steel pipes and reinforcing steel bars, the section steel comprises angle steel, I-shaped steel and channel steel, and the steel structure building is a novel building system, breaks through the industrial boundary lines among the house area industry, the building industry and the metallurgical industry, and is integrated into a novel industrial system. Compared with the traditional concrete building, the steel plate or the section steel replaces reinforced concrete, the steel structure building has higher strength and better shock resistance, and the construction period is greatly reduced because the members can be manufactured in a factory and installed on site, so the steel structure building is widely adopted by countries all over the world, is applied to industrial buildings and civil buildings, and the application of the steel structure building on high-rise and super high-rise buildings is mature day by day and gradually becomes the mainstream building process.
The application of steel is not only used as building materials, but also is applied to building tools in a large number, such as a support frame, a scaffold and the like, a construction tool for cooperating with a building is matched, the existing building supporting structure is generally integrated, for example, when building a modular house, a group of temporary supporting structures are generally required to be built according to the size of the building, so that not only are the construction steps not relatively free, the in-place conditions of all materials are required to be considered, but also waste and inconvenience in repeated use are easily caused, and certain disadvantages are caused in the aspects of transportation, storage and use.
Therefore, a quick construction steel support frame and an implementation method thereof are provided to solve the problems.
Disclosure of Invention
The invention aims to solve the problems and provides a quick construction steel support frame which can be used conveniently and quickly and improves the use freedom degree and an implementation method thereof.
In order to achieve the purpose, the invention adopts the following technical scheme: a quick construction steel support frame and an implementation method thereof comprise the following steps.
In foretell swift formula building steel support frame, including installation foundation column and a plurality of concatenation cylinder and installation tail-boom, installation foundation column and concatenation cylinder and installation tail-boom all are square empty tubulose all be equipped with stabilizing mean on the four sides lateral wall of installation foundation column, the top of installation foundation column and concatenation cylinder and installation tail-boom all is equipped with stabilizing slot, and all is equipped with many spouts on its lateral wall with the one end, the equal fixedly connected with of one end that installation foundation column and concatenation cylinder and installation tail-boom deviate from the spout is used for cooperating the slider of spout, the one end that concatenation cylinder and installation tail-boom deviate from the spout all is equipped with a plurality of climbing mechanisms, the top fixedly connected with supporting mechanism of installation tail-boom, the lower extreme fixedly connected with of concatenation cylinder and installation tail-boom is used for cooperating the ring of inserting of stabilizing slot.
In the quick construction steel support frame, the side walls of the installation bottom column, the splicing column body and the installation tail column are provided with a plurality of weight reduction matching holes which are communicated from inside to outside.
In foretell swift formula building steel support frame, stabilizing mean is including setting up in the first caulking groove of installation foundation lateral wall bottom edge, both ends lateral wall all is equipped with the movable groove about first caulking groove, swing joint has the movable block in the movable groove, be equipped with a plurality of first screw holes in the first caulking groove, the bottom edge of installation foundation rotates and is connected with the stabilizer plate, the upper end of stabilizer plate is equipped with the second caulking groove, be equipped with one row of inside and outside second screw hole that link up on the inner wall of second caulking groove, insert to one side in first caulking groove and the second caulking groove and be equipped with same connecting block, the lateral wall of connecting block respectively with two movable block fixed connection, be equipped with a plurality of third screw holes on the connecting block, it is a plurality of equal interval threaded connection has first bolt in the third screw hole.
In the quick construction steel support frame, the first threaded holes are arranged in the first caulking groove in two rows, and the first threaded holes, the second threaded holes and the third threaded holes are correspondingly arranged.
In foretell swift formula building steel support frame, the spout is close to installation foundation and the setting of concatenation cylinder top edge, and is equipped with the breach of business turn over.
In foretell swift formula building steel support frame, climbing mechanism is including setting up the third caulking groove on concatenation cylinder or installation tail-mast lateral wall, it is connected with the climbing frame to rotate on the inner wall of third caulking groove, the climbing frame is the rectangle cyclic annular, the inner ring of climbing frame rotates and is connected with and supports the frame, be equipped with the wedge draw-in groove on the inner wall of third caulking groove, the wedge draw-in groove with support a swing joint.
In foretell swift formula building steel support frame, the climbing frame is close to third caulking groove upper end edge and sets up, support the frame and be close to the edge setting that the third caulking groove one end was kept away from to the climbing frame.
In foretell swift formula building steel support frame, supporting mechanism fixed connection is in the fixed block on installation tail-mast top, the four corners department of the upper end of fixed block is equipped with a plurality of fourth screw holes, the upper end center department of fixed block is equipped with the moving part, a plurality of backing plates of upper end fixedly connected with of moving part, be equipped with a plurality of fifth screw holes that link up from top to bottom on the backing plate, fifth screw hole female connection has the second bolt, and is a plurality of the backing plate is all through a plurality of second bolt fixed connection.
In foretell swift formula building steel support frame, the moving part is including rotating the movable ball that connects and inlay in the fixed block upper end, be equipped with the screw ring on the fixed block, screw ring and the coaxial setting of movable ball, threaded connection has the thread bush on the screw ring, fixedly connected with fixed plate on the lateral wall of thread bush.
In the implementation method of the quick construction steel support frame,
s1: organizing and building;
when the building needs to be temporarily supported, the mounting bottom columns, the splicing columns and the mounting tail columns are sequentially placed, are vertically assembled in a mode that the inserting rings are inserted into the stable inserting grooves respectively, and after the assembly is finished, the base plates are gradually stacked according to the residual space until the gap between the base plates and the temporary building is controlled to be within 1-2 cm;
s2: fixedly mounting;
the plurality of stabilizing plates are opened through the first caulking grooves, the stabilizing plates are further contacted with the building ground, the contact area is increased, the connecting blocks in the first caulking grooves are drawn out and inserted into the second caulking grooves through the first caulking grooves, and then the first caulking grooves and the second caulking grooves are fixed through a plurality of first bolts, so that the stable triangular structure is integrally formed to further improve the stability of the installation bottom column;
s3: adjusting equipment;
reduce gradually through the polylith backing plate poor with the last clearance of building, when the building takes place to slightly rock or incline, the backing plate can take place the low-angle slope through the activity ball to in the surface of better laminating building, further maintain holistic support stability, personnel's accessible rotates the fixed plate and rotates the thread bush, thereby reach the maximum range of motion of adjustment activity ball, so that the different building environment requirements of better adaptation.
Compared with the prior art, the quick construction steel support frame and the implementation method thereof have the advantages that:
the invention achieves the effect of quickly forming an effective temporary support column by mutually assembling the respective stable slots and the inserting rings through the matching of the arranged mounting bottom column, the splicing column body and the mounting tail column, so as to be convenient for quick and flexible deployment and use, improve the use freedom degree, simultaneously match the sliding chute and the sliding block, and match the use of the climbing frame and the stabilizing plate, thereby effectively achieving the effects of quick storage and combination, improving the effective stability, being convenient for better matching with the use of various projects, simultaneously having good supporting effect, being reusable and having good economical usability.
The invention achieves the effect of gradually reducing the gap between the base plate and the building through the matching of the base plate, the thread sleeve and the movable ball, and the base plate is perfectly attached to the building as much as possible, and meanwhile, the movable ball can provide the shaking amplitude under a certain limit, so that the safety of the support is further improved, the redundancy of the support is improved, and the movable ball is convenient and quick to use and disassemble and has good quick use characteristics.
Drawings
FIG. 1 is a schematic view of the external structure of a quick construction steel support frame mounting bottom column provided by the invention;
FIG. 2 is a schematic view of the construction of the connector block of FIG. 1;
FIG. 3 is a schematic diagram of an external structure of a splicing column of a quick construction steel support frame provided by the invention;
FIG. 4 is a side schematic view of FIG. 3;
FIG. 5 is a schematic view of the external structure of the mounting tail post of the quick construction steel support frame provided by the invention;
FIG. 6 is an exploded schematic view of FIG. 5;
FIG. 7 is an enlarged view of a portion of FIG. 1 at A;
FIG. 8 is an enlarged view of a portion of FIG. 3 at B;
fig. 9 is a partial enlarged view at C in fig. 4.
In the figure, 1 is provided with a bottom column, 2 is provided with a splicing column body, 3 is provided with a tail column, 4 is provided with a stabilizing mechanism, 5 is provided with a stabilizing slot, 6 is provided with a sliding chute, 7 is provided with a sliding block, 8 is provided with a climbing mechanism, 9 is provided with a supporting mechanism, 10 is provided with an inserting ring, 11 is provided with a weight reducing matching hole, 12 is provided with a first caulking groove, 13 is provided with a movable groove, 14 is provided with a movable block, 15 is provided with a stabilizing plate, 16 is provided with a second caulking groove, 17 is provided with a connecting block, 18 is provided with a first bolt, 19 is provided with a third caulking groove, 20 is provided with a climbing frame, 21 is provided with a support, 22 is provided with a wedge-shaped clamping groove, 23 is provided with a fixed block, 24 is provided with a movable part, 25 is provided with a base plate, 26 is provided with a second bolt, 27 is provided with a movable ball, 28 is provided with a threaded sleeve and 29 is provided with a fixing plate.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "front", "rear", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
As shown in fig. 1-9, a swift formula building steel support frame, including installation foundation 1 and a plurality of concatenation cylinder 2 and installation tail post 3, only collocation combination is carried out according to the height that actually uses to a plurality of concatenation cylinder 2, all set up a plurality of inside and outside through lightening the matching hole 11 on the lateral wall of installation foundation 1 and concatenation cylinder 2 and installation tail post 3, a plurality of lightening matching hole 11 can effectually reduce its holistic quality, still do not influence its structural strength simultaneously, can open and locate the surface that does not influence actual effect wantonly, all be equipped with stabilizing mean 4 on the four sides lateral wall that installation foundation 1 and concatenation cylinder 2 and installation tail post 3 all are square empty tubular installation foundation 1.
Stabilizing mean 4 is including setting up in the first caulking groove 12 of 1 lateral wall bottom edge of installation foundation, both ends lateral wall all is equipped with movable groove 13 about first caulking groove 12, swing joint has movable block 14 in the movable groove 13, movable block 14 can be accomodate completely in movable groove 13, be equipped with a plurality of first screw holes in first caulking groove 12, a plurality of first screw holes are two rows of settings in first caulking groove 12, first row is used for cooperating second screw hole and first bolt 18 when accomodating, the second row is used for cooperating fixed connection block 17, first screw hole and second screw hole and the equal mutual corresponding setting of third screw hole.
The bottom edge of installation foundation 1 rotates and is connected with stabilizer plate 15, stabilizer plate 15's upper end is equipped with second caulking groove 16, be equipped with one row of inside and outside second screw hole that link up on the inner wall of second caulking groove 16, second caulking groove 16 can cooperate first caulking groove 12 to carry out further part and accomodate, it is equipped with same connecting block 17 to insert to incline in first caulking groove 12 and the second caulking groove 16, the lateral wall of connecting block 17 respectively with two movable block 14 fixed connection, be equipped with a plurality of third screw holes on the connecting block 17, connecting block 17 can form three horn shapes with stabilizer plate 15, a stability for further improvement installation foundation 1, equal interval threaded connection has first bolt 18 in a plurality of third screw holes, first bolt 18 also can be used to the folding fixed of stabilizer plate 15.
The top of installation foundation column 1 and concatenation cylinder 2 and installation caudal peduncle 3 all is equipped with stable slot 5, and all be equipped with many spouts 6 on its lateral wall with the one end, the equal fixedly connected with of one end that installation foundation column 1 and concatenation cylinder 2 and installation caudal peduncle 3 deviate from spout 6 is used for cooperating the slider 7 of spout 6, spout 6 is close to installation foundation column 1 and the setting of 2 top edges of concatenation cylinder, and be equipped with the breach of business turn over, can make installation foundation column 1 through spout 6, concatenation cylinder 2 and installation caudal peduncle 3 can effectual correlation each other, be convenient for transport and storage, the one end that concatenation cylinder 2 and installation caudal peduncle 3 deviate from spout 6 all is equipped with a plurality of climbing mechanism 8.
Climbing mechanism 8 is including setting up third caulking groove 19 on concatenation cylinder 2 or installation tail-mast 3 lateral wall, it is connected with climbing frame 20 to rotate on the inner wall of third caulking groove 19, climbing frame 20 is the rectangle cyclic annular, the inner ring of climbing frame 20 rotates and is connected with and supports 21, climbing frame 20 can constitute triangular shape with supporting 21, a climbing tool or footing point for provide interim, so that carry out the building operation, climbing frame 20 is close to the setting of third caulking groove 19 upper end edge, support 21 and be close to the edge setting that third caulking groove 19 one end was kept away from to climbing frame 20, be equipped with wedge draw-in groove 22 on the inner wall of third caulking groove 19, wedge draw-in groove 22 with support 21 swing joint.
Top fixedly connected with supporting mechanism 9 of installation tail boom 3, supporting mechanism 9 fixed connection is in the fixed block 23 on 3 tops of installation tail boom, the four corners department of the upper end of fixed block 23 is equipped with a plurality of fourth screw holes, the upper end center department of fixed block 23 is equipped with moving part 24, a plurality of backing plates 25 of upper end fixedly connected with of moving part 24, backing plate 25 is used for eliminating with the last gap of building, moving part 24 is connected and inlays in the movable ball 27 of fixed block 23 upper end including rotating, movable ball 27 can provide the skew range of certain degree for backing plate 25, improve holistic support stability, be equipped with the screw thread ring on the fixed block 23, screw thread ring and the coaxial setting of movable ball 27, threaded connection has thread bush 28 on the screw thread ring, thread bush 28 can be at the internal up-and-down motion of screw thread ring.
Fixedly connected with fixed plate 29 on the lateral wall of thread bush 28, be equipped with a plurality of fifth screw holes that link up from top to bottom on the backing plate 25, fifth screw hole female connection has second bolt 26, second bolt 26 inserts when accomodating and locates on the fourth screw hole, when needs fix a plurality of backing plates 25, then can be used to link up multi-disc backing plate 25, a plurality of backing plates 25 are all through a plurality of second bolt 26 fixed connection, the lower extreme fixedly connected with of concatenation cylinder 2 and installation tail-mast 3 is used for the cooperation to stabilize insert ring 10 of slot 5, it can cooperate to insert ring 10 and carry out the combination concatenation of installation foundation pillar 1 and concatenation cylinder 2 and installation tail-mast 3 to stabilize slot 5.
An implementation method of a quick construction steel support frame is characterized in that,
s1: organizing and building;
when the building needs to be temporarily supported, the mounting bottom posts 1, the splicing posts 2 and the mounting tail posts 3 are sequentially placed, and are vertically assembled in a mode that the inserting rings 10 are inserted into the stabilizing slots 5 respectively, and after the assembly is finished, the base plates 25 are gradually piled up according to the residual space until the gap between the base plates and the temporary building is controlled within 1-2 cm;
s2: fixedly mounting;
the plurality of stabilizing plates 15 are opened through the first caulking grooves 12, the stabilizing plates 15 are further contacted with the building ground, the contact area is increased, the connecting blocks 17 in the first caulking grooves 12 are drawn out and inserted into the second caulking grooves 16, and then the first caulking grooves 12 and the second caulking grooves 16 are fixed through the plurality of first bolts 18, so that a stable triangular structure is integrally formed to further improve the stability of the installation bottom pillar 1, and when the climbing operation is required, the climbing frame 20 in the third caulking grooves 19 can be drawn out and the support frame 21 is inserted into the wedge-shaped clamping groove 22, so that a stable support point for climbing and standing can be provided for a person;
s3: adjusting equipment;
come to dwindle gradually through polylith backing plate 25 and the final clearance of building poor, when the building takes place to slightly rock or when inclining, the backing plate 25 can take place the low-angle slope through activity ball 27 to in the surface of better laminating building, further maintain holistic support stability, personnel's accessible rotates fixed plate 29 and rotates thread bush 28, thereby reaches the maximum range of movement of adjustment activity ball 27, so that the different building environment requirements of better adaptation.
When the invention is used, an operator firstly places the installation bottom pillar 1 on the ground surface, then rotates the first bolt 18 to open the stabilizing plates 15 in a rotating way, after the four stabilizing plates 15 are completely opened, the operator namely slides the connecting block 17 to form an inclined shape, then utilizes the first bolt 18 which is just disassembled to match the first threaded hole and the second threaded hole to fix the connecting block 17, after the four stabilizing plates are completely fixed, the operator takes out the splicing columns 2 again, vertically stacks through the inserting connection of the stabilizing slot 5 and the inserting ring 10, when the stacks reach a sufficient height, then installs the installation tail pillar 3 at the top, in the installation process, the operator can manufacture an open-close simple climbing tool by rotating the climbing frame 20 and the abutting frame 21, and utilizes the wedge-shaped clamping groove 22 to keep stable, and carries out normal climbing operation or other building installation work, when the backing plate 25 height at topmost is obvious not enough, can continue to add backing plate 25, and utilize the second bolt 26 of dismantling to make the backing plate 25 monolithic stationary of multiunit, the user drives thread bush 28 through the mode of rotating fixed plate 29 and rotates, thereby reach the range of rocking of providing the small range under the certain limit, further improvement the security of support, after finishing using, operating personnel still can be through the collocation of spout 6 and slider 7, reach and accomodate the combination fast, conveniently transport and save, convenience when improving repeatedly usable.
Although the terms of mounting bottom post 1, splicing post 2, mounting tail post 3, stabilizing mechanism 4, stabilizing slot 5, sliding slot 6, sliding block 7, climbing mechanism 8, supporting mechanism 9, inserting ring 10, lightening fitting hole 11, first caulking groove 12, movable groove 13, movable block 14, stabilizing plate 15, second caulking groove 16, connecting block 17, first bolt 18, third caulking groove 19, climbing frame 20, support frame 21, wedge-shaped clamping groove 22, fixed block 23, movable piece 24, backing plate 25, second bolt 26, movable ball 27, threaded sleeve 28 and fixing plate 29 are used more extensively herein, the possibility of using other terms is not excluded. These terms are used merely to more conveniently describe and explain the nature of the present invention; they are to be construed as being without limitation to any additional limitations that may be imposed by the spirit of the present invention.

Claims (2)

1. A quick type building steel support frame comprises an installation foundation column (1), a plurality of splicing columns (2) and installation tail columns (3), wherein the installation foundation column (1), the splicing columns (2) and the installation tail columns (3) are all in a square hollow tubular shape, and the quick type building steel support frame is characterized in that stabilizing mechanisms (4) are arranged on four side walls of the installation foundation column (1), stabilizing slots (5) are arranged at the tops of the installation foundation column (1), the splicing columns (2) and the installation tail columns (3), a plurality of sliding grooves (6) are arranged on the side wall of the same end of the installation foundation column, a sliding block (7) used for matching the sliding grooves (6) is fixedly connected to one end of the installation foundation column (1), the splicing columns (2) and the installation tail columns (3) deviating from the sliding grooves (6), a plurality of climbing mechanisms (8) are arranged at one end of the splicing columns (2) and the installation tail columns (3) deviating from the sliding grooves (6), the top of the mounting tail post (3) is fixedly connected with a supporting mechanism (9), and the lower ends of the splicing column body (2) and the mounting tail post (3) are fixedly connected with an inserting ring (10) used for being matched with the stabilizing slot (5);
a plurality of weight-reducing matching holes (11) which are communicated from inside to outside are formed in the side walls of the mounting bottom column (1), the splicing column body (2) and the mounting tail column (3);
the stabilizing mechanism (4) comprises a first caulking groove (12) arranged at the edge of the bottom of the side wall of the mounting bottom column (1), movable grooves (13) are arranged on the side walls of the left end and the right end of the first caulking groove (12), movable blocks (14) are movably connected in the movable grooves (13), a plurality of first threaded holes are formed in the first caulking groove (12), a stabilizing plate (15) is rotatably connected to the edge of the bottom of the mounting bottom column (1), a second caulking groove (16) is arranged at the upper end of the stabilizing plate (15), a row of internally and externally communicated second threaded holes are formed in the inner wall of the second caulking groove (16), the same connecting block (17) is obliquely inserted in the first caulking groove (12) and the second caulking groove (16), the side wall of the connecting block (17) is fixedly connected with the two movable blocks (14) respectively, a plurality of third threaded holes are formed in the connecting block (17), a plurality of third threaded holes are internally and alternately in threaded connection with first bolts (18);
the first threaded holes are arranged in two rows in the first caulking groove (12), and the first threaded holes, the second threaded holes and the third threaded holes are correspondingly arranged;
the sliding groove (6) is arranged close to the top edges of the mounting bottom column (1) and the splicing column body (2) and is provided with a gap for entering and exiting;
the climbing mechanism (8) comprises a third caulking groove (19) arranged on the side wall of the splicing column body (2) or the mounting tail column (3), the inner wall of the third caulking groove (19) is rotatably connected with a climbing frame (20), the climbing frame (20) is in a rectangular ring shape, the inner ring of the climbing frame (20) is rotatably connected with a support frame (21), the inner wall of the third caulking groove (19) is provided with a wedge-shaped clamping groove (22), and the wedge-shaped clamping groove (22) is movably connected with the support frame (21);
the climbing frame (20) is arranged close to the edge of the upper end of the third caulking groove (19), and the support frame (21) is arranged close to the edge of one end, far away from the third caulking groove (19), of the climbing frame (20);
the supporting mechanism (9) is fixedly connected to a fixing block (23) at the top end of the mounting tail post (3), a plurality of fourth threaded holes are formed in four corners of the upper end of the fixing block (23), a moving part (24) is arranged at the center of the upper end of the fixing block (23), a plurality of base plates (25) are fixedly connected to the upper end of the moving part (24), a plurality of vertically-through fifth threaded holes are formed in the base plates (25), second bolts (26) are connected to the fifth threaded holes in an internal thread mode, and the base plates (25) are fixedly connected through the second bolts (26);
moving part (24) are including rotating movable ball (27) of connecting and inlaying in fixed block (23) upper end, be equipped with the screw ring on fixed block (23), screw ring and movable ball (27) coaxial setting, threaded connection has thread bush (28) on the screw ring, fixedly connected with fixed plate (29) on the lateral wall of thread bush (28).
2. A method for implementing the quick construction steel support frame of claim 1,
s1: organizing and building;
when the building needs to be temporarily supported, the mounting bottom columns (1), the splicing columns (2) and the mounting tail columns (3) are sequentially placed, are vertically assembled in a mode that the inserting rings (10) are inserted into the stabilizing slots (5), and after the assembly is finished, base plates (25) are gradually stacked according to the remaining space until the gap between the base plates and the temporary building is controlled within 1-2 cm;
s2: fixedly mounting;
the plurality of stabilizing plates (15) are opened through the first caulking grooves (12), the building ground is further contacted through the stabilizing plates (15), the contact area is increased, the connecting blocks (17) in the first caulking grooves (12) are drawn out and inserted into the second caulking grooves (16), then the first caulking grooves (12) and the second caulking grooves (16) are fixed through a plurality of first bolts (18), so that the first caulking grooves (12) and the second caulking grooves (16) are integrally formed into a stable triangular structure to further improve the stability of the installation bottom pillar (1), and when climbing operation is needed, a climbing support point for climbing and standing can be provided for a person by drawing out the climbing frame (20) in the third caulking grooves (19) and inserting the support frame (21) into the wedge-shaped clamping grooves (22);
s3: adjusting equipment;
come to dwindle gradually through polylith backing plate (25) and the final clearance difference of building, when the building takes place to slightly rock or incline, the backing plate (25) can take place the low angle slope through activity ball (27) to better laminating building's surface, further maintain holistic support stability, personnel's accessible rotates fixed plate (29) and rotates thread bush (28), thereby reach the maximum range of movement of adjustment activity ball (27), so that better adaptation different building environmental requirements.
CN202010358559.7A 2020-04-29 2020-04-29 Quick building steel support frame and implementation method thereof Active CN111576925B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010358559.7A CN111576925B (en) 2020-04-29 2020-04-29 Quick building steel support frame and implementation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010358559.7A CN111576925B (en) 2020-04-29 2020-04-29 Quick building steel support frame and implementation method thereof

Publications (2)

Publication Number Publication Date
CN111576925A CN111576925A (en) 2020-08-25
CN111576925B true CN111576925B (en) 2021-11-05

Family

ID=72124970

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010358559.7A Active CN111576925B (en) 2020-04-29 2020-04-29 Quick building steel support frame and implementation method thereof

Country Status (1)

Country Link
CN (1) CN111576925B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113503059A (en) * 2021-07-21 2021-10-15 姜自艳 Constructional engineering steel construction support frame

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006049841B3 (en) * 2006-10-23 2008-04-24 Doka Industrie Gmbh Support used in building constructions comprises a tube axially profiled in an end region which is accessed from outside when in use
KR20090001095U (en) * 2007-07-27 2009-02-02 김정환 Support for construction
KR20100033786A (en) * 2008-09-22 2010-03-31 박정진 Folding joint structure of support components and folding multi-support
CN105927254A (en) * 2016-06-30 2016-09-07 北京城建七建设工程有限公司 Emergency device for collapse of mined tunnel vault and application method
CN206971809U (en) * 2017-05-24 2018-02-06 姜昊 A kind of civil engineering support
CN207919895U (en) * 2018-03-02 2018-09-28 江西雄宇(集团)有限公司 A kind of steel structure column on steel construction
CN208039624U (en) * 2018-03-22 2018-11-02 海南浙大钢构有限公司 A kind of easy-to-dismount steel column
CN208844964U (en) * 2018-08-16 2019-05-10 广西力轩建设工程有限公司 A kind of construction overlap joint support tube
CN208950367U (en) * 2018-09-19 2019-06-07 广东富生建设(集团)有限公司 A kind of adjustable supporting device for construction
CN209429587U (en) * 2018-12-04 2019-09-24 王岩 A kind of steel structures in construction works construction temporary support
CN210141021U (en) * 2019-06-13 2020-03-13 陕西理工大学 Multi-functional civil engineering construction supports bracket
CN210289239U (en) * 2019-07-03 2020-04-10 长江精工钢结构(集团)股份有限公司 Steel construction for building support of convenient regulation
CN210422004U (en) * 2019-06-14 2020-04-28 尤美婷 Novel building engineering supports device

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2048333B (en) * 1979-05-03 1982-12-15 Evans & Sons Ltd C Props
JPH1181247A (en) * 1997-09-05 1999-03-26 Kawaju Koji Kk Assembling/disassembling method of prefabricated timbering
IT248288Y1 (en) * 1999-11-30 2002-12-16 Veroni S R L TERMINAL TOOL FOR VARIABLE INCLINATION PROP.
KR20070114876A (en) * 2006-05-30 2007-12-05 전승남 Slab support unit
CN103243933A (en) * 2013-04-28 2013-08-14 上海宝冶集团有限公司 Demountable combined supporting device used for steel structure construction
CN107605176B (en) * 2017-09-04 2019-01-04 河南城建学院 A kind of support construction for improving building and adapting to earth's surface
CN208884843U (en) * 2018-05-25 2019-05-21 广州市天作建筑规划设计有限公司 A kind of garden architecture cylindrical structure of supporting & stablizing
CN109025230B (en) * 2018-06-21 2021-04-27 百子建设有限公司 Construction platform for building
CN109811999B (en) * 2019-01-28 2021-03-26 江苏华木空间结构有限公司 Wall construction steel structure strutting arrangement
CN209538748U (en) * 2019-01-30 2019-10-25 煤炭工业合肥设计研究院有限责任公司 A kind of installation upright bar rectified a deviation
CN110107070A (en) * 2019-06-17 2019-08-09 浙江建设职业技术学院 A kind of engineering construction multifunctional platform
CN210343381U (en) * 2019-08-08 2020-04-17 王荣刚 Stable support for underground tunneling

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006049841B3 (en) * 2006-10-23 2008-04-24 Doka Industrie Gmbh Support used in building constructions comprises a tube axially profiled in an end region which is accessed from outside when in use
KR20090001095U (en) * 2007-07-27 2009-02-02 김정환 Support for construction
KR20100033786A (en) * 2008-09-22 2010-03-31 박정진 Folding joint structure of support components and folding multi-support
CN105927254A (en) * 2016-06-30 2016-09-07 北京城建七建设工程有限公司 Emergency device for collapse of mined tunnel vault and application method
CN206971809U (en) * 2017-05-24 2018-02-06 姜昊 A kind of civil engineering support
CN207919895U (en) * 2018-03-02 2018-09-28 江西雄宇(集团)有限公司 A kind of steel structure column on steel construction
CN208039624U (en) * 2018-03-22 2018-11-02 海南浙大钢构有限公司 A kind of easy-to-dismount steel column
CN208844964U (en) * 2018-08-16 2019-05-10 广西力轩建设工程有限公司 A kind of construction overlap joint support tube
CN208950367U (en) * 2018-09-19 2019-06-07 广东富生建设(集团)有限公司 A kind of adjustable supporting device for construction
CN209429587U (en) * 2018-12-04 2019-09-24 王岩 A kind of steel structures in construction works construction temporary support
CN210141021U (en) * 2019-06-13 2020-03-13 陕西理工大学 Multi-functional civil engineering construction supports bracket
CN210422004U (en) * 2019-06-14 2020-04-28 尤美婷 Novel building engineering supports device
CN210289239U (en) * 2019-07-03 2020-04-10 长江精工钢结构(集团)股份有限公司 Steel construction for building support of convenient regulation

Also Published As

Publication number Publication date
CN111576925A (en) 2020-08-25

Similar Documents

Publication Publication Date Title
US10309095B2 (en) Beam connector for arch structure
CN111576925B (en) Quick building steel support frame and implementation method thereof
CN111663648A (en) Building stand coupling mechanism with adjustable
CN108979134B (en) Construction method of floor slab supporting system
CN213268815U (en) Scaffold for building construction
CN216892372U (en) Mechanical connecting device for prestressed concrete pipe pile
CN215802696U (en) Vertical steel bar positioning device of column
CN115306041A (en) Concrete frame beam and section steel column conversion node and construction method of building frame
CN212562450U (en) Assembled building templates subassembly that building engineering used
CN211817847U (en) Builder's jack is encorbelmented to building engineering construction
CN209760742U (en) Simple scaffold for house construction
CN202882373U (en) Improved scaffold
CN219527616U (en) Hydraulic engineering foundation pile
CN213683489U (en) Municipal works rail convenient to dismantle
CN219826026U (en) Adjustable bearing platform foundation construction platform
CN212478456U (en) Socket type door-shaped scaffold
CN215368593U (en) Carrying frame is built in room
CN110453912A (en) A kind of floor joint face casting moulding building template
CN220247565U (en) Folding protective railing of movable scaffold
CN211571991U (en) Firm assembled building structure combats earthquake
CN219711114U (en) Mud purifying tank rack
CN216194099U (en) Temporary support frame for steel box girder pushing construction
CN218912495U (en) Angle-adjustable rack enclosure supporting piece
CN216105700U (en) Tower crane that easily sets up attaches operation platform for wall
CN219431533U (en) Conveniently folded protection fence

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Chen Xiaojun

Inventor after: Lu Keqi

Inventor after: Zhang Dafen

Inventor before: Zhang Dafen

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20211014

Address after: 315000 Dongsheng Village, Xiaying street, Yinzhou District, Ningbo City, Zhejiang Province

Applicant after: Zhejiang Dongxin Construction Co.,Ltd.

Address before: 315300 No. 105, Laozhai, dagutang village, Zhouxiang Town, Cixi City, Ningbo City, Zhejiang Province

Applicant before: Zhang Dafen

GR01 Patent grant
GR01 Patent grant