CN209025464U - A kind of construction discharging platform - Google Patents
A kind of construction discharging platform Download PDFInfo
- Publication number
- CN209025464U CN209025464U CN201821663083.2U CN201821663083U CN209025464U CN 209025464 U CN209025464 U CN 209025464U CN 201821663083 U CN201821663083 U CN 201821663083U CN 209025464 U CN209025464 U CN 209025464U
- Authority
- CN
- China
- Prior art keywords
- protective fence
- pedestal
- support rod
- baffle
- protective
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of construction discharging platforms, including pedestal and shaft, protective fence is mounted at left and right sides of the top of the pedestal, the protective door and protective fence are connected by a hinge, the protective fence, baffle passes through shaft with pedestal and connect, the side of the pedestal is connected with support rod, the surface of the support rod is provided with through-wall bolt, and one end of support rod is connected with wirerope, link is installed at the top of the protective fence, it is fixedly connected between the link and wirerope by safety buckle, the top rear of the pedestal is equipped with clump weight, the inner surface of the protective fence and baffle is mounted on limit hole, it is connected between two limit holes by gag lever post, the utility model is solved since volume is excessive, to waste space occupied, lead to transport difficult, and since gravity unbalance easily causes Security risk, cannot while improving stability, and not influence its fold place the problem of.
Description
Technical field
The utility model relates to technical field of building construction, specially a kind of construction discharging platform.
Background technique
Discharging platform is that various provisional stations and crosshead are often set up in construction site, can be carried out various masonry finishings
It in general can be within certain duration for carrying material, and in the framework type for wherein carrying out various operations with the operations such as painting
Platform, referred to as operating platform.It is a variety of that operating platform is divided into movable operation platform, console mode and overhanging type operating platform,
It can be referred to as transfer platform.
In construction industry, existing building construction discharging platform, to waste space occupied, is led since volume is excessive
Transport difficult is caused, and due to the security risk that gravity unbalance easily causes, it cannot not be influenced while improving stability
It folds and places.
Utility model content
The purpose of this utility model is to provide a kind of construction discharging platforms, to solve to mention in above-mentioned background technique
Out due to volume it is excessive, to waste space occupied, lead to transport difficult, and since the safety that gravity unbalance easily causes is hidden
Suffer from, cannot not influence it while improving stability and fold the problem of placing.
In order to solve the above technical problems, the utility model provides the following technical solutions: a kind of construction discharging platform,
Including pedestal and shaft, it is mounted on protective fence at left and right sides of the top of the pedestal, gear is installed on rear side of the protective fence
Plate, and the installed in front of protective fence has protective door, the protective door and protective fence are connected by a hinge, the protective fence, baffle
Pass through shaft with pedestal to connect, the side of the pedestal is connected with support rod, and the surface of the support rod is provided with spiral shell through walls
Bolt, and one end of support rod is connected with wirerope, the junction of the wirerope and support rod is provided with mounting blocks, the protection
Link is installed at the top of column, is fixedly connected between the link and wirerope by safety buckle, the top rear of the pedestal
Clump weight is installed, the inner surface of the protective fence and baffle is mounted on limit hole, passes through between two limit holes
Gag lever post connection.
Preferably, the bottom of the pedestal is equipped with universal wheel, and one end of the universal wheel is equipped with brake block.
Preferably, reinforcing rod is mounted in the middle part of the protective fence and protective door.
Preferably, the pedestal and support rod are fixedly connected by welding, and the support rod and mounting blocks are solid by bolt
Fixed connection.
Preferably, the protective fence, baffle and limit hole are bolted to connection.
Compared with prior art, the utility model has the beneficial effects that
1. protective fence and baffle when not in use, are turned to the inside into horizontal folding by shaft by the utility model
Protective door is laterally rotated folding by hinge by overlapping state, so that protective door and protective fence is carried out horizontal folding, thus to discharging
Platform carries out folding placement, saves idle space occupied, is transported on transport vehicle convenient for placing it on, when need using
When, protective fence and baffle are attached by limit hole and gag lever post, reach fixed supporting role, to normally be made
With solving discharging platform since volume is excessive, thus the problem of wasting space occupied, leading to transport difficult.
2. preventing from causing security risk due to unbalance stress convenient for gravitational equilibrium when discharging by setting clump weight, lead to
Safety buckle is crossed, its normal folds is not influenced again convenient for the connection and disassembly of wirerope, while improving its stability and places, effectively
Solve the security risk easily caused due to gravity unbalance, cannot not influence its folding while improving stability
The technical issues of placement.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model embodiment;
Fig. 2 is the shaft installation diagram of the utility model embodiment;
Fig. 3 is the clump weight installation diagram of the utility model embodiment;
Fig. 4 is the structural schematic diagram of A in Fig. 1 of the utility model embodiment.
In figure: 1, pedestal;2, protective fence;3, baffle;4, protective door;5, hinge;6, shaft;7, support rod;8, spiral shell through walls
Bolt;9, mounting blocks;10, link;11, wirerope;12, safety buckle;13, clump weight;14, limit hole;15, gag lever post.
Specific embodiment
In order to solve since volume is excessive, to waste space occupied, lead to transport difficult, and since gravity unbalance is easy
Caused by security risk, cannot while improving stability, and not influence its fold place the problem of, the utility model implement
Example provides a kind of construction discharging platform.It is practical new to this that the following will be combined with the drawings in the embodiments of the present invention,
Technical solution in type embodiment is clearly and completely described, it is clear that described embodiment is only the utility model one
Section Example, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not having
Every other embodiment obtained under the premise of creative work is made, is fallen within the protection scope of the utility model.
Embodiment 1
Fig. 1-4 is please referred to, a kind of construction discharging platform, including pedestal 1 and shaft 6, bottom are present embodiments provided
It is mounted on protective fence 2 at left and right sides of the top of seat 1, the rear side of protective fence 2 is equipped with baffle 3, and the installed in front of protective fence 2
There are protective door 4, protective door 4 and protective fence 2 to connect by hinge 5, protective fence 2, baffle 3 are connect by shaft 6 with pedestal 1,
The side of pedestal 1 is connected with support rod 7, and the surface of support rod 7 is provided with through-wall bolt 8, and one end of support rod 7 is connected with steel
The junction of cord 11, wirerope 11 and support rod 7 is provided with mounting blocks 9, and the top of protective fence 2 is equipped with link 10, link
It is fixedly connected between 10 and wirerope 11 by safety buckle 12, the top rear of pedestal 1 is equipped with clump weight 13,2 He of protective fence
The inner surface of baffle 3 is mounted on limit hole 14, is connected between limit hole 14 by gag lever post 15.
In the present embodiment, protective fence 2 and baffle 3 when not in use, are turned to the inside by horizontal folding by shaft 6
Protective door 4 is laterally rotated folding by hinge 5 by overlapping state, so that protective door 4 and protective fence 2 is carried out horizontal folding, thus right
Discharging platform carries out folding placement, saves idle space occupied, is transported on transport vehicle convenient for placing it on, when needs make
Protective fence 2 and baffle 3 are attached by limit hole 14 and gag lever post 15, reach fixed supporting role, to carry out by the used time
Normal use solves discharging platform since volume is excessive, thus the problem of wasting space occupied, leading to transport difficult, pedestal 1
Top rear clump weight 13 is installed, by be arranged clump weight 13, be convenient for discharging when gravitational equilibrium, prevent due to stress not
, security risk is caused, by safety buckle 12, convenient for the connection and disassembly of wirerope 11, while improving its stability again not
It influences its normal folds to place, the security risk that effective solution is easily caused due to gravity unbalance cannot be stablized improving
Property while, and do not influence its fold place the technical issues of.
Embodiment 2
Please refer to Fig. 1-4, be further improved on the basis of embodiment 1: the bottom of pedestal 1 is equipped with universal wheel,
One end of universal wheel is equipped with brake block, and easy to remove and stable, the middle part of protective fence 2 and protective door 4 is mounted on reinforcing rod,
Convenient for improving its safety and stability.
Wherein, pedestal 1 and support rod 7 are fixedly connected by welding, and support rod 7 and mounting blocks 9 are bolted to connection,
Convenient for improving overall stability, while it being easily installed the disassembly of block 9, protective fence 2, baffle 3 and limit hole 14 are solid by bolt
Fixed connection, installing and dismounting and replacement convenient for limit hole 14.
In this practical description, it should be noted that the orientation of the instructions such as term "vertical", "upper", "lower", "horizontal" or
Person's positional relationship is orientation based on the figure or positional relationship, is merely for convenience of this practical and simplified description of description,
Rather than the device or element of instruction or hint meaning must have a particular orientation, and are constructed and grasped with specific orientation
Make, therefore should not be understood as the limitation practical to this.
In this practical description, it is also necessary to explanation, unless otherwise specific regulation and limitation, term " setting ", " peace
Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally
Connection, can be mechanical connection, is also possible to be electrically connected, can be and be directly connected to, and be also possible to be connected by intermediary, can
To be the connection inside two elements.For the ordinary skill in the art, can understand as the case may be above-mentioned
Concrete meaning of the term in this is practical.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of construction discharging platform, it is characterised in that: including pedestal (1) and shaft (6), the top of the pedestal (1)
It is mounted on protective fence (2), is equipped with baffle (3) on rear side of the protective fence (2), and before protective fence (2) at left and right sides of portion
Side is equipped with protective door (4), and the protective door (4) and protective fence (2) are connected by hinge (5), the protective fence (2), baffle
(3) it is connect by shaft (6) with pedestal (1), the side of the pedestal (1) is connected with support rod (7), the support rod (7)
Surface be provided with through-wall bolt (8), and one end of support rod (7) is connected with wirerope (11), the wirerope (11) and branch
The junction of strut (7) is provided with mounting blocks (9), is equipped with link (10) at the top of the protective fence (2), the link (10)
It being fixedly connected between wirerope (11) by safety buckle (12), the top rear of the pedestal (1) is equipped with clump weight (13),
The inner surface of the protective fence (2) and baffle (3) is mounted on limit hole (14), is passed through between two limit holes (14)
Gag lever post (15) connection.
2. construction discharging platform according to claim 1, it is characterised in that: install the bottom of the pedestal (1)
There is universal wheel, one end of the universal wheel is equipped with brake block.
3. construction discharging platform according to claim 1, it is characterised in that: the protective fence (2) and protective door
(4) reinforcing rod is mounted in the middle part of.
4. construction discharging platform according to claim 1, it is characterised in that: the pedestal (1) and support rod (7)
It is fixedly connected by welding, the support rod (7) and mounting blocks (9) are bolted to connection.
5. construction discharging platform according to claim 1, it is characterised in that: the protective fence (2), baffle (3)
It is bolted to connection with limit hole (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821663083.2U CN209025464U (en) | 2018-10-13 | 2018-10-13 | A kind of construction discharging platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821663083.2U CN209025464U (en) | 2018-10-13 | 2018-10-13 | A kind of construction discharging platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209025464U true CN209025464U (en) | 2019-06-25 |
Family
ID=66906265
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821663083.2U Expired - Fee Related CN209025464U (en) | 2018-10-13 | 2018-10-13 | A kind of construction discharging platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209025464U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111663788A (en) * | 2020-06-16 | 2020-09-15 | 北京欧斯度科技有限公司 | Platform of unloading convenient to accomodate |
CN111997380A (en) * | 2020-08-13 | 2020-11-27 | 中煤第三建设(集团)有限责任公司 | Assembled discharging platform for high-rise building construction and construction method thereof |
-
2018
- 2018-10-13 CN CN201821663083.2U patent/CN209025464U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111663788A (en) * | 2020-06-16 | 2020-09-15 | 北京欧斯度科技有限公司 | Platform of unloading convenient to accomodate |
CN111997380A (en) * | 2020-08-13 | 2020-11-27 | 中煤第三建设(集团)有限责任公司 | Assembled discharging platform for high-rise building construction and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206784874U (en) | A kind of scaffold of architectural engineering | |
CN209025464U (en) | A kind of construction discharging platform | |
CN202450762U (en) | Construction lifting platform | |
CN206753009U (en) | One kind building fabricated scaffold | |
CN208916042U (en) | A kind of medium-speed pulverizer pebble coal screeding device | |
JP2011032083A (en) | Loading fitting for high-lift working vehicle | |
CN204212065U (en) | Bridge crossing anticollision barrier punching block erection equipment | |
CN103628692B (en) | A kind of floor beam mounting bracket and use it to install the method for floor beam | |
CN204038917U (en) | Dismountable external hanging service platform | |
CN205296792U (en) | Raise scaffold | |
CN202781420U (en) | Multifunctional operation platform for subsection jointing construction of concrete member | |
CN207109614U (en) | A kind of Hanging Basket for building | |
CN203020205U (en) | Service unit used for vehicle and corresponding engineering machinery | |
CN209522513U (en) | A kind of hanging apparatus for Maintenance of Agricultural Machinery | |
CN205976413U (en) | A hang cage subassembly for installing tower crane support side pipe | |
CN209353864U (en) | A kind of 220kV high-tension apparatus area pinpoints safe fence bar | |
CN207749848U (en) | A kind of fall arrest construction holder | |
CN214615354U (en) | Operating platform for assisting installation of vertical integral hanging plate in indoor space with limited height | |
CN203441074U (en) | Scaffold connecting device | |
CN203392657U (en) | Machine maintenance platform | |
CN207829789U (en) | A kind of novel tower wagon of vcehicular tunnel | |
CN207620433U (en) | A kind of suspension type riding track mounting structure based on central tube | |
CN202227711U (en) | Hard safeguard device for roof fall of building-operation elevator | |
CN103758334A (en) | Scaffold structure for constructing exterior wall of building | |
CN205741886U (en) | A kind of extension die shoe frame for the construction of bridge rectangle pier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190625 Termination date: 20211013 |